COMMISSIONING PACKAGE
Pkg. No. 154-01
Description: Noise n! "i#rtion Mes$re%ents
DIS&'I()&ION:
Original: Commissioning Site Team
Copy
Prepared by: Gary Rougeau
Approved by:
A.S. Class Society
Name / ate: Name / ate
Sign: Sign:
*+,1+,014
+Commissioning Template/Rev !.
,

c on s ul t i ng
en g i n e er s
ModuSpec

*+,1+,014
+Commissioning Template/Rev !.
-
1
SA"#T$ PR#R#%&'S'T#S S'GNAT&R#
T(e )ollo*ing instructions must be read and understood by t(e Person in C(arge o)
t(e +or,site -As de)ined in t(e Permit To +or, system.. uring t(e pre/
commissioning meeting0 (e must veri)y t(at all persons involved in t(e
commissioning (ave read and understand t(e procedure and t(e associated sa)ety
items.
1
T(e Person in C(arge must (ave a t(oroug( ,no*ledge o) t(e system
being commissioned.
2e must understand t(e steps re3uired in t(e sa)e start up and operation
o) t(e e3uipment.
') (e does not (ave t(e necessary ,no*ledge )or t(e sa)e start up and
operation o) t(e e3uipment0 t(en (e is to ensure su))icient e4pertise is
available during t(e commissioning p(ase.
5
T(e 6endor documentation0 including pre/commissioning activities and
commissioning procedures s(all be read and understood by t(e Person in
C(arge prior to issuing t(e notice o) commissioning.
7
T(e commissioning procedure must be read and understood in advance
o) t(e actual commissioning activities. ') t(e Person in C(arge does not
understand or agree *it( any part o) t(e *ritten procedure0 (e must
discuss t(is *it( t(e procedure aut(or and come to a mutual agreement
as to any modi)ications to be incorporated.
Note: An. %o!i/ictions %$st #e presente! to t0e Co%%issioning
Mnger /or 0is cceptnce prior to co%%encing n. cti1ities on
t0e s.ste%.
8
T(e General +or, Permit -issued as part o) t(e Permit to +or, system.0
must be read and understood by all persons participating in t(e
commissioning activities.
!
As prt o/ t0e &ot2 S/et. &sk Instr$ction 3&S&I4 t2k5 t0e Person in
C0rge %$st e6p2in t0e opertion o/ t0e s.ste% n! especi22. t0e
ssocite! s/et. !e1ices.
7e s0o$2! 01e goo! 2e1e2 o/ con/i!ence o/ t0e co%petence o/ t0e
personne2 ssigne! to t0e co%%issioning cti1ities.
9
Commissioning s(ould not progress unless ade3uate communication is
establis(ed at all areas a))ected during t(e test.
:
T(e Person in C(arge or a 3uali)ied associate0 must veri)y t(at t(ere are
no integral sa)ety devices or systems *(ic( (ave been bypassed or made
inoperable by ot(er means0 prior to t(e start o) energi;ing.
To ac(ieve t(is0 (e may need to c(ec, t(e <ec(anical Completion -<C.
pac,age and discuss t(is *it( t(e 6endor or ot(er parties *(o (ave
carried out <ec(anical completion activities. ') suc( alteration to a sa)ety
system (ave been made t(en t(e )ollo*ing veri)ication must be made:
C(ec, t(at t(e alteration is essential to commissioning t(e
system.
#nsure t(at ot(er means are in place *(ic( e3ual or e4ceed t(e
protection provided by t(e bypassed device or system.
'ntegral Sa)ety system bypasses or isolations must be approved
by t(e Commissioning <anager or Sa)ety <anager

1#

SA"#T$ PR#R#%&'S'T#S S'GNAT&R#
=
#nsure t(at t(e latest copy o) t(e punc( list is included *it( t(e >&N
-livening up notice.. T(e Person in C(arge s(ould c(ec, t(is list )or items
*(ic( could cause con)usion or may be a potential (a;ard. ') suc( items0
in (is opinion0 e4ist0 it must be broug(t to t(e attention o) t(e
Commissioning <anager.
?
Prior to energi;ing any part o) any system0 all integral sa)ety devices suc(
as but not limited to0 emergency stops0 limit s*itc(es0 overload limiting
devices must be veri)ied as being correctly ad@usted and operational.
1A
'mmediately )ollo*ing t(e energi;ation0 a test o) all sa)ety devices and
alarms must be carried out to t(e e4tent t(is is practical.
'n t(e case o) electrical devices0 t(is s(ould be ac(ieved by continuity
testing i) )easible.
') t(is is not )easible0 t(en e4treme care must be ta,en t(at operating a
sa)ety device *ill not move or start any part o) t(e system.
2ydraulic control devices s(ould be tested *it( pilot pressure only.
') a test is not practical0 t(e data and certi)ication o) t(e device s(ould be
revie*ed.
') t(ere is any deviation )rom normal testing practices0 t(e Commissioning
<anager must be in)ormed.
11
T(e order o) t(e test e4ecution s(ould )ollo* t(at as described in t(e
commissioning procedure unless ot(er*ise agreed.
T(e e4ceptions to t(is0 )or e4ample0 can be load testing o) li)ting devices0
(o*ever in 22 cses5 integr2 s/et. !e1ices %$st #e teste! n!
pro1e! re2i#2e prior to 22 ot0er co%%issioning cti1ities.
15
'n general0 )aults )ound during commissioning s(ould be recti)ied prior to
carrying out any )urt(er commissioning activities.
T(ose o) a serious nature *ill void t(e commissioning test until remedial
*or, (as been carried out.
All )aults must be entered into t(e commissioning punc( list.
17
Signature o) t(e Person 'n C(arge o) +or,site.
ate:
*+,1+,014
+Commissioning Template/Rev !.
1
escription:
Noise n! "i#rtion
"eri/iction
S"' Code: 154-01
<anu)acturer: N+A Type: N+A
<C/C
pac,age:
N+A Serial no: N+A
Revision no.: 1 >ocation: N+A
No. escription Approved
1 System description
5 Scope o) *or, )or t(e system
7 Re)erences )or t(e system0 ocumentation0 Certi)ication
8 Prere3uisites )ul)illed
! Test and support e3uipment and personnel
9 Per)ormance and Acceptance testing0 ata veri)ication
8or !eti2s #o$t t0e #o1e ite%s see t0e /o22o9ing s0eets.
Doc$%enttion re1ision recor!
R#6. No ate 'ssue escription Prepre! #. 'e1ision re:$este! #.
Appro1e! #.
O'
A 7A
T2
Buly A5 'nitial
1 59
t(
August A5
6ibration
<easurements
Added
.
1!8/A1 Noise n! "i#rtion Mes$re%ents -
COMMISSIONING P'OCED)'ES CON&EN&S
1.A S$ST#< #SCR'PT'ON AN TAG >'STCCCCCCCCCCCCCCCCC 8
5.A SCOP# O" +ORDCCCCCCCCCCCCCCCCCCCCCCCCCCC 9
7.A R#"#R#NC#S "OR T2# S$ST#<CCCCCCCCCCCCCCCCCCC.. :
8.A PR#R#%&'S'T#SCCCCCCCCCCCCCCCCCCCCCCCCCCC.. :
!.A T#ST / S&PPORT #%&'P<#NT AN P#RSONN#>CCCCCCCCCCCC. :
9.A P#R"OR<ANC# AN ACC#PTANC# T#ST'NG0 ATA 6#R'"'CAT'ON.CCC.=
9.1 GeneralCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC =
9.5 "ailure Processing CCCCCCCCCCCCCCCCCCCCCCCCCC =
9.7 Commissioning <et(od CCCCCCCCCCCCCCCCCCCCCCCC =
9.7.1 General
9.7.5 Operational Test E 2eat Run
9.7.7 Commissioning Procedure ...CCCCCCCCCCCCCCCC. ?
9.7.8 Commissioning demonstration CCCCCCCCCCCCCCC.15
9.7.! System acceptance CCCCCCCCCCCCCCCCCCC... 17
:.A ATA S2##TS "OR T#ST #%&'P<#NTCCCCCCCCCCCCCCCC 18
=.A CO<<'SS'ON'NG ATA AN 2'STOR$ S2##TSCCCCCCCCCCC 1!
?.A CO<<'SS'AN'NG P&NC2 >'STCCCCCCCCCCCCCCCCCCC 19
1A.A 'NSTR&<#NT CA>'FRAT'ON R#%&'R#<#NTSCCCCCCCCCCCC 1:
11.A APP#N'GCCCCCCCCCCCCCCCCCCCCCCCCCCC.C 1=
e.g. <anu)acturers Commissioning Procedures
Applicable ra*ings
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 4
1.0 S;S&EM DESC'IP&ION:
&0e /o22o9ing is #rie/ !escription o/ t0e e:$ip%ent to #e co%%issione!. &0e
s.ste% 2i%its /or t0is proce!$re 01e #een pre-!e/ine! n! re s0o9n on t0e
%rke! $p !r9ings in t0e ppen!i6 o/ t0is !oc$%ent.
NOISE AND "I('A&ION CON&'O<
It is i%portnt t0t t0ese tests re per/or%e! in n or!er2. /s0ion5 #. :$2i/ie!
personne2 n! in ccor!nce 9it0 t0e CNSOP( Stn!r!s E2e%ent , prt *n! t0e
Norsok Stn!r!s n! t0e est#2is0e! proce!$res. It is 2so i%portnt t0t t0e
1eri/iction tests re 9e22 !oc$%ente!. &est 2ike t0ese re nor%22. s$#contrcte! to
recognise! speci2ist co%pn..
T(e noise level tests *ill probably (ave to be per)ormed as a part o) t(e sea trails and
t(ere)ore incorporated into t(e plans )or t(ose. 2o*ever0 t(e sound dampening tests can be
done independent o) sea trials as soon as t(e compartments in 3uestion are completed.
"ull noise level mapping o) all areas s(all be per)ormed. +(ere )easible0 t(is s(all be made
during t(e commissioning p(ase. "or ot(er areas0 t(is s(all be done a)ter start/up *(en all
relevant noise sources are in operation.
A preliminary noise test is recommended during commissioning o) e3uipment0 *(ic(
represent noise sources t(at may lead to e4cess o) t(e area limits.
uring concept de)inition and optimisation0 it s(all be ensured t(at:
<a@or noise and vibration sources are localised.
Possible use o) lo* noise e3uipment is evaluated.
A revie* o) t(e localisation o) noisy e3uipment and areas in relation to silent areas is
per)ormed.
T(e use o) Hbu))erI ;ones is evaluated.
uring engineering0 it s(all be ensured t(at:
Signi)icant noise and vibration sources are identi)ied0 and t(eir in)luences evaluated.
Sound absorption treatment )or all enclosed areas0 sound insulation and vibration
isolation )or e3uipment and mac(inery are speci)ied.
<a4imum noise and vibration levels )or signi)icant noise and vibration sources are speci)ied
on t(e basis o) area noise and vibration limits are t(e acoustic properties and t(e ade3uate
sound insulation bet*een areas. A sa)ety margin o) 7dF s(ould be applied in t(e
calculations. Additive e))ects o) several sources in t(e same area s(all be ta,en into
account. Noise data s(eets )or all potential noisy e3uipment s(all be prepared and included
in t(e in3uiries0 see Anne4 2. 6endors s(all be re3uested to propose noise reduction
measures0 i) e3uipment does not meet t(e re3uirements. All noise data s(all be
guaranteed. Procedures )or testing and control o) t(e guaranteed levels s(all be re3uired in
t(e contract.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 5
1.A S$ST#< #SCR'PT'ON: continued
Re3uirements to acoustic pipe insulation are speci)ied.
Noise and vibration levels are predicted and documented )or t(e di))erent areas o)
installation at a stage o) t(e pro@ect *(ere all re3uirements (ave been stated. T(e
individual noise e4posure s(all be calculated )or typical categories o) employees *or,ing in
areas *it( a noise level above =7dF-A.. No use o) ear protection s(all be assumed )or t(e
calculations.
'n areas *(ere *(ole body vibration limits may be e4ceeded0 structural vibration
analysis are per)ormed.
Noise and vibration predictions are updated0 based on vendor guaranteed noise and
vibration data and t(e detail design o) t(e installation.
uring )abrication0 it s(all be ensured t(at all HnoisyI non/standard e3uipment are tested
according to a de)ined test procedure during t(e "abrication acceptance test. "or standard
e3uipment0 data )rom earlier tests may be accepted. All important tests s(all be e4ecuted or
*itnessed by a 3uali)ied noise control engineer.
't s(all be ensured t(at0 *(ere )easible0 a )ull noise mapping o) t(e di))erent areas o)
installation is done during commissioning.
A recommended procedure )or noise control is presented in Anne4 B.
Gener2
'nstallation o) lo* noise e3uipment s(all be t(e primary noise control measure. "or piping
systems0 selection o) lo* noise valves and ot(er components *it( lo* noise properties s(all
be given priority.
Noisy e3uipment and e3uipment *it( (ig( structure borne sound emission levels and areas
*it( noisy activities -e.g. lay do*n areas0 *or, s(ops. s(all not be located in t(e immediate
vicinity o) areas *it( a noise level limit o) !AdF-A. or belo* -e.g. o))ices0 clinic0 central
control room0 sleeping/recreation areas..
No noise sources t(at may signi)icantly reduce t(e speec( intelligibility s(all be installed in
t(e immediate vicinity o) li)eboat stations and muster points. T(is also applies to t(e
location o) sa)ety relie) valves.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents =
1.A S$ST#< #SCR'PT'ON: continued
T(ere s(all only be needs o) s(orter stay )or inspection purposes in unmanned mac(inery
rooms during running o) mac(inery. T(is s(ould be accomplis(ed t(roug( location o) noisy
mac(ines in separate rooms. T(ere s(all be no regular access *ays t(roug( unmanned
mac(inery rooms to ot(er *or,places.
Are Noise <i%its
T(e )ollo*ing noise level limits re)lect t(e re3uirements )or conservation o) (earing:
T(e individual employeeJs ma4imum e4posure to noise during 15 (ours *or,ing day is
=7dF-A..
T(e ma4imum allo*able noise level in any situation is 17AdF-C. -HP#ADI.. T(is limit also
applies to Henclosed normally unmanned areas.I
Anne4 A covers vibration limits and area noise level limits0 total and )or 26AC.
T(e area noise level limits s(all apply as ma4imum levels at any location *it(in an area0 but
not closer t(an 1m to e3uipment and ot(er noisy installations.
All limits re)er to broadband noise *it(out any distinct tonal c(aracteristics. 'n case o) tonal
c(aracteristics0 t(e noise level limit s(all be set !dF lo*er.
"or areas0 *(ere t(e area noise level limit according to Anne4 A is =!dF-A. or ?AdF-A.0 t(e
limit o) ?AdF-A. s(all apply only *(ere a lo*er limit is un)easible. ') an area limit o) ?AdF-A.
is incompatible *it( t(e individual employeeJs ma4imum noise e4posure0 measures in
design to reduce t(e needs o) stay in t(e noise ;one s(all be evaluated.
'n *or,s(ops and ,itc(en0 t(e noise limits re)er to bac,ground noise including ventilation
system and e4ternal noise sources0 but no manually controlled operations. "or t(ese
operations0 t(e ma4imum noise e4posure )or 15 (ours *or,ing days applies.
'n control rooms0 o))ices0 computer rooms0 radio rooms and laboratories t(e noise level
limits re)er to bac,ground noise including 26AC as *ell as noise sources in continuous use
*it(in t(e actual room.
uring design emergency conditions0 e.g. near sa)ety relie) valves0 )ire pumps or outdoor
areas during )ull emergency )laring0 etc.0 only t(e ma4imum allo*able noise level o)
17AdF-C. applies.
T(e noise level in t(e muster areas s(all not e4ceed ?AdF-A. and t(e noise level in t(e
radio room0 t(e emergency management room and t(e central control room s(all not
e4ceed 9AdF-A. during emergency )laring.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents *
1.A S$ST#< #SCR'PT'ON: continued
Access to control rooms0 o))ices0 laboratories etc. )rom noisy areas s(ould be via corridors
or bu))er ;ones in *(ic( t(e noise levels do not e4ceed t(e 3uiet room noise level by more
t(an !dF. Access )rom *al,*ays to permanently manned areas s(ould be provided *it(out
passing a ;one *it( noise level above =7dF-A..
+(en selecting t(e design o) enclosed spaces0 i.e. *(en decisions on acoustic treatment
s(all be ta,en0 t(e re3uirements to PA system and speec( intelligibility s(all be ta,en into
account. >o* reverberation times s(all be ad(ered to.
"or *or,s(ops0 laboratories0 control rooms0 radio room0 meeting rooms0 co))ee bars rest/T6
rooms dining room and o))ices0 t(e average octave band sound absorption coe))icient s(all
not be less t(an A.8 in t(e )re3uency range 5!A2; to 5,2;.
T(e partitions bet*een rooms s(all be designed in order to ac(ieve an ade3uate sound
insulation. <inimum permissible air borne sound insulation indices )or (ori;ontal0 vertical
and diagonal sound transmission bet*een ad@acent rooms are s(o*n in table 5. Acoustic
rating o) sound insulation s(all be according to 'SO :1:/1.
Noisy rooms +or, rooms Silent rooms Corridors/staircases
Noisy
rooms
8AdF
1.
8AdF 8!dF
5.
7!dF
+or, rooms 8A dF 8AdF 7!dF
Silent rooms 8AdF 8AdF
Notes
1. oes not apply to partition bet*een ,itc(en and dining room.
5. Common partition *it( clinic/*ard s(all be avoided.
7. T(e ma4imum un)avourable deviation )rom t(e re)erence curve s(ould not e4ceed =dF.
#4amples o) HNoisy roomsI are gymnasium0 T6/rooms/cinema0 ,itc(en0 dining0 and c(ange
rooms. H+or, roomsI are o))ices0 meeting rooms0 radio room0 and control rooms. HSilent
roomsI re3uire a (ig( degree o) privacy and include cabins0 clinic/*ard0 and rest rooms -e.g.
reading rooms..
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents >
MIPS &AG <IS&
Comm.
P,g. No.
Ob@ect Number Ob@ect Name Ob@ect Type
N/A N/A N/A N/A
,.0 SCOPE O8 ?O'K:
't is t(e intention t(at t(e entire system0 as detailed in section 1.A *ill be commissioned.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents @
't is t(e intention t(at t(e entire system0 as detailed in section 1.A *ill be
Commissioned.
T(e scope o) t(e )inal commissioning o) t(is e3uipment *ill encompass testing and
satis)actory veri)ication o) all applicable operational parameters in entirety to ensure
t(at t(e e3uipment is )it )or purpose. T(ere)ore it is a precondition t(at all applicable
au4iliary systems and ancillary e3uipment essential to t(e operation o)
57?1177A1.doc be mec(anically complete and clear o) all A punc( items prior to
commencement o) )inal commissioning o) t(is item.
Additionally0 t(e 6endors "AT E SAT results are to be available )or enclosure in t(e
Appendi4 o) t(is document )or re)erence during )inal commissioning.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 10
-.0 'E8E'ENCES 8O' &7E S;S&EM:
C7ECK I8
7.1 T(e mec(anical completion pac,age.
7.1.1 <ec(anical dra*ings
7.1.5 #lectrical dra*ings
7.1.7 P and ' dra*ings
7.7 S(ipyard sa)ety procedures manual.
7.8 C>ASS SOC'#T$ rules and regulations0 i) applicable
7.! O*ner speci)ications
7.9 Canadian speci)ic regulations
4. P'E'EA)ISI&ES:
C7ECK I8
8.1 6eri)y t(at t(e HReady )or commissioning release noteI (as been completed
8.5 All KAJ punc( list items to be cleared. -<'PS <C punc( list attac(ed.
8.7 Prior to commencing tests0 veri)y t(at eac( instrument t(at is used during
t(e commissioning tests (as been calibrated. Record t(e e3uipment type
and serial numbers and t(e calibration due dates on t(e Test #3uipment
ata S(eet0 *(ic( is attac(ed to t(is pac,age.
8.8 Permit to *or, system in place.
8.! Personnel in t(e area in)ormed t(at commissioning is about to
commence.
8.9 Suitable 3uali)ied and competent personnel only s(ould per)orm tests0 e.g.
engineers and electricians *(o are )amiliar *it( t(e system.
8.: Prior to t(e start o) t(e tests0 it s(ould be veri)ied t(at temporary and non/
critical s(ip systems used in t(e )ollo*ing services are complete0 to t(e e4tent
necessary to complete t(e test procedure.
8.:.1 #lectric po*er )or motors
8.:.5 Necessary ad@ustments and preliminary tests (ave been
conducted
8.:.7 Necessary maintenance to t(e e3uipment (as been carried out0
e.g.0 oil levels (ave been c(ec,ed0 greasing (as been done0 etc.
+(ere e3uipment (as a cran,case0 an oil sample s(ould be
ta,en prior to running.
5.0 &ES& + S)PPO'& EA)IPMEN& AND PE'SONNE<
C7ECK I8
'EA)I'ED
!.1 Applicable test e3uipment: See attac(ed list in t(e appendi4
!.5 Applicable Support e3uipment: See attac(ed list in t(e appendi4
!.7 Support personnel
!.7.1 6endors commissioning engineers0 i) applicable
!.7.5 $ard support personnel
!.7.7 operations representatives
!.7.8 Regulatory body representative
!.7.!
!.8 Responsibilities:
!.8.1 ocumentation
!.8.5 Test implementation ORCT
!.8.7 Test e3uipment ORCT
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 11
=. PE'8O'MANCE AND ACCEP&ANCE &ES&ING5 DA&A "E'I8ICA&ION:
C7ECK I8
'EA)I'ED
9.1 General notes
9.1.1 Read t(is entire test procedure prior to initiating t(e tests described (ere
a)ter.
9.1.5 T(e test personnel *ill strictly ad(ere to all t(e sa)ety instructions and
precautions including0 but not limited to all Caution and +arning notes in
t(is test.
9.1.7 All t(e e3uipment *ill be operated in accordance *it( t(e appropriate
Tec(nical <anuals and good s(ipboard sa)ety practices by 3uali)ied
operating personnel *it( due regard )or personnel and e3uipment sa)ety.
9.1.8 #nsure t(at all po*er sources are de/energised during cold and (ot
insulation c(ec,s.
9.1.! Prior to energising and during operation o) electrical e3uipment tested
during t(e proceedings0 all sa)ety precautions speci)ied by t(e 2ali)a4
S(ipyard manuals s(all be )ully observed.
9.1.9 T(e initial commissioning s(all be carried out prior to t(e demonstration
)or Operations0 and C>ASS SOC'#T$.
9.1.: T(e parties mentioned in 9.1.9 must be in)ormed by e/mail 58 (ours prior
to t(e demonstration -i) )easible.. C>ASS SOC'#T$ may re3uire *itness
to t(e sa)ety device testing.
9.5 "ailures are to be processed as )ollo*s:
9.5.1 Any )ailure0 unsatis)actory condition or situation re3uiring remedial action
*ill be reported and recorded on a punc( list.
9.5.5 A)ter corrective actions (ave been ta,en0 repeat t(e necessary -i) any.
steps o) t(e test procedure and record t(e results.
9.7 Commissioning met(od:
9.7.1 General:
9.7.1.1 Operate all manual valves t(roug( one complete cycle0 to ensure
proper operation.
9.7.5 Operational test and 2eat run
C<ASS SOCIE&; M)S& (E IN"I&ED &O A<< COMMISSIONING
AC&I"I&IES
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 1,
9.7.8 CO<<'SS'ON'NG #<ONSTRAT'ON
COMMISSIONING P'OCED)'E S;S&EM DEMONS&'A&ION
O(BEC&I"E
T(e system (as been commissioned and t(e results )rom t(e various tests are attac(ed to t(is
document.
T(e purpose o) t(is )inal section is to demonstrate t(e system to t(e partyJs listed belo*
Procedure Number
1!8/A1
System
Noise 6eri)ication
T#ST ATT#N##S R#PR#S#NTAT'6#S NA<#S
Commissioning. A
Operations. F
C>ASS SOC'#T$ C

6#NOR #
T#ST A F C #
1.
5.
7.
8.
!.
9.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 1-
9.7.! S$ST#< ACC#PTANC#
S;S&EM ACCEP&ANCE
S$ST#< N&<F#R
1!8/A1
#SCR'PT'ON
Noise 6eri)ication
"&RT2#R T#ST'NG R#%&'R# $#S
NO
#NT#R #TA'>S O" AN$ "&RT2#R T#ST'NG R#%&'R# F#>O+.
T2# AFO6# S$ST#< 2AS F##N T#ST# ACCOR'NG TO T2# PROC#&R#S #SCR'F#
AN "O&N TO OP#RAT# SAT'S"ACTOR'>$.
T2# &N#RS'GN# AGR## T2AT NO "&RT2#R T#ST'NG 'S R#%&'R# AN
T2# S$ST#< CAN F# TAD#N O6#R F$ OP#RAT'ONS
+'TN#SS NA<# AN CO<PAN$ S'GNAT&R# AN AT#
OP#RAT'ONS

*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 14
:.A ATA S2##TS "OR T#ST #%&'P<#NT
&est e:$ip%ent $se!
Mn$/ct$rer + Mo!e2 + Description + Seri2 No.
C2i#rtion
Dte
Co%%ents
1.
,.
-.
4.
5.
=.
*.
Remar,s
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 15
= CO<<'SS'ON'NG AN ATA 2'STOR$ S2##T
COMMISSIONING DA&A AND 7IS&O'; S7EE&
Ob@ective: T(is page is to be used to record data t(at is relevant during t(e commissioning and
acceptance process.
ate escription
Commissioning
#ngineer
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 1=
?.A CO<<'SS'ON'NG P&NC2 >'ST
&7IS PAGE IS )SED &O 'ECO'D P)NC7 <IS& I&EMS ?7IC7 A'E ENCO)N&E'ED D)'ING
COMMISSIONING &ES&ING.
P&NC2 'T#<S TO F# TRANS"#RR# TO T2# <AST#R P&NC2 >'ST 'N <'PS
Dte ite%
p$nc0e!
Dte ite% !!e!
to Mster P$nc0
<ist
Mster
p$nc0 2ist
n$%#er
Description
Dte ite%
c2ere!
Co%%issioning
Engineer
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 1*
1A.A 'NSTR&<#NT CA>'FRAT'ON R#%&'R#<#NTS
INS&')MEN& CA<I('A&ION 'EA)I'EMEN&S
'nstrument Tag 'nstrument Type
Calibration
Certi)icate
Calibration
ue ate
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 1>
11.A APP#N'G
D'A?ING C "ENDO' IN8O'MA&ION
ocument Number ocument escription Pages Revision
ANN#G A +ORD'NG #N6'RON<#NT AR#A >'<'TS -NOR<AT'6#.
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents 1@
'oo% Description <e1e2 o/
Mnning
Noise
&ot2
!(3A4
Noise 7"AC
!(3A4
Act$2 Pss+8i2
#4ternal *al,*ays
and access *ays
=A
Stairs0 *al,*ays
and access *ays in
enclosed areas
-
>ay do*n area :!
<uster area & :!
"ire Pump Room & 11A =A
General Process
and &tility Areas
' =!/?A
7.
26AC Rooms & ?A
S*itc( Gear
Rooms A0F0C0E
and Trans)ormer
Room
' =! :A
Central Control
Room0 Fridge0
Fac,/up control
room.
< !A
9.
8!
Co))ee S(op
Outside >%
< 9A
9.
!A
Fattery Room & =! :A
<ain Generator
Rooms
A0F0C0E
& =!/?A
7.
:A
#mergency
Generator Room
& 11A
>ocal Control
Room
' 9A !A
'nst/#l. +or,s(op < 9!
5. 9.
!A
<ec(anical
+or,s(op/+elding
< 9!
5. 9.
!A
Centre Stores < 9!
9.
9A
Stores L Small
Parts
< 9!
9.
9A
>aboratory '/< 9A !A
Paint S(op ' 9!
9.
!!
Sac, Room ' 9!
5. 9.
!!
+or,s(op O))ice < !! !A
Crane Cabin < 9!
:.
9A
rillerJs Cabin < 9! 9A
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents ,0
'oo% Description <e1e2 o/
Mnning
Noise
&ot2
!(3A4
Noise 7"AC
!(3A4
Act$2 Pss+8i2
&nmanned
<ac(inery Rooms
& 11A =A
>ocal 'nstrument
Room
& :! 9A
Co))ee S(op in >%0 ' 8! 8A
ining Room < !! !A
T6 Rooms etc < !!
>aundry < :A
/ mac(inery area < :! 9A
/ *or, area < 9! 9A
Ditc(en < 9A
5.
!!
is( +as(ing < :A !!
Gymnasium ' !A 8!
Cabins < 8A
9.
7!
2ospital/Sic, Fay < 8A
9.
7!
O))ices/<eeting
Rooms
< 8!
9.
8A
Radio Room < !A 8!
Toilets/C(ange
Room
' 9A !A
rill "loor < =!
<on,ey Foard < =!
Pipe Rac, Area ' =!
<ud/+ell >ogging ' 9A !A
S(ale S(a,er ' =!/?A
7.
<ud Room0 <i4ing
Area
' =!/?A
7.
<ud Pump Room ' =!/?A
7.
<ud >ab ' 9A !!
FOP Control Room ' =!/?A
7.
FOP Stores '
FOP +or,s(op '/<
AP6 Room '
RO6 Room '
2eavy Tool Store '
<ud/Cement Room '
Au4 <ac(inery
Room
'
+ater Treatment
Room
'
T(ruster Rooms '
*+,1+,014
+Commissioning Template/Rev !.
1!8/A1 Noise n! "i#rtion Mes$re%ents ,1
'oo% Description <e1e2 o/
Mnning
Noise
&ot2
!(3A4
Noise 7"AC
!(3A4
Act$2 Pss+8i2
Pontoons '
2elicopter +aiting
Room
'
1. < M Permanently manned
' M 'ntermittently manned
& M Normally unmanned
5. T(e noise limit re)ers to bac,ground noise including ventilation system and e4ternal noise
sources0 but not manually controlled operations. "or t(ese operations0 t(e ma4imum noise
e4posure )or 15 (ours *or,ing day applies.
7. =!dF-A. is pre)erred in order to ensure t(at t(e individual employeeJs ma4imum e4posure to
noise during a 15 (ours *or,ing day is =7dF-A.. A ma4imum area noise level limit o) ?AdF-A.
s(all apply0 *(ere t(e lo*er limit is un)easible.
8. Category 5 applies outside >%.
!. "or mobile o))s(ore installations0 t(e noise re3uirement during operations is !dF-A. (ig(er
t(an t(e one given in table.
9. "or crane cabins0 t(e re3uirement re)ers to t(e e3uivalent sound level to *(ic( t(e crane
driver is e4posed during a time period de)ined by a typical crane cycle -in Nor*ay c).
e)inition given in NS 8=1!..