You are on page 1of 8

Project

Spreadsheets to BS 8110

Client
Location

Bando
Res tower - 275 thk

REINFORCED CONCRETE COUNCIL


Made by

Date

BS

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls v2.1 on CD

Page

29-Jul-2014

Checked

Revision

Job No

1999-2003 BCA for RCC

4298

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997 - GENERAL DATA


LOAD COMBINATIONS

NOTES
Initial prestress + OW + construction load on all spans
INPUT IS UNDERLINED.
FRAMES ARE ASSUMED
Initial prestress + OW + construction load on odd spans
TO BE BRACED
Initial prestress + OW + construction load on even spans
Final prestress + dead + imposed load on all spans
Final prestress + dead + imposed load on odd spans
Final prestress + dead + imposed load on even spans
Final prestress + factored dead and imposed load on all spans
Final prestress + factored dead + factored imposed load on odd spans
Final prestress + factored dead + factored imposed load on even spans
Final prestress + dead + 30% imposed load on odd spans

SLS 1
SLS 2
SLS 3

INITIAL

SLS 4
SLS 5
SLS 6
ULS 1

FINAL

ULTIMATE

ULS 2
ULS 3

DEFLECTION

SLS 7

LOAD FACTORS
DEAD
IMPOSED
OPTIONS

min

max

1
0

1.4
1.6

VIBRATION
Limiting reponse factor = 8

Stressing Ends

L
(L, R, B) Prestress system
B
(U, B)
Assume 20% max redistribution
0.8
BS 8110 Class
3
(Clause 4.1.3)
.
Slab or beam
S
(B or S)Limiting crack width
0.2
mm
.
In slabs, nominal top bonded reinforcement in span?
Y
(Y or N; use Y for dissimilar spans)
Slab type
S
(S)olid, (R)ibbed or (W)affle, supported by beam Damping, z (2% to 8%) 5%

Jacking F/strength

MATERIALSCONCRETE
fcu = 50
At days 4.80
fci = 33.18
Cement content 330
Ave ambient during curing = 15C
STRAND

fpu = 1860
Ep = 195

REBAR

fy = 460
gm = 1.05

sc = 16.50
st =
Ec28 = 30
sic = 13.27
sit =
Eci = 23.94
W/C ratio 0.55
OPC or RHPC ?
gm =
Longterm R/H % 50
Ap, mm = 100
Rel % = 2

= 0.140
Draw in= 6
COVERS

to links

LOADING SEQUENCE Permanent loads for assessment

unmodified
unmodified
.

K = 0.0010
Depth to strand centre = 37
Top
30

Bottom
30

Sides
30

60
5.1

80
7.5

30% of Imposed is permanent

Load

@ Age

fcut

Et

Ec

kN/m

days

N/mm

kN/mm

Creep

kN/mm

4.80
60
-=-

33.18
54.00

23.94
31.44

3.98
2.34

4.81
9.41

25.79

3.34

5.94

Own weight
62.00
Applied dead
31.50
Quasi-Permanent Imposed 8.10
COMBINED
101.60

5.80
4.18
OPC
1.50

NOTES on MATERIALS
BRITISH LOW RELAXATION STRAND
Type

Dia

Area

Standard

15.2
12.5
15.7
12.9
15.2
12.7

139
93
150
100
165
112

Super
Compact

Breaking Weight

1670
1770
1770
1860
1820
1860

1.090
0.730
1.180
0.785
1.295
0.890

RELAXATION at 0.7fpu
Ambient C
20
Relaxation
1.8

40
3.5

100
10.7

Project

Spreadsheets to BS 8110

Client
Location

Bando
Res tower - 275 thk

REINFORCED CONCRETE COUNCIL


Made by

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls v2.1 on CD

SUMMARY iv
(e) SHEAR

Date

BS

Page

29-Jul-2014

Checked

Revision

Job No

1999-2003 BCA for RCC

4298

Link = 10
Span 1

Left
V
844.7
cracked?
Y
Vc
1167.9
No of legs
8
Links not required
0

Span 2

Right
1000.7
Y
1478.6
8
0

Left
648.0
Y
1470.1
8
0

Span 3

Right
318.3
N
3459.4
8
0

Left
0.0
N
0.0
8
0

Right
0.0
N
0.0
8
0

ULS SHEAR ENVELOPE

2000
1000

879.6

604.5

0.0
-353.1

-1000

-1035.5

-2000
(f) VIBRATION
Span 1
Response factor 0.53
OK

Span 2

Span 3

0.34
OK

0.00
OK

(g) DEFLECTION
MAX DEFLECTIONS

5
0
-5
-10
-15
-20
-25
-30

1.42

0.09
-0.4

0.00
0.0

-22.7
Transfer

Span 1 = 22.7mm < 44

Final

OK

Col centres

Zero axis

Span 2 = 0.7mm < 22

OK
-

SUPPORT REACTIONS
ULS 4
ULS 5
ULS 6
DEAD
IMPOSED
COLUMN MOMENTS
Above
ULS 4
Below

ULS 5

Above
Below

ULS 6

Above
Below

Supt 1

Supt 2

Supt 3

Supt 4

879.6
879.6
436.8
445.4
142.4

1718.4
1491.3
1196.2
941.3
257.3

274.7
58.5
353.1
156.1
45.9

0.0
0.0
0.0
0.0
0.0

Supt 1

Supt 2

Supt 3

Supt 4

252.68
252.68
255.64
255.64
147.87
147.87

-287.54
-287.54
-306.56
-306.56
-216.47
-216.47

-21.76
-21.76
0.63
0.63
-38.63
-38.63

0.00
0.00
0.00
0.00
0.00
0.00

kN
kN
kN
kN
kN

kNm
kNm
kNm
kNm
kNm
kNm

Project

Spreadsheets to BS 8110

REINFORCED CONCRETE COUNCIL

Client
Bando
Location Res tower - 275 thk

Made by

Date

BS

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls v2.1 on CD

Checked

Page

1999-2003 BCA for RCC

TYPICAL CALCULATION
for Span 1 at 3.30 m from C/L of LH support
Class 3 Rectangular section,

29-Jul-14
Revision

Job No

4298
BS 8110
Reference

h = 275 mm, bw = 9000 mm.

Ac = 2475000mm2, Z top = 113.4E6 mm, and Z bottom = 113.4E6 mm


Tendons are bonded, Ap = 100mm2, fpu = 1,860 N/mm2 and 48.9 mm from soffite
There are 50 tendons, jacked to 1,488 N/mm or 80.0% fpu

SUMMARY!E71, D

Prestress losses at this section are -6,314.2 kN at transfer and -5,594.1 kN longterm
(b) Stresses at transfer
M = 35.7 kNm hogging, and prestressing force = 6,611.8 kN

4.3.5

Max compression (bottom) = M/Z + P/A = 35.7E3 / 113.4 + 6,611.8 / 2475 = 2.99 N/mm
< 13.27 N/mm allowed

Max tension (top) = M/Z - P/A = 35.7E3 / 113.4 - 6,611.8 / 2475 = 0.00 N/mm
< 4.44 N/mm allowed

(c) Stresses in service

4.3.4

M = 256.8 kNm sagging, and prestressing force = 5,891.7 kN


Max compression (top) = 256.83E6 / 113.4E6 + 5,891.7E3 / 2475E3 = 4.64 N/mm
< 16.67 N/mm allowed

Max tension (top) = -136.53 / 113.4 - 5,891.7 / 2475 = 0.00 N/mm


< 6.22 N/mm allowed

(d) MOR at ultimate limit state

4.3.7

M = 1,293.4 kNm sagging, and prestressing force = 5,891.7 kN


fpe = 1000 x 5,891.7 / 50 / 100 = 1,178.3 N/mm
Reinforcement d = 227 mm
Rp = 1860 x 100 x 50 / 50 / 9000 / (275 - 48.88) = 0.091
fpe/fpu = 1,178.3 / 1860 x 1.05 = 0.665
Lte = 4,547 mm
fpb (bonded)
= 1,771.4 N/mm

Eq 52

Tendon force = 1,771.4 x 50 x 100 / 1000 = 8,857.1 kN


Rebar force = 460 / 1.05 x 4,021 / 1000 = 1,761.7 kN
Total tensile force = 8,857.1 + 1,761.7 = 10,618.8 kN
Compression block depth, dn = 1000 / 10,618.8 / 0.45 / 50 / 9000 = 52.44 mm
MOR = (8,857.1 ( 275 - 48.9 - 52.44 / 2) + 1,761.7 x (227 - 52.44 / 2)) / 1000
= 2,124.3 kNm > 1,293.4 ok

Eq 51

Project

REINFORCED CONCRETE COUNCIL

Spreadsheets to BS 8110

Client
Bando
Location Res tower - 275 thk

Made by

POST-TENSIONED ANALYSIS & DESIGN TO BS 8110


Originated from RCC42.xls v2.1 on CD

DETAILED CALCULATIONS ix
(d) ULS MOMENT CHECKS
Supt 1

DESIGN MOMENT
TENDON HEIGHT
fpe
Hinges
Lt
Lte
dt
137.5
dr
227.0
Rp
0.150
fpe/fpu
0.666
TABLE 4.4 1a
0.99
1b
0.99
2a
0.92
2b
0.92
fpb bonded
1753
fpb unbonded
1337
TENDON FORCE 8765
As
4021
REBAR FORCE 1761.7
TOTAL TENSION 10526
dn
52.0
Steel stress
438
Zt
111.5
Zr
201.0
MOR
1331.5

1560.6
37.9
1178
3
13.64
4547
237.1
227.0
0.087
0.665
1.00
1.00
1.00
1.00
1771
1489
8857
4021
1761.7
10619
52.4
438
210.9
200.8
2221.6

(e) SHEAR

Span 1

fcp
Vco
CRACKED
Aps
As
d
As%
fpe/fpu
vc
Vcr
Vc
Asv/Sv
Sv

(f) VIBRATION
ny : ly
Ix : Iy
lx : ly
kx : ky
w
dx : dy
f'x : f'y
fbx : fby
fx : fy
Nx : Ny
Cx : Cy
Rx : Ry
R

Left
844.7
488.8
216.3
Y
2.383
4100.8
3800
7821
183.5
0.474
0.528
0.556
1167.9
1167.9
0.000
0

Checked

Revision

Right
1000.7
1315.4
687.3
Y
2.372
4095.8
3800
7821
232.3
0.374
0.525
0.484
1478.6
1478.6
0.000
0

Span 2

Right
1061.8
238.0
1158

226.3
121.1
1132
3
16.50
5500
153.9
227.0
0.064
0.637
1.00
1.00
1.00
1.00
1771
1306
4251
4021
1761.7
6013
29.7
438
139.1
212.2
965.1

238.0
238.0
227.0
227.0
0.087
0.042
0.663
0.654
1.00
#N/A
1
#N/A
1
1
1
1
1771
#N/A
1487
1440
8857
#N/A
4021
1761.7 1761.7
10619
#N/A
52.4
#N/A
438
#N/A
211.8
#N/A
200.8
#N/A
2229.5
#N/A

Supt 3

Left
64.6
137.5
1118

Right
318.3
64.6
98.4
N
1.084
3459.4
2300
6321
194.4
0.361
0.441
0.500
1237.4
3459.4
0.000
0

Right
0.0
0.0
0

137.5
0.0
227.0
0.0
0.072
0.000
0.631
0.000
1.00
0.00
1
0
1
0
1
0
1771
0
1272
0
4251
0
4021
1761.7 1761.7
6013
1762
29.7
0.0
438
0
122.7
0.0
212.2
0.0
895.2
0.0

Span 2

Left
648.0
1061.8
325.4
Y
1.123
3480.3
2300
6321
231.0
0.304
0.457
0.453
1470.1
1470.1
0.000
0

14
Job No

Date

Supt 2

Left
1315.4
238.0
1174

Page

29-Jul-2014

1999-2003 BCA for RCC

Span 1

Right
488.8
137.5
1180

V
Mu
M0
Cracked ?
UNCRACKED

Date

BS

0.0
0.0
0
0
0.00
0
0.0
0.0
0.000
0.000
0.00
0.00
0.00
0.00
0
0
0
0
0.0
0
0.0
0
0.0
0.0
0.0

Left
0.0
0.0
0

0.0
0.0
0.000
0.000
0.00
0
0
0
0
0
0
0
0.0
0
0.0
0
0.0
0.0
0.0
ft = 1.697

Left
0.0
0.0
0.0
N
0.000
0.0
0
0
0.0
0.000
0.000
0.000
0.0
0.0
0.000
0

4298

Right
0.0
0.0
0.0
N
0.000
0.0
0
0
0.0
0.000
0.000
0.000
0.0
0.0
0.000
0

Links not required

nx = 2
Span 1

Span 2

5
9.000
1.6E+10 1.6E+10
2.444
4.091
1.167
1.060
101.60
56.44
22.74
10.41
6.45
3.96
5.34
2.22
6.06
3.43
1.490
1.820
247.4
544.0
0.18
0.35
0.53

5
9.000
1.6E+10 1.6E+10
1.222
8.182
1.669
1.015
101.60
56.44
0.68
10.41
9.22
22.01
2.28
21.33
6.79
21.80
1.245
2.640
236.0
30.0
0.29
0.06
0.34

0
0.000
0
0
0.000
0.000
0.000
0.000
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0! #DIV/0!
0.00
0.00
1.000
1.000
0.0
0.0
0.00
0.00
0.00

Khan/Williams Ref
(Concrete Society Method)
(9.8)
(9.9, 9.10)

(9.11)
(9.12, 9.13)
(9.14)
(9.17, 9.18)
(9.19)
(9.20)
(9.21)

Project

Spreadsheets to BS 8110

Client
Location

Bando
Res tower - 275 thk

REINFORCED CONCRETE COUNCIL


Made by

DEFLECTION CALCULATIONS (ii)

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls v2.1 on CD

SPAN 2
Distance
Element b
d'
As(t)

As(b) = 4021
175
350
175
225
48
48
4021
4021

Date

BS
Checked

Revision

h=
1175
275
48
4021
23.94
3E+06
3E+08
137.5
137.5
2E+10
5.94
3E+06
4E+08
137.5
137.5
2E+10
31.44
3E+06
3E+08
137.5
137.5
2E+10

16
Job No

1999-2003 BCA for RCC

d = 227
0
625
900
88
275
275
48
48
48
4021
4021
4021
TRANFORMED SECTION PROPERTIES at TRANSFER
E=
A
3E+06 3E+06 3E+06 3E+06 3E+06
S A.Yt
3E+08 3E+08 3E+08 3E+08 3E+08
Yt
137.5
137.5
137.5
137.5
137.5
Yb
137.5
137.5
137.5
137.5
137.5
Ixx
2E+10 2E+10 2E+10 2E+10 2E+10
TRANFORMED SECTION PROPERTIES - LONGTERM
E=
A
3E+06 3E+06 3E+06 3E+06 3E+06
S A.Yt
4E+08 4E+08 4E+08 4E+08 4E+08
Yt
137.5
137.5
137.5
137.5
137.5
Yb
137.5
137.5
137.5
137.5
137.5
Ixx
2E+10 2E+10 2E+10 2E+10 2E+10
TRANFORMED SECTION PROPERTIES - IMPOSED
E=
A
3E+06 3E+06 3E+06 3E+06 3E+06
S A.Yt
3E+08 3E+08 3E+08 3E+08 3E+08
Yt
137.5
137.5
137.5
137.5
137.5
Yb
137.5
137.5
137.5
137.5
137.5
Ixx
2E+10 2E+10 2E+10 2E+10 2E+10

Page

29-Jul-2014

275
1450
275
48
4021.2
m=
3E+06
3E+08
137.5
137.5
2E+10
m=
3E+06
4E+08
137.5
137.5
2E+10
m=
3E+06
3E+08
137.5
137.5
2E+10

bw =
1725
275
48
4021.2
8.35
3E+06
3E+08
137.5
137.5
2E+10
33.67
3E+06
4E+08
137.5
137.5
2E+10
6.36
3E+06
3E+08
137.5
137.5
2E+10

9000
2000
275
48
4021.2
m-1=
3E+06
3E+08
137.5
137.5
2E+10
m-1=
3E+06
4E+08
137.5
137.5
2E+10
m-1=
3E+06
3E+08
137.5
137.5
2E+10

bf =
2275
275
48
4021.2
7.35
3E+06
3E+08
137.5
137.5
2E+10
32.67
3E+06
4E+08
137.5
137.5
2E+10
5.36
3E+06
3E+08
137.5
137.5
2E+10

9000
2550
275
48
4021.2

hf = 0
bd3/12 = 2E+10
2825
3100
3375
3650
275
275
275
275
48
48
48
48
4021.2 4021.2 4021.2 4021.2

4298

3925
275
48
4021

4200
275
48
4021

4475
275
48
4021

4750
225
48
4021

4925
175
48
4021

5100
88
48
4021

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
4E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

3E+06
3E+08
137.5
137.5
2E+10

M (SLS 2)
-98.1
-65.9
-52.6
-46.6
-40.8
-35.1
-29.6
-24.2
-19.1
-14.0
-9.1
-4.4
1/R
-3E-07 -2E-07 -1E-07 -1E-07 -1E-07 -9E-08 -8E-08 -6E-08 -5E-08 -4E-08 -2E-08 -1E-08
Load
-2E-05 -3E-05 -3E-05 -3E-05 -3E-05 -3E-05 -2E-05 -2E-05 -1E-05 -1E-05 -7E-06 -3E-06
Load x dist -0.001 -0.0052 -0.0108 -0.0208 -0.0262 -0.0295 -0.0307 -0.0299 -0.0272 -0.0228 -0.0166 -0.0089
End slope -0.0002
Span d
0
-0.03
-0.05
-0.08
-0.10
-0.11
-0.12
-0.12
-0.11
-0.10
-0.09
-0.07
Cant d
0
0.06
0.03
0.00
-0.03
-0.04
-0.05
-0.06
-0.05
-0.05
-0.04
-0.03
d
0
-0.03
-0.05
-0.08
-0.10
-0.11
-0.12
-0.12
-0.11
-0.10
-0.09
-0.07

0.2
5E-10
1E-07
0.0004

4.6
1E-08
3E-06
0.0111

8.9
2E-08
6E-06
0.0231

13.0
3E-08
9E-06
0.0364

16.9
4E-08
1E-05
0.0508

20.7
5E-08
1E-05
0.0662

24.4
6E-08
1E-05
0.0676

22.6
6E-08
1E-05
0.0507

-0.06
-0.02

-0.04
-0.01

-0.03
0.00

-0.02
0.01

-0.01
0.01

0.00
0.01

0.00
0.01

0.00
0.01

13.0
3E-08
3E-06
0.0147
2E-05
0
0

-0.06

-0.04

-0.03

-0.02

-0.01

0.00

0.00

0.00

DEFLECTIONS at TRANSFER

DEFLECTIONS - LONGTERM

M (SLS 7) -257.9 -204.1 -169.0 -130.3


-95.1
-63.4
1/R
-2E-06 -2E-06 -2E-06 -1E-06 -9E-07 -6E-07
Load
-0.0002 -0.0003 -0.0004 -0.0003 -0.0002 -0.0002
Load x dist -0.0094 -0.0595 -0.1266 -0.213 -0.2238 -0.195
End slope -0.0012
Span d
0
-0.18
-0.29
-0.36
-0.34
-0.26
Cant d
0
3.11
2.88
2.63
2.46
2.37
d
0.0
-0.2
-0.3
-0.4
-0.3
-0.3

-35.3
-3E-07
-9E-05
-0.134

-10.8
-1E-07
-3E-05
-0.0486

10.2
1E-07
3E-05
0.0536

27.7
3E-07
7E-05
0.1649

41.6
4E-07
0.0001
0.2777

52.0
5E-07
0.0001
0.3844

58.9
6E-07
0.0002
0.4773

62.2
6E-07
0.0002
0.5488

61.9
6E-07
0.0002
0.5912

58.1
6E-07
0.0002
0.5968

50.8
5E-07
0.0001
0.558

39.9
4E-07
0.0001
0.4673

25.5
2E-07
5E-05
0.2592

10.9
1E-07
2E-05
0.0892

-0.12
2.32

0.04
2.29

0.20
2.27

0.36
2.25

0.50
2.21

0.61
2.13

0.68
2.02

0.71
1.87

0.70
1.67

0.64
1.42

0.54
1.14

0.40
0.82

0.23
0.47

0.12
0.23

-12.4
-1E-07
-1E-05
-0.0512
0.0007
0
0

-0.1

0.0

0.2

0.4

0.5

0.6

0.7

0.7

0.7

0.6

0.5

0.4

0.2

0.1

0.0

-11.2
-2E-08
-6E-06
-0.014

-2.8
-6E-09
-2E-06
-0.004

4.1
8E-09
2E-06
0.0064

9.7
2E-08
5E-06
0.0164

13.7
3E-08
8E-06
0.0255

16.4
3E-08
9E-06
0.0329

17.6
4E-08
1E-05
0.038

17.5
3E-08
1E-05
0.0402

15.8
3E-08
9E-06
0.0389

12.8
3E-08
6E-06
0.0273

10.1
2E-08
4E-06
0.0174

-0.10
-0.10

-0.08
-0.08

-0.07
-0.06

-0.05
-0.05

-0.04
-0.03

-0.02
-0.02

-0.01
-0.01

-0.01
-0.01

0.00
0.00

0.00
0.00

0.00
0.00

6.8
1E-08
1E-06
0.0059
2E-06
0
0

-0.10

-0.08

-0.07

-0.05

-0.04

-0.02

-0.01

-0.01

0.00

0.00

0.00

DEFLECTIONS - IMPOSED

M(SLS 4-7) -135.4 -122.4 -109.9


-91.5
-74.6
-59.0
-44.9
-32.3
-21.0
1/R
-3E-07 -2E-07 -2E-07 -2E-07 -1E-07 -1E-07 -9E-08 -6E-08 -4E-08
Load
-2E-05 -4E-05 -5E-05 -5E-05 -4E-05 -3E-05 -2E-05 -2E-05 -1E-05
Load x dist -0.001 -0.0075 -0.0173 -0.0314 -0.0368 -0.0381 -0.0357 -0.0305 -0.0231
End slope -0.0002
Span d
0
-0.04
-0.07
-0.10
-0.12
-0.13
-0.13
-0.13
-0.12
Cant d
0
-0.03
-0.06
-0.10
-0.12
-0.13
-0.13
-0.12
-0.11
d
0
-0.04
-0.07
-0.10
-0.12
-0.13
-0.13
-0.13
-0.12

Spreadsheets to BS 8110

Project

Res tower - 275 thk

Location

GRAPH DATA I

Made by BS Job No 4298


Date
29-Jul-14
REINFORCED CONCRETE COUNCIL

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls v2.1 on CD

1999-2003 BCA for RCC

GEOMETRY
0
-3400
-200
3900
-200
-3900
1000
-1500

BEAM X
BEAM Y
C SECa X
C SECa Y
C SECb X
C SECb Y
B SEC X
B SEC Y

LOADING
UDL X
DEAD
IMPOSED
PUD X
PUD D
PUD L
PL X
PLs D
PLs L

0
3400
-200
4900
200
-3900
10000
-1500

0
0
200
4900
200
-4900
10000
-1500

11000
0
200
3900
-200
-4900
10000
-1500

11000
-3400
-200
3900
-200
-3900
10000
-1775

scaling factor 21.16


0
0
11000
0
1978.6 1978.6
1979
2550
2550
0
0
0
2550
2550
2550
2550
2550
2550
0
0
2550
2550
2550
2550

11000
0
1978.6
0
2550
2550
0
2550
2550

11000
0
1978.6

-2337.50
11000 11000
3400
0
10800
3900
10800
-3900
1000
1000
-1775
-1500

11000
1978.6
2550
11000
2550
2550

0
2550
2550

STRESS DIAGRAMS
Balance scaling =
Vl

Vr

W1

we

485.90
484.91
409.57
737.75
735.77
585.09
628.91
######
######
591.74

296.82
296.82
296.82
264.49
264.49
264.49
264.49
264.49
264.49
264.49

-83.02
-83.02
-83.02
-73.98
-73.98
-73.98
-73.98
-73.98
-73.98
-73.98

-0.2

-0.2

0.2

137.5
0.00
0
0
0
0
0
0
0
0
0
0
0

137.5
0.00
0
48.913
51.675
-41.73
390.22
395.74
208.93
268.84
488.75
488.75
267.28

137.5
0.00
0
48.913
51.675
-41.73
390.22
395.74
208.93
268.84
488.75
488.75
267.28

3.042
3.130
0.000
0.000
0.541
5.872
4.422
0.000
0.027
6.692
7.702
0.000
20.00

3.042
3.130
0.000
0.000
0.541
5.872
4.422
0.000
0.027
6.692
7.702
0.000
20.00

344.60
345.59
272.43
587.75
589.73
443.41
1 488.69
879.56
879.56
436.76

S
P
A
N

SPAN 1
X

profile X
PROFILE
BALANCE
Beam

M-SLS 1
M-SLS 2
M-SLS 3
M-SLS 4
M-SLS 5
M-SLS 6
M-SLS 7
M-ULS 1
M-ULS 2
M-ULS 3
Pi
Pf
C top @ trans
0
C btm @ trans
0
T top @ trans
0
T btm @ trans
0
C top, final
0
C btm, final
0
T top, final
0
T btm, final
0
C top, ULS
0
C btm, ULS
0
T top, ULS
0
T btm, ULS
0
sc final
20.00

x profile
Vl

288.71
250.75
275.35
460.79
384.88
434.07
2 380.93
682.84
455.74
604.47

S
P
A
N

16500
0
10800
4900
11200
-3900
1000
-1500

16500
-3400
11200
4900
11200
-4900
1000
-1500

16500
3400
11200
3900
10800
-4900

16500
1978.6
2550
11000
2550
2550
11000
2550
2550

16500
0
1978.6
11000
2550
2550
11000
2550
2550

16500
0
0
11000
2550
2550

16500
0
0

X
Top
n/a

-0.40
275
137.50

11.00
275
137.50

Vr

W1

we

126.54
90.25
139.90
201.96
129.37
228.68
177.87
274.71
58.51
353.08

194.64
194.64
194.64
177.74
177.74
177.74
177.74
177.74
177.74
177.74

-59.94
-59.94
-59.94
-54.74
-54.74
-54.74
-54.74
-54.74
-54.74
-54.74

16500
0
10800
3900
10800
-3900
9250
-1500

16500
0

16500
0
0
16500
0
0

11000
2550
2550

16500
0
0
16500
0
0
11000
2550
2550

11.00
275
137.50

16.50
275
137.50

16.50
275
0.00

S
P
A
N
3

0.55
Btm
0
0
0
0.2
0.65
1.1
1.1
1.65
2.2
2.75
0
0.45
0.9
0.9
1.45
2
2.55
137.5
132.4
117.3
117.3
94.5
75.5
60.3
293.88 293.88 293.88 -73.98 -73.98 -73.98 -73.98
0
0
0
0
0
0
0
48.913 -58.325 -83.491 -83.491 -65.23 -49.244 -35.533
51.675 -56.008 -81.619 -81.619 -63.903 -48.462 -35.295
-41.734 -119.08 -117.08 -117.08 -69.336 -27.95 7.0775
390.22 178.53 50.761 50.761 -47.092 -130.87 -200.58
395.74 183.17 54.504 54.504 -44.438 -129.31 -200.1
208.93 57.031 -16.421 -16.421 -55.305 -88.284 -115.36
268.84 98.116 7.4763 7.4763 -50.188 -99.496 -140.45
488.75
156
-81.983 -81.983 -299.8 -487.33 -644.57
488.75
156
-81.983 -81.983 -299.8 -487.33 -644.57
267.28 118.37 47.911 47.911 12.683 -16.639 -40.056
6618.9 6617.8 6616.8 6616.8 6615.6 6614.3 6613.0
5898.3 5897.4 5896.4 5896.4 5895.2 5894.1 5892.9
3.042
3.724
3.706
3.706
3.284
3.107
2.985
3.130
2.180
1.954
1.954
2.110
2.426
2.734
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.541
1.880
2.527
2.527
2.869
3.535
4.149
5.872
3.997
2.863
2.863
1.990
1.603
1.364
4.422
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.027
1.339
3.105
3.105
5.025
6.677
8.063
6.692
3.758
2.805
2.805
2.494
2.235
2.028
7.702
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.044
7.658 13.205
20.00
20.00
16.50
16.50
16.50
16.50
16.50

18250
-1500

16500
-2337.5
16300
3900
16300
-3900
18250
-1500

16500
0
16300
4900
16700
-3900
18250
-1500

16500
0
0
16500
0
0

16500
0
0
16500
0
0

16.50
275
0.00

16.90
275
0.00

Vl

Vr

W1

we

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TypiCalc!
0
3.30
3.1
48.9
-73.98
0
-24.097
-24.404
35.7465
-256.21
-256.83
-136.53
-173.04
-771.52
-771.52
-57.568
6611.8
5891.7
2.887
2.987
0.000
0.000
4.645
1.177
0.000
0.000
9.182
1.873
0.000
17.683
16.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
3.85
3.65
41.3
-73.98
0
-14.936
-15.787
58.057
-297.77
-299.47
-151.79
-197.29
-868.19
-868.19
-69.174
6610.5
5890.6
2.810
3.183
0.000
0.000
5.020
1.042
0.000
1.040
10.034
1.770
0.000
21.094
16.50

0
4.4
4.2
37.5
-73.98
0
-8.0493
-9.4449
74.009
-325.26
-328.05
-161.14
-213.17
-934.57
-934.57
-74.874
6609.3
5889.4
2.754
3.323
0.000
0.000
5.271
0.959
0.000
2.049
10.618
1.720
0.000
23.436
16.50

0
4.95
4.75
37.5
-73.98
0
-3.4378
-5.3779
83.602
-338.67
-342.56
-164.6
-220.7
-970.67
-970.67
-74.669
6607.8
5888.0
2.717
3.407
0.000
0.000
5.399
0.928
0.000
2.563
10.936
1.721
0.000
24.711
16.50

16700
4900
16700
-4900
18250
-1775

16700
3900
16300
-4900
9250
-1775

16300
3900
16300
-3900
9250
-1500

16500
0
0

16500
0
0

0
302.50
16
558.62

0
-27.5
0
-124.76

9250
-1500

16500 16500
16500 16500 16500
500
500
500
500
500
16500 16500
16500 16500 16500
-2837.5 -2837.5 -2837.5 -2837.5 -2837.5
9250
16500 16500 16500
-1500
-1500
-1500
-1500

11
302.5
16
558.62

11
-27.5
0
-124.76

16.5
302.5
16
558.62

16500
-1500

16.5
-27.5
0
-124.76

16500
-1500

16500
-1500

16.5
302.5
16
558.62

16.5
-27.5
0
-124.76

16500
-1500

16500
-1500

16500
-1500

LOAD COMBINATIONS
INITIAL

FINAL

5.5
5.3
41.3
-73.98
0
-1.1012
-3.5858
86.837
-338.02
-342.99
-162.14
-219.87
-976.47
-976.47
-68.558
6606.1
5886.5
2.701
3.435
0.000
0.000
5.402
0.949
0.000
2.581
10.986
1.774
0.000
24.919
16.50

20
6.05
5.85
48.9
-73.98
0
-1.0394
-4.0686
83.713
-323.29
-329.34
-153.78
-210.69
-951.99
-951.99
-56.542
6604.4
5884.9
2.704
3.406
0.000
0.000
5.281
1.022
0.000
2.102
10.770
1.879
0.000
24.058
16.50

SLS 1
SLS 2
SLS 3
SLS 4
SLS 5
SLS 6

0
6.6
6.4
60.3
-73.98
0
-3.2526
-6.8262
74.23
-294.48
-301.63
-139.52
-193.15
-897.23
-897.23
-38.62
6602.7
5883.3
2.728
3.322
0.000
0.000
5.036
1.147
0.000
1.128
10.287
2.037
0.000
22.129
16.50

7.15
6.95
75.5
-73.98
0
-7.7405
-11.859
58.389
-251.6
-259.84
-119.34
-167.26
-812.17
-812.17
-14.793
6601.0
5881.7
2.772
3.182
0.000
0.000
4.667
1.324
0.000
0.000
9.536
2.246
0.000
19.133
16.50

Initial prestress + OW + construction load on all spans


Initial prestress + OW + construction load on odd spans
Initial prestress + OW + construction load on even spans
Final prestress + dead + imposed load on all spans
Final prestress + dead + imposed load on odd spans
Final prestress + dead + imposed load on even spans

20
7.7
7.5
94.5
-73.98
0
-14.503
-19.166
36.189
-194.65
-203.98
-93.268
-133.01
-696.83
-696.83
14.94
6599.3
5880.2
2.835
2.985
0.000
0.000
4.174
1.554
0.000
0.000
8.519
2.508
0.000
15.068
16.50

0
8.25
8.05
117.3
-73.98
0
-23.541
-28.748
7.6302
-123.63
-134.04
-61.287
-90.403
-551.2
-551.2
50.578
6597.6
5878.6
2.919
2.733
0.000
0.000
3.557
1.835
0.000
0.000
7.234
2.821
0.000
9.936
16.50

8.8
8.6
143.9
-73.98
0
-34.854
-40.605
-27.287
-38.532
-50.036
-23.399
-39.442
-375.29
-375.29
92.122
6595.9
5877.0
3.023
2.424
0.000
0.000
2.816
2.168
0.000
0.000
5.683
3.187
0.000
3.735
16.50

20
0
20
9.35
9.9
9.9
10.35
9.15
9.7
9.7
10.15
174.3
208.5
208.5
230.6
-73.98 -73.98 429.46 429.46
0
0
0
0
-48.441 -64.303 -64.303 -21.77
-54.737 -71.144 -71.144 -29.056
-68.563 -116.2 -116.2 -102.7
60.637 173.88 173.88 327.97
48.045 160.2
160.2
313.4
20.394 70.092 70.092 166.12
19.875 87.547 87.547 200.1
-169.08 67.405 67.405 334.4
-169.08 67.405 67.405 334.4
139.57 192.93 192.93 291.95
6594.2 6592.5 6592.5 6591.2
5875.4 5873.9 5873.9 5872.6
3.269
3.688
3.688
3.568
2.237
2.097
2.097
2.471
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.194
1.755
1.755
0.908
2.908
3.906
3.906
5.264
0.000
0.000
0.000
2.074
0.000
0.000
0.000
0.000
3.864
1.779
1.779
0.000
3.604
4.074
4.074
5.321
0.000
0.000
0.000
2.300
0.000
0.000
0.000
0.000
16.50
20.00
20.00
20.00

ULTIMATE
DEFLECTION

0
10.8
10.6
238.0
429.46
0
133.65
125.92
20.955
593.43
577.97
368.05
420.2
723.61
723.61
496.86
6589.8
5871.3
2.478
3.841
0.000
0.000
0.000
7.604
11.437
0.000
0.000
8.751
16.027
0.000
20.00

10.8
10.6
238.0
0.00
0

ULS 1
ULS 2
ULS 3
SLS 7

Final prestress + factored dead and imposed load on all spans


Final prestress + factored dead + factored imp load on odd spans
Final prestress + factored dead + factored imp load on even spans
Final prestress + dead + 30% imposed load on odd spans

11

116.32
119.28
11.51
505.36
511.28
295.74
364.55
661.18
661.18
352.76

229.32
221.39
101.63
738.57
722.72
483.20
543.95
927.24
927.24
613.34

4.577
4.377
37.1

4.394
4.194
37.5

4.894
4.694
37.3

4.742
4.542
37.0

5.052
4.852
37.9

4.671
4.471
37.0

-6.314 -8.1121
-7.8851 -9.5018
77.796 73.869
-337.95 -335.26
-341.72 -338.73
-164.51 -163.99

6608.9
5889.0
2.740
3.356
0.000
0.000

6609.3
5889.4
2.754
3.322
0.000
0.000

6608.0
5888.2

6608.4
5888.6

5.391
0.929
0.000
0.633

5.365
0.934
0.000
0.607

-974.03 -956.16
-974.03 -956.16
-73.981 -75.511
6607.5 6608.6
5887.7 5888.8

10.965
1.727
0.000
6.208

10.808
1.714
0.000
6.050

Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete Council
is intended for those who will evaluate the significance and limitations of its contents and take
responsibility for its use and application. No liability (including that for negligence) for any loss
resulting from such advice or information is accepted by the BCA, RCC or their subcontractors,
suppliers or advisors. Users should note that all BCA software and publications are subject to
revision from time to time and should therefore ensure that they are in possession of the latest
version.
This spreadsheet should be used in compliance with the accompanying publication 'Spreadsheets
for concrete design to BS 8110 and EC2' available from British Cement Association, Telford
Avenue, Crowthorne, Berkshire RG45 6YS.
Status of spreadsheet
Public release version.

This spreadsheet is shareware. It may be distributed freely, but


may not be used for commercial purposes until the user has
registered with the RCC.

Revision history RCC42 Post tensioned Analysis & Design

Date

Version

Action

22-Jan-03 RCC42 v2.1

DETR logo replaced by DTI.

11-Oct-02 RCC42 v2.0

Version 2 enhancements

1-Nov-99

RCC42 v1.1

06-Aug-99 RCC42 v1.0

Grade 60 concrete bug fixed


First public release.
Includes b version comments

rced Concrete Council


its contents and take
gligence) for any loss
r their subcontractors,
cations are subject to
ssession of the latest

lication 'Spreadsheets
t Association, Telford

stributed freely, but


until the user has

Size (kB)
1716
1735
1648
1647

You might also like