This case study summarizes the brazing repair process used on cracked blades in the low pressure turbine of a power plant. Cracks were found at blade joints during an overhaul. The cracks were ground away and the surfaces were prepared. An low melting temperature alloy was used to fill the joints via brazing. Several steps were followed, including applying flux, heating to melt the alloy, cooling, and finishing. The brazing successfully repaired the cracked blades so the turbine could continue operating for decades more.
This case study summarizes the brazing repair process used on cracked blades in the low pressure turbine of a power plant. Cracks were found at blade joints during an overhaul. The cracks were ground away and the surfaces were prepared. An low melting temperature alloy was used to fill the joints via brazing. Several steps were followed, including applying flux, heating to melt the alloy, cooling, and finishing. The brazing successfully repaired the cracked blades so the turbine could continue operating for decades more.
This case study summarizes the brazing repair process used on cracked blades in the low pressure turbine of a power plant. Cracks were found at blade joints during an overhaul. The cracks were ground away and the surfaces were prepared. An low melting temperature alloy was used to fill the joints via brazing. Several steps were followed, including applying flux, heating to melt the alloy, cooling, and finishing. The brazing successfully repaired the cracked blades so the turbine could continue operating for decades more.
Korba east thermal power station is operated by Chhattisgarh state power Generation Company limited. Korba east thermal power station, Korba was commissioned its first unit of 50 Mw capacity on 5 Sep -1966 with the collaboration with Russian government and added three more units by 31 st Oct 1968. It has increased its capacity to 440 mw capacity by adding two unit of 120 mw capacity by 1981 with the help of Bharat heavy Electrical Limited and with a boiler of its own and one boiler of ABL. Korba east thermal power station has always welcomed new ideas and concepts for improvising its efficiency. Reformation of process is a regular feature at KTPS. The plants officials are always ready to adopt newer technologies and believe in continual improvement and setting newer bench marks. EWAC Association goes hand in hand from last 3 decades. EWAC services are regarded very high at Korba east thermal power station. Various technologies have been offered to the plant which has been very well accepted by the plant
ABOUT THE JOB
The fifth unit of Korba east thermal power station was commissioned on 27-apr- 1976 and is running successfully for a period of nearly four decades supplying continuous service to the state of Chhattisgarh (which was earlier a part of Madhya Pradesh). The power plant is built with the help of Russian technology. During the capitol over hauling it was found that there were very small cracks developed at the joint of blade and lacing wire and pitting marks are observed on of 5 th and 6 th stage blade of low pressure turbine.
(Low pressure turbine)
Position of crack in the valve
Application details
Nature of problem- crack developed in joint area of lacing and blade and pitting marks due to erosion by steam. Working parameters Base metal- Alloy steel Recommended electrode- Eutecrod 1801 The Salient features of Eutecrod 1801 is as follows Low melting temp of 600 degree Celsius which ensures that the blades never got over heated to form any distortion and cracks. Silver bearing alloy due to which it is very thin flowing so that it can fill very intricate gaps in the joint. Especially designed for dissimilar metal combinations. It has a tensile strength of 90,000 Psi which ensure a high safety of margin.
STEP BY STEP WELDING PROCEDURE 1st step- Dye penetration test is done on all blades to find the cracks and pitting marks. It was found that almost all blades of 5 th and 6 th stages had developed small cracks at the lacing wire area and pitting marks were also present at blade tips.
Dye penetration test
2 nd step- After the cracks are found out it is removed by grinding. Due to which the parent material is also exposed and also the oxides are also removed from the surface
Grinding is being done
Surface after grinding 3 rd step- Eutector 1801 flux is applied on the freshly prepared surface. Function of flux It dissolves the oxides and removes it to the surface of molten filler metal. Spread ahead of the filler metal and so protect the metal surface from oxidation. Promotes capillary of the filler metal.
Flux being applied before brazing
4 th step- Now the brazing area is broadly heated with an excess acetylene flame till the flux liquefies. When the flux liquefies filler rod is introduced into the joining area and is melted with the flame and deposited at the joint.
Brazing is being done
Joints after brazing 5 th step- The joints are cooled slowly and all the flux residues are removed. Then with the help of grinder the surface profile is matched.
Final view of the turbine blades after the excess material is removed by grinding
For Further Information Please Contact NARENDRA PATEL EASE KORBA Ph-07509572413 Mail- np.ewac@gmail.com