You are on page 1of 6

NO.

COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
QTY. OF SPARE
MATERIAL
CONTRACT CLAUSE DESCRIPTION CONTRACT CLAUSE NUMBER CONTRACT CLAUSE
DESCRIPTION OF
DOCUMENT
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
MIR LOG
INSPECTION REQUESTS
LOG
NCR STATUS
RFI LOG
TEST RESULTS LOGS
particular specification
cast in Place Concrete
Section 03300
Particular Specifiction
section 033800
Technical Spec. -
Curtain wall, Glass &
Cladding Division
8, Section
1.9/1.9.1/1.9.2
Technical Spec. -
Strutural Steel
Corrosion protection
Schedule, Section
05080
Section 4 & 5
Appendix A B
Technical Spec. -
Strutural Steel
Corrosion protection
Schedule, Section
05080
Section 4 & 5
Appendix A B
Particular Specification
non Structural Steel
Section 05300
Division 13- Finishes
Section 013150
Division 13- Finishes
Section 09600
Architectural Spec. -
Wood and Wood
Decorative Section
06100 / General
requirements
Contractor
AS BUILTS SPARE MATERIALS &MAINTENANCE WARRANTIES&GUARANTEES
Documentation Required for Final Handover
Master Check List
CIVIL WORKS
SR#
LOCKS &KEYS OTHER DOCUMENTATION
Completion
%
Completion
Date
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Received by
PMC
1 ACC
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
BEIJING JIANGE
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Technical Specifications-
Curtain wall, Glass &
Cladding Division 8,
Section 3.6
2 FRYSSINET
4 EVERSENADI
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
5 BEST STEEL
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
7 UTTC
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
6
STAR
ELEVATOR &
METAL WORKS
8 TRADE LINE
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
9
GIBCA
FURNITURE
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
5th February 2009 HANDOVER CHECK LIST (1of6) FM E 23 Rev 0
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
QTY. OF SPARE
MATERIAL
CONTRACT CLAUSE DESCRIPTION CONTRACT CLAUSE NUMBER CONTRACT CLAUSE
DESCRIPTION OF
DOCUMENT
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
particular specification
cast in Place Concrete
Section 03300
Contractor
AS BUILTS SPARE MATERIALS &MAINTENANCE WARRANTIES&GUARANTEES
Documentation Required for Final Handover
Master Check List
CIVIL WORKS
SR#
LOCKS &KEYS OTHER DOCUMENTATION
Completion
%
Completion
Date
Received by
PMC
1 ACC
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Archetectural Spec.-
Doors Section 08100/
General Requirements
Architectural Spec. -
Painting Works
Section 09900
Material Waranty fro
National Paint Factory.
Sub-structure
waterproffing
Section 07100 /
1.6/General
requirements
Architectural Spec. -
Bitumen Membrane
W/P Section 07110
/07112. Liquid & Damp
proofing Section
07150/07152.
Architectural Spec. -
Painting Works
Section 09900
Material Waranty fro
National Paint Factory.
Architectural Spec. -
Wood and Wood
Decorative Section
06100 / General
requirements
Architectural Spec. -
Doors
Section 08100 /
General requirements
Architectural Spec. -
Wood and Wood
Decorative Section
06100 / General
requirements
Architectural Spec. -
Wood and Wood
Decorative Section
06100 / General
requirements
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
9
GIBCA
FURNITURE
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
11
MAZHAR AL
ZEN
CARPENTRY
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
10 GHUZLAN
12
RIMAL
ENGINEERING
PRODUCT
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
13
C& B BUILDING
MATERIALS
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
15 WESTERN INT'L
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
14 AMC
16 SALEM
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
17
AL NAHAS
COATING &
PAINTING
WORKS
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
18
ARABIAN
HORIZON
5th February 2009 HANDOVER CHECK LIST (2of6) FM E 23 Rev 0
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
QTY. OF SPARE
MATERIAL
CONTRACT CLAUSE DESCRIPTION CONTRACT CLAUSE NUMBER CONTRACT CLAUSE
DESCRIPTION OF
DOCUMENT
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
particular specification
cast in Place Concrete
Section 03300
Contractor
AS BUILTS SPARE MATERIALS &MAINTENANCE WARRANTIES&GUARANTEES
Documentation Required for Final Handover
Master Check List
CIVIL WORKS
SR#
LOCKS &KEYS OTHER DOCUMENTATION
Completion
%
Completion
Date
Received by
PMC
1 ACC
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Division 9 - Finishes
Section 9200
Architectural Spec. -
Painting Works
Section 09900
Material Waranty fro
National Paint Factory.
Architectural Spec. -
Painting Works
Section 09900
Material Warranty
from Fosroc for
FC150, 140 & Letherin
2.
Division 9 - Finishes
Section 9500
Division 9 - Finishes
Section 9500, 09200
Division 9 - Finishes
Section 9700
Division 9 - Finishes
Section 9600
Division 9 - Finishes
Section 9600
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
19
BELHASA
PROJECTS
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
18
ARABIAN
HORIZON
20
VALENCIA
MARBLE
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
21
SARIEDDIN
TRADING
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
24 PROTEM
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
23 CIPPCO
25
FUTURE
DECORE
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
26 TRENDS
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
27 PLAXIT DRY MIX
5th February 2009 HANDOVER CHECK LIST (3of6) FM E 23 Rev 0
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
QTY. OF SPARE
MATERIAL
CONTRACT CLAUSE DESCRIPTION CONTRACT CLAUSE NUMBER CONTRACT CLAUSE
DESCRIPTION OF
DOCUMENT
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
particular specification
cast in Place Concrete
Section 03300
Contractor
AS BUILTS SPARE MATERIALS &MAINTENANCE WARRANTIES&GUARANTEES
Documentation Required for Final Handover
Master Check List
CIVIL WORKS
SR#
LOCKS &KEYS OTHER DOCUMENTATION
Completion
%
Completion
Date
Received by
PMC
1 ACC
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Division 9 - Finishes
Section 9200
Particular Specification
- Case in Place
Concrete Section
03300/3.18, 3.19
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
28 UPC
Section 4.3.1
General
Specifications Clause
8.1.4 &
Section 01100,
Clause 4, Division 1
27 PLAXIT DRY MIX
CONTRACT REQUIREMENTS FOR AS BUILTS
The contractor shall provide to the employer's Representative four (4) weeks prior to the time of completion of the Works As Built Drawings. Immediately on completion of any subcontract works, all subcontractors shall prepare a set of final "AS BUILT" drawings
of the subcontract works. These drawings shall be a complete record of the subcontract works showing the position of pipe runs, valves, equipment, automatic controls etc. for the mechanical services and cable routes, switchgear, distribution boards, switches,
socket outlets, lighting points, auxiliary equipment etc. for the electrical services.
The drawings shall also indicate the position of all access panels for encased works. During the conduct of Works the Subcontractor shall agree with the Employer's Representative a logical system of switchboard distribution and circuit reference numbers, and
these numbers shall be shown on the final As Built Drawings.
CONTRACT REQUIREMENTS FOR OPERATION AND MAINTENANCE MANUALS
Operating and maintenance instructions (manual) together with drawings of works as completed within 10 days of completion of works
5th February 2009 HANDOVER CHECK LIST (4of6) FM E 23 Rev 0
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT CLAUSE DESCRIPTION
CONTRACT
CLAUSE
NOS. CONTRACT CLAUSE DESCRIPTION OF DOCUMENT
NO. COPIES
REQUIRED
TOTAL NO. CONTRACT CLAUSE
MIR LOG
INSPECTION REQUESTS LOG
TESTING & COMMISSIONING
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
TESTING & COMMISSIONING
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
TESTING & COMMISSIONING
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
TESTING & COMMISSIONING
LIST OF SPARE PARTS
MIR LOG
INSPECTION REQUESTS LOG
TESTING & COMMISSIONING
MIR LOG
Mech. - Gen.
Requirement Sec.
15010/3.17/3.18
Mech. - Gen.
Requirement Sec.
15010/3.17/3.18
Completion %
Completion
Date
Received by
PMC
Contractor SR#
AS BUILTS OTHER DOCUMENTATION OPERATION &MAINTENANCE MANUALS WARRANTIES&GUARANTEES LOCKS &KEYS
1 THERMO
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
OTIS 2
3 GEBAL TRADING
LIEONWELD
MEISER
4
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
8
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
ELECTRO-MECHANICAL AND PLUMBING WORKS
Mech. - Gen.
Requirement Sec.
15010/3.17/3.18
Elec. - Gen.
Requirement Sec.
16010/3.34
Electric Traction
lifts - General
requirements
Section 14200,
14210 & 14220
Sanitary Ware &
Accessories
Architectural
Spec. Section
10800
Sanitary Ware &
Accessories
Architectural
Spec. Section
10800
ESTERN WINGS
EQUIPMENTS
6
5
ELECNCO
GENERAL
SERGAS
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Documentation Required for Final Handover
Master Check List
SARIEDDIN
TRADING
SANITARY
MATERIALS CO.
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
7
9
11
10
WMS METAL
INDUS.
XSPLATFORM
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Building
Maintenance Unit
Section
11014/3.6/3.7
Mech. - Gen.
Requirement Sec.
15010/3.17/3.18
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
Architectural
Specification -
11100 -
Equipment
5th February 2009 HANDOVER CHECKLIST (5of6) FM E 23 Rev 0
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT
CLAUSE
NO. COPIES
REQUIRED
TOTAL
NO.
CONTRACT CLAUSE DESCRIPTION
CONTRACT
CLAUSE
NOS. CONTRACT CLAUSE DESCRIPTION OF DOCUMENT
NO. COPIES
REQUIRED
TOTAL NO. CONTRACT CLAUSE
Completion %
Completion
Date
Received by
PMC
Contractor SR#
AS BUILTS OTHER DOCUMENTATION OPERATION &MAINTENANCE MANUALS WARRANTIES&GUARANTEES LOCKS &KEYS
1 THERMO
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
ELECTRO-MECHANICAL AND PLUMBING WORKS
Mech. - Gen.
Requirement Sec.
15010/3.17/3.18
Elec. - Gen.
Requirement Sec.
16010/3.34
Documentation Required for Final Handover
Master Check List
INSPECTION REQUESTS LOG
TESTING & COMMISSIONING
LIST OF SPARE PARTS
CONTRACT REQUIREMENTS FOR AS BUILTS
The contractor shall provide to the employer's Representative four (4) weeks prior to the time of completion of the Works As Built Drawings. Immediately on completion of any subcontract works, all subcontractors shall prepare a set of final "AS BUILT" drawings of the subcontract works. These
drawings shall be a complete record of the subcontract works showing the position of pipe runs, valves, equipment, automatic controls etc. for the mechanical services and cable routes, switchgear, distribution boards, switches, socket outlets, lighting points, auxiliary equipment etc. for the electrical
services.
The drawings shall also indicate the position of all access panels for encased works. During the conduct of Works the Subcontractor shall agree with the Employer's Representative a logical system of switchboard distribution and circuit reference numbers, and these numbers shall be shown on the
final As Built Drawings.
CONTRACT REQUIREMENTS FOR OPERATION AND MAINTENANCE MANUALS
Operating and maintenance instructions (manual) together with drawings of works as completed within 10 days of completion of works
11 XSPLATFORM
Section 4.1 & 4.3.1 Gen.
Specifications Clause
3.3.5.10 & 8.1.4 & Section
01100, Clause 4, Division 1
Building
Maintenance Unit
Section
11014/3.6/3.7
Section 4.1 & 4.3.1
Gen. Specifications
Clause 3.3.5.10 &
8.1.4 & Section
01100, Clause 4,
Division 1
5th February 2009 HANDOVER CHECKLIST (6of6) FM E 23 Rev 0