PULLS OF THUM8 5TH LD|T|ON 75

8SP|A 8G 9/2011
Costs
8ullolng servlces lnstallatlon costs |or ol||erent bullolng types

(Sbell ano core)


(Cat A |lt-out)


--
L/m
2
o| total
M8L cost
L/m
2
o| total
M8L cost
L/m
2
o| total
M8L cost
L/m
2
o| total
M8L cost
Sanltaryware 2.7 0.3 0.7 0.2 6.48 1.8 0.0 0.0
Dlsposal lnstallatlons 14.0 1.5 10.7 3.5 18.91 5.2 7.4 2.7
Water lnstallatlons 16.3 1.7 10.7 3.5 12.74 3.5 0.0 0.0
Space beatlng ano alr
treatment
347.3 37.0 62.4 20.5 106.46 29.5 140.6 50.5
ventllatlng servlces 42.4 4.5 46.3 15.2 41.8 11.6 0.0 0.0
Llectrlcal lnstallatlon 259.9 27.7 110.7 36.3 97.99 27.2 77.8 27.9
Gas lnstallatlon 1.8 0.2 0.8 0.3 1.24 0.3 0.0 0.0
Protectlon systems 46.9 5.0 13.5 4.4 30.59 8.5 21.3 7.6
Communlcatlon 156.7 16.7 33.3 10.9 23.11 6.4 12.6 4.5
Speclal lnstallatlons* 49.6 5.3 15.8 5.2 20.98 5.8 19.0 6.8
-
-
Costs oerlve |rom tbe SPON'S 2011 M8L prlce book ano bave been cross-re|erenceo wltb ln|ormatlon provloeo by Sense Cost Consultancy. Tbe costs
oo not lncluoe vAT. Tbey oo lncluoe prellmlnarles, pro|lt ano overbeaos |or tbe bullolng servlces contractor.
All areas are gross lnternal area (G|A) unless otberwlse stateo.
All prlces apply to tbe Lonoon area. Apply tbe |ollowlng |actors to obtaln reglonal prlces: Soutb Last: 0.94, Soutb West: 0.9, Last ano West Mlolanos:
0.85, Last Anglla: 0.84, Nortb Last: 0.86, Nortb West: 0.84, Scotlano: 0.92, Wales: 0.88, Nortbern |relano: 0.68.
New bullo termlnal bullolng. 25,000 m
2
G|A. Costs ecluoe baggage banollng, cbeck-ln systems, pre-cbeck-ln ano boarolng securlty
systems, vertlcal transportatlon ano servlces to alrcra|t stanos. Heat source vla olstrlct malns. Space beatlng ano alr treatment lncluoes LTHW beatlng system,
cbllleo water system, supply ano etract alr conoltlonlng system ano an allowance |or servlces to communlcatlons rooms. Llectrlcal lnstallatlon lncluoes Hv/Lv
swltcbgear, stanoby generator, malns ano sub malns lnstallatlon, small power lnstallatlon, llgbtlng ano lumlnalres, emergency llgbtlng, ano power to mecbanlcal
servlces. Communlcatlons lnstallatlons lncluoe |lre ano smoke oetectlon ano alarms, volce/publlc aooress systems, lntruoer oetectlon, securlty, CCTv ano
access control, wlreways |or telepbones oata ano structureo cable, structureo cable lnstallatlon, |llgbt ln|ormatlon olsplay system.
Two storey, naturally ventllateo sbopplng mall o| 33,000 m
2
. Space beatlng ano alr treatment lncluoes conoenser water system, LTHW
lnstallatlon, alr conoltlonlng system ano over-ooor beaters at entrances. Llectrlcal lnstallatlon lncluoes Lv olstrlbutlon, stanoby power, general, eternal
ano emergency llgbtlng, small power, mecbanlcal servlces supplles ano UPS |or securlty ano CCTv. Cost assoclateo wltb tenants' |lt-out ano car parklng
are not lncluoeo ln tbls cost mooel.
Speculatlve 15 storey o||lce ln Central Lonoon o| 19,300 m
2
G|A |or multlple tenant occupancy. Four plpe |an coll unlt system wltb
roo| mounteo coollng towers, gas |lreo bollers ano water cooleo cblllers ln tbe basement. ventllatlng servlces lncluoe tollet ano basement etract ano
mlscellaneous ventllatlon systems. Llectrlcal lnstallatlon lncluoes generator, Hv/Lv supply ano olstrlbutlon, general llgbtlng ano power systems ano
electrlcal servlces to mecbanlcal equlpment. Flt-out costs are L/m
2
N|A, baseo on a N|A o| 12,500 m
2
.
* 8ullolng management system |8MS], unless otberwlse stateo.
-