You are on page 1of 32

Site Master

TM
Model S331D
Cable and Antenna Analyzer
MAINTENANCE MANUAL
490 JARVIS DRIVE MORGAN HILL, CA 95037-2809 P/N: 10580-00101
REVISION H
PRINTED: OCTOBER 2012
COPYRIGHT 2004-2012 ANRITSU CO.
Tableof Contents
1. I ntroducti on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. Descri pti on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3. VNA Frequency Accuracy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
4. VNA Return Loss Veri fi cati on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
5. Power Moni tor Veri fi cati on (Opti on 5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
6. Power Meter Veri fi cati on (Opti on 29) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
7. T1/E1 Veri fi cati on (Opti on 50). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
8. I nstaCal Modul e Veri fi cati on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
9. Battery Pack Removal and Repl acement . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
10. Battery I nformati on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
11. Front Panel Assembl y Removal and Repl acement. . . . . . . . . . . . . . . . . . . . . . 17
12. LCD Assembl y Repl acement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
13. Key Pad PCB Repl acement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
14. Key Pad Membrane Repl acement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
15. Mai n PCB Assembl y Repl acement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
16. Opti on 5 Power Moni tor PCB Assembl y Repl acement . . . . . . . . . . . . . . . . . . . 23
17. Opti on 50 T1/E1 Tester PCB Assembl y Repl acement . . . . . . . . . . . . . . . . . . . . 24
18. Accessori es and Repl aceabl e Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
19. Customer Servi ce . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Site Master MM i
1. Introduction
Thi s manual provi des mai ntenance i nstructi ons for the Si te Master Model S331D Cabl e, Antenna and
Base Stati on Anal yzer. I t descri bes the product and provi des performance veri fi cati on procedures, parts
repl acement procedures, and a repl aceabl e parts l i st.
2. Description
The Si te Master i s a handhel d SWR/RL (standi ng wave rati o/return l oss), Di stance-To-Faul t and power
meter (opti onal ) measurement i nstrument. I t combi nes a synthesi zed source, a VSWR Bri dge, and re-
cei ver ci rcui try i n a compact i nstrument.
The fol l owi ng secti ons contai n tests that can be used to veri fy the performance of the Si te Master Model
S331D.
Throughout thi s manual , the term VNA may be used to denote Return Loss, SWR, Cabl e Loss and DTF
modes. Al l other modes are referenced i ndi vi dual l y.
3. VNA Frequency Accuracy
The fol l owi ng test can be used to veri fy the CW frequency accuracy of the Si te Master. Measurement cal i -
brati on of the Si te Master i s not requi red for thi s test.
a. Equipment Required:
Spectrum Anal yzer Anri tsu Model MS2665C or equi val ent
10 MHz Reference Standard
b. Procedure:
1. Connect a 10 MHz Reference si gnal to the 10 MHz STD Ref I n of the MS2665C or equi val ent.
2. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a five minute warm up for the internal circuitry to stabilize.
3. Press the FREQ/DIST key, then press the F1 soft key and set F1 to 1000 MHz, then press the
ENTER key.
4. Press the F2 soft key, set F2 to 1000 MHz, then press the ENTER key.
5. Press the MEAS/DISP key, then press the Fixed CW soft key to turn Fi xed CW On.
6. Connect the RF cabl e from the Si te Master Refl ecti on Test Port to the RF I nput on the MS2665C
or equi val ent.
Site Master MM 1
7. Set up the MS2665C as fol l ows:
(a) Press the Preset key, then sel ect Preset All (F1).
(b) Press the Frequency key.
(c) Press the 1 key and then the GHz key to change the Center Frequency to 1 GHz.
(d) Press the Span key.
(e) Press the 7, 5, 0, and kHz keys sequenti al l y to change the Frequency Span to 750 kHz.
(f) Press the RBW key.
(g) Press the 1, 0 and kHz keys sequenti al l y to change the RBW to 10 kHz.
(h) Press the VBW key.
(i ) Press the Filter Off soft key (F3) to turn the VB fi l ter off.
(j) Press the Amplitude key.
(k) Press the 0, and dBm keys sequenti al l y to change the Reference Level to 0 dBm.
(l ) Press the Log Scale soft key (F5)
(m) Sel ect 2 dB/Div (F3) and the press the return soft key.
NOTE: If the Site Master has gone into the hold mode, press the RUN/HOLD key to return to normal
mode.
8. When a peak response appears on the Spectrum Anal yzer, press the Marker Peak Search key on
the Spectrum Anal yzer. Veri fy that the marker peak readout val ue i s 1000 MHz 75 kHz.
9. On the Si te Master, press the MEAS/DISP key then the Fixed CW soft key to turn Fi xed CW off.
4. VNA Return Loss Verification
The fol l owi ng test can be used to veri fy the accuracy of return l oss measurements. Measurement cal i bra-
ti on of the Si te Master i s requi red for thi s test.
a. Equipment Required:
20 dB offset, Anri tsu SC7423
6 dB offset, Anri tsu SC7424
Open/Short, Anri tsu 22N50
50 Ohm Termi nati on, Anri tsu 28N50-2 or SM/PL
b. Procedure:
1. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a five minute warm up for the internal circuitry to stabilize.
2. Press the MODE key.
3. Use the Up/Down arrow key to hi ghl i ght Return Loss, then press ENTER.
4. Press the START CAL key.
5. Fol l ow the i nstructi ons on the screen to perform a cal i brati on usi ng a 22N50 Open/Short and
28N50-2 or SM/PL Termi nati on.
6. Connect the 20 dB offset to the Refl Test Port and veri fy that the readi ng i s 20 dB 1.7 dB.
7. Connect the 6 dB offset to the Refl Test Port and veri fy that the readi ng i s 6 dB 1.2 dB.
2 Site Master MM
5. Power Monitor Verification (Option 5)
The fol l owi ng test can be used to veri fy the accuracy of the power moni tor functi on.
a. Equipment Required:
Anri tsu MG3692A Synthesi zed Si gnal Source, wi th opti ons 2A, 4 and 15A
Anri tsu ML2438A Dual Channel Power Meter or equi val ent
Anri tsu MA2442D Hi gh Accuracy Power Sensor or equi val ent
Anri tsu 34NN50A 50 Ohm adapter or equi val ent
Anri tsu 34RKNF50 50 Ohm adapter or equi val ent
Anri tsu 15NN50-1.5C RF Coaxi al Cabl e or equi val ent
Anri tsu 560-7N50B N Type RF Detector
Aerofl ex/Wei nschel 1870A Power Spl i tter
b. Procedure:
1. Turn on the power meter and si gnal source.
NOTE: Before continuing, allow a five minute warm up for the internal circuitry to stabilize.
2. Set the MG3692A output power l evel to 5 dBm.
3. Set the MG3692A output to 1 GHz CW.
4. Connect the power sensors to the power meter and cal i brate the sensors.
5. On the power meter, press the Sensor key, the Cal Factor soft key, and then the FREQ soft key.
Use the keypad to enter 1 GHz as the i nput si gnal frequency, whi ch sets the power meter to the
proper power sensor cal factor. Press the SENSOR key on the power meter to di spl ay the power
readi ng.
6. Connect MG3692A, power meter, RF detector, Power Spl i tter and Power Sensor as shown i n Fi g-
ure 1.
Site Master MM 3
SENSOR
A
ML2437A POWER METER
SOURCE
15NN50-1.5C
34RKNF50
ADAPTER
1870A
DETECTOR
HOLD
RUN
START
CAL
AUTO
SCALE
SAVE
SETUP
RECALL
SETUP
LIMIT MARKER
SAVE
DISPLAY
RECALL
DISPLAY
PRINT
MODE FREQ/DIST AMPLITUDE MEAS/DISP
SYS
ENTER
CLEAR
ESCAPE
ON
OFF
/
1 2
4
5 6
7 8
9 0
3
+-
.
MT8212A CellMaster
Fi gure 1. Power Monitor Verification Setup
7. Connect the external power suppl y (Anri tsu part number 40-187-R) to the Si te Master.
8. On the Si te Master, press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on
the Si te Master. (Thi s sets the i nstrument to the factory preset state.)
9. Press the MODE key. Use the Up/Down arrow key to hi ghl i ght Power Monitor and then press
ENTER.
10. On the MG3692A press the Level key, then use the knob to adjust the power l evel so that the
power meter reads -40 dBm.
11. Veri fy that the Si te Master readi ng i s -40 dBm 1.0 dB.
12. Repeat steps 10 and 11 for the other power l evel setti ngs shown i n Tabl e 1.
4 Site Master MM
Power In @ 1 GHz Specification
0 dBm 1 dB
-7 dBm 1 dB
-21 dBm 1 dB
-40 dBm 1 dB
Tabl e 1 Power Monitor Test Levels
6. Power Meter Verification (Option 29)
The fol l owi ng test can be used to veri fy the accuracy of the power measurements.
a. Equipment Required:
Anri tsu MG3692A Synthesi zed Si gnal Source, wi th opti ons 2A, 4 and 15A
Anri tsu ML2438A Dual Channel Power Meter or equi val ent
Anri tsu MA2442A Hi gh Accuracy Power Sensor or equi val ent
Anri tsu N241A50 Power Spl i tter or equi val ent
Anri tsu 34NN50A 50W adapter or equi val ent
Anri tsu 34RSN50 50W adapter or equi val ent
Anri tsu 34RKNF50 50W adapter or equi val ent
Anri tsu 15NNF50-1.5C RF Coaxi al Cabl e or equi val ent
Aerofl ex/Wei nschel Model 44-10, 10 dB Fi xed Attenuator
b. Procedure:
1. Turn on the power meter and si gnal source.
NOTE: Before continuing, allow a 30-minute warm up for the internal circuitry to stabilize.
2. On the power meter, press the Channel key, the Setup soft key and then the CHANNEL soft key to
di spl ay Channel 2 setup menu. Press the INPUT key twi ce to set the i nput confi gurati on to B.
Press the Sensor key to di spl ay both Sensor A and Sensor B Readi ngs.
3. Connect the power sensors to the power meter and cal i brate the sensors.
4. Set the MG3692A output power l evel to 5 dBm.
5. Set the MG3692A output to 50 MHz CW.
6. On the power meter, press the Sensor key, the Cal Factor soft key, and then the FREQ soft key. Use
the keypad to enter 50 MHz as the i nput si gnal frequency, whi ch sets the power meter to the
proper power sensor cal factor. Press the SENSOR key on the power meter to di spl ay the power
readi ng.
7. Connect sensor A to the MG3692A output, measure the output power l evel and record the val ue
i n col umn A of Tabl e 2.
Site Master MM 5
A B C D E
Freq (MHz)
Sensor A Reading
@ Source Output
Sensor A Reading
@ end of Attenu-
ator
Splitter/Attenuator
Combined Loss
Sensor B Reading
@ Power Splitter
Output
Sensor B Path
Power Splitter
Loss
50
1000
2000
2850
Tabl e 2. Output Power Level
8. Di sconnect Sensor A from the MG3692A output.
9. Connect the power spl i tter to the MG3692A output and the Sensor B to one of the power spl i tter
outputs. I nstal l the 10 dB Fi xed Attenuator to the other power spl i tter output and then connect
Sensor A to the end of the Attenuator. Refer to Fi gure 2.
10. Record the new sensor A readi ng i n col umn B of Tabl e 2.
11. Record Sensor B readi ng i n col umn D of Tabl e 2.
12. Cal cul ate the Spl i tter/Attenuator Combi ned Loss usi ng the fol l owi ng formul a and record the re-
sul t i n col umn C of Tabl e 2: C = A B
13. Cal cul ate the Sensor B path Power Spl i tter Loss usi ng the fol l owi ng formul a and record the re-
sul t i n col umn E of Tabl e 2: E = A D
14. Repeat steps 10 through 13 for 1000 MHz, 2000 MHz and 2850 MHz.
15. Cal cul ate the desi red Sensor B Readi ng for 30 dBm Test Power Level at the end of 10 dB at-
tenuator usi ng the fol l owi ng formul a: Desi red Sensor B Readi ng = Test Power Level + C E
16. Record the cal cul ated resul ts i n Tabl e 3.
6 Site Master MM
Vodu| al| or
L| re 0perale
3lardoy
Leve|
Frequercy
3ysler
0ulpul
0r 0ll
RF 0ulpul
509
C| ear
Erlry
8ac|
3pace
Z 8 9
1 5
1 2 3
0 . /-
SENSOR B SENSOR A
A
B
ML2438A POWER METER
MG369XA SOURCE
15NNF50-1.5C
34RSN50
ADAPTER
N241A50
ATTENUATOR
Fi gure 2. Test Setup
Freq (MHz) Desired Sensor B Reading for 30 dBm Input to Site Master
50
1000
2000
2850
Tabl e 3. 30 dBmTest Power Level
17. Usi ng the power spl i tter, coaxi al cabl e and adapters, connect the Si te Master to the si gnal source
and the power sensor as shown i n Fi gure 3.
18. Connect the external power suppl y (Anri tsu part number 40-187-R) to the Si te Master.
19. On the Si te Master, press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on
the Si te Master. (Thi s sets the i nstrument to the factory preset state.)
20. Press the MODE key. Use the Up/Down arrow key to hi ghl i ght Power Meter and then press ENTER.
21. Press the Center soft key and enter 50, then press the MHz soft key to set the center frequency to
50 MHz.
22. Press the Span soft key and enter 3, then press the MHz key to set the span to 3 MHz.
23. On the Power Meter, press the Sensor key and then the CalFactor soft key. Sel ect the FREQ soft
key and enter 50 MHz for the I nput Si gnal Frequency. Thi s sets the power meter to the proper
power sensor cal factor. Press the Sensor key to di spl ay the power readi ng.
24. Set the MG3692A output to 50 MHz CW and adjust the power l evel so that the power meter di s-
pl ays the correspondi ng desi red Sensor B Readi ng for -30 dBm as recorded i n Tabl e 3.
25. Veri fy that the Power Meter readi ng i s wi thi n the speci fi cati ons i n Tabl e 4.
NOTE: If the reading is unstable, turn on RMS Averaging by pressing the MEAS/DISP key, then the
RMS Averaging soft key. The number of points to average can be set to low, medium or high.
26. Repeat steps 22 and 25 for 1000 MHz, 2000 MHz, and 2850 MHz.
Site Master MM 7
HOLD RUN
START CAL AUTO SCALE
SAVE SETUP RECALL SETUP
LIMIT MARKER
SAVE DISPLAY RECALL DISPLAY
PRINT
MODE FREQ/DIST AMPLITUDE MEAS/DISP
SYS
ENTER
CLEAR
ESCAPE
ON
OFF
/
1 2
4
5 6
7 8
9 0
3
+-
.
MT8212A CellMaster
Vodu| al| or
L| re 0perale
3lardoy
Leve|
Frequercy
3ysler
0ulpul
0r 0ll
RF 0ulpul
509
C| ear
Erlry
8ac|
3pace
Z 8 9
1 5
1 2 3
0 . /-
ML2438A POWER METER
MA2442A
MG3692A SOURCE
S331D
15NNF50-1.5C
34NN50A
ADAPTER
10 dB
ATTENUATOR
34RSN50 ADAPTER
N241A50
Fi gure 3. Power Meter Verification Setup
Freq (MHz) Measured Value
Specification for units with
S/N 405039 and below
Specification for units with
S/N 405040 and above
50 30 dBm 1 dB 30 dBm 1.5 dB
1000 30 dBm 1 dB 30 dBm 1.5 dB
2000 30 dBm 1 dB 30 dBm 1.5 dB
2850 30 dBm 1.5 dB 30 dBm 1.5 dB
Tabl e 4. Power Meter Accuracy
7. T1/E1 Verification (Option 50)
Thi s procedure veri fy that the T1/E1 Tester of the Si te Master i s functi oni ng properl y.
a. Equipment Required:
Tektroni x TDS3032B Osci l l oscope wi th opti on TDS 3TMT
Tektroni x AFTDS Di fferenti al Si gnal Adapter
Anri tsu Bantam-Pl ug-to-Bantam-Pl ug Extender Cabl e (P/N 806-16)
T1/E1 Self Test
1. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a 30-minute warm up for the internal circuitry to stabilize.
2. Press the SYS key, then the Self Test soft key.
3. When the Si te Master has passed the standard sel f test, press the T1/E1 Test soft key.
4. After the Si te Master has passed the T1/E1 sel f test, press the ESCAPE/CLEAR key.
T1 Mask Test
1. Set the Adapter swi tch to 100 ohms, then connect i t to the scope.
2. Connect one end of the extender cabl e to the TRANSMI T port of the Si te Master and the other
end to the AFTDS at Ch1 of the osci l l oscope.
3. On the Si te Master, press the MODE key, then use Up/Down key to hi ghl i ght T1 Tester and press
the ENTER key.
4. Press the MEAS/DISP key and the Vpp soft key, and use the Terminate/Bridged soft key to sel ect Termi-
nate at the bottom of the di spl ay.
5. Press the Back soft key, then press the BERT soft key
6. Press the MEAS/DISP key and sel ect the Setup soft key.
7. Press the More soft key, then sel ect the Clock Source soft key.
8. Press the Internal soft key, then press the Back soft key.
9. Press the Transmit Level soft key and sel ect 0 dB, then press the Back soft key twi ce.
10. Press the Pattern soft key, then use the Up/Down arrow key to hi ghl i ght 1 IN 8 and press the
ENTER key.
11. Set up the scope as fol l ows:
(a) Press the QUI CKMENU key, then use the MENU soft key to sel ect Tel ecom.
(b) Use the Standard arrow soft key to sel ect G.703DS1 (I TU-T), 1.544 M b/s.
(c) Press the AUTOSET key. The yel l ow waveform shoul d fal l wi thi n the bl ue mask.
(d) Press the Waveform Threshol d soft key, and use the Control /Coarse knob to set the the wave-
form to 400 and the Threshol d to 20.
(e) Press the Autofi t soft key and use the Control /Coarse knob to set the number to 1.
(f) Press the Run Test soft key.
12. Record the fai l ed number for 400 waveforms. The fai l ed number shoul d be l ess than the sel ected
Threshol d, whi ch i s 20.
8 Site Master MM
E1 Mask Test
1. Set the Adapter swi tch to 120 ohms and connect i t to the scope.
2. Connect the Extender cabl e to the Transmi t port of the Si te Master.
3. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a 30-minute warm up for the internal circuitry to stabilize.
4. On the Si te Master, press the MODE key, then use Up/Down key to hi ghl i ght E1 Tester and press
the ENTER key.
5. Press the MEAS/DISP key and the Vpp soft key, and use the Terminate/Bridged soft key to sel ect Termi-
nate at the bottom of the di spl ay.
6. Press the Back soft key, then press the BERT soft key.
7. Press the MEAS/DISP key and sel ect the Setup soft key.
8. Press the More soft key, then press the Impedance soft key and sel ect 120W.
9. Press the Back soft key, then sel ect the Clock Source soft key.
10. Press the Internal soft key, then press the Back soft key twi ce.
11. Press the Pattern soft key, then use the Up/Down arrow key to hi ghl i ght 1 IN 8 and press the
ENTER key.
12. Set up the scope as fol l ows:
(a) Press the QUI CKMENU key, then use the MENU soft key to sel ect Tel ecom.
(b) Use the Standard arrow soft key to sel ect E1 Sym (I TU-T), 2.048 M b/s.
(c) Press the AUTOSET key. The yel l ow waveform shoul d fal l wi thi n the bl ue mask.
(d) Press the Waveform Threshol d soft key, and use the Control /Coarse knob to set the the wave-
form to 400 and the Threshol d to 20.
(e) Press the Autofi t soft key and use the Control /Coarse knob to set the number to 1.
(f) Press the Run Test soft key.
13. Record the fai l ed number for 400 waveforms. The fai l ed number shoul d be l ess than the sel ected
Threshol d, whi ch i s 20.
T1 Transmit Level Test
1. Set the Adapter swi tch to 100 ohms then connect i t to the scope.
2. Connect the Extender cabl e to the Transmi t port of the Si te Master.
3. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a 30-minute warm up for the internal circuitry to stabilize.
4. On the Si te Master, press the MODE key, then use Up/Down key to hi ghl i ght T1 Tester and press
the ENTER key.
5. Press the MEAS/DISP key and the Vpp soft key, and use the Terminate/Bridged soft key to sel ect Termi-
nate at the bottom of the di spl ay.
6. Press the Back soft key, then press the BERT soft key.
7. Press the MEAS/DISP key and sel ect the Setup soft key.
8. Press the More soft key, then sel ect the Clock Source soft key.
Site Master MM 9
9. Press the Internal soft key, then press the Back soft key.
10. Press the Transmit Level soft key and sel ect 0 dB, then press the Back soft key twi ce.
11. Press the Pattern soft key, then use the Up/Down arrow key to hi ghl i ght 1 IN 8 and press the
ENTER key.
12. Set up the osci l l oscope as fol l ows:
(a) Press QUI CK MENU, then use the MENU soft key to sel ect Tel ecom.
(b) Use the Standard arrow soft key to sel ect None.
(c) Use the MENU soft key agai n to sel ect Scope.
(d) Press the AUTOSET key, then set the hori zontal SCALE to 2 mi cro seconds.
(e) Press the MEASURE key, then press the MORE soft key three ti mes.
(f) Sel ect the Pk-Pk soft key and record the Pk-Pk readi ng. The speci fi cati on i s 6.0 to 7.6 Vp-p.
E1 Transmit Level Test
1. Set the probe swi tch to 120 ohms.
2. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a 30-minute warm up for the internal circuitry to stabilize.
3. On the Si te Master, press the MODE key, then use Up/Down key to hi ghl i ght E1 Tester and press
the ENTER key.
4. Press the MEAS/DISP key and the Vpp soft key, and use the Terminate/Bridged soft key to sel ect Termi-
nate at the bottom of the di spl ay.
5. Press the Back soft key, then press the BERT soft key.
6. Press the MEAS/DISP key and sel ect the Setup soft key.
7. Press the More soft key, then sel ect the Clock Source soft key.
8. Press the Internal soft key, then press the Back soft key.
9. Press the Impedance soft key and sel ect 120W, then press the Back soft key twi ce.
10. Press the Pattern soft key, then use the Up/Down arrow key to hi ghl i ght 1 IN 8 and press the
ENTER key.
11. Set up the Osci l l oscope as fol l ows:
(a) Press QUI CK MENU, then use the MENU soft key to sel ect Tel ecom.
(b) Use the Standard arrow soft key to sel ect None.
(c) Use the MENU soft key agai n to sel ect Scope.
(d) Press the AUTOSET key, then set the hori zontal SCALE to 1 mi cro second.
(e) Press the MEASURE key, then press the MORE soft key unti l pk-pk appears.
(f) Sel ect the Pk-Pk soft key and record the Pk-Pk readi ng. The speci fi cati on i s 4.2 to 7.2 Vp-p.
T1 Error Detection Verification
NOTE: During this test the both transmit and Receive cable should be disconnected.
1. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
2. On the Si te Master, press the MODE key, then use Up/Down key to hi ghl i ght T1 Tester and press
the ENTER key.
10 Site Master MM
3. Press the MEAS/DISP key and the Vpp soft key, and use the Terminate/Bridged soft key to sel ect Termi-
nate at the bottom of the di spl ay.
4. Press the Back soft key, then press the BERT soft key.
5. Press the MEAS/DISP key and sel ect the Setup soft key.
6. Press the More soft key, then sel ect the Clock Source soft key.
7. Press the Internal soft key, then press the Back soft key.
8. Press the Setup Error Insert soft key, then sel ect the Bit soft key and the Burst soft key.. Enter a
number (for exampl e, 150) and press ENTER.
9. Press the Back soft key, then sel ect the Transmit Level soft key and sel ect 0 dB.
10. Press the MEAS/DISP key, sel ect BERT and sel ect the Start/Stop Measure soft key.
11. Press the Insert Errors soft key and observe the number i n the Bit Errors row. The number must
match the number entered i n Step 7 above. Thi s number must i ncrease by the number entered i n
Step 7 above every ti me the Insert Errors soft key i s pressed. For exampl e, i f 150 i s entered i n Step
7, the fi rst number observed wi l l be 150. The next ti me the Insert Errors soft key i s pressed, the
number must be 300, etc.
E1 Error Detection Verification
NOTE: Disconnect all the cables from the Transmit and Receive ports during this test.
1. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
2. On the Si te Master, press the MODE key, then use Up/Down key to hi ghl i ght E1 Tester and press
the ENTER key.
3. Press the MEAS/DISP key and the Vpp soft key, and use the Terminate/Bridged soft key to sel ect Termi-
nate at the bottom of the di spl ay.
4. Press the Back soft key, then press the BERT soft key.
5. Press the MEAS/DISP key and sel ect the Setup soft key.
6. Press the More soft key, then sel ect the Clock Source soft key.
7. Press the Internal soft key, then press the Back soft key.
8. Press the Impedance soft key and sel ect 120W, then press the Back soft key.
9. Press the Setup Error Insert soft key, then sel ect the Bit soft key then the Burst soft key. Enter a num-
ber (for exampl e, 150) and press ENTER.
10. Press the Back soft key three ti mes.
11. Press the MEAS/DISP key, sel ect BERT and sel ect the Start/Stop Measure soft key.
12. Press the Insert Errors soft key and observe the number i n the Bit Errors row. The number must
match the number entered i n Step 8 above. Thi s number must i ncrease by the number entered i n
Step 8 above every ti me the Insert Errors soft key i s pressed. For exampl e, i f 150 i s entered i n Step
8, the fi rst number observed wi l l be 150. The next ti me the Insert Errors soft key i s pressed, the
number must be 300, etc.
Site Master MM 11
8. InstaCal Module Verification
Thi s test veri fi es the performance of the Anri tsu Si te Master I nstaCal Cal i brati on Modul e. The I nstaCal
Modul e, part number I CN50, i s an opti onal accessory for the S331D.
a. Equipment Required:
I nstaCal Modul e, part number I CN50
20 dB offset, Anri tsu SC5270
6 dB offset, Anri tsu SC5237
b. Procedure
1. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
(Thi s sets the i nstrument to the factory preset state.)
NOTE: Before continuing, allow a five minute warm up for the internal circuitry to stabilize.
2. Press the MODE soft key.
3. Use the Up/Down arrow key to hi ghl i ght RETURN LOSS, then press ENTER.
4. Press the START CAL key. The message CONNECT OPEN or I nstaCal TO RF Out PORT wi l l
appear i n the di spl ay.
5. Connect the I nstaCal modul e to the RF Out port and press the ENTER key.
NOTES: If this particular InstaCal module has been used to calibrate this Site Master before, the Site
Master senses the familiar InstaCal module and automatically calibrates the unit using the OSL proce-
dure.
If the Site Master senses that the characterization data for the InstaCal module connected to this Site
Master is different than the one currently stored, it will display soft key options to keep or replace the
InstaCal characterization data.
Selecting the YES soft key transfers all of the characterization data from this InstaCal module to the
Site Master. The transfer may take up to three minutes. This option is preferred if this InstaCal module
is to stay with this particular Site Master. Once completed, the data will not need to be transferred
again for this combination of Site Master and InstaCal module.
Selecting the NO soft key will temporarily transfer only the portion of the characterization data neces-
sary for this particular calibration. This transfer takes approximately 30 to 60 seconds, and will have to
be repeated every time a calibration is done using this combination of Site Master and InstaCal mod-
ule.
6. Veri fy that the cal i brati on has been properl y performed by checki ng that the CAL ON! message i s
di spl ayed i n the upper l eft corner of the di spl ay.
7. Remove the I nstaCal modul e from the RF Out port and connect the 20 dB Offset to the RF Out
port.
8. Measure the return l oss of the 20 dB Offset. The l evel shoul d be 20 dB, 2 dB across the cal i -
brated frequency range.
9. Remove the 20 dB Offset from the RF Out port and connect the 6 dB Offset to the RF Out port.
10. Measure the return l oss of the 6 dB Offset. The l evel shoul d be 6 dB, 1.2 dB across the cal i -
brated frequency range.
12 Site Master MM
9. Battery Pack Removal and Replacement
Thi s procedure provi des i nstructi ons for removi ng and repl aci ng the Si te Master battery pack.
NOTE: Many of the procedures in this section are generic, and apply to many similar instruments.
Photos and illustrations used are representative and may show instruments other than the Site Master.
1. Wi th the Si te Master standi ng upri ght on a stabl e surface, l ocate the battery access door (Fi gure 4).
2. Li ft up the access door handl e and rotate i t 90 degrees countercl ockwi se, as i l l ustrated i n Fi gure 5.
Site Master MM 13
BATTERY ACCESS DOOR
Fi gure 4. Battery Access Door Location
Fi gure 5. RotatetheBattery Access Door Handle
3. Li ft the door and remove, as i l l ustrated i n Fi gure 6.
4. Grasp the battery l anyard and pul l the battery strai ght up and out of the uni t, as i l l ustrated i n Fi g-
ure 7.
5. Repl acement i s the opposi te of removal . Note the ori entati on of the battery contacts, and be sure to
i nsert the new battery wi th the contacts faci ng the rear of the uni t (Fi gure 8).
14 Site Master MM
Fi gure 6. RemovingtheBattery Access Door
Fi gure 7. RemovingtheBattery
BATTERY CONTACTS
Fi gure 8. Battery Orientation
10. Battery Information
The fol l owi ng i nformati on rel ates to the care and handl i ng of the Si te Master battery, and Ni MH batter-
i es i n general .
The Ni ckel Metal Hydri de (Ni MH) battery suppl i ed wi th the Si te Master i s shi pped i n a di scharged
state. Before usi ng the Si te Master, the i nternal battery must fi rst be charged for three hours, ei ther i n
the Si te Master or i n the opti onal battery charger (Anri tsu part number: 2000-1029).
Use onl y Anri tsu approved battery packs.
Recharge the battery onl y i n the Si te Master or i n an Anri tsu approved charger.
Wi th a new Ni MH battery, ful l performance i s achi eved after three to fi ve compl ete charge and di s-
charge cycl es.
When the Si te Master or the charger i s not i n use, di sconnect i t from the power source.
Do not charge batteri es for l onger than 24 hours; overchargi ng may shorten battery l i fe.
I f l eft unused a ful l y charged battery wi l l di scharge i tsel f over ti me.
Temperature extremes wi l l affect the abi l i ty of the battery to charge: al l ow the battery to cool down or
warm up as necessary before use or chargi ng.
Di scharge an Ni MH battery from ti me to ti me to i mprove battery performance and battery l i fe.
The battery can be charged and di scharged hundreds of ti mes, but i t wi l l eventual l y wear out.
The battery may need to be repl aced when the operati ng ti me between chargi ng becomes noti ceabl y
shorter than normal .
Never use a damaged or worn out charger or battery.
Stori ng the battery i n extreme hot or col d pl aces wi l l reduce the capaci ty and l i feti me of the battery.
Never short-ci rcui t the battery termi nal s.
Do not drop, muti l ate or attempt to di sassembl e the battery.
Do not di spose of batteri es i n a fi re!
Batteri es must be recycl ed or di sposed of properl y. Do not pl ace batteri es i n househol d garbage.
Al ways use the battery for i ts i ntended purpose onl y.
WARNING: This equipment is supplied with a rechargeable battery that could potentially leak
hazardous compounds into the environment. These hazardous compounds present a risk of injury or
loss due to exposure. Anritsu Company recommends removing the battery for long-term storage of the
instrument and storing the battery in a leak-proof, plastic container. Follow the environmental storage
requirements specified in the product data sheet.
Site Master MM 15
10.1. Battery TestingProcedure
1. Wi th the Si te Master off and the battery i nstal l ed, connect the Uni versal AC Adapter to the
12.5-15VDC (1350 mA) connector. The External Power LED and the Battery Charging LED wi l l l i ght.
NOTES: If the Battery Charging LED does not light, the battery may be too low to immediately start full
charging. Leaving the unit connected to AC power for several hours may bring the battery up to a level
where full charging can begin. Turn the unit off and back on to see if the Battery Charging LED lights
indicating a full charge cycle has begun.
Charging is inhibited below 0C and above 45C. If the unit is too hot, the battery will not start charging
until the unit temperature has reached 43C.
2. Di sconnect the AC-DC Adapter when the Battery Charging LED turns off, i ndi cati ng the battery i s
ful l y charged.
3. Press and hol d the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the Si te Master.
Thi s sets the i nstrument to the factory preset state. Press ENTER when prompted to conti nue.
4. Press the SYS key, fol l owed by the STATUS soft key. Veri fy that the i ndi cated battery charge i s
80%. I f the val ue i s 80% or above, press the ESCAPE/CLEAR key and conti nue wi th thi s procedure.
I f the val ue i s l ower than 80%, a di scharge/charge cycl e may be needed to i mprove the battery ca-
paci ty. Compl etel y di scharge the battery, as descri bed i n Steps 5 and 6 bel ow, and then recharge
the battery as descri bed i n Steps 1 and 2. I f the battery capaci ty does not i ncrease after a di s-
charge/charge cycl e, repl ace the battery.
5. Press the START CAL key (to keep the Si te Master from goi ng i nto HOLD mode) and make note of
the test start ti me.
6. When the Si te Master di spl ay fades and the Si te Master swi tches i tsel f off, make note of the test
stop ti me.
7. The total test ti me (Step 5 to Step 6) shoul d be 1.5 hours. I f the battery charge i s near 80% and
the total battery test ti me i s <70 mi nutes, repl ace the battery.
16 Site Master MM
11. Front Panel Assembly Removal and Replacement
Thi s procedure provi des i nstructi ons for removi ng and repl aci ng the Si te Master front panel assembl y.
Wi th the front panel assembl y removed, the LCD di spl ay, keypad PCB, keypad membrane, and mai n
PCB assembl i es can be removed and repl aced.
NOTE: Many of the procedures in this section are generic, and apply to many similar instruments.
Photos and illustrations used are representative and may show instruments other than the Site Master.
1. Remove the external power suppl y, i f i nstal l ed, and remove the battery from the uni t.
2. Pl ace the Si te Master face up on a stabl e work surface.
3. Remove the four rubber corner bumpers by careful l y l i fti ng and sl i di ng the bumpers off of the case
corners (Fi gure 9).
4. Wi th the bumpers removed, the access hol es for the case screws are reveal ed. Use a Phi l l i ps screw-
dri ver to remove the four screws securi ng the two hal ves of the Si te Master case together.
5. Careful l y l i ft up on the ri ght si de (as vi ewed from the front) of the front hal f of the case and begi n to
separate the two hal ves.
CAUTION
Do not force or pull the two halves of the case apart completely, as there are delicate cables attached
between the two halves that must be disconnected first.
6. I f the uni t i s equi pped wi th a monochrome di spl ay, careful l y depress the l atch tab and di sconnect the
monochrome LCD di spl ay cabl e from J3 on the mai n PCB.
or
I f the uni t i s equi pped wi th a col or di spl ay, careful l y di sconnect the di spl ay cabl e from J14 on the
mai n PCB.
7. Careful l y di sconnect the keypad i nterface cabl e from J4 on the mai n PCB.
Site Master MM 17
Fi gure 9. RemovingtheCorner Bumpers
8. Careful l y di sconnect the LCD di spl ay backl i ght cabl e from J1 on the mai n PCB.
9. Remove the front panel assembl y.
10. Reverse the above steps to repl ace the front panel assembl y.
NOTE: The corner bumpers only mount one way. That is, the raised area inside one end of the bumper
(Figure 10) is made to conform to the contour of the front cover only.
18 Site Master MM
RAISED AREA
Fi gure 10. Corner Bumper Detail
J4
J1
J3
J14
Fi gure 11. SiteMaster Front Panel CableConnections
12. LCD Assembly Replacement
Thi s procedure provi des i nstructi ons for removi ng and repl aci ng the Li qui d Crystal Di spl ay (LCD) once
the front panel assembl y has been separated from the Si te Master.
1. Remove the front panel assembl y as di rected i n secti on 11.
2. Pl ace the front panel assembl y face down on a protected work surface.
3. Remove the 14 Phi l l i ps screws that attach the backi ng pl ate to the front panel assembl y.
4. Rel ease the LCD di spl ay cabl e from the retai ni ng cl i p on the front panel backi ng pl ate.
5. Remove the front panel backi ng pl ate, careful l y feedi ng the LCD cabl e through the access hol e to
avoi d damage to the cabl e or connector.
6. Remove the rubber cushi on pad from the LCD assembl y and remove the assembl y.
7. Reverse the above steps to i nstal l the repl acement assembl y.
Site Master MM 19
FRONT PANEL
BACKING PLATE
LCD CABLE
RETAINING CLIP
Fi gure 12. Front Panel BackingPlate
13. Key Pad PCB Replacement
Thi s procedure provi des i nstructi ons for removi ng and repl aci ng the key pad PCB.
1. Remove the front panel assembl y as di rected i n secti on 11.
2. Pl ace the front panel assembl y face down on a protected work surface.
3. Remove the 14 Phi l l i ps screws that attach the backi ng pl ate to the front panel assembl y.
4. Rel ease the LCD di spl ay cabl e from the retai ni ng cl i p on the front panel backi ng pl ate (Fi gure 12).
5. Remove the front panel backi ng pl ate, careful l y feedi ng the LCD cabl e through the access hol e to
avoi d damage to the cabl e or connector.
6. Remove the rubber cushi on pad from the key pad PCB and remove the PCB.
7. Reverse the above steps to i nstal l the repl acement assembl y.
20 Site Master MM
KEYPAD PCB
Fi gure 13. Front Panel Keypad PCB Location
14. Key Pad Membrane Replacement
Thi s procedure provi des i nstructi ons for repl aci ng the key pad membrane.
1. Remove the front panel assembl y as di rected i n secti on 11.
2. Remove the key pad PCB as di rected i n secti on 13.
3. Remove the keypad membrane by gentl y pul l i ng the membrane up and out of the hol es i n the front
panel .
4. Reverse the above steps to i nstal l the repl acement membrane.
Site Master MM 21
KEYPAD MEMBRANE
Fi gure 14. Front Panel Keypad Membrane
15. Main PCB Assembly Replacement
Thi s procedure provi des i nstructi ons for repl aci ng the mai n PCB assembl y wi th the connector panel at-
tached.
1. Remove the front panel assembl y as di rected i n secti on 11.
2. Di sconnect the battery connector from J7 on the mai n PCB.
3. Di sconnect the semi -ri gi d coaxi al cabl e from the RF I n connector on the connector panel .
4. Remove the three PCB mounti ng screws and l i ft the Control PCB assembl y wi th the connector panel
attached sl i ghtl y.
5. Careful l y reach between the Mai n PCB and the SPA PCB and di sconnect the cabl es from J2 and J4
on the SPA PCB.
6. Remove the Mai n PCB.
7. Remove the three .25 standoffs and four Phi l l i ps screws and remove the Spectrum Anal yzer PCB.
8. Reverse the above steps to i nstal l the new mai n PCB.
NOTE: The main PCB connector panel fits into grooves in the two halves of the case. Make sure the
panel is correctly aligned with the grooves before reassembling the two halves together.
22 Site Master MM
PCB MOUNTING
SCREWS (3)
BATTERY
CONNECTOR
RF IN
CONNECTOR
Fi gure 15. Main PCB (shown with optional T1/ E1 PCB installed)
J2
J4
Fi gure 16. SpectrumAnalyzer PCB
16. Option 5 Power Monitor PCB Assembly Replacement
Thi s procedure provi des i nstructi ons for repl aci ng the Power Moni tor PCB Assembl y.
1. Remove the front panel assembl y as di rected i n on page 17, Front Panel Assembl y Removal and
Repl acement.
2. Remove the enti re Mai n PCB assembl y from the bottom case as di rected on page 22.
3. On the upper ri ght corner, l ocate and remove the nut that secures the bl ank pl ate to the connec-
tor panel .
4. Careful l y remove the bl ank pl ate from the connector panel .
5. I nstal l the new connector pl ate (p/n 61536) to the connector panel and secure i t wi th the nut that
was removed i n step 4.
6. Use a sharp kni fe to cut a hol e al ong the openi ng of the new connector pl ate.
7. I nstal l the three standoffs (p/n 785-405) to the mai n board on the si de that faces the Front Panel
assembl y and secure them wi th three Phi l l i ps screws (p/n 900-720) from the si de that faces the
bottom case.
8. I nstal l the Opti on 5 PCB assembl y (p/n 63066-3) to the mai n board. Careful l y al i gn J1 to J6 of
the mai n board when i nstal l i ng. Refer to Fi gure 17.
9. Secure the Opti on 5 PCB assembl y to the standoffs usi ng the l ast three Phi l l i ps screws.
10. Careful l y push the DI N connector through the openi ng on the connector panel and secure i t wi th
the nuts (p/n 900-326) suppl i ed.
Site Master MM 23
Fi gure 17. Power Monitor PCB Assembly Replacement
17. Option 50 T1/E1 Tester PCB Assembly Replacement
Thi s procedure provi des i nstructi ons for repl aci ng the T1/E1 Tester PCB assembl y.
1. Remove the front panel assembl y as di rected i n on page 17, Front Panel Assembl y Removal and
Repl acement.
2. Remove the enti re Mai n PCB assembl y from the bottom case as di rected on page 22.
3. Remove the si x T1/E1 PCB mounti ng screws and careful l y l i ft the PCB assembl y di sconnecti ng
J2 (T1/E1 PCB) from J6 (Mai n PCB).
4. After J2 and J6 (from the under si de of the PCB) have been di sconnected careful l y l i ft up the bot-
tom and pul l out the PCB cl eari ng the T1/E1 connector i nterface.
5. Reverse the above steps to i nstal l the new T1/E1 PCB.
24 Site Master MM
Fi gure 18. T1/ E1 Tester PCB
18. Accessories and Replaceable Parts
Accessori es and repl aceabl e parts for the Si te Master S331D are l i sted bel ow.
Site Master MM 25
Accessories
Part Number Description Qty
10580-00079 Users Guide, Site Master S33xD 1
10580-00100 Programming Manual, Site Master S33xD (disk only) 1
2300-347 Handheld Software Tools 1
40-187-R Power Supply 1
2000-1029 Battery Charger 1
22N50 Open/Short, N Male 1
SM/PL Precision Termination, N Male 1
806-62 Automotive Power Adapter 1
806-16 Bantam Plug to Bantam Plug Cable Assembly 1
806-116 Bantam Plug to BNC Male Cable Assembly, 8 ft 1
806-117 Two Bantam Plugs to RJ48 Cable Assembly, 8 ft 1
800-441 Serial Interface Cable Assembly 1
65717 Soft Carrying Case 1
Replaceable Parts
Part Number Description Qty
510-87 N Male Connector 2
15-102 Monochrome Liquid Crystal Display Assembly 1
15-123 TFT Color Liquid Crystal Display Assembly 1
633-27 Rechargeable Battery, NiMH 1
ND62289 Main PCB Assembly, S331D, Serial Number 404999 1
ND62278 Main PCB Assembly, S331D, with Option 29, Serial Number 404999 1
ND61829 Main PCB Assembly, S331D, Serial Number 405001 through 538117 1
ND63391 Main PCB Assembly, S331D, with Option 29, Serial Number 405001 through 538117 1
ND64435 Main PCB Assembly, S331D, with Option 31, Serial Number 405001 through 538117 1
ND64436 Main PCB Assembly, S331D, with Options 29, 31, Serial Number 405000 through 538118 1
ND65773 Main PCB Assembly, S331D, Serial Number 538118 1
ND65774 Main PCB Assembly, S331D, with Option 29, Serial Number 538118 1
ND65775 Main PCB Assembly, S331D, with Option 31, Serial Number 538118 1
ND65776 Main PCB Assembly, S331D, with Options 29, 31, Serial Number 538118 1
ND68111 Main PCB Assembly, S331D, with Options 2 and 16 1
ND68112 Main PCB Assembly, S331D, with Options 2, 16 and 29 1
ND68113 Main PCB Assembly, S331D, with Options 2, 16 and 31 1
ND68493 Main PCB Assembly, S331D, with Options 2, 16, 29 and 31 1
26 Site Master MM
67199-3 Keypad PCB Assembly 1
46649-4 Membrane Keypad, Main, with Contrast symbol 1
46649-6 Membrane Keypad, Main, without Contrast symbol 1
Hardware
Part Number Description Qty
900-861 Pan Head Screw, 4-20, 0.365 15
900-791 Screw, 2-56, 0.375 77
900-720 Screw, 4-40, 0.187 5
900-326 Kep Nut, 4-40, 0.187 3
790-18 M-F Standoff, 4-40, 0.375, Hex 2
785-927 M-F Standoff, 4-40, 0.625 3
785-929 M-F Standoff, 4-40, 0.265 3
761-79 Cap Vinyl, Black, round 2
Case Parts
Part Number Description Qty
46652-3 Top Case only (for units with Monochrome LCD Display) 1
61440-1 Top Case only (for units with TFT Color LCD Display) 1
46653-3 Bottom Case only 1
48231-3 Battery Door 1
790-509
790-510
48241
Battery Door Latch (3 pieces)
1
790-511 Door Lock Receptacle 1
46655 Case Corner Bumpers 4
46662 LCD Retainer Plate 1
48241 Foam, LCD Corners 9
48278 Foam, LCD Window 1
46659 Foam, LCD Backing 1
46661 Foam, Keypad Backing 1
19. Customer Service
To l ocate the nearest Anri tsu Customer Servi ce Center, pl ease refer to the Anri tsu web page:
http://www.anri tsu.com/Contact.asp
Site Master MM 27

You might also like