CarboSTIM carbonate Stimulation Service - Your Engineered Solution for Production Enhancement in carbonate reservoirs. Injection of acids into carbonate reservoirs leads to the formation of highly conductive flow channels.
CarboSTIM carbonate Stimulation Service - Your Engineered Solution for Production Enhancement in carbonate reservoirs. Injection of acids into carbonate reservoirs leads to the formation of highly conductive flow channels.
CarboSTIM carbonate Stimulation Service - Your Engineered Solution for Production Enhancement in carbonate reservoirs. Injection of acids into carbonate reservoirs leads to the formation of highly conductive flow channels.
Your Engineered Solution for Production Enhancement in Carbonate Reservoirs Presented by: Rommel E Arias CarboSTIM Design / Execute / Evaluate StimCADE FracCADE CarboSTIM Chemistry Super X Emulsion - High Temperature (SXE - HT) NARS Plus CarboSTIM Placement Self Diverting Acid (SDA/LCA) OilSEEKER FoamMAT Stimulation of Carbonates The injection of acids into carbonate reservoirs leads to the formation of highly conductive flow channels. Fracture Acidizing Matrix Acidizing Conductive etch paths Wormholes Pore Level Carbonate Stimulation H+ carbonate Acid invades porous matrix where it reacts with the pore walls. H+ Pore Collision Acid attack increases pore diameter H+ carbonate H+ Pore Collision Ever widening pore channels can collide. H+ H+ Q = 0.04 cm 3 /min PV inj = 43.1 Q = 0.11 cm 3 /min PV inj = 10.0 Q = 0.3 cm 3 /min PV BT = 3.3 Q = 1.05 cm 3 /min PV BT = 0.8 Q = 10 cm 3 /min PV BT = 2.1 Q = 60 cm 3 /min PV BT = 6.7 Wormhole Structures P o r e
V o l
t o
B r e a k t h r o u g h 1 10 100 10 -3 10 -2 10 -1 10 0 10 1 10 2 Injection rate [cm 3 /min] 3.4% HCl length = 4 in. diameter = 1.5 in. Matrix Self-Diverting Acids Polymer gelled acid base Treatments stages - diverter slugs Create a temporary rigid gel while spending in Wormholes created by previous acid stage Acidized natural fractures Pre / post production logs confirm uniform treatment Breaks to a low viscosity when spent (little damage) Viscosity and pH
SDA cross-links when pH 3
= + 1000 cP Rigid cross-linked gel SDA breaks-back when pH 4 = 15 cP pH Matrix Self-Diverting Acid Systems Applications (Carbonate formations) Oil , water or gas wells up to 300 o F Horizontal wells Intervals with high permeability contrasts Benefits Improved zone coverage , increased productivity Reduced acid treatment volumes Effective diversion in cased or open hole Improved productivity CarboSTIM Well 1B1 Production Rate 1540 bopd Should you stimulate this well? If so, how? What information do you need? HEEL MIDDLE TOE 400 ft. 200 ft. 400 ft. THIEF ZONE? CarboSTIM - Candidate Recognition Well 1B1 Pre-Treatment Production: 1540 bopd Post-Treatment Prediction: 2550 bopd@ skin = 0 2840 bopd@ skin =- 2 3200 bopd@ skin =- 4 CarboSTIM - Stimulation Strategy Determine How to Achieve Your Production Goal OPTION #1 Design a Matrix Treatment using StimCADE Perform Economic Analysis. Does the net present value (NPV) of the treatment reach your goal? Perform the Matrix Stimulation Treatment Does the treatment achieve your production goal? YES Evaluate Monthly Production Evaluate Mechanical Problems Is a zero or slightly positive skin required Is your well an under-producer? i.e. A valid candidate for stimulation Are there mechanical problems? Is a negative skin required to yield your target production? NO NO YES YES NO Results of StimCADE simulation of bullhead placement using 15% HCl into Well #1B1. CarboSTIM Clients Objective: Maximize acid flow into Zones 2 and 3 Non-thief zones. Treatment: 15,000 gallons of 15% HCl 33% of the acid enters the thief zone at the Heel 4.7 gallons of HCl per foot reaches the Toe section (Zone 3). Bullheading not efficient - Client did not meet objective! 0 5000 10000 15000 20000 Volume (gal) 0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 W o r m h o l e
L e n g t h
( f t ) Zone 1 Heel Zone 2 Middle Zone 3 Toe 1 2 --- Treatment Fluids --- 1 - SEA WATER 2 - 15% HCl StimCADE* *Mark of Schlumberger Acid Placement: Wormhole length vs. Volume by Zone 0 1 2 3 Radial Penetration (ft) 6400 6800 7200 7600 8000 Z o n e
D e p t h
( f t ) SEA WATER 15% HCl StimCADE* *Mark of Schlumberger Radial Penetration Plot Face/Compact Dissolution CarboSTIM Clients Objective: Maximize acid flow into Zones 2 and 3 Non-thief zones. Treatment: 15,000 gallons of 15% HCl Self Diverting Acid (SDA) Coiled Tubing placement Post-treatment = 1750 bopd NPV @ 100 days = $31K Payout = 81 days Results of StimCADE simulation of coiled tubing placement using 15% HCl with SDA diversion into Well #1B1. 0 1 2 3 4 Radial Penetration (ft) 6400 6800 7200 7600 8000 Z o n e
D e p t h
( f t ) SEA WATER SDA 15% HCl StimCADE* *Mark of Schlumberger Radial Penetration Plot 0 5000 10000 15000 20000 25000 Volume (gal) 0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 W o r m h o l e
L e n g t h
( f t ) Zone 1 Heel Zone 2 Middle Zone 3 Toe 1 2 3 2 3 --- Treatment Fluids --- 1 - SEA WATER 2 - SDA 3 - 15% HCl StimCADE* *Mark of Schlumberger Acid Placement: Wormhole length vs. Volume by Zone CarboSTIM - Fluid Selection Matrix Stimulation Acid Fracturing Propped Fracturing Type of Treatment Temperature < 200 F Mud and Silt Removal Acid MSR Super X Emulsion (250 F.) Temperature 200 - 350 F Super X Emulsion SXE - HT Temperature 350 - 500 F Organic Acid MSR FORMIC MSR ACETIC NARS Plus Temperature < 300 F Pressure Gradient > 0.5 PSI/FT Temperature 300 - 400 F DGA 400 Super X Emulsion HT (350 F) Leakoff Control Acid LCA Super X Emulsion (250 F) Super X Emulsion HT (350 F) SXE Temperature < 200 F YF100 YF100LG / ClearFRAC Temperature 200 - 300 F YF100 EC or HTD YF500 / ClearFRAC (250 F) Temperature 300 - 400 F YF100 EC (350 F) YF500 HT YF 800 YES NO 0 5000 10000 15000 20000 25000 Volume (gal) 0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 W o r m h o l e
L e n g t h
( f t ) Zone 1 Heel Zone 2 Middle Zone 3 Toe 1 2 3 2 3 Treatment Fluids 1 - SEA WATER 2 - SDA 3 - SXE - HT StimCADE* *Mark of Schlumberger Acid Placement: Wormhole length vs. Volume by Zone 0 1 2 3 4 Radial Penetration (ft) 6400 6800 7200 7600 8000 Z o n e
D e p t h
( f t ) SEA WATER SDA SXE - HT StimCADE* *Mark of Schlumberger Radial Penetration Plot CarboSTIM Results of StimCADE simulation of coiled tubing placement with SDA diversion and Super X Emulsion into Well #1B1. Clients Objective: Maximize acid flow into Zones 2 and 3 Non-thief zones. Treatment: 15,000 gallons of SXE-HT Self Diverting Acid (SDA) Coiled Tubing placement Post-treatment = 2350 bopd NPV @ 100 days = $533K Payout = 18 days Wormhole CarboSTIM Clients Objective: Maximize acid flow into Zones 2 and 3 Non-thief zones. Treatment: 22,500 gallons of SXE-HT Self Diverting Acid (SDA) Coiled Tubing placement Post-treatment = 2650 bopd NPV @ 100 days = $707K Payout = 16 days Results of StimCADE simulation of coiled tubing placement with SDA diver- sion and Super X Emulsion into horizontal well with the thief zone at the Heel 0 1 2 3 4 Radial Penetration (ft) 6400 6800 7200 7600 8000 Z o n e
D e p t h
( f t ) SEA WATER SDA SXE - HT StimCADE* Radial Penetration Plot 0 5000 10000 15000 20000 25000 30000 Volume (gal) 0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 W o r m h o l e
L e n g t h
( f t ) Zone 1 Heel Zone 2 Middle Zone 3 Toe 1 2 3 2 3 --- Treatment Fluids --- 1 - SEA WATER 2 - SDA 3 - SXE - HT StimCADE* *Mark of Schlumberger Acid Placement: Wormhole length vs. Volume by Zone *Mark of Schlumberger CarboSTIM - Stimulation Strategy Determine How to Achieve Your Production Goal OPTION #2 Design Acid Frac Treatment using FracCADE OPTION #3 Design a Propped Fracture Treatment using FracCADE Perform Economic Analysis. Does the net present value (NPV) of the treatment reach you goal? Perform Economic Analysis. Does the net present value (NPV) of the treatment reach you goal? Perform the Acid Frac Treatment Perform the Propped Fracture Treatment Does the treatment achieve your production goal? Does the treatment achieve your production goal? YES YES OPTION #1 Design a Matrix Treatment using StimCADE Perform Economic Analysis. Does the net present value (NPV) of the treatment reach your goal? Perform the Matrix Stimulation Treatment Does the treatment achieve your production goal? YES Evaluation Production Monthly Evaluate Mechanical Problems Is a zero or slightly positive skin required Is your well an under-producer? i.e. A valid candidate for stimulation Are there mechanical problems? Is a negative skin required to yield your target production? NO NO YES YES NO CarboSTIM - Realtime Monitoring StimCADE: MatTIME skin FracCADE: Net Pressure plot Modify the treatment on-the-fly based on well response CarboSTIM - Post Treatment Evaluation StimCADE/FracCADEs post- treatment analysis Better understand treatment results Improve future designs. Treatment Pressure and Skin Treating fluid efficiency Diverter efficiency Pre and Post Treatment Production Treatment objectives vs results Modify input data Monitor production CarboSTIM Conclusion IMPROVE YOUR PRODUCTION and ROI! Design/Execute/Evaluate StimCADE FracCADE Chemistry SXE - HT NARS - Plus Placement SDA/LCA OilSEEKER FoamMAT The CarboSTIM Service step-by-step approach: CarboSTIM An Engineered Solution for Production Enhancement