All India Renewable Energy Regulatory And Policy Data Base


(All India RE-RAP Data Base)
Step-1
Step-2
Template flow for RE Regulatory Data Base

A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of various renewable energy specific parameters (viz.
technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respective detailed sheets of each specific parameter.


Hyperlinks direct to detail
sheets which give key sub
parameters for central and
state level.
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all
States and UTs.
a. FIT Wind
b. FIT Solar Thermal
c. FIT Solar PV
d. FIT Biomass
e. FIT Bagasse Cogen
f. FIT MSW
g. FIT SHP
h. FIT Biomass Gassifier
i. FIT Biogas
j. FIT other Technologies
k. ...
l. RPO Summary
m. REC
n. Grid Connectivity
o. Open Access

Step-3
Step-4
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all
States and UTs.
a. FIT Wind
b. FIT Solar Thermal
c. FIT Solar PV
d. FIT Biomass
e. FIT Bagasse Cogen
f. FIT MSW
g. FIT SHP
h. FIT Biomass Gassifier
i. FIT Biogas
j. FIT other Technologies
k. ...
l. RPO Summary
m. REC
n. Grid Connectivity
o. Open Access

Unique Code for each Reference Documents built based on following sub-codes which are scalable

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to
the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents.
For example all reference docs for Karnataka could be filtered as shown below.

Step-5
Step-6
Folder Structure for maintaining base documents
All files/ base documents maintained in single folder (Advantage: One point access of all reference document)
File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy)
Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
will help in monthly updation)

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to
the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents.
For example all reference docs for Karnataka could be filtered as shown below.

Folder Structure for maintaining base documents
All files/ base documents maintained in single folder (Advantage: One point access of all reference document)
File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy)
Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
will help in monthly updation)

Template flow for RE Regulatory Data Base

A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of various renewable energy specific parameters (viz.
technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respective detailed sheets of each specific parameter.


Hyperlinks direct to detail
sheets which give key sub
parameters for central and
state level.
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all
States and UTs.
a. FIT Wind
b. FIT Solar Thermal
c. FIT Solar PV
d. FIT Biomass
e. FIT Bagasse Cogen
f. FIT MSW
g. FIT SHP
h. FIT Biomass Gassifier
i. FIT Biogas
j. FIT other Technologies
k. ...
l. RPO Summary
m. REC
n. Grid Connectivity
o. Open Access

Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all
States and UTs.
a. FIT Wind
b. FIT Solar Thermal
c. FIT Solar PV
d. FIT Biomass
e. FIT Bagasse Cogen
f. FIT MSW
g. FIT SHP
h. FIT Biomass Gassifier
i. FIT Biogas
j. FIT other Technologies
k. ...
l. RPO Summary
m. REC
n. Grid Connectivity
o. Open Access

Unique Code for each Reference Documents built based on following sub-codes which are scalable

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to
the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents.
For example all reference docs for Karnataka could be filtered as shown below.

Folder Structure for maintaining base documents
All files/ base documents maintained in single folder (Advantage: One point access of all reference document)
File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy)
Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
will help in monthly updation)

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to
the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents.
For example all reference docs for Karnataka could be filtered as shown below.

Folder Structure for maintaining base documents
All files/ base documents maintained in single folder (Advantage: One point access of all reference document)
File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy)
Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
will help in monthly updation)

Tariff (Rs/kWh) Control period Tariff (Rs/kWh) Control period Tariff (Rs/kWh) Control period Tariff (Rs/kWh) Control period Tariff (Rs/kWh) Control period
4.49 (with AD) 4.54(w/o AD)
9.63 (Plant comissioned by 31 Mar
2014)
with AD - 10.45
9.63 (Roof top and SSPG
comissioned by 31 mar 2014)
NA
Summary Sheet
NA NA Uttarakhand
Zone-1 (5.15 Rs/kWh without AD,
4.75 with AD)
Zone-2 ((4.35 Rs/kWh without AD,
Lev - 12.95
AD - 1.15
after AD - 11.80
No Tariff Order/Regulations available
Tamil Nadu
Lev - 18.45
AD- 4.11
After AD - 14.34
4.694 NA 01/08/2012 to 31/07/2014
Sikkim
From FY2010-11 to FY2012-13
FY2009-10 to FY 2013-14
Tripura No Tariff Order/Regulations available
Rs 5.32/kWh (Without AD) & Rs
5.2/kWh (With AD)
2012-13
11.95 (Without AD)
With AD - 10.45
11.95 (Small Solar thermal power gen
comissioned by 31 Mar 2015
FY 2012-13 Revised Tariff-4.96 for
water cooled / 5.42 for Air cooled
April 1, 2009 to March 31, 2014
Parameters and tariffs to be
determined through suo-motu petition
or on case-to-case basis
2009-10 to 2014-15
Lev - 12.46
AD - 1.24
After AD - 11.22
Lve - 14.73
AD - 2.41
After AD-12.32
4.09 Orissa
Rs 5.31/kWh (Without AD) & Rs
4.48/kWh (With AD)
Lev- 17.80
AD -3.03
After AD -14.77
5.83
2011-12 to 2014-15
From FY2010-11 to FY2012-13
Rajasthan
5.18 (without AD) 4.90 (with AD)-for
projects in aisalmer, Jodhpur and
Barmer districts
Punjab
Provisions akin to CERC, 5.96
(without AD) 5.36 (with AD)
Lev - 10.39
AD - 1.04
After AD - 9.35
FY 2013-15 (3 years)
FY2010-11 to FY2014-15
Rs 4.4/kWh (Without AD) & Rs
4.12/kWh (With AD)
2010-11 to 2012-13
NA Nagaland
NA NA Meghalaya NA NA
Mizoram 2010-11 to 2014-15
FY 2013-15 (3 years) NA
FY2013-14 and FY2014-15
2010-11 to 2014-15
NA 2010-11 to 2014-16
NA 2010-11 to 2014-15
5.41
2.26(F.C)+ 2.53(V.C)= 4.79 (for FY
2012-13)
2010-11 to 2014-15
10.44 (capacity >2 MW),
10.70 (Capacity upto 2 MW)
NA
Aug 2012 to March 2014
FY 2010-14(5 years from the date of
commencement )
NA
March 2012 to end of FY 2013-14
Manipur
Maharashtra
Wind power density Tariff(Rs
/kWh)
200-250 5.67
Lev -11.16 (11.66 - RT & SSPGP)
AD -1.65 (1.65)
after AD -9.51 (10.01)
Lev - 13.44
AD - 1.97
After AD - 11.47
12.65 No tariff Order Madhya Pradesh 4.35
2.55 NA
NA
For projects commissioned before dec
31, 2009
No tariff Order
1.91(FT)+1.99(VT)= 3.90(for FY
2012-13
till 31.3.2013
NA Kerala 3.64 15.18 (including incentives)
11.35 NA
June 2010 to June 2013
Upto March 31, 2013 commissioning
NA Till March 31, 2015
NA NA Karnataka
Average tariff for first 10 years from
signing of PPA= Rs 3.70/kWh
14.5 (Including rooftop and small
solar PV plants)
Jharkhand N.A
5 years(2012-13 to 2017-18)
NA Till March 31, 2015
NA
5 years(2012-13 to 2017-18)
NA No tariff Order NA
12.17
5.59 (for watercooled)
5.88 (for aircooled condenser)
Haryana
Wind power density Tariff(Rs
/kWh)
200-250 = 6.14
9.18 (SPV Crystalline)
8.90 (SPV Thin film)
NA
2012-17 (5 years from the date of
commencement)
three years from 1st June,
2010 to 31st May, 2013.
Jammu and
Kashmir
Himachal
Pradesh
N.A
No tariff Order No tariff Order
3.83 3 years(till FY 13-FY15)
4.65 (with AD) 4.71(w/o AD)
NA
Gujarat
Gross Tariff - Rs 4.23/kWh
Depreciation- Rs 0.38/kWh
Net Tariff-Rs 4.23/kWh
For MW Scale Plants: Jan 2012-
March 2013: 10.37 (Without AD),
09.28 (With AD), FY 2013-14: 9.64
12.91 (Without AD) 11.55
(With AD)
NA
NA 5 Years(2011-12-2016-17)
Delhi N.A
Chhattisgarh N.A
NA NA
NA NA 3 years(till March 2014)
NA
Arunachal
Pradesh
N.A
13.11 (Without AD) 11.87
(With AD)
NA
Wind power density Tariff(Rs
/kWh)
<200 = 5.96, 5.36(with A.D)
200-250 = 5.42, 4.87(with A.D)
250-300 = 4.77, 4.29(with A.D)
300-400 = 3.97, 3.57(with A.D)
>400 = 3.73 , 3.35(with A.D)
FY 2012-13
Bihar N.A
10.9 (Without AD)
09.85 (With AD)
Assam N.A
2009-10 to 2014-15
STATE / CENTRE
Wind Solar PV Solar Thermal Biomass
Bagasse based cogeneration
Andhra Pradesh
For first 10 years-3.5
For next 10 years-determined
thereafter
17.91 (Without AD)
14.95 (With AD)
15.31 (Without AD) 12.85
(With AD)
No tariff Order 5 Years( 2012-13 to 2017-18)
NA
CERC
Lev - 10.39
AD - 1.04
After AD - 9.35
FY 2012-13
Lev - 12.46
AD - 1.24
After AD - 11.22
FY 2012-13 ***given below in separate table FY 2012-13
FY 2012-14 (3 years)
2010-11 to 2012-13
Provisions akin to CERC (April 2012
to March 2017)
***given below in separate table FY 2012-13
1. All new RE projects, which are
entering into PPA on or after Janu1,
2010 for a period of 10 years
Applicable to project proposals
submitted after Nov 22, 2010
May 2010 to March 31, 2013
FY 2012-13
FY 2010-11 to FY 2014-15
FY 2013-15 (3 years)
N.A
August 11, 2012 to March 31, 2016
Commissioned during FY 2012-13
According to the generic tariff Order
(Duration to be fixed as find
appropriate by the Commission)
FY 2012-13 to FY 2016-17
(5 years)
June 23, 2010 to March 31, 2013
3.51 Rs/kWh
FY 2009-12 (3 years from notification
of these regulations)
For WPP having entered into PPA
btw May 1, 2009 to March 31, 2014
From 2012-13 to 2016-17
(5 yr)
April 1, 2012 to March 31, 2015 (3
years)
N.A
From April 1, 2012 to 2016-17
(5 yrs)
August 31, 2012 to March 31, 2014
NA
FY 2010-11 upto March 31, 2013
NA
FY 2010-11 (till 31/05/12)
FY 2009-12 (3 years from the
commensment of these regulations)
NA
Lev - 15.51
AD - 3.35
After AD - 12.16
FY 2009-12 (3 years from notification
of these regulations)
FY 2010-14(5 years from date of
notification)
FY 2013-15 (3 years)
FY- 2012-14 (3 years)
Plant comissioned in FY (2012-13)
onwards
FY 2012-16 (5 years from the
notification of order)
Jan 29, 2012 to March 31, 2015
3 years(till FY 13-FY15)
NA
FY 2009-12 (3 years from notification
of these regulations)
Lev - 17.70
AD - 1.65
after AD - 16.05
2010-11 and 2011-12
April 2012 to March 2017
Jan 2012 to Mar 2014
Upto March 31, 2015 commissioning
April 2012 to March 2017
3 years starting from FY 2012-13
FY- 2012-14 (3 years)
Plant comissioned in FY (2012-13)
onwards
FY 2012-16
FY 2012-13
NA
FY 2010-11 (till 31/05/12)
Upto March 31, 2013 commissioning
Aug 2012 to March 2014
FY 2010-14(5 years from the date of
commencement )
FY 2010-14(5 years from date of
notification)
FY 2013-15 (3 years)
Jan 29, 2012 to March 31, 2015
3 years(till FY 13-FY15)
2012-17 (5 years from the date of
commencement)
June 2010 to June 2013
2010-11 and 2012-13
Jan 2012 to Mar 2014
Upto March 31, 2015 commissioning
April 2012 to March 2017
1.06.2010 to 31.03.2013.
3 years(till FY 13-FY15)
NA
NA
FY 2009-12 (3 years from the
commensment of these regulations)
NA
NA
2009-10 to 2014-15
5 Years( 2012-13 to 2017-18)
3 years(till March 2014)
NA
5 Years(2011-12-2016-17)
No tariff Order
NA
August1, 2012 to July 31, 2014
NA
FY2009-10 to FY2013
No Tariff Order/Regulations available
No Tariff Order/Regulations available
Prepared by ABPS Infra Page10/123
Summary Sheet
STATE / CENTRE
Wind Solar PV Solar Thermal Biomass
Bagasse based cogeneration
5.02
CERC Tariff for Biomass for FY 2012-13
State Lev. FC Lev. VC
Tariff (With AD)
(FY 201213)
AD Benefit
Net Levellised
(without AD)
Andhra Pradesh 2.06 3.12 5.18 0.13 5.05
Haryana 2.10 3.55 5.65 0.13 5.52
Maharashtra 2.11 3.63 5.74 0.13 5.61
Punjab 2.12 3.71 5.83 0.13 5.70
Rajasthan 2.06 3.10 5.16 0.13 5.03
Tamil Nadu 2.06 3.07 5.12 0.13 4.99
Uttar Pradesh 2.07 3.17 5.24 0.13 5.11
Others 2.08 3.33 5.42 0.13 5.29
CERC Tariff for Bagasse Co-gen for FY 2012-13
State Lev. FC Lev. VC
Tariff (With AD)
(FY 201213)
AD Benefit
Net Levellised
(without AD)
Andhra Pradesh 2.77 2.29 5.06 0.21 4.85
Haryana 2.48 3.25 5.73 0.18 5.55
Maharashtra 2.22 3.2 5.42 0.16 5.26
Punjab 2.44 2.86 5.3 0.18 5.12
Tamil Nadu 2.15 2.46 4.61 0.16 4.45
Uttar Pradesh 2.8 2.55 5.35 0.21 5.14
Others 2.43 2.77 5.2 0.18 5.02
<5 MW 5-10 MW 10 - 25 MW
1 5.4 5.4 5.4 5.4 5.4
2 5.22 5.22 5.22 5.8 5.22
3 5.04 5.04 5.48 5.6 5.04
4 4.86 5.12 5.28 5.4 4.86
5 4.68 4.93 5.09 5.2 4.68
6 4.5 4.74 4.9 5.01 4.5
7 4.33 4.56 4.71 4.81 4.33
8 4.16 4.37 4.52 4.62 4.16
9 3.98 4.19 4.33 4.43 3.98
10 3.81 4.01 4.14 4.23 3.81
11 2.3 2.42 2.5 2.56 2.3
12 2.34 2.46 2.54 2.6 2.34
13 2.38 2.51 2.59 2.64 2.38
14 2.42 2.55 2.63 2.69 2.42
15 2.46 2.59 2.68 2.74 2.46
16 2.51 2.64 2.73 2.79 2.51
17 2.56 2.69 2.78 2.84 2.56
18 2.6 2.74 2.83 2.89 2.6
19 2.65 2.79 2.88 2.95 2.65
Daman & Diu No RE Order/Regulations No tariff Order
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available Pondicherry No RE Order/Regulations No tariff Order No tariff Order No tariff Order No Tariff Order/Regulations available
No Tariff Order/Regulations available
NA
No tariff Order No tariff Order No tariff Order No Tariff Order/Regulations available
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No tariff Order
No tariff Order
No tariff Order No tariff Order Lakshadweep No RE Order/Regulations No tariff Order No tariff Order No tariff Order No Tariff Order/Regulations available
Dadra and Nagar
Haveli
No RE Order/Regulations No tariff Order No tariff Order No tariff Order No Tariff Order/Regulations available No tariff Order
No Tariff Order/Regulations available No Tariff Order/Regulations available No tariff Order
No Tariff Order/Regulations available
No tariff Order
Chandigargh No RE Order/Regulations No tariff Order No tariff Order No tariff Order
No Tariff Order/Regulations available
Andaman Nicobar No RE Order/Regulations No tariff Order No tariff Order No tariff Order No Tariff Order/Regulations available
10/08/2012 to 10/08/2015
Goa
Union Territories
West Bengal and
so on for all the
states
Tariff cap of 5.70 for 10 years from
effectiveness of Regulations
10 (Capacity ranging 100 KW to 2
MW availing GBI)
10 (Grid connected plant not eligible
NA 5.00 3.3
Uttar Pradesh
13 (comissioned by Dec 2011,not
covered under GOI incentive scheme)
refer worksheet 'Additional Data',
Table 1
2010-11 to 2013-14
NA Uttarakhand
Zone-1 (5.15 Rs/kWh without AD,
4.75 with AD)
Zone-2 ((4.35 Rs/kWh without AD,
Lev - 12.95
AD - 1.15
after AD - 11.80
No RE Order/Regulations
Rs.3.21/Kwh with an escalation of
5.72%p.a.
No RE Order/Regulations
No tariff Order
FY 2010-11 upto March 31, 2013
Oct 1, 2009 to Mar 31, 2014
10 years for wind
No RE Order/Regulations
No RE Order/Regulations
FY 2009-12 (3 years from the
commensment of these regulations)
FY 2010-14 (5 years)
FY 2013-17 (5 Years)
No tariff Order No tariff Order
No RE Order/Regulations
Lev - 17.70
AD - 1.65
after AD - 16.05
15 (comissioned by Dec 2011,not
covered under GOI incentive scheme)
No tariff Order
No tariff Order
No tariff Order
No tariff Order
No tariff Order
No tariff Order
No tariff Order
No tariff Order
FY 2009-12 (3 years from the
commensment of these regulations)
FY 2010-14 (5 years)
NA
No tariff Order
No tariff Order
FY2009-10 to FY2013
October 1, 2009 to March 31, 2014
NA
No tariff Order
No tariff Order
No tariff Order
No Tariff Order/Regulations available
Table 1: Tariffs of SHP in Madhya Pradesh
Year
Run of the River Projects Canal Based Projects
Tariff without considering GoMP
free power policy (Rs./kWh)
Tariff considering GoMP free power policy (Rs./kWh) Tariff without considering GoMP
free power policy (Rs./kWh)
Prepared by ABPS Infra Page11/123
Summary Sheet
STATE / CENTRE
Wind Solar PV Solar Thermal Biomass
Bagasse based cogeneration
20 2.71 2.85 2.94 3.01 2.71
21 2.76 2.91 3 3.07 2.76
22 2.82 2.96 3.06 3.13 2.82
23 2.88 3.03 3.13 3.19 2.88
24 2.94 3.09 3.19 3.26 2.94
25 3 3.16 3.26 3.33 3
26 3.07 3.23 3.33 3.41 3.07
27 3.14 3.3 3.41 3.48 3.14
28 3.21 3.38 3.49 3.56 3.21
29 3.28 3.45 3.57 3.65 3.28
30 3.36 3.54 3.65 3.73 3.36
Prepared by ABPS Infra Page12/123
Tariff (Rs/kWh) Control period Tariff (Rs/kWh) Control period
No Tariff Order/Regulations available
2011-12 to 2014-15
2010-11 to 2012-13
2012-13
NA
NA
NA
30/06/2010 to 31/03/2013
2010-11 to 2014-15
2010-11 to 2014-15
2010-11 to 2014-16
9/4/2012 to 8/4/2017
31/3/2012 to 31/3/2015
No Tariff Order/Regulations available
2009-10 to 2014-15
5 Years(2011-12-2016-17)
No Tariff Order/Regulations available
No Tariff Order/Regulations available
3 years(till FY 13)
18/12/2012 to 31/3/2017
2012-13 to 2016-17
No Tariff Order/Regulations available
Parameters are defined on case to
case basis
No Tariff Order/Regulations available
NA
NA
No Tariff/Parameters Defined
NA
NA
NA
NA
NA
NA
NA
NA
No Tariff Order/Regulations available NA
Project Specific Tariff Determination
NA No Tariff Order/Regulations available No Tariff Order/Regulations available
No Tariff Order/Regulations available
Parameters are defined on case to
case basis
No Tariff Order/Regulations available
Project Specific Tariff Determination
Rs 4.88/kWh (<=5 MW) & Rs
4.16/kWh (5-25 MW) w/o AD and Rs
4.5/kWh & Rs 3.82/kWh respectively
NA
NA Project Specific Tariff Determination
Parameters and tariffs to be
determined through suo-motu petition
or on case-to-case basis
NA NA
NA
No Tariff Order/Regulations available NA
Project Specific Tariff Determination
Rs 3.91/kWh (<=5 MW) & Rs
3.64/kWh (5-25 MW) w/o AD and Rs
3.31/kWh & Rs 3.09/kWh respectively
Project Specific Tariff Determination
NA
No Tariff Order/Regulations available
NA
Project Specific Tariff Determination NA
Project Specific Tariff Determination NA
Rs 4.88/kWh NA NA
NA Rs 2.94/kWh NA
NA
Rs 3.40/kWh for the first 10 years
after signing the PPA
NA
NA Refer Table 1 below
NA
Rs 4.15/kWh
NA
NA NA
Project Specific Tariff Determination NA NA
Project Specific Tariff Determination NA
No Tariff Order/Regulations available
NA
Rs 2.49/kWh for the first year and Rs
2.833/kWh from the second year
onwards
No Tariff Order/Regulations available
Project Specific Tariff Determination Case to Case basis
6.8
Project Specific Tariff Determination NA
NA No Tariff Order/Regulations available
Project Specific Tariff Determination NA
Small Hydro
4.04 in 2009-10 and 5%escalation
thereafter till 2013-14
No Tariff/Parameters Defined
Municipal solid Waste
Project Specific Tariff Determination NA
NA
HP, Uttarakhand and NE
States
(Below 5MW) - 4.14(without AD),
3.82 (with AD)
(5MW-25MW)-
3.54(without AD), 3.25 (with AD)
Other States
(Below 5MW) - 4.88(without AD),
FY 2012-13 NA
Prepared by ABPS Infra Page13/123
Small Hydro
Municipal solid Waste
<5 MW 5-10 MW 11 - 25 MW
5.4 5.4 5.4
5.22 5.22 5.8
5.04 5.48 5.6
5.12 5.28 5.4
4.93 5.09 5.2
4.74 4.9 5.01
4.56 4.71 4.81
4.37 4.52 4.62
4.19 4.33 4.43
4.01 4.14 4.23
2.42 2.5 2.56
2.46 2.54 2.6
2.51 2.59 2.64
2.55 2.63 2.69
2.59 2.68 2.74
2.64 2.73 2.79
2.69 2.78 2.84
2.74 2.83 2.89
2.79 2.88 2.95
NA No Tariff Order/Regulations available
NA
NA
NA
NA No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
NA
No Tariff Order/Regulations available
No Tariff Order/Regulations available
NA
10/08/2012 to 10/08/2015
No Tariff Order/Regulations available
No Tariff Order/Regulations available NA
2010-11 to 2013-14
NA No Tariff Order/Regulations available
NA
NA
NA
NA
No Tariff Order/Regulations available
NA
NA No Tariff Order/Regulations available NA
NA No Tariff Order/Regulations available NA
Capped at Rs 5.1/kWh upto August
10, 2022
4.4
No Tariff Order/Regulations available
Rs 2.89/kWh for existing projects and
Rs 3.21 for new Projects under the
head 'Other NCE Projects'
UPERC specifies 'year of operation'
based fixed cost and financial year
based tariff. It does not specify the
Project Specific Tariff Determination
Tariff considering GoMP free power policy (Rs./kWh)
Table 1: Tariffs of SHP in Madhya Pradesh
Canal Based Projects
Prepared by ABPS Infra Page14/123
Small Hydro
Municipal solid Waste
2.85 2.94 3.01
2.91 3 3.07
2.96 3.06 3.13
3.03 3.13 3.19
3.09 3.19 3.26
3.16 3.26 3.33
3.23 3.33 3.41
3.3 3.41 3.48
3.38 3.49 3.56
3.45 3.57 3.65
3.54 3.65 3.73
Prepared by ABPS Infra Page15/123
FIT:WIND
ANNEXURE-1A
Financial Parameters
STATE / CENTRE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
Capacity Utilisation
Factor (%)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and Duties
CERC (FY12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
Wind power density Tariff(Rs
/kWh)
<200 = 5.96, 5.36(with A.D)
200-250 = 5.42, 4.87(with A.D)
250-300 = 4.77, 4.29(with A.D)
300-400 = 3.97, 3.57(with A.D)
>400 = 3.73 , 3.35(with A.D)
575 (FY 2012-13)
Wind power density
CUF
<200 = 20%
200-250 = 22%
250-300 = 25%
300-400 = 30%
>400 = 32%
25
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
Draft RE Tariff Regulations, 2012
(April 2, 2012)
N.A
Haryana
Himachal Pradesh
Draft RE Tariff Regulations, 2012
Jammu and Kashmir
Karnataka
Kerala
Madhya Pradesh
June 23, 2010 to March 31,
2013
4.35
Average tariff for first 10 years from
signing of PPA= Rs 3.70/kWh
3.64
Jharkhand
Pass through on
actual incurred
basis
1. All new RE projects,
which are entering into PPA
on or after Janu1, 2010 for
a period of 10 years
2. Also applicable to
Applicable to project
proposals submitted after
Nov 22, 2010
May 2010 to March 31,
2013
Pass through on
actual incurred
basis
470 N.A
Chhattisgarh
Regulations for Determination of Tariff
for procurement of power from wind
generators
(June 23, 2010)
Order for determination of tariff for RE
sources
(Dec, 11,2009)
(Power Procurement from RE sources )
second amendment Regulation, 2010
(Nov 22, 2010)
Wind Tariff Order
(May, 14, 2010)
Andhra Pradesh
Arunachal Pradesh
April 1, 2012 to March 31,
2015 (3 years)
N.A N.A
From April 1, 2012 to 2016-
17
(5 yrs)
Wind power density
CUF
200-250 = 20%
250-300 = 23%
300-400 = 27%
>400 = 30%
25
Shall be taken into
consideration while
determining tariff
N.A
25
Shall be taken into
consideration while
determining tariff
Suo Moto Petition for Determination of
Levellised Tariff for RE Projects dated Sept
2012
Wind Tariff Order
(Order No.2 of 2012, Aug 8, 2012)
575
24% 25
Takes into account benefit
of depreciation. Shall take a
view on GBI once MNRE
announces the scheme
Gujarat
Assam
Bihar
Wind power density
CUF
200-250 = 20%
250-300 = 25%
300-400 = 30%
>400 =32%
Delhi
HPERC( Promotion of Generation from
Renewable Energy sources and Terms
and conditions of Tariff) Regulations,
2012
(Dec 17, 2012)
N.A
N.A
Draft RE Tariff Regulations, 2012
(January 13, 2012)
N.A
Excluding evacuation-Rs 568
lakh/MW
Evacuation cost=Rs 38
lakh/MW
456
470
N.A
Gross Tariff - Rs 4.23/kWh
Depreciation- Rs 0.38/kWh
Net Tariff-Rs 4.23/kWh
N.A
25
Shall be taken into
consideration while
determining tariff
Pass through on
actual incurred
basis
N.A N.A N.A N.A
N.A N.A N.A N.A N.A
575 (FY 2012-13) subject to
indexation mechanism as per
CERC RE Tariff Regulation
575 for FY 2012-13 subject to
indexation
Wind power density
CUF
upto 200 =20%
201-250 = 22%
251-300 = 25%
301-400 =30%
>400 =32%
25
Shall be taken into
consideration while
determining tariff
Tariff determined
shall be inclusive
of all taxes and
duties
N.A N.A 25
26.50% 25
Shall not take into
consideration incentives
allowed by Govt for tariff
determination
515 for first year subject to
indexation
20% 25
Shall be taken into
consideration iGBI incentive
while determining tariff
N.A
20% 25 N.A
Tariff determined
shall be inclusive
of all taxes and
duties
22% 20
Shall be taken into
consideration while
determining tariff.
Generating company shall
disclose the details of such
subsidy/incentive if availed
along with application of
fixation of tariff and get the
rate adjusted appropriately
Tariff determined
shall be inclusive
of all taxes and
duties
492 (FY 2011-12), indexation
mechanism as per CERC RE
Tariff Regulation
For WPP having entered
into PPA btw May 1, 2009
to March 31, 2014
Wind Tariff Order in respect of "New
Wind Based Power Projects
( O.P No. 6/7 of 2009)
RE Tariff Regulations, 2012
(April 9, 2012)
24.50% 20 N.A
Pass through on
actual incurred
basis
Tariff exclusive of
taxes and duties,
pass through
allowed on actual
basis
From 2012-13 to 2016-17
(5 yr)
N.A N.A N.A
Shall be taken into
consideration while
determining tariff
Normative Parameters
For first 10 years-3.5
For next 10 years-determined
thereafter
N.A
STATE-WISE FEED-IN-TARIFF FOR WIND
August 11, 2012 to March
31, 2016
Wind power density Tariff(Rs
/kWh)
200-250 = 6.14
250-300 = 4.91
300-400 = 4.09
>400 = 3.84
Commissioned during FY
2012-13
According to the generic
tariff Order (Duration to be
fixed as find appropriate by
the Commission)
FY 2012-13 to FY 2016-17
(5 years)
N.A
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
Tariff exclusive of
taxes and duties,
pass through
allowed on actual
basis
N.A
500
N.A
1. Shall be taken into
consideration while
determining tariff.
2. 90% of the capital
subsidy available to project
as per applicable scheme of
MNRE/State Govt shall be
considered
Tariff determined
shall be inclusive
of all taxes and
duties
Wind power density
CUF
upto 200 = 20%
201-250 =22%
251-300 =25%
301-400 =30%
>400 =32%
Pass through on
actual incurred
basis
CERC (FY13-14)
Draft CERC Generic RE Tariff Order for
FY 2013-14;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
Wind power density Tariff(Rs
/kWh)
<200 = 6.27, 5.78(with A.D)
200-250 = 5.70, 5.25(with A.D)
250-300 = 5.02, 4.63(with A.D)
300-400 = 4.18, 3.85(with A.D)
>400 = 3.92 , 3.61(with A.D)
595.99 (FY 2013-14)
Wind power density
CUF
<200 = 20%
200-250 = 22%
250-300 = 25%
300-400 = 30%
>400 = 32%
25
Prepared by ABPS Infra Page16/123
FIT:WIND
ANNEXURE-1A
Financial Parameters
STATE / CENTRE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
Capacity Utilisation
Factor (%)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and Duties
CERC (FY12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
Wind power density Tariff(Rs
/kWh)
<200 = 5.96, 5.36(with A.D)
200-250 = 5.42, 4.87(with A.D)
250-300 = 4.77, 4.29(with A.D)
300-400 = 3.97, 3.57(with A.D)
>400 = 3.73 , 3.35(with A.D)
575 (FY 2012-13)
Wind power density
CUF
<200 = 20%
200-250 = 22%
250-300 = 25%
300-400 = 30%
>400 = 32%
25
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
Tariff exclusive of
taxes and duties,
pass through
allowed on actual
basis
Normative Parameters
STATE-WISE FEED-IN-TARIFF FOR WIND
No RE
Order/Regulations
No RE Order/Regulations
No RE
Order/Regulation
s
No RE Order/Regulations
No RE
Order/Regulations
wind zone 1 (upto 20%)
No RE Order/Regulations
No RE Order/Regulations
No RE
Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
Rs. 575 Lakh /MW. Capital
cost is apportioned among
plant machinery, civil works &
land at 85%, 10% and 5%
respectively.
20 27.15%
467.13 Lakhs/MW
25
Any Policy support by way
of capital subsidy /Capital
Finance Assistance (CFA),
higher depreciation benefit
or GBI, which becomes
Tax is not a pass
through; ROE
comupted on pre-
tax basis
19%
515
200-250 - 20%
250-250 - 23%
300-400 - 27%
>400 - 30%
Tariff exclusive of
taxes and duties,
pass through
allowed on actual
basis
Tariff exclusive of
Tax; ROE
computed on pre-
tax basis
Direct Taxes
included in the
Tariff.
Taxes and duties
levied by the
appropriate
Government other
than direct
taxes shall be
allowed as pass
through on actual
Price cap excludes
taxes
Joint Electricity Regulatory
Commission for
Manipur & Mizoram (Terms and
Conditions for Tariff determination from
Renewable
Energy Sources) Regulations, 2010.
600 Lakhs/MW (FY 2010-11)
Draft Meghalaya State Electricity
Regulatory Commission (Terms and
Conditions for determination of Tariff
for Generation from Renewable Energy
Sources) Regulations, 2012.
Maharashtra
Mizoram
Meghalaya NA
FY 2010-11 to FY 2014-15
Generic Tariff Order
( March 30, 2012)
Rs. 575 Lakh / MW
(FY 2012-13)
FY 2012-13
FY 2013-15 (3 years)
Nagaland Electricity Regulatory
Commission (Terms and Conditions for
Determination of Generation Tariff for
Renewable Energy) Regulations, 2011
Manipur
Takes into account benefit
of depreciation. However
shall not take into account
GBI benefit into tariff
determinattion
Pass through on
actual incurred
basis
200-250 - 20%
250-250 - 23%
300-400 - 27%
>400 - 30%
25
Shall be considered in Tariff
computation as when
availed
Tariff exclusive of
taxes and duties.
Taxes and duties
allowed allowed as
pass through on
actual incurred
basis
Provisions akin to
CERC (25)
Incentive or subsidy availed
to be computed on case to
case basis by Punjab State
Corporation ltd and the
same to be reduced from
the tariff to that extent for
a period of 12 years.
Provisions akin to
CERC (Tariff
exclusive of Tax;
ROE computed on
pre-tax basis)
21%- Jaisalmer, Jodhpur
and Barmer districts
20%- Other
districts
Provisions akin to CERC (575
lakh/MW)
530 Lakh/MW for FY 13
25
Incentive or subsidy offered
by Central/State Govt. shall
be considered while
determining tariff
25
Shall be considered in Tariff
computation as when
availed
Tariff exclusive of
taxes and duties.
Taxes and duties
allowed allowed as
Wind power density
CUF
200-250 =20%
250-300 =23%
300-400 =27%
>400 =30%
25
April 1, 2009 to March 31,
2014
Provisions akin to CERC
(April 2012 to March 2017)
2010-11 to 2012-13
Provisions akin to CERC, 5.96
(without AD) 5.36 (with AD)
5.18 (without AD) 4.90 (with AD)-for
projects in aisalmer, Jodhpur and
Barmer districts
5.44 (without AD) 5.14 (with AD)-for
FY 2012-14 (3 years)
Rs 5.31/kWh (Without AD) & Rs
4.48/kWh (With AD)
200-250 - 20%
250-250 - 23%
300-400 - 27%
>400 - 30%
Not specified separately Uttar Pradesh UPERC - CNCE Regulations, 2009
Tariff Order (Dated 14/09/2010)
Order on adoption of CERC RE Tariff
Regulation and determination of
generic RE Tariff for FY 2012-13
Rajasthan
3.51 Rs/kWh
Oct 1, 2009 to Mar 31, 2014
Rs.3.21/Kwh with an escalation of
5.72% p.a.
Uttarakhand
Uttarakhand Electricity Regulatory
Commission
(Tariff and Other Terms for Supply of
Electricity from Renewable Energy
Sources and
non-fossil fuel based Co-generating
Stations) Regulations, 2010
August 31, 2012 to March
31, 2014
FY 2010-11 upto March 31,
2013
Zone-1 (5.15 Rs/kWh without AD,
4.75 with AD)
Zone-2 ((4.35 Rs/kWh without AD,
4.00 with AD)
Zone-3 (3.65 Rs/kWh without AD,
3.35 with AD)
Zone-4 ((3.20 Rs/kWh without AD,
2.90 with AD)
NA
FY 2009-12 (3 years from notification
of these regulations)
Rs. 467 Lakh / MW
(FY 2010-11)
Nagaland
Orissa
Punjab
West Bengal
Draft WBERC(Cogeneration and
Generation of
Electricity from Renewable Sources of
Energy) Regulations, 2012
Tariff cap of 5.70 for 10 years from
effectiveness of Regulations
Not specified separately
Sikkim
Tamil Nadu
Not specified
separately
10 years for wind
No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
No RE
Order/Regulation
s
RERC (Terms and Conditions of Tariff)
Regulations, 2009,
Draft Tariff Order on Wind Projects for
Union Territories
Not specified separately
Comprehensive Tariff Order on Wind
Energy (Order No. 6 of 2012) dated
July 31, 2012
Tripura
TERC (Cogeneration and Generation of
Electricity from renewable source of
Energy) regulation 2009
No RE Order/Regulations No RE Order/Regulations
No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
No RE
Order/Regulation
s
No RE Order/Regulations
No RE
Order/Regulations
Andaman Nicobar
Chandigargh
Dadra and Nagar
Haveli
No RE Order/Regulations
No RE Order/Regulations
No RE
Order/Regulation
s
No RE Order/Regulations
Goa
Pondicherry No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Wind power density
CUF
Upto 200 = 20%
201-250 =22%
251-300 =25%
301-400 =30%
>400 =32%
No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
No RE
Order/Regulation
s
No RE Order/Regulations
No RE
Order/Regulations
Not specified separately
25
Only 75% of the capital
subsidy for the financial
year of commissioning as
per
applicable scheme of
MNRE shall be considered
for tariff determination.
Not specified separately Not specified separately
Not specified
separately
Not specified
separately
No RE Order/Regulations
No RE
Order/Regulation
s
No RE Order/Regulations
No RE
Order/Regulations
Daman & Diu
Lakshadweep
No RE Order/Regulations
No RE Order/Regulations
No RE
Order/Regulation
s
No RE Order/Regulations
No RE
Order/Regulations
Wind power density Tariff(Rs
/kWh)
200-250 5.67
(including AD of 0.81/kWh)
250-300 4.93
(including AD of 0.70/kWh)
300-400 4.20
(including AD of 0.60/kWh)
>400 3.78
(including AD of 0.54/kWh)
516.94 for FY 2012-13 subject
to indexation
25
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
Prepared by ABPS Infra Page17/123
FIT:WIND
Late Payment
surcharge
Reference Archives
CE98R01060212,

CE98O01270312
CE98R01060212,

CE98B01251012
HP08A01250712 HP98R01171212
AP01O01010509
AR98R01090412
AS98A01130112
N.A
CG98A01020412
N.A
GJ01O01080812
HR98O01030912
JK98A01000012
JH01R01230610
KA98O01111209
KL98R01221110
MP01O01140510
1.25% per month if
payment delayed
beyond 60 days
N.A
N.A
1.25% per month if
payment delayed
beyond 60 days
N.A
1.25% per month if
payment delayed
beyond 60 days
1.25% per month if
payment delayed
beyond 60 days
1.25% per month if
payment delayed
beyond 30days
N.A
N.A
2% over and above
short term SBI PLR
p.a. if payment
delayed beyond
30days
1.25% per month if
payment delayed
beyond 60 days
N.A
Normative Parameters
N.A
1.25% per month if
payment delayed
beyond 60 days
1.25% per month if
payment delayed
beyond 60 days
HR98O01250112
Prepared by ABPS Infra Page18/123
FIT:WIND
Late Payment
surcharge
Reference Archives
Normative Parameters
1.25% per month if
payment delayed
beyond 60 days
RJ98R01230109
RJ01B01080612
No RE
Order/Regulations
No RE
Order/Regulations
No RE
Order/Regulations
No RE
Order/Regulations
1.25% per
month on daily
basis for delay
beyond a period of
1.5 month from the
1.25% per month
for payments
delayed beyond a
period of 60 days
from the date of
billing
Penalty of 1% per
month shall be
levied for delayed
payment by the
licensee
1.25% per month if
payment delayed
beyond 60 days
TN01O01310712
TR98R01230309
UA98R01060710
1.25% per month
for payments
delayed beyond 60
days from billing
1.25% per month
for delays beyond a
period of 60 days
from the date of
billing
WB98A01100812 Not specified
ML98A01050912
NL98R01300811
OR98O01140910
PB98O01190712
UP98R01220310
MN98R01150410
MH98O01300312
1.25% per month if
payment delayed
beyond 60 days
1.25% per month
for payments
delayed beyond 60
days from billing
date
1.25% per month
for payments
delayed beyond 60
days from billing
1.25% p.m. beyond
2 months
No RE
Order/Regulations
No RE
Order/Regulations
No RE
Order/Regulations
Prepared by ABPS Infra Page19/123
FIT: SOLAR
ANNEXURE-1B
Financial Parameters
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
Capacity Utilisation
Factor (%)
Auxiliary Consumption
(%)
Useful life
(yrs)
9.63 (Plant comissioned by 31
Mar 2014)
with AD - 10.45
9.63 (Roof top and SSPG
comissioned by 31 mar 2014)
25
CERC (FY12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
Lev - 10.39
AD - 1.04
After AD - 9.35
1000 (FY 201213) 19%
Andhra Pradesh
IA No 17 of 2010, dated July 14, 2010
2010-11 and 2011-12
17.91 (Without AD)
14.95 (With AD)
25
25
25
STATE-WISE FEED-IN-TARIFF FOR SOLAR PV
Normative Parameters
Arunachal Pradesh
APSERC RE Tariff Regulations, 2012
dated April 9, 2012
April 2012 to March 2017 1000 19%
Assam
RE Tariff Regulation (Draft) dated Jan
13, 2012
Jan 2012 to Mar 2014 1442 19%
Bihar
BERC Order on Petition 12/2012, dated May
29, 2012, Solar Tariff Regulations dated Aug
2, 2010
Upto March 31, 2015
commissioning
10.9 (Without AD)
09.85 (With AD)
1000 19% 25
Chhattisgarh RE Tariff Regulation dated Apr 02, 2012 April 2012 to March 2017 1000 19% 25
Delhi Solar PV Tariff Regulations 2012
3 years starting from FY 2012-
13
1000 19% 25
Gujarat GERC Order 1 of 2012 dated Jan 27, 2012 Jan 29, 2012 to March 31, 2015
For MW Scale Plants: Jan 2012-
March 2013: 10.37 (Without AD),
09.28 (With AD), FY 2013-14:
1000 (MW scale Plants), 1200
(kW scale plants)
18% with 1% annual
degradation
0.25% 25
Haryana
Suo Moto Petition for Determination of
Levellised Tariff for RE Projects dated Sept
2012
3 years(till FY 13-FY15)
9.18 (SPV Crystalline)
8.90 (SPV Thin film)
894( SPV-C)
863 (SPV-TF)
19%
N.A N.A
0% 25
25 Himachal Pradesh
HPERC( Promotion of Generation from
Renewable Energy sources and Terms
and conditions of Tariff) Regulations,
2012
According to the generic tariff
Order (Duration to be fixed as
find appropriate by the
Commission)
N.A N.A
Jammu and Kashmir
JKSERC (Terms and Conditions for Tariff
determination from RE Sources) Regulations
(Draft), 2012
2012-17 (5 years from the date
of commencement)
1000 19% 25
Jharkhand
(Determination of Tariff for Procurement
of Power from Solar PV and Solar
Thermal Power Projects)
REGULATIONS, 2010 dated June 23,
June 2010 to June 2013 1700 19% 25
Karnataka
KERC Order on Solar Power Tariff
Determination dated July 13, 2010
Upto March 31, 2013
commissioning
14.5 (Including rooftop and small
solar PV plants)
1550 19% 25
Kerala
Power procurement from Solar Plants
by Distribution
Licensee - Regulation 2008 dated Jan 1,
2009
For projects commissioned
before dec 31, 2009
15.18 (including incentives) 2250 21% 20
Madhya Pradesh
Tariff Order for Solar Based Power
Generation dated Aug 01, 2012
Aug 2012 to March 2014
10.44 (capacity >2 MW),
10.70 (Capacity upto 2 MW)
1025 (capacity >2 MW),
1050 (capacity upto 2 MW)
19% with 1% annual
deration from 3rd yr
onwards
0.25% 25
Maharashtra
MERC RE tariff regulayions,2010 ,Case
No 10 of 2012
(Mar 30, 2012)
FY 2010-14(5 years from the
date of commencement )
Lev -11.16 (11.66 - RT & SSPGP)
AD -1.65 (1.65)
after AD -9.51 (10.01)
1000 (FY 2012-13)
19%
1900 (FY 2010-11) 19% NA
NA 25
25
&Mizoram
Manipur
JERC of Manipur & Mizorum (RE Tariff
regulation) 2010 dated 15 Apr,2010
FY 2010-14(5 years from date
of notification)
Meghalaya
Draft Meghalaya State Electricity
Regulatory Commission (Terms and
Conditions for determination of Tariff for
Generation from Renewable Energy
Sources) Regulations, 2012.
FY 2013-15 (3 years) NA 1000 (FY 2012-13) 19% NA 25
Nagaland
NERC (terms and condition for
determination of generation tariff for
renewable energy) regulation 2011
FY- 2012-14 (3 years) 1690 19-21% NA 25
Orissa
OERC redetermination of generic tariff
for solar PV and Solar thermal,Case No
1 of 2012
Plant comissioned in FY (2012-
13) onwards
Lev- 17.80
AD -3.03
After AD -14.77
1690 19% NA 25
Punjab
Adoption of CERC RE tariff regulation
2012,Petetion no 35 of 2012,dated 19
July 2012
FY 2012-16 (5 years from the
notification of order)
Lev - 10.39
AD - 1.04
After AD - 9.35
1000 19% NA 25
940
20% with deration of 0.5%
PA after 2nd year
0.25%
NA NA NA Sikkim Tariff order or Regulation not found NA NA NA
Rajasthan
RERC (Determination of benchmark capital
cost for solar PV and Solar thermal power
projects) dated 13 may 2012
19% with a deration of 1%
every year after ten years.
2% 25
25
Tamil Nadu
TNERC (tariff order for projects covered
under JNNSM) dated 27/05/10
FY 2010-11 (till 31/05/12)
Lev - 18.45
AD- 4.11
After AD - 14.34
17.15
25 FY 2012-16 (3 yrs) CERC (FY13-14)
Draft CERC Generic RE Tariff Order for
FY 2013-14;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
Lev - 8.75
AD - 0.88
After AD - 7.87
800 (FY 2013-14) 19%
Prepared by ABPS Infra Page20/123
FIT: SOLAR
ANNEXURE-1B
Financial Parameters
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
Capacity Utilisation
Factor (%)
Auxiliary Consumption
(%)
Useful life
(yrs)
CERC (FY12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
Lev - 10.39
AD - 1.04
After AD - 9.35
1000 (FY 201213) 19% 25
STATE-WISE FEED-IN-TARIFF FOR SOLAR PV
Normative Parameters
NA
19% with a deration of 1%
every year after ten years.
2% 25 Tamil Nadu
TNERC (tariff order for projects covered
under JNNSM) dated 27/05/10
FY 2010-11 (till 31/05/12)
Lev - 18.45
AD- 4.11
After AD - 14.34
17.15
Tripura
TERC (Cogeneration and Generation of
Electricity from renewable source of
Energy) regulation 2009
FY 2009-12 (3 years from
notification of these regulations)
West Bengal
Draft WBERC (Cogeneration &
generation of electricity from renewable
energy source), regulation 2012
FY 2013-17 (5 Years)
10 (Capacity ranging 100 KW to 2
MW availing GBI)
10 (Grid connected plant not
eligible for any incentive and
Uttar Pradesh
UPERC (Captive and Non-conventional
Energy generating plants )regulation
2009
FY 2010-14 (5 years)
15 (comissioned by Dec 2011,not
covered under GOI incentive
scheme)
Uttarakhand
FY 2009-12 (3 years from the
commensment of these
regulations)
Lev - 17.70
AD - 1.65
after AD - 16.05
1700 (Projects comissioned on
or after 1/04/09)
19% NA 25
Prepared by ABPS Infra Page21/123
FIT: SOLAR
Subsidy and incentive by
Central /State Govt
Taxes and Duties Late Payment surcharge
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Shall be considered
(including AD) and per unit
benefit shall be derived on
levellised basis
Normative Parameters
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
1. Shall be taken into
consideration while
determining tariff.
2. 90% of the capital
Tariff determined shall be
inclusive of all taxes and
duties
1.25% per month if
payment delayed beyond
60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
1.25% per month beyond
a delay of 30 days
1.25% per month beyond
a delay of 30 days
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
RE developers shall be
exempted from all types of
taxes and duties
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
RE developers shall be
exempted from all types of
taxes and duties
1.25% per month beyond
a delay of 60 days
NA
Subsidy shall be workout
and tariff shall be reduced
for a period of 12 years
RE developers shall be
exempted from all types of
taxes and duties
1.25% per month beyond
a delay of 60 days
NA NA
AD benefit shall be factored
in the tariff
GBI
1% per month for
payment after 30 days of
billing
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
Prepared by ABPS Infra Page22/123
FIT: SOLAR
Subsidy and incentive by
Central /State Govt
Taxes and Duties Late Payment surcharge
Tariff exclusive of taxes and
duties, pass through allowed
on actual basis
1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Normative Parameters
AD benefit shall be factored
in the tariff
Exempt from Income tax
and all other taxes and
duties & other levies
imposed by State/central
1.25% per month beyond
a delay of 60 days
1% per month for
payment after 30 days of
billing
75% of capital subsidy for
the financial year of
comissioning as per
applicable scheme of MNRE
Including Direct Tax but
Exclusive other tax and
duties
10% tax rate for 0-10
1.25% per month beyond
a delay of 60 days
Prepared by ABPS Infra Page23/123
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Arunachal Pradesh
Andhra Pradesh
IA No 17 of 2010, dated July 14, 2010
CERC (FY 12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)
Assam
RE Tariff Regulation (Draft) dated Jan
13, 2012
Bihar
Order on Petition 12/2012, dated May 29,
2012, Solar Tariff Regulations dated Aug 2,
2010
Chhattisgarh RE Tariff Regulation dated Apr 02, 2012
Delhi
Gujarat GERC Order 1 of 2012 dated Jan 27, 2012
CERC (FY13-14)
Draft CERC Generic RE Tariff Order for
FY 2013-14;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
Haryana
Suo Moto Petition for Determination of
Levellised Tariff for RE Projects dated Sept
2012
Himachal Pradesh
HPERC( Promotion of Generation from
Renewable Energy sources and Terms
and conditions of Tariff) Regulations,
2012
Jammu and Kashmir
JKSERC (Terms and Conditions for Tariff
determination from RE Sources)
Regulations (Draft), 2012
Jharkhand
(Determination of Tariff for Procurement
of Power from Solar PV and Solar
Thermal Power Projects)
REGULATIONS, 2010 dated June 23,
Karnataka
KERC Order on Solar Power Tariff
Determination dated July 13, 2010
Kerala
Madhya Pradesh
Tariff Order for Solar Based Power
Generation dated Aug 01, 2012
Maharashtra
MERC RE tariff regulayions,2010 ,Case
No 10 of 2012
(Mar 30, 2012)
Manipur
JERC of Manipur & Mizorum (RE Tariff
regulation) 2010 dated 15 Apr,2010
&Mizoram
Meghalaya
Draft Meghalaya State Electricity
Regulatory Commission (Terms and
Conditions for determination of Tariff for
Generation from Renewable Energy
Sources) Regulations, 2012.
Nagaland
NERC (terms and condition for
determination of generation tariff for
renewable energy) regulation 2011
Orissa
OERC redetermination of generic tariff
for solar PV and Solar thermal,Case No
1 of 2012
Punjab
Adoption of CERC RE tariff regulation
2012,Petetion no 35 of 2012,dated 19
July 2012
Pondicherry No tariff Order
Daman & Diu No tariff Order
Lakshadweep No tariff Order
Chandigargh No tariff Order
Dadra and Nagar Haveli No tariff Order
Goa No tariff Order
Andaman Nicobar No tariff Order
Union Territories
Rajasthan
RERC (Determination of benchmark capital
cost for solar PV and Solar thermal power
projects) dated 13 may 2012
Sikkim Tariff order or Regulation not found
Tamil Nadu
TNERC (Tariff order for Solar thermal
projects covered by JNNSM) dated
08/07/2010
Tripura
TERC (Cogeneration and Generation of
Electricity from renewable source of
Energy) regulation 2009
Uttarakhand
UERC (Tariff and other terms for supply
of electricity from renewable enrgy
sources and non fossil fuel based
cogeneration) regulation 2010
Uttar Pradesh
UPERC (Captive and Non-conventional
Energy generating plants )regulation
2009
West Bengal NA
ANNEXURE-1B
Financial Parameters
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
2010-11 and 2012-13
15.31 (Without AD)
12.85 (With AD)
FY 2012-16 (3 yrs)
Lev - 12.46
AD - 1.24
After AD - 11.22
1300 (FY 201213)
STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)
Jan 2012 to Mar 2014 1500
Upto March 31, 2015
commissioning
13.11 (Without AD)
11.87 (With AD)
1300
April 2012 to March 2017 1300
Jan 29, 2012 to March 31, 2015
12.91 (Without AD)
11.55 (With AD)
1400
FY 2012-16 (3 yrs)
Lev - 11.90
AD - 1.21
After AD - 10.69
1200 (FY 201314)
3 years(till FY 13-FY15) 12.17 1300
According to the generic tariff
Order (Duration to be fixed as
find appropriate by the
Commission)
N.A N.A
2012-17 (5 years from the date
of commencement)
1300
June 2010 to June 2013 1300
Upto March 31, 2013
commissioning
11.35 1300
Aug 2012 to March 2014 12.65 1325
FY 2010-14(5 years from the
date of commencement )
Lev - 13.44
AD - 1.97
After AD - 11.47 1300
FY 2010-14(5 years from date
of notification)
1500 (FY2010-11)
FY 2013-15 (3 years) NA 1300 (FY2012-13)
FY- 2012-14 (3 years) 1530
Plant comissioned in FY (2012-
13) onwards
Lve - 14.73
AD - 2.41
After AD-12.32
1530
FY 2012-16
Lev - 12.46
AD - 1.24
After AD - 11.22 1300
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order
FY 2012-13
11.95 (Without AD)
With AD - 10.45
11.95 (Small Solar thermal
1275
NA NA NA
FY 2010-11 (till 31/05/12)
Lev - 15.51
AD - 3.35
After AD - 12.16
1556 (FY 2010-11)
NA
FY 2009-12 (3 years from
notification of these
regulations)
FY 2009-12 (3 years from the
commensment of these
regulations)
Lev - 12.95
AD - 1.15
after AD - 11.80
1300 (Projects comissioned on
or after 1/04/09)
FY 2010-14 (5 years)
13 (comissioned by Dec
2011,not covered under GOI
incentive scheme)
NA NA NA
Capacity Utilisation
Factor (%)
Auxiliary Consumption
(%)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
25
Normative Parameters
23%
23%
10% 25
Shall be considered
(including AD) and per unit
benefit shall be derived on
levellised basis
10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% with 0.25% annual
degradation
10.00% 25
10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23%
23% 10% 25
N.A N.A 25
1. Shall be taken into
consideration while
determining tariff.
2. 90% of the capital
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 10 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 8% 25
23% with 0.5% annual
deration from 3rd yr
onwards
10% 25
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
24% 10% 25
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
23% 10% 25
Subsidy shall be workout
and tariff shall be reduced
for a period of 12 years
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
23% with a deration of
0.25% every year after
fourth year.
6.50% 25
NA NA NA NA
23% with a deration of 1%
every year after ten years.
10% 25
AD benefit shall be factored
in the tariff
23% 10% 25
75% of capital subsidy for
the financial year of
comissioning as per
applicable scheme of MNRE
NA NA NA NA
Taxes and Duties
Late Payment
surcharge
Reference
CE98R01060212
CE98O01270312
CE98R01060212
CE98B01251012
BR02O01290512
BR02R01020810
AP02O01140610
1.25% per month
beyond a delay of 60
days
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
Normative Parameters
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
AS98A01130112
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
CG98R01020412
GJ02O01270112
HR98O01030912
Tariff determined shall be
inclusive of all taxes and
duties
1.25% per month if
payment delayed
beyond 60 days
HP98R01171212
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
JK98A01000012
1.25% per month
beyond a delay of 30
days
JH02R01230610
KA02O01130710
1.25% per month
beyond a delay of 30
days
MP02O01010812
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
MH98O01300312
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
MN98R01150410
MZ98R01150410
Tariff exclusive of taxes
and duties, pass through
allowed on actual basis
1.25% per month
beyond a delay of 60
days
ML98A01050912
RE developers shall be
exempted from all types
of taxes and duties
1.25% per month
beyond a delay of 60
days
NL98R01300811
RE developers shall be
exempted from all types
of taxes and duties
1.25% per month
beyond a delay of 60
days OR02O01010212
RE developers shall be
exempted from all types
of taxes and duties
1.25% per month
beyond a delay of 60
days PB98O01190712
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
RJ02O01300512
NA NA
1% per month for
payment after 30 days
of billing
TN02O01080710
TR98R01230309
Including Direct Tax but
Exclusive other tax and
duties
10% tax rate for 0-10
1.25% per month
beyond a delay of 60
days
UA98R01060710
Exempt from Income tax
and all other taxes and
duties & other levies
imposed by State/central
1.25% per month
beyond a delay of 60
days
UP98R01220310
NA NA
Archives
HR02Z01000612
FIT:BIOMASS
ANNEXURE-1C
Financial Parameters
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period
Tariff
(Rs/kWh)
Capital Cost
(lakh/MW)
Specific heat rate
(kcal/kWh)
Auxiliary
Consumption
(%)
Calorific Value
(kCal/kg)
Punjab
PSERC Suo Motu Order on RE Tariff by
adopting CERC Tariff
From FY2010-11 to
FY2012-13
Rajasthan
RERC Tariff Regulation 2009 dated
January 23, 2009,
Tariff Order dated Dec 21, 2012
FY2009-10 to FY
2013-14
FY 2012-13
Revised Tariff-
4.96 for water
cooled / 5.42 for
Air cooled
521.24/564.68
4300 during
stabilisation and 4200
after stabilization / 4540
before stabilization and
4440 after stabilization
10.5 % during s and
10% after tabilization /
12.5 % during s and
12% after tabilization
3400
5.83 445 4000 10% 3300
3522 10%
10% 3467 Nagaland
Nagaland Electricity Regulatory
Commission (Terms and Conditions for
Determination of Generation Tariff for
Renewable Energy) Regulations, 2011
FY2010-11 to
FY2014-15
403 3800
Orissa
OERC Suo Moto Tariff Order dated
September 14, 2010 in Petition No
37/2008
From FY2010-11 to
FY2012-13
4.09 450 3800
&Mizoram
Joint Electricity Regulatory Commission
for
Manipur & Mizoram (Terms and
Conditions for Tariff determination from
2010-11 to 2014-15 NA 520 3800
10% 3467 Meghalaya
Draft Meghalaya State Electricity
Regulatory Commission (Terms and
Conditions for determination of Tariff for
Generation from Renewable Energy
Sources) Regulations, 2012.
FY 2013-15
(3 years)
NA 550 3800
Maharashtra MERC suo motu Tariff Order dated
FY2013-14 and
FY2014-15
5.41 402.54 10% 3611
Joint Electricity Regulatory Commission
for
Manipur & Mizoram (Terms and
Conditions for Tariff determination from
2010-11 to 2014-15 NA 520 3800 10%
Kerala No tariff Order No tariff Order
10% 3467
3467 Manipur
Madhya Pradesh Biomass Tariff Order_ March 2, 2012
March 2012 to end
of FY 2013-14
450 3800
3800
10% 3612
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
9%
10% 3467 Jharkhand
Biomass and NFFcogen Tariff
Regulations_27012010
Till March 31, 2015 NA 450 3800
Himachal Pradesh
HPERC( Promotion of Generation from
Renewable Energy sources and Terms
and conditions of Tariff) Regulations,
2012
According to the
generic tariff Order
(Duration to be fixed
as find appropriate
N.A N.A
Karnataka RE Tariff Order(111209) NA NA 487
Jammu and Kashmir Draft RE Tariff Regulations_July 2012
5 years(2012-13 to
2017-18)
NA 445 4000
N.A N.A
10% 3300
Gujarat Bagass Tariff Order - Order No. 5 of 2010-May 17, 2010
1.06.2010 to
31.03.2013.
4.49 (with AD)
4.54(w/o AD)
454 3800
3800 10%
10% 3300
N.A
3458 Haryana
Haryana RE (Biomass) Tariff Order -
03092012
3 years(till FY 13-
FY15)
5.59 (for
watercooled)
5.88 (for aircooled
condenser)
445 (aircooled condenser)
475 (water cooled condenser)
Delhi No tariff Order No tariff Order NA NA NA NA NA
3300
10% 3300 Bihar
Order on Tariff Determination for
Biomass Plants to be commissioned
in 2012-13 to 2016-17
5 Years( 2012-13 to
2016-17)
FC - 2.08/kWh
VC - 3.34/kWh
with 5% annual
escalation in fuel
cost
445 4000
10% 3467
Chhattisgarh Draft RE Tariff Regulation_April 2012
5 Years(2011-12-
2016-17)
NA 445 4000 10%
Assam
Notification (Draft)
Dated Guwahati the 13th January, 2012
3 years(till March
2014)
NA 426 3800
CERC (FY13-14)
Draft CERC Generic RE Tariff Order for
FY 2013-14;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
***given below in
separate table
462 (FY 13-14)
10% 3300
3275
10% 3300
Arunachal Pradesh Tariff Notification Dated April 9, 2012
5 Years( 2012-13 to
2016-17)
NA 445 4000
4000
CERC (FY 12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
***given below in
separate table
445 (FY 12-13) 4000
Andhra Pradesh Tariff Order (Dated 31/03/2009) & 2009-10 to 2014-15 NA 400 3,800
STATE-WISE FEED-IN-TARIFF FOR BIOMASS
Normative Parameters
9%.
10% 3300
Prepared by ABPS Infra Page39/123
FIT:BIOMASS
ANNEXURE-1C
Financial Parameters
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period
Tariff
(Rs/kWh)
Capital Cost
(lakh/MW)
Specific heat rate
(kcal/kWh)
Auxiliary
Consumption
(%)
Calorific Value
(kCal/kg)
CERC (FY 12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
***given below in
separate table
445 (FY 12-13) 4000
STATE-WISE FEED-IN-TARIFF FOR BIOMASS
Normative Parameters
10% 3300
CERC Tariff for Biomass for FY 2012-13
State Lev. FC Lev. VC
Tariff (With AD)
(FY 201213)
AD Benefit
Net Levellised
(without AD)
Andhra Pradesh 2.06 3.12 5.18 0.13 5.05
Haryana 2.10 3.55 5.65 0.13 5.52
Maharashtra 2.11 3.63 5.74 0.13 5.61
Punjab 2.12 3.71 5.83 0.13 5.70
Rajasthan 2.06 3.10 5.16 0.13 5.03
Tamil Nadu 2.06 3.07 5.12 0.13 4.99
Uttar Pradesh 2.07 3.17 5.24 0.13 5.11
Others 2.08 3.33 5.42 0.13 5.29
CERC Proposed Tariff for Biomass for FY 2013-14
State Lev. FC Lev. VC
Tariff (With AD)
(FY 201213)
AD Benefit
Net Levellised
(without AD)
Andhra Pradesh 2.21 3.37 5.58 0.14 5.44
Haryana 2.25 3.84 6.09 0.14 5.95
Maharashtra 2.26 3.92 6.18 0.14 6.04
Punjab 2.27 4.01 6.28 0.14 6.14
Rajasthan 2.20 3.35 5.55 0.14 5.41
Tamil Nadu 2.20 3.31 5.51 0.14 5.37
Uttar Pradesh 2.21 3.43 5.64 0.14 5.50
Others 2.23 3.60 5.83 0.14 5.69
No tariff Order
No tariff Order No tariff Order
Lakshadweep No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Pondicherry No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order
No tariff Order Dadra and Nagar Haveli No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Daman & Diu No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Chandigargh No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order
No tariff Order No tariff Order
No tariff Order No tariff Order Andaman Nicobar No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
WBERC does not
specify the project
parameters for
determination of tariff. It
Union Territories
Goa No tariff Order
Uttar Pradesh
UPERC (Captive and Non- Conventional
Energy Generating Plants) Regulations,
2009
(hereinafter referred to as CNCE
October 1, 2009 to
March 31, 2014
5.02 NA NA NA NA
West Bengal
Draft West Bengal Electricity Regulatory
Commission (Cogeneration and
Generation of Electricity from
Renewable Sources of Energy)
NA 5.00
WBERC does not specify the
project parameters for
determination of tariff. It only
specifies a cap for the tariff.
WBERC does not
specify the project
parameters for
determination of tariff. It
WBERC does not
specify the project
parameters for
determination of tariff. It
Tripura NA NA NA NA NA
Uttarakhand
UERC (Tariff and Other Terms for
Supply of Electricity from Renewable
Energy Sources and non-fossil fuel
based Co-generating Stations)
FY2009-10 to
FY2013
450 4200 10% 3371
Sikkim NA NA NA NA
10%
NA NA
Tamil Nadu
Comprehensive Tariff Order for
Biomass Power Plants, Order No 8 of
2012 dated July 31 ,2012
August1, 2012 to
July 31, 2014
4.694 445 3840
NA NA
3200
Rajasthan
RERC Tariff Regulation 2009 dated
January 23, 2009,
Tariff Order dated Dec 21, 2012
FY2009-10 to FY
2013-14
FY 2012-13
Revised Tariff-
4.96 for water
cooled / 5.42 for
Air cooled
521.24/564.68
4300 during
stabilisation and 4200
after stabilization / 4540
before stabilization and
4440 after stabilization
NA
10.5 % during s and
10% after tabilization /
12.5 % during s and
12% after tabilization
3400
Prepared by ABPS Infra Page40/123
FIT:BIOMASS
1921.5
Plant Load Factor (%)
Fuel Cost
(Rs/ MT)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and
Duties
Late Payment
surcharge
Reference Archives
CE98R01060212
CE98B01251012
excluded from
the tariff
NA
NA
RJ98R01230109 /
RJ04O01091211
RJ04O01211212
PB98O01190712
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
2756 20
1921.5 for FY012-13 ( with
5% esc)
20
Passed on to
utility/consumer
excluded from
the tariff
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
then75% from 2nd year
onward
Passed on to
utility/consumer
NA OR98O01140910
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
1968 20
Passed on to
utility/consumer
excluded from
the tariff
excluded from
the tariff
NA NL98R01300811
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
1855 for FY010 -11 ( with
5% esc)
20
Passed on to
utility/consumer
excluded from
the tariff
NA
85%
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
2084 for FY010 -11 ( with
5% esc)
20
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of
60 days
ML98A01050912
MZ98R01150410
2084 for FY010 -11 ( with
5% esc)
20
Passed on to
utility/consumer
2018 for FY2012 -13 ( with
5% esc)
20
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Passed on to
utility/consumer
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
2605 20
Passed on to
utility/consumer
No tariff Order
excluded from
the tariff
NA
NA MN98R01150410
NA MP04O0120312
MH98R01070610 /
MH98O01300312
excluded from
the tariff
During stabilisation : 60
% (ii)During the
remaining period of the
first year of operation of
KL07R02191108 No tariff Order No tariff Order No tariff Order
2100 20 NA NA
No tariff Order No tariff Order
NA KA98O01111209 75%
1280 FY 2009-10 ( 5%
esc)
20 NA NA
NA NA JH04R01270110 70%
1797- FY2010-11 (5%
esc)
20 NA
During stabilisation : 60
% (ii)During the
remaining period of the
first year of operation of
N.A
Tariff determined shall be
inclusive of all taxes and
duties
1.25% per month if
payment delayed
beyond 60 days
HP98R01171212
pass through
on actual
incurred basis
subject to
pass through
on actual
incurred basis
subject to
1.25% per month,
beyond 60 days
JK98A01010712
HP98A01240712
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Capitalisation of RE projects
during second half of the
2500(indexation or 5% esc) 20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Capitalisation of RE projects
N.A
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Capitalisation of RE projects
70% for 1st year &
80% from 2nd year
onwards.
1600 (5% esc)
70% for 1st year &
80% from 2nd year
onwards.
2556 - FY 2012-13(5%
esc)
20
pass through
on actual
incurred basis
subject to
1.25% per month,
beyond 60 days
NA NA NA NA
1.25% per month,
beyond 60 days
CG98A01020412
First six months of COD:
60%
ii. Next six months upto
one year of COD: 70%
2476 for FY 2012-13
(linked with indexation)
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Capitalisation of RE projects
pass through
on actual
incurred basis
subject to
NA NA BR04O01301112
First six months of COD:
60%
ii. Next six months upto
one year of COD: 70%
iii. From 2nd Year of
COD onwards: 80 %
2476 for FY 2012-13 (5%
escalation)
20 NA
70%
2018 for FY 2012-13 (5%
esc)
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Capitalisation of RE projects
pass through
on actual
incurred basis
subject to
1.25% per month,
beyond 60 days
AS98A01130112
1.25% per month
beyond a delay of
60 days
CE98R01060212,
CE98O01270312
Andhra Pradesh-2502.01
Haryana-2847.86
Maharashtra-2912.71
Punjab-2978.63
Rajasthan-2485.80
Tamil Nadu-2460.94
Uttar Pradesh-2545.24
Other States-2676.01
60% during stabilisation
period ,
70% for remaining
stabilisation period of 1st
year and then

80% from 2nd year
onward
60% during stabilisation
period ,
70% for remaining
stabilisation period of 1st
year and then

80% from 2nd year
onward
Andhra Pradesh-2315
Haryana-2635
Maharashtra-2695
Punjab-2756
Rajasthan-2300
Tamil Nadu-2277
Uttar Pradesh-2355
Other States-2476
20
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
20
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
BR04C01010712
1.25% per month,
beyond 60 days
HR98O01030912
Normative Parameters
NA
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Capitalisation of RE projects
pass through
on actual
incurred basis
subject to
1.25% per month,
beyond 60 days
GJ04O01170510
pass through
on actual
incurred basis
subject to
production of
NA NA NA
AR98R0190412
1.25% per month
beyond a delay of
60 days
HR98O01250112/ HR98R0130211
AP98O0120911 80%.
1300 for base year 2009-
10 (5%esc)
20
Passed on to
utility/consumer
over and above
the determined
tariffs, to be
reimbursed by
70%
2283 for FY2012-13
(5%esc)
Prepared by ABPS Infra Page41/123
FIT:BIOMASS
1921.5
Plant Load Factor (%)
Fuel Cost
(Rs/ MT)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and
Duties
Late Payment
surcharge
Reference Archives
1.25% per month
beyond a delay of
60 days
CE98R01060212,
CE98O01270312
60% during stabilisation
period ,
70% for remaining
stabilisation period of 1st
year and then

80% from 2nd year
onward
Andhra Pradesh-2315
Haryana-2635
Maharashtra-2695
Punjab-2756
Rajasthan-2300
Tamil Nadu-2277
Uttar Pradesh-2355
Other States-2476
20
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
Normative Parameters
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
WBERC does not
specify the project
parameters for
determination of
WB98A01100812
WBERC does not
specify the project
parameters for
determination of tariff. It
WBERC does not specify
the project parameters for
determination of tariff. It
only specifies a cap for the
WBERC does not
specify the project
parameters for
determination of
WBERC does not specify
the project parameters for
determination of tariff. It only
specifies a cap for the tariff.
WBERC does
not specify the
project
parameters for
NA NA NA
passed on to
utility/consumer
NA
1.25% p.m. beyond
2 months
UP98R01220310
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
NA NA NA NA NA
UA98R01060710
NA
Passed on to
utility/consumer
1518 for FY009-10 ( with
5% esc)
20
75% passed onto
utility/consumer
NA
1.25% p.m. beyond
60 days
NA
NA NA NA NA
80% 2277 20
NA NA
interest of 1% per
Month
TN04O01310712
NA
RJ98R01230109 /
RJ04O01091211
NA
NA
RJ04O01211212
1921.5 for FY012-13 ( with
5% esc)
20
Passed on to
utility/consumer
excluded from
the tariff
60% before stabilisation
period , 70% for
remaining stabilisation
period of 1st year and
then75% from 2nd year
onward
Prepared by ABPS Infra Page42/123
FIT:BAGASSE_COGEN
ANNEXURE-1D
Financial Parameters
STATE
Tariff Regulations / or Order or
Draft
(Ref. no. dt)
Control period
Tariff
(Rs/kWh)
Capital Cost
(lakh/MW)
Station heat rate
(kcal/kWh)
Auxiliary
Consumption
(%)
Calorific Value
(kCal/kg)
Plant Load Factor (%)
Fuel Cost
(Rs/ MT)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and
Duties
Late Payment
surcharge
CERC Tariff for Bagasse Co-gen for FY 2012-13
State Lev. FC Lev. VC
Tariff (With AD)
(FY 201213)
AD Benefit
Net Levellised
(without AD)
Andhra Pradesh 2.77 2.29 5.06 0.21 4.85
Haryana 2.48 3.25 5.73 0.18 5.55
Maharashtra 2.22 3.2 5.42 0.16 5.26
Punjab 2.44 2.86 5.3 0.18 5.12
Tamil Nadu 2.15 2.46 4.61 0.16 4.45
Uttar Pradesh 2.8 2.55 5.35 0.21 5.14
Others 2.43 2.77 5.2 0.18 5.02
CERC Proposed Tariff for Bagasse Co-gen for FY 2013-14
State Lev. FC Lev. VC
Tariff (With AD)
(FY 201213)
AD Benefit
Net Levellised
(without AD)
Andhra Pradesh 2.95 2.47 5.42 0.23 5.19
Haryana 2.64 3.51 6.16 0.20 5.96
Maharashtra 2.37 3.46 5.83 0.18 5.66
Punjab 2.60 3.09 5.69 0.20 5.49
Tamil Nadu 2.29 2.66 4.95 0.18 4.78
Uttar Pradesh 2.98 2.76 5.73 0.23 5.50
Others 2.59 2.99 5.58 0.20 5.38
-
CERC (FY 12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
***given below in separate
table
420 3600 8.50% 2250
UP&AP - 45%
TN & Maha - 60%
Other States - 53%
Tariff Order (Dated 31/03/2009)
2009-10 to 2014-
15
325 3700
over and
above the
determined
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of
60 days
STATE-WISE FEED-IN-TARIFF FOR BAGASSE_COGEN
Normative Parameters
Andhra Pradesh-1307
Haryana-1859
Maharashtra-1832
Punjab-1636
Tamil Nadu-1408
Uttar Pradesh-1458
Other States-1583
Passed on to
utility/consumer
CERC (FY13-14)
Draft CERC Generic RE Tariff Order
for FY 2013-14;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
***given below in separate
table
436.36 (For FY 13-14) 3600 8.50% 2250
Andhra Pradesh
No tariff Order
9.0% 2300 55% 950 20
Assam
20
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
No tariff Order Arunachal Pradesh Tariff Notification Dated April 9, 2012
5 Years( 2012-13
to 2016-17)
No tariff Order No tariff Order No tariff Order
53% 1306(5% esc) 20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
pass through
on actual
incurred basis
1.25% per month,
beyond 60 days
Bihar
Order on Tariff Determination for
Bagasse based Co-generation Plants
to be commissioned
in 2012-13 to 2016-17
5 Years( 2012-13
to 2016-17)
FC - 2.29/kWh
VC - 2.77/kWh with 5%
annual escalation in fuel cost
420 3650 8.50% 2275 53%
1.25% per month,
beyond 60 days
No tariff Order No tariff Order 20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
pass through
on actual
incurred basis
2250
3600
No tariff Order No tariff Order
pass through
on actual
incurred basis
1.25% per month,
beyond 60 days
53%
1583 ( for first year, after
through indexation)
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Notification (Draft)
Dated Guwahati the 13th January,
2012
3 years(till March
2014)
NA 421 3600 8.50%
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
8.50% 2250 Chhattisgarh
Draft RE Tariff Regulation_April
2012(NFF Cogen)
5 Years(2011-12-
2016-17)
NA 420
8.50% 2250
Delhi No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Gujarat Bagass Tariff Order - Order No. 4 of 2010-May 31, 2010
8.50% 2250 53%
60% 1200(5% esc) 20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Haryana Haryana Biomass Tariff Order -03092012
3 years(till FY 13-
FY15)
3.83 421.3 3600
three years from
1st June,
2010 to 31st May,
4.65 (with AD) 4.71(w/o AD) 415 3600
Jammu and Kashmir Draft RE Tariff Regulations_July 2012 5 years(2012-13 to
2017-18)
NA 420 3600
Himachal Pradesh
HPERC( Promotion of Generation from
Renewable Energy sources and Terms
and conditions of Tariff) Regulations,
According to the
generic tariff Order
(Duration to be
N.A N.A N.A
53% 1163(5% esc) 20
8.50%
N.A N.A
1.25% per month,
beyond 60 days
53%
1600 (indexation or 5%
esc)
20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
pass through
on actual
incurred basis
pass through
on actual
incurred basis
1.25% per month if
payment delayed
beyond 60 days
N.A N.A 20
Tariff determined shall be
inclusive of all taxes and
duties
NA 400 3600 8.5% 2250
2250
3600 8% 2250 60% 1025(with 5% esc) 20
55% 12
Karnataka RE Tariff Order(111209) NA NA 365
Jharkhand
Biomass and NFFcogen Tariff
Regulations_27012010
Till March 31, 2015
8.50% 2250
2300
350
55% 775 20 275 3700 8%
Maharashtra
Tariff Regulations (Dated 07/06/2010)
& RE Tariff Order March 31, 2012
Kerala Power Procurement Regulations 2008 NA 2.55
Madhya Pradesh
Tariff Order on Bagass based Co-
gen_03092008
till 31.3.2013
1.91(FT)+1.99(VT)= 3.90(for
FY 2012-13
60% 1832 20
passed on to
utility/consumer
passed on to
utility/consum
er
1.25% p.m. beyond
60 days
Manipur Tariff Regulations (Dated 15/04/2010)
2010-11 to 2014-
15
NA 516 3600 8.50% 2250 53% 1350 20
passed on to
utility/consumer
passed on to
utility/consum
er
1.25% p.m. beyond
60 days
2010-11 to 2014-
15
2.26(F.C)+ 2.53(V.C)= 4.79
(for FY 2012-13)
398.07 3600
Meghalaya
Draft Meghalaya State Electricity
Regulatory Commission (Terms and
Conditions for determination of Tariff
for Generation from Renewable Energy
Sources) Regulations, 2012.
FY 2013-15
(3 years)
NA 420 3600
&Mizoram Tariff Regulations (Dated 15/04/2010)
2010-11 to 2014-
16
NA 516 3600
53% 1221 20
8.50%
8.50% 2250
1.25% per month
beyond a delay of
60 days
45% for 120 days of
operation
60% for 240 days of
operation
1583 20
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
passed on to
utility/consum
er
1.25% p.m. beyond
60 days
53% 1350 20
passed on to
utility/consumer
NA 398 3600 8.50% 2250
3467
passed on to
utility/consumer
passed on to
utility/consum
er
3600
Parameters and
tariffs to be
determined through
1.25% p.m. beyond
60 days
Parameters
and tariffs to
be determined
3600 8.50% 2250 53% 1221 20
2250 80% 2357 20
passed on to
utility/consumer
Orissa Tariff Order (Dated 14/09/2010)
2010-11 to 2012-
13
Rs 4.4/kWh (Without AD) &
Rs 4.12/kWh (With AD)
398.07
passed on to
utility/consum
er
1.25% p.m. beyond
60 days
Nagaland Tariff Regulations (Dated 08/2011)
2011-12 to 2014-
15
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Parameters and tariffs
to be determined
through suo-motu
passed on to
utility/consum
er
1.25% p.m. beyond
60 days
420
Parameters and tariffs to
be determined through
suo-motu petition or on
Parameters and tariffs to
be determined through
suo-motu petition or on
Parameters and
tariffs to be
determined
Parameters and tariffs to be
determined through suo-
motu petition or on case-to-
passed on to
utility/consumer
Parameters and tariffs to be
determined through suo-motu
petition or on case-to-case
Parameters and tariffs
to be determined
through suo-motu
Parameters and tariffs
to be determined
through suo-motu
8.50%
Sikkim No Tariff Order/Regulations available
Punjab Tariff Order (Dated 19/07/2012) 2012-13
Rs 5.32/kWh (Without AD) &
Rs 5.2/kWh (With AD)
Rajasthan Tariff Regulations (Dated 23/01/2009)
2009-10 to 2014-
15
Parameters and tariffs to be
determined through suo-
motu petition or on case-to-
9% 2300 55%
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
Tamil Nadu Tariff Order (Dated 31/07/2012)
01/08/2012 to
31/07/2014
NA 420 3700
8.50%
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Tripura No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
Uttarakhand Tariff Regulations (Dated 06/07/2010) NA NA 445 3600
20 NA NA
1% p.m. beyond 30
days
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
No Tariff Order/Regulations
available
1050
1.25% p.m. beyond
60 days
NA
2010-11 to 2013-
14
refer worksheet 'Additional
Data', Table 1
UPERC specifies 'year of
operation' based fixed cost
and financial year based
UPERC specifies 'year
of operation' based
fixed cost and financial
UPERC specifies 'year
of operation' based
fixed cost and financial
UPERC specifies 'year
of operation' based
fixed cost and financial
2250
75% passed onto
utility/consumer
passed on to
utility/consum
er
WBERC does not specify
the project parameters for
determination of tariff. It
WBERC does
not specify the
project
NA NA
NA
passed on to
utility/consum
er
1.25% p.m. beyond
2 months
Uttar Pradesh Tariff Regulations (Dated 22/03/2010)
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
45% 1013 20
WBERC does not
specify the project
parameters for
WBERC does not
specify the project
parameters for
WBERC does not specify
the project parameters for
determination of tariff. It
UPERC specifies 'year of
operation' based fixed
cost and financial year
UPERC specifies 'year of
operation' based fixed
cost and financial year
UPERC specifies
'year of
operation' based
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
West Bengal
Draft Tariff Regulations (Dated
10/08/2012)
10/08/2012 to
10/08/2015
3.3
WBERC does not specify the
project parameters for
determination of tariff. It only
WBERC does not
specify the project
parameters for
Goa No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
Union Territories
Andaman Nicobar No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
Chandigargh No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Dadra and Nagar
Haveli
No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Daman & Diu No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Lakshadweep No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulation
s available
Pondicherry No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
pass through
on actual
incurred basis
1.25% per month,
beyond 60 days
1583(5% esc) 20
pass through
on actual
incurred basis
1.25% per month,
beyond 60 days
UP&AP - 45%
TN & Maha - 60%
Other States - 53%
Andhra Pradesh-1412.58
Haryana-2009.17
Maharashtra-1979.99
Punjab-1768.16
Tamil Nadu-1521.74
Uttar Pradesh-1575.78
Other States-1710.88
20
Shall be factored in the
tariff on per unit benefit
derived on levellised basis
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of
60 days
662(with 5% esc) 20
Normative capital cost,
Accelerated Depreciation ,
Corporate income tax rate,
Prepared by ABPS Infra Page43/123
FIT:BAGASSE_COGEN
Reference Archives
CE98R01060212
CE98O01270312
CE98R01060212
CE98B01251012
AP98O01310309
AP98O0120911
AR98R0190412
AS98A01130112
BR07O01301112
CG98R01120412
JH07R01270110
JK98A01000712
HP98A01240712
MP07O0130908
KA98O01111209
KL07R02191108
MH98R01070610 /
MH98O01300312
MN98R01150410
NL98R01300811
ML98A01050912
MZ98R01150411
RJ98R01230109
OR98O01140910
PB98O01190712
TN07O01310712
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
UA98R01060710
WB98A01100812
UP98R01220310
HR98O01030912
GJ07O01310510
HR98O01250112/
HR0O01270511/
HR98R0130211
BR07C01000712
HP98R01171212
Prepared by ABPS Infra Page44/123
FIT:SMALL HYDRO
ANNEXURE-1F
Financial Parameters
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
Capacity Utilisation
Factor (%)
Auxiliary Consumption
(%)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and
Duties
Late Payment
surcharge
35
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
No Tariff/Parameters
Defined
No
Tariff/Parameters
Defined
No Tariff/Parameters
Defined
CERC (FY 12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
HP, Uttarakhand and NE
States
(Below 5MW) - 4.14(without
AD), 3.82 (with AD)
(5MW-25MW)-
3.54(without AD), 3.25 (with
AD)
Other States
(Below 5MW) - 4.88(without
AD), 4.50 (with AD)
(5MW-25MW)-
4.16(without AD), 3.82 (with
AD)
HP, Uttarakhand and NE
States
(Below 5MW) - 770
(5MW-25MW)- 700
Other States
(Below 5MW) - 600
(5MW-25MW)- 550
HP, Uttarakhand and NE
States - 45%
Other States- 30%
1%
Andhra Pradesh No Tariff/Parameters Defined
No Tariff/Parameters
Defined
No Tariff/Parameters
Defined
No Tariff/Parameters Defined
No Tariff/Parameters
Defined
35
passed on to
utility/consumer
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of 60
days
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of 60
days
35
passed on to
utility/consumer
No
Tariff/Paramet
ers Defined
No
Tariff/Parameters
Defined
STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO
Normative Parameters
1% Arunachal Pradesh Tariff Regulations (Dated 9/4/2012) 9/4/2012 to 8/4/2017 NA
700 (<=5 MW) & 630 (5-25
MW)
45%
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
Assam
Draft Tariff Regulations (Dated
13/01/2012)
31/3/2012 to 31/3/2015 NA
669 (<=5 MW) & 602 (5-25
MW)
45% 1%
Bihar No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Chhattisgarh
Draft RE Tariff Regulation_April
2012(NFF Cogen)
5 Years(2011-12-2016-17) NA
600 (<=5 MW) & 550 (5-25
MW)
30% 1% 35
passed on to
utility/consumer
water
charges/statuto
ry charges as
1.25% p.m. beyond
60 days
Delhi No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Gujarat No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Haryana RE Tariff Regulations (Dated 03/02/2011) 3 years(till FY 13) Case to Case basis Case to Case basis Case to Case basis Case to Case basis 35
passed on to
utility/consumer
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
Himachal Pradesh
HPERC( Promotion of Generation from
Renewable Energy sources and Terms and
conditions of Tariff) Regulations, 2012
(Dec 17, 2012)
18/12/2012 to 31/3/2017 NA
780 (100kW - 2MW), 750 (2-5
MW) & 700 (5-25 MW)
- 1.00% 40
passed on to
utility/consumer
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
NA
770 (<=5 MW) & 700 (5-25
MW)
45%
NA 0.50% 20 NA NA NA
1.25% p.m. beyond
60 days
Jharkhand Tariff Regulations (Dated 03/07/2007) NA NA NA
Jammu and Kashmir Draft RE Tariff Regulations 2012-13 to 2016-17
1% NA NA
1% 35
passed on to
utility/consumer
Karnataka RE Tariff Order (Dated 11/12/2009) NA
Rs 3.40/kWh for the first 10
years after signing the PPA
475 30%
0.50% 25 NA NA NA Kerala
Tariff amendment Regulations (Dated
22/11/2010)
NA Rs 2.94/kWh 520 30%
NA NA
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
passed on to
utility/consume
r not included
NA
Maharashtra Tariff Regulations (Dated 07/06/2010) 2010-11 to 2014-15 NA
498.88 (<=5 MW) & 453.53 (5-
25 MW)
30% 1% 35
passed on to
utility/consumer
passed on to
utility/consumer
Madhya Pradesh
SHP Tariff Regulations (Dated
30/06/2010)
30/06/2010 to 31/03/2013 Refer Table 1 below
700 for Run of the river, 600
for canal based generation
35% for Run of the river,
30% for canal based
generation
1% 30 NA
Manipur Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-15 NA
812 (<=5 MW) & 730 (5-25
MW)
40%
&Mizoram Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-16 NA
812 (<=5 MW) & 730 (5-25
MW)
40% 201% 35
passed on to
utility/consumer
1% 35
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
101% 35
Meghalaya
Draft Meghalaya State Electricity
Regulatory Commission (Terms and
Conditions for determination of Tariff for
Generation from Renewable Energy
Sources) Regulations, 2012.
FY 2013-15
(3 years)
NA
770 (<=5 MW) & 700 (5-25
MW) (for 2012-13)
45%
1% 35
passed on to
utility/consumer
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
Nagaland Tariff Regulations (Dated 08/2011) 2011-12 to 2014-15 NA
635 (<=5 MW) & 571 (5-25
MW)
30%
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
passed on to
utility/consume
r
1.25% p.m. beyond
60 days
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of 60
days
Punjab Tariff Order (Dated 19/07/2012) 2012-13
Rs 4.88/kWh (<=5 MW) &
Rs 4.16/kWh (5-25 MW)
w/o AD and Rs 4.5/kWh &
600 (<=5 MW) & 550 (5-25
MW)
30% 1% 35
passed on to
utility/consumer
Parameters and tariffs to be
determined through suo-
motu petition or on case-to-
Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13
Rs 3.91/kWh (<=5 MW) &
Rs 3.64/kWh (5-25 MW)
w/o AD and Rs 3.31/kWh &
600 (<=5 MW) & 550 (5-25
MW)
35% 1% 35
passed on to
utility/consumer
Rajasthan Tariff Regulations (Dated 23/01/2009) 2009-10 to 2014-15
Parameters and tariffs to be
determined through suo-
motu petition or on case-to-
Parameters and tariffs to be
determined through suo-motu
petition or on case-to-case
Parameters and tariffs to
be determined through suo-
motu petition or on case-to-
Sikkim No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations available
No Tariff
Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
Parameters are defined on
case to case basis
Parameters are
defined on case to
case basis
Parameters are defined on
case to case basis
Parameters
and tariffs to
be determined
Parameters and
tariffs to be
determined through
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
Parameters and tariffs to
be determined through suo-
motu petition or on case-to-
Parameters and
tariffs to be
determined
Tamil Nadu
Parameters are defined on case to case
basis
Parameters are defined on
case to case basis
Parameters are defined on
case to case basis
Parameters are defined on
case to case basis
Parameters are defined on
case to case basis
No Tariff
Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulati
ons available
No Tariff
Order/Regulations
available
1.25% p.m. beyond
60 days
Parameters are
defined on
case to case
basis
Parameters are
defined on case to
case basis
Tripura No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations available
NA
45% 1% 35
75% passed onto
utility/consumer
passed on to
utility/consume
r
Uttar Pradesh Tariff Regulations (Dated 22/03/2010) 2010-11 to 2013-14
UPERC specifies 'year of
operation' based fixed cost
and financial year based
UPERC specifies 'year of
operation' based fixed cost and
financial year based tariff. It
UPERC specifies 'year of
operation' based fixed cost
and financial year based
UPERC specifies 'year of
operation' based fixed cost
and financial year based
UPERC specifies
'year of operation'
based fixed cost
passed on to
utility/consume
r
1.25% p.m. beyond
2 months
Uttarakhand Tariff Regulations (Dated 06/07/2010) NA
700 For 0-5 MW, 685 For 5-10
MW, 670 For 10-15 MW, 650
For 15-20 MW & 630 For 20-
West Bengal
Draft Tariff Regulations (Dated
10/08/2012)
10/08/2012 to 10/08/2015 4.4
WBERC does not specify the
project parameters for
determination of tariff. It only
WBERC does not specify
the project parameters for
determination of tariff. It
WBERC does not specify
the project parameters for
determination of tariff. It
WBERC does not
specify the project
parameters for
NA NA NA
Goa No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
1% 35
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
CERC (FY13-14)
Draft CERC Generic RE Tariff Order for
FY 2013-14;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
HP, Uttarakhand and NE
States
(Below 5MW) - 4.37(without
AD), 4.02 (with AD)
(5MW-25MW)-
3.74(without AD), 3.42 (with
AD)
Other States
(Below 5MW) - 5.15(without
AD), 4.74 (with AD)
(5MW-25MW)-
4.39(without AD), 4.01 (with
AD)
HP, Uttarakhand and NE
States
(Below 5MW) - 798.11
(5MW-25MW)- 725.55
Other States
(Below 5MW) - 621.90
(5MW-25MW)- 570.08
HP, Uttarakhand and NE
States - 45%
Other States- 30%
Prepared by ABPS Infra Page45/123
FIT:SMALL HYDRO
ANNEXURE-1F
Financial Parameters
STATE
Tariff Regulations / or Order or Draft
(Ref. no. dt)
Control period Tariff (Rs/kWh)
Capital Cost
(lakh/MW)
Capacity Utilisation
Factor (%)
Auxiliary Consumption
(%)
Useful life
(yrs)
Subsidy and incentive by
Central /State Govt
Taxes and
Duties
Late Payment
surcharge
35
Shall be factored in the tariff
on per unit benefit derived
on levellised basis
CERC (FY 12-13)
CERC Generic RE Tariff Order for FY
2012-13;
CERC (Terms and Conditions for Tariff
determination from
Renewable Energy Sources)
Regulations, 2012
FY 2012-16 (3 yrs)
HP, Uttarakhand and NE
States
(Below 5MW) - 4.14(without
AD), 3.82 (with AD)
(5MW-25MW)-
3.54(without AD), 3.25 (with
AD)
Other States
(Below 5MW) - 4.88(without
AD), 4.50 (with AD)
(5MW-25MW)-
4.16(without AD), 3.82 (with
AD)
HP, Uttarakhand and NE
States
(Below 5MW) - 770
(5MW-25MW)- 700
Other States
(Below 5MW) - 600
(5MW-25MW)- 550
HP, Uttarakhand and NE
States - 45%
Other States- 30%
1%
Tariff exclusive
of taxes and
duties, pass
through
allowed on
actual basis
1.25% per month
beyond a delay of 60
days
STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO
Normative Parameters
<5 MW 5-10 MW 10 - 25 MW <5 MW 5-10 MW 11 - 25 MW
1 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4
2 5.22 5.22 5.22 5.8 5.22 5.22 5.22 5.8
3 5.04 5.04 5.48 5.6 5.04 5.04 5.48 5.6
4 4.86 5.12 5.28 5.4 4.86 5.12 5.28 5.4
5 4.68 4.93 5.09 5.2 4.68 4.93 5.09 5.2
6 4.5 4.74 4.9 5.01 4.5 4.74 4.9 5.01
7 4.33 4.56 4.71 4.81 4.33 4.56 4.71 4.81
8 4.16 4.37 4.52 4.62 4.16 4.37 4.52 4.62
9 3.98 4.19 4.33 4.43 3.98 4.19 4.33 4.43
10 3.81 4.01 4.14 4.23 3.81 4.01 4.14 4.23
11 2.3 2.42 2.5 2.56 2.3 2.42 2.5 2.56
12 2.34 2.46 2.54 2.6 2.34 2.46 2.54 2.6
13 2.38 2.51 2.59 2.64 2.38 2.51 2.59 2.64
14 2.42 2.55 2.63 2.69 2.42 2.55 2.63 2.69
15 2.46 2.59 2.68 2.74 2.46 2.59 2.68 2.74
16 2.51 2.64 2.73 2.79 2.51 2.64 2.73 2.79
17 2.56 2.69 2.78 2.84 2.56 2.69 2.78 2.84
18 2.6 2.74 2.83 2.89 2.6 2.74 2.83 2.89
19 2.65 2.79 2.88 2.95 2.65 2.79 2.88 2.95
20 2.71 2.85 2.94 3.01 2.71 2.85 2.94 3.01
21 2.76 2.91 3 3.07 2.76 2.91 3 3.07
22 2.82 2.96 3.06 3.13 2.82 2.96 3.06 3.13
23 2.88 3.03 3.13 3.19 2.88 3.03 3.13 3.19
24 2.94 3.09 3.19 3.26 2.94 3.09 3.19 3.26
25 3 3.16 3.26 3.33 3 3.16 3.26 3.33
26 3.07 3.23 3.33 3.41 3.07 3.23 3.33 3.41
27 3.14 3.3 3.41 3.48 3.14 3.3 3.41 3.48
28 3.21 3.38 3.49 3.56 3.21 3.38 3.49 3.56
29 3.28 3.45 3.57 3.65 3.28 3.45 3.57 3.65
30 3.36 3.54 3.65 3.73 3.36 3.54 3.65 3.73
Goa No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Union Territories
Andaman Nicobar No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Chandigargh No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Dadra and Nagar Haveli No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Daman & Diu No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
Lakshadweep No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Pondicherry No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
Tariff without
considering GoMP free
Tariff considering GoMP free power policy (Rs./kWh)
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulatio
ns available
Table 1: Tariffs of SHP in Madhya Pradesh
Year
Run of the River Projects Canal Based Projects
Tariff without considering GoMP free
power policy (Rs./kWh)
Tariff considering GoMP free power policy (Rs./kWh)
Prepared by ABPS Infra Page46/123
FIT:SMALL HYDRO
Reference
CE98R01060212
CE98B01251012
AR98R01090412
CE98R01060212, CE98O01270312
AP98O01310309
AS98A01130112
No Tariff Order/Regulations
available
CG98A01020412
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
HR98O01250112/
HR0O01270511/ HR98R0130211
HP98R01171212
JH08R01030707
JK98A01000712
KL98R01221110
MH98R01070610
KA98O01111209
MP08R01300608
MZ98R01150411
MN98R01150410
NL98R01300811
PB98O01190712
ML98A01050912
OR98O01140910
No Tariff Order/Regulations
available
RJ98R01230109
No Tariff Order/Regulations
available
TN08Z01000310
UA98R01060710
UP98R01220310
WB98A01100812
No Tariff Order/Regulations
available
Prepared by ABPS Infra Page47/123
FIT:SMALL HYDRO
Reference
CE98R01060212, CE98O01270312
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
Prepared by ABPS Infra Page48/123
STATE
Projects (Project
name)
Technology
(Incineration/
Biomethanation/
Gasification)
CERC
Andhra Pradesh NA -
NA
Arunachal Pradesh
Assam
Bihar NA
Delhi
Timarpur Okhla Waste
Management Co. Ltd.
(16 MW)
Chhattisgarh NA NA
Incineration &
Biomethanation
Gujarat
Hanjer Green Power
Pvt. Ltd. (15 MW)
Incineration
Haryana
Himachal Pradesh
Jammu and Kashmir NA NA
Karnataka
Srinivasa Gayathri
Resource Recovery
Ltd. (8 MW)
Incineration
Jharkhand NA NA
Madhya Pradesh NA NA
Kerala NA NA
Manipur NA -
Maharashtra
Solapur Bioenergy
Systems Pvt. Ltd. (2.83
MW)
Biomethanation
Meghalaya NA -
&Mizoram NA -
Orissa NA -
Nagaland NA -
Punjab NA -
Rajasthan NA -
Sikkim NA -
Sikkim NA -
Tripura NA -
Tamil Nadu NA -
Uttarakhand NA -
Uttar Pradesh NA -
West Bengal NA -
Goa NA NA
Union Territories
Andaman Nicobar NA NA
Chandigargh NA NA
Dadra and Nagar Haveli NA NA
Daman & Diu NA NA
Lakshadweep NA NA
Pondicherry NA NA
ANNEXURE-1E
Financial Parameters
Tariff Order
(Ref. no. dt)
Tariff
(Rs/kWh)
Capital Cost
(lakh/MW)
NA NA NA
Tariff Order
(dt 31/03/2009)
4.04 in 2009-10 and
5% escalation
thereafter till 2013-14
STATE-WISE FEED-IN-TARIFF FOR MSW
Project Parameters not specified
in the order
Project Specific Tariff
Determination
Project Specific Tariff
Determination
NA NA NA
Draft Tariff Regulations (Dated January
13, 2012)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Tariff Regulations
(dt 09/04/2012)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Draft RE Tariff Regulation_April
2012(NFF Cogen)
Order dt 20/01/2011
Rs 2.49/kWh for the
first year and Rs
2.833/kWh from the
second year onwards
Project awarded through tariff
based competitive bidding.
(Auxilliary Consumption of 22%)
Tariff order (dt 30/07/2011) 6.8 690.7
Tariff Regulations (Dated February 03,
2011)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Draft Tariff Regulations (Dated July 24,
2012)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
NA
1111.125
Draft RE Tariff Regulations_July 2012
Project Specific Tariff
Determination
Tariff Order (dt 28/02/2012) Rs 4.15/kWh
NA NA
NA
NA NA NA
NA NA
Rs 4.88/kWh
Project Specific Tariff
Determination
Tariff Regulations (Dated 15/04/2010)
Project Specific Tariff
Determination
1277 Tariff Order (dt 03/09/2010)
Project Specific Tariff
Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
Project Specific Tariff
Determination
Tariff Regulations (Dated 15/04/2010)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Tariff Order (Dated 14/09/2010)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Tariff Regulations (Dated 08/2011)
Tariff Order (Dated 19/07/2012)
Project Specific Tariff
Determination
Tariff Regulations (Dated 23/01/2009)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff
Order/Regulations
available
Tariff Regulations (Dated 06/07/2010)
Project Specific Tariff
Determination
No Tariff Order/Regulations
available
Project Specific Tariff
Determination
Tariff Regulations (Dated 22/03/2010)
Rs 2.89/kWh for
existing projects and
Rs 3.21 for new
Projects under the
The regulations have the
provision of determining the
tariffs of new projects on case-to-
case basis
Draft Tariff Regulations (Dated
10/08/2012)
Capped at Rs 5.1/kWh
upto August 10, 2022
No parameters specified
NA NA NA
NA NA NA
NA NA NA
NA NA
NA NA NA
NA
NA NA NA
NA NA NA
Station heat rate
(kcal/kWh)
Auxiliary
Consumption
(%)
Calorific Value Range
(kCal/kg)
Plant Load Factor (%)
Project Parameters not
specified in the order
NA NA NA NA
Normative Parameters
Project Parameters not
specified in the order
Project Parameters not
specified in the order
Project Parameters not
specified in the order
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
NA
Project Specific Tariff
Determination
Project Specific Tariff
Determination
NA NA NA
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project awarded
through tariff based
competitive bidding.
(Auxilliary Consumption
of 22%)
Project awarded
through tariff based
competitive bidding.
(Auxilliary Consumption
of 22%)
Project awarded
through tariff based
competitive bidding.
(Auxilliary Consumption
of 22%)
Project awarded through
tariff based competitive
bidding. (Auxilliary
Consumption of 22%)
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
60% for the first year and
80% from the second year
onwards
4100 11.5% 2250
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
4300 15% 2200 73%
NA
NA NA NA
NA NA NA
NA
NA
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
NA NA NA
Project Specific Tariff
Determination
78.90%
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
- 12.72% 4800
No Tariff
Order/Regulations
available
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
The regulations have
the provision of
determining the tariffs
of new projects on case-
Project Specific Tariff
Determination
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific Tariff
Determination
The regulations have
the provision of
determining the tariffs
of new projects on case-
The regulations have
the provision of
determining the tariffs
of new projects on case-
The regulations have the
provision of determining
the tariffs of new projects
on case-to-case basis
No parameters
specified
No parameters
specified
No parameters
specified
No parameters specified
NA NA
NA
NA NA
NA
NA NA
NA
NA NA
NA NA
NA NA
NA NA
NA
NA NA
NA
NA NA
NA NA NA
NA NA
Fuel Cost
(Rs/ MT)
Useful life
(yrs)
Reference
AP98O01310309
NA NA
Normative Parameters
Project Parameters not
specified in the order
Project
Parameters not
specified in the
order
AR98R01090412
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
AS98A01130112
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
CG98A01020412
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
NA NA NA
DL09O01200111
Project awarded through
tariff based competitive
bidding. (Auxilliary
Consumption of 22%)
20
HR98R01030211
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
1320 20 GJ09O01300711
Project Specific Tariff
Determination
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
HP98A01240712
JK98A01000712
Project Specific
Tariff
Determination
KA09O01280212 NA
NA NA NA
20
NA NA
NA NA NA
NA
MN98R01150410
Project Specific Tariff
Determination
MH09O01030910 - 20
Project Specific
Tariff
Determination
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
MZ98R01150411
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
No Tariff
Order/Regulations
available
NL98R01300811
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
OR98O01140910
Project Specific
Tariff
Determination
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
RJ98R01230109
Project Specific Tariff
Determination
Project Specific
Tariff
Determination
PB98O01190712
Project Specific Tariff
Determination
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff
Order/Regulations
available
No Tariff
Order/Regulations
available
Project Specific
Tariff
Determination
UA98R01060710
Project Specific Tariff
Determination
NA
The regulations have the
provision of determining
the tariffs of new projects
on case-to-case basis
The regulations
have the provision
of determining the
tariffs of new
UP98R01220310
No parameters specified
No parameters
specified
WB98A01100812
NA
NA
NA NA
NA NA
NA
NA
NA
NA
NA
NA
NA
NA NA NA
NA NA
NA NA
Incineration
Biomethanation
Gasification
RPO
ANNEXURE-II
STATE
RPO/REC Regulations / or Order or Draft
(Ref. no. dt)
Applicability to Captive / Open Access (Y /
N) & Capacity
RPO Regulation No. RE Technology 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Non-Solar 4.75% 4.75% 4.75% 4.75% 4.75% 4.75%
Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
Total 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
Non-Solar 4.10% 5.45% 6.80%
Solar 0.10% 0.15% 0.20%
Total 4.20% 5.60% 7.00%
Non-Solar 2.70% 4.05% 5.40% 6.75%
Solar 0.10% 0.15% 0.20% 0.25%
Total 2.80% 4.20% 5.60% 7.00%
Non-Solar 2.25% 3.75% 4.00% 4.25%
Solar 0.25% 0.25% 0.50% 0.75% 1.00% 1.25% 1.50% 1.75% 2.00% 2.50%
Total 2.50% 4.00% 4.50% 5.00%
Non-Solar 5.00% 5.25%
Solar 0.25% 0.50%
Total 5.25% 5.75%
Non-Solar 1.90% 3.25% 4.60% 5.95% 7.30% 8.65%
Solar 0.10% 0.15% 0.20% 0.25% 0.30% 0.35%
Total 2.00% 3.40% 4.80% 6.20% 7.60% 9.00%
Non-Solar 1.70% 2.60%
Solar 0.30% 0.40%
Total 2.00% 3.00%
Non-Solar 5.50% 6.00%
Solar 0.50% 1.00%
Total 6.00% 7.00%
Non-Solar 1.50% 2.00% 3.00%
Solar 0.00% 0.05% 0.10%
Total 1.50% 2.05% 3.10%
Non-Solar 10.00% 10.00% 10.00% 10.00% 11.00% 12.00% 13.00% 14.00% 15.00% 15.50%
Solar 0.01% 0.25% 0.25% 0.25% 0.25% 0.25% 0.50% 0.75% 1.00% 2.00%
Total 10.01% 10.25% 10.25% 10.25% 11.25% 12.25% 13.50% 14.75% 16% 17.50%
Non-Solar 2.90% 4.75%
Solar 0.10% 0.25%
Total 3.00% 5.00%
Non-Solar 2.50% 3.00%
Solar 0.50% 1.00%
Total 3.00% 4.00%
Non-Solar 10% and 7%
Solar 0.25%
Total
(Discoms only)
10.25% &
7.25%
Non-Solar 3.35% 3.65% 3.95% 4.25% 4.55% 4.85% 5.15% 5.45% 5.75% 6.05%
Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
Total 3.60% 3.90% 4.20% 4.50% 4.80% 5.10% 5.40% 5.70% 6.00% 6.30%
Non-Solar 2.10% 3.40% 4.70% 6.00%
Solar 0.40% 0.60% 0.80% 1.00%
Total 2.50% 4.00% 5.50% 7.00%
Non-Solar 6.75% 7.75% 8.50% 8.50% 8.50%
Solar 0.25% 0.25% 0.50% 0.50% 0.50%
Total 7.00% 8.00% 9.00% 9.00% 9.00%
Non-Solar 2.75% 4.75%
Solar 0.25% 0.25%
Total 3.00% 5.00%
Non-Solar 5.75% 6.75%
Solar 0.25% 0.25%
Total 6.00% 7.00%
Non-Solar 0.45% 0.60%
Solar 0.30% 0.40%
Total 0.75% 1.00%
Non-Solar 6.75% 7.75%
Solar 0.25% 0.25%
Total 7.00% 8.00%
Non-Solar 4.90% 5.35% 5.80% 6.25% 6.70%
Solar 0.10% 0.15% 0.20% 0.25% 0.30%
Total 5.00% 5.50% 6.00% 6.50% 7.00%
Non-Solar 2.37% 2.83% 3.37% 3.81%
Solar 0.03% 0.07% 0.13% 0.19%
Total 2.40% 2.90% 3.50% 4.00%
Non-Solar 5.50% 6.35% 7.00%
Solar 0.50% 0.75% 1.00%
Total 6.00% 7.10% 8.20%
Non-Solar 8.95%
Solar 0.05%
Total 9.00%
Non-Solar 0.90% 1.90%
Solar 0.10% 0.10%
Total 1.00% 2.00%
Non-Solar 4.50% 5.00%
Solar 0.03% 0.05%
Total 4.53% 5.05%
Non-Solar 4.50% 5.00%
Solar 0.50% 1.00%
Total 5.00% 6.00%
Non-Solar 3.75% 4.70% 5.60% 6.50% 7.40%
Solar 0.25% 0.30% 0.40% 0.50% 0.60%
Total 3.00% 4.00% 4.00% 5.00% 6.00% 7.00% 8.00%
Regulation 4(b), Page no:- 3
STATE-WISE SUMMARY of RPO REGULATIONS
Andhra Pradesh
Order 16 of 2008 (March 31, 2009),
Order 10 of 2010 (July 6, 2010),
Regulation No 1 of 2012 (FY 13 to FY 17)
Y (Captive- 1 MW and Above) & OA
Order 16 of 2008 (Para 1)
Order 10 of 2010 (Page no:-7)
Regulation 3, Page No:- 3
Bihar
RPO Regulation Notification Nov 2010, Solar
RPO amended vide Order on Case 12 of 2012 dated
May 29, 2012
Arunachal Pradesh
Regulation: Notification No.
APSERC/notification/8/2012
Assam Notification-(AERC/21/2010)- November 2, 2010 Y Regulation 4.1, Page no:- 2663
Y (Captive- 1 MW and Above) & OA
Chhattisgarh
Regulation (No. 36/CSERC/2011) March 04, 2011
Y- Captive and OA (1 MW and above) Regulation 4.3, Page no:- 7 of 19
Y (Captive- 5 MW and Above) & OA
Regulation 4.1, Page no:- 3, Page 7 of
17 of Order 12 of 2012
Haryana
Regulation (No: HERC/23/2011 2nd Amendment)
November 25, 2011
Captive (5 MW and Above) & OA Reg 64 Chapter 10, page no. 26
Himachal Pradesh
Notification (No. HPERC/438 Amendment)
October 3, 2011
Y Captive 1 MW and Above & OA
Delhi Notification (Final RPO REC Regulation dated 01/10/12 )
Captive:- 1 MW and above, OA:- Contract
Demand exceeding 1 MW
Regulation 4.1, Page no:- 13
JERC (Goa & UT) NOTIFICATION
(No.: JERC-14/2010) November 30, 2010
NA (Obligated Entities are Discoms only) Regulation 1.1, Page no:- 3
Gujarat Notification No. 3 of 2010, April, 17, 2010 Captive (5 MW and Above) & OA Regulation 4.1, Page no:- 7
Kerala
Notification
(No. 1517/CT/2010/KSERC) November 23, 2010
Y Regulation 3.1 Page no:- 2
Madhya Pradesh
Jammu and Kashmir
Notification
(No: JKSERC/10) March 11, 2011
OA and Captive( Contract Demand 1
MVA/MW and Above)
Regulation 7.1, Page no:- 8
Jharkhand
Notification (No. 28 --) July 21, 2010 OA and Captive( Contract Demand 1 MVA/ 5
MW and Above)
Regulation 5.2 Page no:- 5
Regulation 4.1, Page no:- 3
Karnataka Notification (No. S/03/1) March 16, 2011
OA and Captive( Contract Demand 5 MVA/ 5
MW and Above) 5% RPO for Captive and OA
consumers
Regulation 4(i)Page no:- 3 for Discoms
and Regulation 4(ii), (iii) for captive
and OA
Maharashtra
Notification (No.MERC/Legal/2010/483) June 7,
2010
OA ( Contract Demand 1 MVA and Above)
and Captive( Installed Capacity 1 MW and
Above)
Regulation 7.1, Page no:- 5
Manipur
&Mizoram
Meghalaya
Notification (NO.MSERC/05/61)
December, 21 2010 Y Regulation 4 (2), Page No- 3
Notification (No. 3042/MPERC-2010.) November
9, 2010
Y Regulation 4.1 Page no:- 3
Orissa
Notification (No. OERC-Engg-02/2010)
September 30, 2010 Y Captive(5MW and Above) & OA Regulation 3(1), page No-2
Rajasthan
Notification (No.RERC/Secy./Regulation - 85)
MAY 24, 2011 Y- Captive and OA (1 MW and above) Regulation 4(2), Page No-4
Sikkim Not Issued
Notification (No.PSERC/Secy./Reg./55)
June 3, 2011 (No explicit mentioning about who are
Obligated Entities)
Regulation 3(1), page No-3
Nagaland
Notification (No.NERC/REGN/2011) August 29,
2011 OA ( consumption 1 MW and Above) and
Captive( consumption 1 MW and Above)
Regulation 2.1, Page No-5
Uttarakhand
UERC (Tariff and other terms for supply of
electricity from RE sources and non-fossil fuel
based Co-generating stations), dated July 6, 2010
Regulation9(1) Page no:- 13 of 48
Notification
(No. H. 13011/5/09-JERC) May 5, 2010.
OA ( cosumption 1 MW and Above) and
Captive( consumption 1 MW and Above)
Regulation 2.1, Page no-5
Punjab
West Bengal
Draft WBERC (Cogeneration and Generation of
electricity from RE), 2012, dated August 10, 2012
N Regulation 3.1 Page no:- 4 of 19
Y Captive(5MW and Above) and OA Regulation 4.1, Page 4
Uttar Pradesh
Notification (No. UPERC/Secy/Regulation/10 -
787) August 17 , 2010
Y Captive (1 MW and Above) & OA Regulation 4.1 Page no:- 4
Y
Tamil Nadu
Notification No. (TNERC / RPO / 19 / 2,) July 29,
2011
Y--- OA, Phase 1 -(till April 1, 2012):- 2 MVA
and above, Phase 2- ( April1, 2012 to April
1, 2013):- 1 MVA and Above. Phase 3 - (after
April 1, 2013:- all OA Consumers
Amendment to Regulation 3, Page 2
Tripura
Notification (No. F.25/TERC/2009/415)
September 16, 2010.
Prepared by ABPS Infra Page62/123
RPO
2021-22
3.00%
16.00%
3.00%
19.00%
6.35%
0.25%
6.60%
Prepared by ABPS Infra Page63/123
REC
ANNEXURE-III
STATE
REC Regulations
(Y/N)
Nodal Agency
Average Power Purchase Cost
(Rs/kWh)
Applicability Reference (REC Regulation) Reference (SNA) Reference (APPC) Archives
AP98R02210312 AP98R03210312 AP98R03210312
STATE-WISE REC PROVISIONS
Andhra Pradesh Y State Load Dispatch Centre 2.00 March 2012 to May 31, 2012
Assam Y Assam Energy Development Agency AS98R02011210 AS98Z03041110
Arunachal Pradesh N
CG98O03220611
Bihar Y Bihar Renewable Energy Development Agency BR98R02161110 BR98Z03241110
Chhattisgarh Y Chhattisgarh Renewable Energy Development Agency
CSPDCL: 2.11
BSP-TEED: 4.66
JSPL: 3.00
2012-13 CG98R02040311 CG98O03091110
Delhi Y (Draft)
Energy Efficiency and Renewable Energy Management
Centre
DL98R02011012 DL98O03181111
JERC (Goa & UT) Y
Gujarat Y Gujarat Energy Development Agency GJ98R02170410 GJ98Z03160710
Haryana Y Haryana Renewable Energy Development Agency HR98R02030211 HR98Z03061010
Himachal Pradesh Y Directorate of Energy 2.20 2012-13 HP98R02260510 HP98Z03190610 HP98O03160712
Jammu and Kashmir Y
Jammu & Kashmir State Power Development Corporation
(for SHP >2MW), Jammu & Kashmir Energy Development
Agency (for all RE other than >2MW SHP), Ladakh
JK98R02110311 JK98Z03030111
Jharkhand Y Jharkhand Renewable Energy Development Agency JH98R02210710 JH98Z03210810
Karnataka Y State Load Dispatch Center 2.60 2012-13 KA98R02160311 KA98Z03010411 KA98O03270612
Kerala Y
Agency for Nonconventional Energy and Rural
Technology
KL98R02231110 KL98O03031210
Madhya Pradesh Y MP Urja Vikas Nigam Ltd. MP98R02191110 MP98O03070211
Maharashtra Y Maharashtra Energy Development Agency MH98R02070610 MH98O03010710
Manipur Y Manipur Renewable Energy Development Agency MN98R02050510 MN98Z03070910
&Mizoram Y Imphal & Zoram Energy Development Agency MZ98R02050510 MZ98Z03070910
Meghalaya Y
Meghalaya Non- Conventional & Rural Energy
Development Agency
ML98R02211210 ML98Z03201211
Nagaland Y NL98R02290811
Orissa Y Orissa Renewable Energy Development Agency OR98R02300910 OR98Z03030211
Punjab Y Punjab Energy Development Agency PJ98R02030611 PJ98Z03301110
Rajasthan Y Rajasthan Renewable Energy Corporation 2.57 2011-12 RJ98R02301210 RJ98Z03160610 RJ98O03131011
Sikkim N
Tamil Nadu Y State Load Dispatch Centre 2.54 2012-13 TN98R02071210 TN98O03071210 TN98O03030912
Tripura Y Tripura Renewable Energy Development Agency TR98R02160910 TR98Z03080910
Uttarakhand Y Uttrakhand Renewable Energy Development Agency 2.68 2012-13 UK98R02031110 UK98O03020512 UK98O03290512
Uttar Pradesh Y
Uttar Pradesh New and Renewable Energy
Development agency
UP98O02170810 UP98O03040211
West Bengal Y (Draft)
Prepared by ABPS Infra Page64/123
OPEN ACCESS
ANNEXURE-V
STATE
Intra-State Open Access
Regulations
(Y/N)
Nodal agency
Application fee
(Rs)
Gujarat Y
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- SLDC
-Both within gujarat but different DISCOM-SLDC
-Injection point in the intra-state transmission system within gujarat-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and
-Both within same DISCOM- SLDC
-Both within gujarat but different DISCOM-STU
-Injection point in the intra-state transmission system within gujarat-STU
-In different states-CTU
c) Long term
-Both within same DISCOM- SLDC
-Both within gujarat but different DISCOM-STU
-Injection point in the intra-state transmission system within gujarat-STU
2. Open Access Customer connected to Intra-State Trans system
a) Short term
-Both within Gujarat (in intra-state transmission system)- SLDC
-Injection point in the distribution system within gujarat-SLDC
-In different states-RLDC of the region of consumer
b) Medium term
-Both within Gujarat- STU
-Injection point in the distribution system within gujarat-STU
-In different states-CTU
c) Long term
-Both within Gujarat- STU
-Injection point in the distribution system within gujarat-STU
-In different states-CTU
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Rs 2000
-Both within gujarat but different DISCOM-Rs 5000
-Injection point in the intra-state transmission system within Gujarat-Rs 5000
-In different states-As per CERC Regulation
b) Medium term
-Both within same DISCOM- Rs 25000
-Both within gujarat but different DISCOM-Rs 50000
-Injection point in the intra-state transmission system within gujarat-Rs 50000
-In different states-As per CERC Regulation
c) Long term
-Both within same DISCOM- Rs 25000
-Both within gujarat but different DISCOM-Rs 50000
-Injection point in the intra-state transmission system within gujarat-Rs 50000
2. Open Access Customer connected to Intra-State Trans sysem
a) Short term
-Both within Gujarat (in intra-state transmission system)- Rs 5000
-Injection point in the distribution system within gujarat-Rs 5000
-In different states-As per CERC Regulation
b) Medium term
-Both within Gujarat- Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW)
-Injection point in the distribution system within gujarat-Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW)
-In different states-As per CERC Regulation
c) Long term
-Both within Gujarat- Rs 50000 (for capacity < 100 MW) ; Rs 100000 ( for capacity >100 MW)
-Injection point in the distribution system within gujarat-Rs 50000 (for capacity < 100 MW) ; Rs 100000 ( for capacity >100 MW)
-In different states-As per CERC Regulations
Delhi Y
1. Transmission Open Access
a) For Long term open access-STU
b) For Short term open access-SLDC
2. Distribution Open Access-SLDC
1. Transmission Open Access
a) Long term- Rs 1 lakh
b) Short term- Rs 10000
2. Distribution Open Access
a) Long term-Rs 25000
b) Short term-Rs 2500
Chhattisgarh Y
a) For transactions where the point of drawal or point of injection is located on the network of STU-STU for
LT and MT, SLDC for ST
b) For transactions where the point of drawal or point of injection is located on the network of intra-state
transmission licensee and there is no involvement of STU network for conveyance of electricity-Concerned
Transmission licensee for LT, MT and ST
c) For transactions where the point of drawal or point of injection is located at STU and intra-state
transmission licensee-STU for LT and MT, SLDC for ST
d) For transactions where the point of drawal or point of injection is located on intra-state transmission
system and distribution licensees- STU for LT and MT, SLDC for ST
e) Both on same DISCOM network and no invovement of transmission ntw -Concerned DISCOM for LT,
MT and ST
f) Both on same DISCOM network but invovement of transmission ntw - STU for LT and MT, SLDC for ST
g) Both within same state but different DISCOMs- STU for LT and MT, SLDC for ST.
a) For transactions where the point of drawal or point of injection is located on the network of STU- Rs 2 lakh for LT, Rs 1 lakh for MT and
Rs 2500 for ST
b) For transactions where the point of drawal or point of injection is located on the network of intra-state transmission licensee and there is
no involvement of STU network for conveyance of electricity- Rs 2 lakh for LT, Rs 1 lakh for MT and Rs 2500 for ST
c) For transactions where the point of drawal or point of injection is located at STU and intra-state transmission licensee-Rs 4 lakh for LT,
Rs 2 lakh for MT, Rs 5000 for ST
d) For transactions where the point of drawal or point of injection is located on intra-state transmission system and distribution licensees- Rs
4 lakh for LT, Rs 2 lakh for MT, Rs 5000 for ST
e) Both on same DISCOM network and no invovement of transmission ntw - Rs 2 lakh for LT, Rs 1 lakh for MT and Rs 2500 for ST
f) Both on same DISCOM network but invovement of transmission ntw - Rs 4 lakh for LT, Rs 2 lakh for MT, Rs 5000 for ST
g) Both within same state but different DISCOMs- Rs 4 lakh for LT, Rs 2 lakh for MT, Rs 5000 for ST
Bihar Y
a) For Long term open access-STU
b) For Short term open access-SLDC
a) Long term-Rs 50000
b) Short term-Rs 5000
Assam Y
1. For LONG TERM
a) STU for transactions where the point of drawal or point of injection is located on the intra-state
transmission system.
b) Otherwise the Distribution licensee of the area where point of drawl is located.
2. For SHORT TERM
Nodal agency is SLDC
a) Long term= Rs 100000
b) Short term= Rs 5000
Arunachal Pradesh Draft Regulation
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Concerned DISCOM
-Injection point in the intra-state transmission system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and
-Both within same DISCOM- Concerned DISCOM
-Injection point in the intra-state transmission system within gujarat-STU
-In different states-CTU
c) Long term
-Both within same DISCOM- concerned DISCOM
-Injection point in the intra-state transmission system within state-STU
-In diff states- CTU
2. Open Access Customer connected to Intra-State Trans system
a) Short term
-Both within state (in intra-state transmission system)- SLDC
-Injection point in the distribution system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term
-Both within state- STU
-Injection point in the distribution system within state-STU
-In different states-CTU
c) Long term
-Both within Gujarat- STU
-Injection point in the distribution system within state-STU
-In different states-CTU
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
-Injection point in the intra-state transmission system within Arunachal-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
-In different states-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
b) Medium term
-Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW
-Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively
-In different states-Rs 1 lacs
c) Long term
-Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW
-Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively
-In different states-Rs 1 lacs
2. Open Access Customer connected to Intra-State Trans sysem
a) Short term
-Both within Arunachal (in intra-state transmission system)- Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
-Injection point in the distribution system within Arunachal-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
-In different states-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
b) Medium term
-Both within Arunachal- Rs 100000 (for capacity >5MW) ; Rs 50000 ( for capacity < 5MW)
-Injection point in the distribution system within Arunachal -Rs 100000 (for capacity > 5MW) ; Rs 50000 ( for capacity <5 MW)
-In different states-Rs 1 lacs
c) Long term
-Both within Arunachal- Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW)
-Injection point in the distribution system within Arunachal-Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW)
-In different states-Rs 2 lacs
STATE-WISE OPEN ACCESS PROVISIONS
Andhra Pradesh Y
a) For Long term open access-STU
b) For Short term open access-SLDC
a) Long term-Rs 10000
b) Short term-Rs 1000
Prepared by ABPS Infra Page65/123
OPEN ACCESS
ANNEXURE-V
STATE
Intra-State Open Access
Regulations
(Y/N)
Nodal agency
Application fee
(Rs)
STATE-WISE OPEN ACCESS PROVISIONS
Andhra Pradesh Y
a) For Long term open access-STU
b) For Short term open access-SLDC
a) Long term-Rs 10000
b) Short term-Rs 1000
Madhya Pradesh
Meghalaya Y
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Concerned DISCOM
-Both within same state but different DISCOM-SLDC
-Injection point in the intra-state transmission system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within same DISCOM- Concerned DISCOM
-Both within state but different DISCOM-STU
-Injection point in the intra-state transmission system within state-STU
-In different states-CTU
2. Open Access Customer connected to Intra-State Trans system
a) Short term
-Both within state(in intra-state transmission system)- SLDC
-Injection point in the distribution system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within state- STU
-Injection point in the distribution system within state-STU
-In different states-CTU
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
-Injection point in the intra-state transmission system within state-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
-In different states-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
b) Medium term
-Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW
-Different DISCOM-Rs 50000 upto 5MW and Rs 1 lakhs above 5MW
Injection point in the intra-state transmission system within state-Rs 50000 and Rs 1 lac respectively
-In different states-Rs 1 lacs
c) Long term
-Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW
-Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively
-In different states-Rs 1 lacs
2. Open Access Customer connected to Intra-State Trans sysem
a) Short term
-Both within state (in intra-state transmission system)- Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
-Injection point in the distribution system within state-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
-In different states-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
b) Medium term
-Both within state- Rs 100000 (for capacity >5MW) ; Rs 50000 ( for capacity < 5MW)
-Injection point in the distribution system within state -Rs 100000 (for capacity > 5MW) ; Rs 50000 ( for capacity <5 MW)
-In different states-Rs 1 lacs
c) Long term
-Both within state- Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW)
-Injection point in the distribution system within state-Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW)
-In different states-Rs 2 lacs
For all Medium-Term and Long-Term Open Access :
(a) STU for transactions for where the point of drawal or point of injection is
located on the intra-state transmission network;
(b) Otherwise the Distribution Licensee of the area where the point of drawal
is located.
For Short-Term Open Access transactions,: SLDC.
Short term-Rs 5000
Long term/Medium term-Rs 1 lakhs
Kerala
&Mizoram
Manipur
Y
Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Maharashtra Y
Transmission Open Access-STU
Distribution open access-Concerned Discom
Transmission OA-Rs 10000
Y
A generating company or a licensee requiring open access shall apply to the respective licensee, whose
transmission system/distribution system is intended to be used or immediately connected.
N.A
Karnataka Y
The nodal agency for arranging the long-term open access shall be the state transmission utility if its
system is used; otherwise the nodal agency shall be the respective distribution licensee, within whose area
the point of drawal is situated.
(2) For short term open access the nodal agency shall be the state load dispatch center.
Long term-Rs 5000
Short term-Rs 1000
Jharkhand Y
(i) The nodal agency for arranging the long term transmission/ distribution access shall be the State
Transmission Utility or the Transmission Licensee or the Distribution Licensee whose system is used or is
to be used for such long term access.
(ii) The nodal agency for the short-term access shall be the State Load Despatch Centre.
Long term OA in transmission-Rs 25000
Long term OA in distribution-Rs 10000
Short term OA-Rs 5000
Himachal Pradesh Y
For LT and MT OA
a) At intra-state transmission system -STU
b) At distribution system-SLDC.
For Short term
a) OA to intra-state transmission-SLDC
b) OA in distribution system-concerned DISCOM
a) Short term- 5000
b) Medium term- Rs 1 lac upto 5MW and Rs 2 lac for 5 to 10 MW and Rs 6 lac above 10 MW
c) Long term- Rs 2 lac upto 5MW and Rs 4 lac for 5 to 10 MW and Rs 6 lac above 10 MW
Jammu and Kashmir Y
a)Long term OA-SLDC
b) Short term-STU
Long Term :Rs 50000 for both open access in transmission and distribution
Short Term: Rs 5000
Haryana Y
1. Intra-State Open Access- STU
2. Inter-State Open Access- CTU except RLDC for short term a) Short term- Rs 5000
b) Medium term- Rs 100000
c) Long term- Rs 200000
Gujarat Y
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- SLDC
-Both within gujarat but different DISCOM-SLDC
-Injection point in the intra-state transmission system within gujarat-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and
-Both within same DISCOM- SLDC
-Both within gujarat but different DISCOM-STU
-Injection point in the intra-state transmission system within gujarat-STU
-In different states-CTU
c) Long term
-Both within same DISCOM- SLDC
-Both within gujarat but different DISCOM-STU
-Injection point in the intra-state transmission system within gujarat-STU
2. Open Access Customer connected to Intra-State Trans system
a) Short term
-Both within Gujarat (in intra-state transmission system)- SLDC
-Injection point in the distribution system within gujarat-SLDC
-In different states-RLDC of the region of consumer
b) Medium term
-Both within Gujarat- STU
-Injection point in the distribution system within gujarat-STU
-In different states-CTU
c) Long term
-Both within Gujarat- STU
-Injection point in the distribution system within gujarat-STU
-In different states-CTU
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Rs 2000
-Both within gujarat but different DISCOM-Rs 5000
-Injection point in the intra-state transmission system within Gujarat-Rs 5000
-In different states-As per CERC Regulation
b) Medium term
-Both within same DISCOM- Rs 25000
-Both within gujarat but different DISCOM-Rs 50000
-Injection point in the intra-state transmission system within gujarat-Rs 50000
-In different states-As per CERC Regulation
c) Long term
-Both within same DISCOM- Rs 25000
-Both within gujarat but different DISCOM-Rs 50000
-Injection point in the intra-state transmission system within gujarat-Rs 50000
2. Open Access Customer connected to Intra-State Trans sysem
a) Short term
-Both within Gujarat (in intra-state transmission system)- Rs 5000
-Injection point in the distribution system within gujarat-Rs 5000
-In different states-As per CERC Regulation
b) Medium term
-Both within Gujarat- Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW)
-Injection point in the distribution system within gujarat-Rs 25000 (for capacity < 100 MW) ; Rs 50000 ( for capacity >100 MW)
-In different states-As per CERC Regulation
c) Long term
-Both within Gujarat- Rs 50000 (for capacity < 100 MW) ; Rs 100000 ( for capacity >100 MW)
-Injection point in the distribution system within gujarat-Rs 50000 (for capacity < 100 MW) ; Rs 100000 ( for capacity >100 MW)
-In different states-As per CERC Regulations
Prepared by ABPS Infra Page66/123
OPEN ACCESS
ANNEXURE-V
STATE
Intra-State Open Access
Regulations
(Y/N)
Nodal agency
Application fee
(Rs)
STATE-WISE OPEN ACCESS PROVISIONS
Andhra Pradesh Y
a) For Long term open access-STU
b) For Short term open access-SLDC
a) Long term-Rs 10000
b) Short term-Rs 1000
Uttar Pradesh Y
Long term-STU
Short term-SLDC
Short term-Rs 5000
Long term/Medium term-Rs 50000-1 lakhs
Uttarakhand Y
1. Open Access Customer connected to 66kV or below
a) Short term
-Both within same DISCOM- Concerned DISCOM
-Both within same state but different DISCOM-SLDC
-Injection point in the intra-state transmission system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within same DISCOM- Concerned DISCOM
-Both within state but different DISCOM-STU
-Injection point in the intra-state transmission system within state-STU
-In different states-CTU
2. Open Access Customer connected to 132 kV or above
a) Short term
-Both within state(in intra-state transmission system)- SLDC
-Injection point in the distribution system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within state- STU
-Injection point in the distribution system within state-STU
1. Open Access Customer connected to 66kV or below
a) Short term
Both within same DISCOM- Rs 2000
-Both within same state but different DISCOM-Rs 5000
-Injection point in the intra-state transmission system within state-Rs 5000
-In different states-Rs 5000
b) Medium term and Long term
-Both within same DISCOM- Rs 50000
-Both within state but different DISCOM-Rs 1 lakh
-Injection point in the intra-state transmission system within state-Rs 1 lakh
-In different states-Rs 1 lakh
2. Open Access Customer connected to 132 kV or above
a) Short term
-Both within state(in intra-state transmission system)- Rs 5000
-Injection point in the distribution system within state-Rs 5000
-In different states-Rs 5000
b) Medium term
-Both within state- Rs 1 lakh
-Injection point in the distribution system within state-Rs 1 lakh
Tripura Y
The Nodal Agency for arranging long-term open access shall be the state
transmission utility if its system is used; otherwise the Nodal agency shall be the
respective distribution licensee, within whose area the point of drawal is
Long term OA-Rs 5000
Short Term OA-Rs 1000
Sikkim N.A
N.A N.A
Tamil Nadu Y
Long term-STU
Short term-SLDC
Long Term OA
a) For conventional generators-Rs 5000
b) for non-conventional generators- Rs 200/MW subject to maximum of Rs 5000
Short term OA= Rs 1000
Rajasthan Y
Long term/Short term-STU Long term- Rs50000
Short term-Rs 5000
Orissa Y
The nodal agency for arranging long-term open access shall be the STU if the transmission system is
used; otherwise the nodal agency shall be the respective distribution licensee within whose area the
point of drawl is situated.
For short-term open access transactions, the nodal agency for receiving and processing applications
shall be the State Load Despatch Centre (SLDC).
Long term transmission OA-Rs 1 lakhs
Long term distribution OA-Rs 50000
Short term OA-Rs 5000
Punjab Y
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Concerned DISCOM
-Both within same state but different DISCOM-SLDC
-Injection point in the intra-state transmission system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within same DISCOM- Concerned DISCOM
-Both within state but different DISCOM-STU
-Injection point in the intra-state transmission system within state-STU
-In different states-CTU
2. Open Access Customer connected to Intra-State Trans system
a) Short term
-Both within state(in intra-state transmission system)- SLDC
-Injection point in the distribution system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within state- STU
-Injection point in the distribution system within state-STU
-In different states-CTU
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Rs 2000
-Injection point in the intra-state transmission system within state-Rs 5000
-In different states-As per CERC Regulations
b) Medium term and Long term
-Both within same DISCOM- Rs 50000
Injection point in the intra-state transmission system within state-Rs 1 lakhs
-In different states-As per CERC Regulations
2. Open Access Customer connected to Intra-State Trans sysem
a) Short term
-Both within state (in intra-state transmission system)- Rs 5000
-Injection point in the distribution system within state-Rs 5000
-In different states-As per CERC Regulations
b) Medium term
-Both within state- Rs 1 lakh
-Injection point in the distribution system within state -Rs 1 lakh
-In different states-As per CERC Regulations
c) Long term
-Both within state- Rs 2 lakh
-Injection point in the distribution system within state-Rs 2 lakh
-In different states-As per CERC Regulations
Nagaland Y
For all Medium-Term and Long-Term Open Access :
(a) STU for transactions for where the point of drawal or point of injection is
located on the intra-state transmission network;
(b) Otherwise the Distribution Licensee of the area where the point of drawal
is located.
For Short-Term Open Access transactions,: SLDC.
Long term-Rs 10000
Short term-Rs 1000
Meghalaya Y
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Concerned DISCOM
-Both within same state but different DISCOM-SLDC
-Injection point in the intra-state transmission system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within same DISCOM- Concerned DISCOM
-Both within state but different DISCOM-STU
-Injection point in the intra-state transmission system within state-STU
-In different states-CTU
2. Open Access Customer connected to Intra-State Trans system
a) Short term
-Both within state(in intra-state transmission system)- SLDC
-Injection point in the distribution system within state-SLDC
-In different states-RLDC of the region of consumer
b) Medium term and Long term
-Both within state- STU
-Injection point in the distribution system within state-STU
-In different states-CTU
1. Open Access Customer connected to Distribution system
a) Short term
-Both within same DISCOM- Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
-Injection point in the intra-state transmission system within state-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
-In different states-Rs 5000 for capacity less than 5 MW and Rs 10000 above 5 MW
b) Medium term
-Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW
-Different DISCOM-Rs 50000 upto 5MW and Rs 1 lakhs above 5MW
Injection point in the intra-state transmission system within state-Rs 50000 and Rs 1 lac respectively
-In different states-Rs 1 lacs
c) Long term
-Both within same DISCOM- Rs 25000 for capacity upto 5 MW and Rs 50000 for capacity above 5 MW
-Injection point in the intra-state transmission system within Arunachal-Rs 50000 and Rs 1 lac respectively
-In different states-Rs 1 lacs
2. Open Access Customer connected to Intra-State Trans sysem
a) Short term
-Both within state (in intra-state transmission system)- Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
-Injection point in the distribution system within state-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
-In different states-Rs 10000 and Rs 5000 resp for upto 5 MW and above 5MW
b) Medium term
-Both within state- Rs 100000 (for capacity >5MW) ; Rs 50000 ( for capacity < 5MW)
-Injection point in the distribution system within state -Rs 100000 (for capacity > 5MW) ; Rs 50000 ( for capacity <5 MW)
-In different states-Rs 1 lacs
c) Long term
-Both within state- Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW)
-Injection point in the distribution system within state-Rs 2 lacs (for capacity > 5 MW) ; Rs 1 lac ( for capacity < 5MW)
-In different states-Rs 2 lacs
Prepared by ABPS Infra Page67/123
OPEN ACCESS
ANNEXURE-V
STATE
Intra-State Open Access
Regulations
(Y/N)
Nodal agency
Application fee
(Rs)
STATE-WISE OPEN ACCESS PROVISIONS
Andhra Pradesh Y
a) For Long term open access-STU
b) For Short term open access-SLDC
a) Long term-Rs 10000
b) Short term-Rs 1000
Pondicherry Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Lakshadweep Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Daman & Diu Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Dadra and Nagar Haveli Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Chandigargh Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Goa Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Andaman Nicobar Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Union Territories Y
Long term-STU
Short term-SLDC
Long term-Rs 50000
Short term-Rs 5000
Uttar Pradesh Y
Long term-STU
Short term-SLDC
Short term-Rs 5000
Long term/Medium term-Rs 50000-1 lakhs
West Bengal Y
The Nodal Agency for arranging the Long Term Open Access within the State shall be the STU if its system
is used. Otherwise, the Nodal Agency shall be the Transmission or the Distribution Licensee in whose
system the point of drawal of electricity is located;
The Nodal Agency for Short Term Open Access and open access for emergency requirement and trial run
within the state shall be the SLDC.
1. Both source and drawl within WB
a) Cogeneration and Renewable
i) Long term-Rs 50000
ii) Short Term-Rs 5000
2. Both source and Drawl outside WB
a) Cogeneration and renewable
i) Long term-Rs 50000
ii) Short term-Rs 5000

Prepared by ABPS Infra Page68/123
OPEN ACCESS
Transmission charges and losses Cross-subsidy surcharge Wheeling charges Banking provisions
Transmission chargers for FY 2012-13=2720 MW/day
Transmission losses=3.85%
No Cross Subsidy for Solar.
No Cross subsidy for wind not availing REC benefit, and CSS would
be applicable in case of REC benefit
1. SOLAR PROJECTS:
A) Wheeling at consumption site at 66 kV and above: Normal
transmission charges and losses(
B) At consumption site below 66 kV: ( normal charges plus
transmission and wheeling loss @ 7%.
C) Wheeling at 11kV and above and below 66 kV
- within same DISCOM: distribution loss of 3% in kind
-different DISCOM: normal transmission charges and T&D loss of
10% of energy fed.
D) Wheeling at 415 V or below:No wheeling charges
2. WIND PROJECTS
A) Wheeling at consumption site at 66 kV and above: Normal
transmission charges and losses(
B) At consumption site below 66 kV:
-( normal charges plus transmission and wheeling loss @ 10%.
-For small investors, with only one WEG in the state: normal
charges plus transmission and wheeling loss @ 7%.
c)
No banking shall be allowed in case of third party sale. The energy wheeled is required to be consumed in
the same time block. Any unutilized energy is to be considered as sale to the utility and for the same the
distribution licensee should pay 85% of the tariff determined by the Commission.
No cross-subsidy for renewable energy projects Wheeling charges for FY 2012-13 for various DISCOMS are:
A. At LT level
1) BRPL-88.88 paisa/unit
2) BYPL-97.99 paisa/unit
3) TPDDL-78.72 paisa/unit
B. At 11 kV
1) BRPL-10.15 paisa/unit
2) BYPL-12.06 paisa/unit
3) TPDDL-50.96paisa/unit
C. At 33/66 kV
1) BRPL-0.43 paisa/unit
2) BYPL-2.36 paisa/unit
3) TPDDL-15.01 paisa/unit
D. Above 66 kV level
Zero wheeling charges
However, no banking facility shall be provided for supply of electricity from renewable energy sources
through open access.
The charges related to transmission and wheeling
shall be 6 %of the energy input into the system for the
consumer using State grid for procuring power from
renewable energy based power generating stations
located in the State. Other than these charges, they shall
not be required to pay any transmission charges or wheeling
charges either
in cash or kind.
For open access consumers procuring power from renewable
energy based power generating plant, the cross subsidy surcharge
payable shall be 50%of the cross subsidy surcharge
determined for that year.
a) For EHT consumers Rs 0.654 per unit (which is 50% of the
computed value of Rs 1.309 per unit).
b) For HT consumers Rs 0.379 per unit (which is 50% of the
computed value of Rs 0.758 per unit).
The charges related to transmission and wheeling shall be 6
%of the energy input into the system for the consumer using
State grid for procuring power from renewable energy based
power generating stations located in the State. Other than these
charges, they shall not be required to pay any transmission
charges or wheeling charges either in cash or kind.
No banking facility for supply of Renewable energy sources through Open Access
Long Term charges=53310/MW/month
Short Term Charges: Rs 438.16/MW/day
Transmission losses=4% in kind
For 132 kV consumers = 60 Ps./kWh.
For 33 kV consumers (other than HTSS) = 54 Ps./kWh.
For 11 kV consumers (other than HTSS) = 52 Ps./kWh
For HTSS consumers 33 kV = 0 Ps./kWh
At 33 kV:10.81 paisa/unit, losses of 6% in kind
At 11 kV:12.64 pasia/unit; losses of 8% in kind
N.A
Transmission losses=4.25% for FY 2012-13
Long term Transmission charges for FY 2010-11=70
paisa/unit
Short Term Transmission charges=Rs 8736.65/ MW/day
(charges shall be applicable till next Order by the
Commission)
To be determined on case to case basis The following information,
Voltage wise Distribution cost 33 kV, 11 kV, LT 3-Phase and
LT 1-Phase
Voltage wise Losses at distribution voltages
Energy input and energy sales at different voltages 33 kV, 11
kV, LT-3
Phase & 1-Phase
is required to compute the wheeling charges, which the APDCL
should submit at the earliest.
The Commission will determine the wheeling charges after
receiving the above data
from APDCL.
Developers can avail of the facility of banking of energy within fixed period spans of 6
months. All terms and conditions of the banking shall be incorporated in banking agreement to be drawn
with the IPPs/Users society. This shall be approved, as may be required, by the regulator.
N.A
Applicable Charges and losses
N.A N.A Banking of Power shall not be allowed without prior permission of the State Government.
The CSS surcharge for HT Industrial Tariff for various DISCOMs
are:
1. At 11 kV-
a) CPDCL-Rs 1.88 /unit
b) EPDCL- Rs 2.18/unit
c) NPDCL-Rs 1.71/unit
d) SPDCL-Rs 1.58/unit
2. At 33 kV
a) CPDCL-Rs 1.72 /unit
b) EPDCL- Rs 2..00/unit
c) NPDCL-Rs 1.78/unit
d) SPDCL-Rs 1.69/unit
3. At 132 kV and above
a) CPDCL-Rs 1.43 /unit
b) EPDCL- Rs 2..26/unit
c) NPDCL-Rs 1.70/unit
d) SPDCL-Rs 2.28/unit
(Detailed list of charges for various consumers are summarised
under Page 20 of the Reference Order
SOLAR :
(Extract of Solar Policy):There will be no wheeling and
transmission charges for wheeling of powergenerated from the
Solar Power Projects , to the desired location/s for captive
use/third party sale within the state through 33 KV system subject
to industries maintaining their demand within its contracted
demand.
However, wheeling and transmission charges for wheeling of
power generated from the Solar Power Projects for sale outside
the state will be as per APERC regulations
The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive
generating plants, if not consumed during the billing month, would be deemed to have been sold to
respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as
amended
a) For FY 2012-13- Rs 65.50/kW/month
Transmission losses (in kind)= 4.06%
b) For FY 2013-14- Rs 61.03/kW/month
Losses-4.02%
Prepared by ABPS Infra Page69/123
OPEN ACCESS
Transmission charges and losses Cross-subsidy surcharge Wheeling charges Banking provisions
Applicable Charges and losses
The CSS surcharge for HT Industrial Tariff for various DISCOMs
are:
1. At 11 kV-
a) CPDCL-Rs 1.88 /unit
b) EPDCL- Rs 2.18/unit
c) NPDCL-Rs 1.71/unit
d) SPDCL-Rs 1.58/unit
2. At 33 kV
a) CPDCL-Rs 1.72 /unit
b) EPDCL- Rs 2..00/unit
c) NPDCL-Rs 1.78/unit
d) SPDCL-Rs 1.69/unit
3. At 132 kV and above
a) CPDCL-Rs 1.43 /unit
b) EPDCL- Rs 2..26/unit
c) NPDCL-Rs 1.70/unit
d) SPDCL-Rs 2.28/unit
(Detailed list of charges for various consumers are summarised
under Page 20 of the Reference Order
SOLAR :
(Extract of Solar Policy):There will be no wheeling and
transmission charges for wheeling of powergenerated from the
Solar Power Projects , to the desired location/s for captive
use/third party sale within the state through 33 KV system subject
to industries maintaining their demand within its contracted
demand.
However, wheeling and transmission charges for wheeling of
power generated from the Solar Power Projects for sale outside
the state will be as per APERC regulations
The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive
generating plants, if not consumed during the billing month, would be deemed to have been sold to
respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as
amended
a) For FY 2012-13- Rs 65.50/kW/month
Transmission losses (in kind)= 4.06%
b) For FY 2013-14- Rs 61.03/kW/month
Losses-4.02%
Rs 7768/MW/day which shall be
equivalent to paise 32.40 per Kwh.
The cross subsidy surcharge for IEHT is @ paise 41 per Kwh.
The Cross subsidy surcharge for IHT consumers is @ paise 68
per Kwh.
Rs 23008/MW/Day. No Provisions specified yet
Wheeling Charges
LT Network
RInfra-D 0.88 Rs/kWh
MSEDCL - 0.36 Rs/kWh
TPC-D - 0.38 Rs/kWh
HT Network
RInfra-D - 0.46 Rs/kWh
MSEDCL (11 kV) - 0.21 Rs/kWh
MSEDCL (33 kV) - 0.04 Rs/kWh
TPC-D - 0.19 Rs/kWh
Banking available for self use and third party wheeling for period of 1 year
N.A(These charges shall be
determined by the Commission as and when the situation
arises, in light of relevant
Railways-Rs 1.14 /unit
(However, in case (e.g. Public Water Works, Other than Irrigation,
Bulk Residential Users, Bulk Supply to Exemptees etc., CSS is zero)
The Distribution Company in whose area the energy is consumed
(irrespective of the point of injection) shall deduct 2% of the
energy injected towards wheeling charges in terms of units.The
Banking of 100%allowed subject to following conditions:
Retail Tariff Order for FY 2012-13 mentions that the
Regulatory Process is underway for determination of such
charges
Long term or medium term= 213.39 Rs/kW/month
Short/collective/renewable = 0.29 Rs/kWh
Transmission loss =4.24%
25% of the
applicable CSS for open access consumer purchasing power from
renewable
sources of energy.
Retail Tariff Order for FY 2012-13 mentions that the Regulatory
Process is underway for determination of such charges
Regulatory Process underway for determination of such charges
as mentioned in the Retail Tariff Order for FY 2012-13
No Provisions specified
Total wheeling charges through distribution/tranmission network=
5% in kind. No charges for solar
2% Banking charges for wind and small hydro. No charges for Solar
Transmission charge: 22 paisa/unit
Transmission loss at EHT level:3%
EHT-66 kV: 11 paisa/kWh
EHT-110kV: 0.00 paisa/kWh
Railways: 24 paisa/kWh
HT I Industrial: Rs 0.00/kWh
HT II Non-Industrial: 49 paisa/kWh
HT-IV Commercial: Rs 2.55/kWh
Wheeling charge: 26 paisa/unit In case of captive generating plants with seasonal generation or infirm generation such as small hydel
projects or wind, the distribution licensee may provide adequate facilities for banking of surplus power,
provided such captive generating plants agree to pay banking charges.
Provided that such banking shall not be allowed if such plants sell energy to other persons.
Provided further that it shall not be the obligation of the distribution licensee to allow banking in cases where
control over the fuel supply is possible or in cases where scheduling and dispatch is possible.
(Banking charges shall be 5% of the energy banked and banking period shall be of 8 months starting from
1st of June every year. Withdrawal of banked energy shall be done on slot to slot basis within monthly billing
cycle as follows.
(a) Peak hour generation with peak hour consumption
(b) Off peak hour generation with off peak hour consumption
(c) Normal hour generation with normal hour consumption.
Jharkhand does not have a Renewable Policy as yet to deal with this issue. But it is
recommended that facility for 100% banking of generated power is allowed on the
condition that banked power will not be returned by more than a fixed quantity at one time.
Utilities should facilitate banking though proper arrangement so that power banked
during off-peak period is not drawn during peak season.
Nil 66 kV and above:
a) HT-2a: 43 paisa/unit
b) HT-2b- 205 paisa/unit
HT level-11kV/33kV:
a) HT-2a: 11 paisa/unit
b) HT-2b: 173 paisa/unit
Renewable energy based power generation projects in Jharkhand are exempted from open access charges as per Government of Jharkhand notified the Industrial Policy
in the year 2001, slient features of which is reproduced in the Wind Regulations. However wind Regulations allows only a 50% discount on wheeling charges and other surcharge on wheeling
charges applicable to conventional form of generation shall be applicable for wind generation projects in Jharkhand.
ST rate for FY 2012-13:
Charges Rs.496.00/day.
Transmission Losses (EHV) 5%
Nil For distribution (Wheeling) Rs.1396.00/day.
Distribution Loses (HV) 5%
The Wind Power Generators are eligible for one month banking for the
electricity generated during the month. However, they are eligible to utilize the same
during the month in proportion to the energy generated during peak and normal hours
period. No banking facility for third party open access
Short term transmission charges=2.15 paisa/kWh
Long Term/Medium Term transmission charges=Rs
11157/MW/month
EHT level (>66 kV): 47 paisa/unit
HT level (>11kV): 110 paisa/unit
LT level (<11 kV): 231 paisa/unit
( As per Hydro policy: Wheeling for captive use within the State
shall be allowed by HPSEB at a fee of 2% (including system
losses). For sale/captive use of power outside the State the
HPSEB shall levy wheeling charges @ 10% (including system
losses) of the energy received (excluding royalty) at the
interconnection point for wheeling/transfer of power up to the
mutually agreed inter-state point.)
As per hydro policy, Banking of energy will also be allowed by the HPSEB as per prevailing rules and
regulations.
Further, Third party sale of power within the State shall not be allowed
Transmission Tariff for short term: 21 paisa/kWh
Transmission loss:2.5%
1. For HT industry: 92 paisa/unit
2. For NDS HT: 80 paisa/unit
3. Bulk Supply other than domestic: 92 paisa/unit
4. Railways: 78 paisa/unit
(CSS not applicable to captive generators and seeking open access
for self consumption)
Wheeling Charges for FY 2012-13: 51 paisa/unit The banking facility shall be allowed for a period of one year by the Licensee/ Utilities free of cost.
However, withdrawal of banked power should be allowed only during non-peak hours. If the banked energy
is not utilized within a period of twelve months from the date of power banked with the concerned power
utilities/ licensee, it will automatically lapse and no charges shall be paid in lieu of such power.
Transmission chargers for FY 2012-13=2720 MW/day
Transmission losses=3.85%
No Cross Subsidy for Solar.
No Cross subsidy for wind not availing REC benefit, and CSS would
be applicable in case of REC benefit
1. SOLAR PROJECTS:
A) Wheeling at consumption site at 66 kV and above: Normal
transmission charges and losses(
B) At consumption site below 66 kV: ( normal charges plus
transmission and wheeling loss @ 7%.
C) Wheeling at 11kV and above and below 66 kV
- within same DISCOM: distribution loss of 3% in kind
-different DISCOM: normal transmission charges and T&D loss of
10% of energy fed.
D) Wheeling at 415 V or below:No wheeling charges
2. WIND PROJECTS
A) Wheeling at consumption site at 66 kV and above: Normal
transmission charges and losses(
B) At consumption site below 66 kV:
-( normal charges plus transmission and wheeling loss @ 10%.
-For small investors, with only one WEG in the state: normal
charges plus transmission and wheeling loss @ 7%.
c)
No banking shall be allowed in case of third party sale. The energy wheeled is required to be consumed in
the same time block. Any unutilized energy is to be considered as sale to the utility and for the same the
distribution licensee should pay 85% of the tariff determined by the Commission.
Prepared by ABPS Infra Page70/123
OPEN ACCESS
Transmission charges and losses Cross-subsidy surcharge Wheeling charges Banking provisions
Applicable Charges and losses
The CSS surcharge for HT Industrial Tariff for various DISCOMs
are:
1. At 11 kV-
a) CPDCL-Rs 1.88 /unit
b) EPDCL- Rs 2.18/unit
c) NPDCL-Rs 1.71/unit
d) SPDCL-Rs 1.58/unit
2. At 33 kV
a) CPDCL-Rs 1.72 /unit
b) EPDCL- Rs 2..00/unit
c) NPDCL-Rs 1.78/unit
d) SPDCL-Rs 1.69/unit
3. At 132 kV and above
a) CPDCL-Rs 1.43 /unit
b) EPDCL- Rs 2..26/unit
c) NPDCL-Rs 1.70/unit
d) SPDCL-Rs 2.28/unit
(Detailed list of charges for various consumers are summarised
under Page 20 of the Reference Order
SOLAR :
(Extract of Solar Policy):There will be no wheeling and
transmission charges for wheeling of powergenerated from the
Solar Power Projects , to the desired location/s for captive
use/third party sale within the state through 33 KV system subject
to industries maintaining their demand within its contracted
demand.
However, wheeling and transmission charges for wheeling of
power generated from the Solar Power Projects for sale outside
the state will be as per APERC regulations
The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive
generating plants, if not consumed during the billing month, would be deemed to have been sold to
respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as
amended
a) For FY 2012-13- Rs 65.50/kW/month
Transmission losses (in kind)= 4.06%
b) For FY 2013-14- Rs 61.03/kW/month
Losses-4.02%
Transmission Charges
Long term:
At 132 kV level : 0.176 Rs/kWh
above 132 kV level: 0.132 Rs/kWh
Short Term:
At 132 kV level : 0.05 Rs/kWh
above 132 kV level: 0.04 Rs/kWh
Transmission Loss : 3.63% (FY 2012-13)
NIL as per retail Tariff Orders Common for all DISCOMs
Connected at 11 kV:
Long term - Rs. 0.527 / kWh
Short term - Rs 0.132 /kWh
Connected above 11 kV:
Long term - Rs. 0.329 / kWh
Short term - Rs 0.082 /kWh
a) Banking of energy upto 100%, as agreed between the plant and the distribution licensee, shall
be allowed during the the period 17:00 hrs. to 22:00 Hrs. (specified as peak hours for this purpose).
b. Withdrawal of power shall be allowed only during the period other than
17:00 hrs. to 22:00 Hrs.
c. The plants shall provide ABT compliant Special Energy Meters and the monthly settlement of energy
sales shall be done based on:
i. Power supplied during the peak hours as per SEM meter readings
ii. Power banked as per daily schedules given for banking of power during the month.
The lower of the two shall be considered as banked power and monthly
settlement shall be done for the balance energy supplied by the plant at the
rate specified for supply of electricity to distribution licensee.
Provided that till implementation of intra-state ABT in the state of Uttar Pradesh, lower of the
Power supplied during the peak hours as per SEM meter readings and the power banked as per the
declaration given by the generating plant shall be considered as banked power.
d. Upon introduction of intra-state ABT in the state of Uttar Pradesh, the banking as well as withdrawal of
banked energy shall be subject to day ahead scheduling.
e. The power withdrawn by the plant as ascertained by SEM readings, which could not be considered as
withdrawal from banked power, shall be considered as power purchased by the plant.
A Generating Plant shall be allowed to withdraw power that was banked during a particular
financial year in the same year or during the following financial year.
No generator shall be allowed the facility of banking the electricity generated by them,
nor will such facility be extended to any open access customers.
As per Tariff Order Unless determined otherwise by the Commission in the respective
years tariff order, no cross
subsidy surcharge or additional surcharge shall be payable by the
consumers seeking open
access to transmission and/or distribution system.
As per Tariff Order Banking provisions stipulated in the RE Regulations for the State.
(1) Applicable only in case of Captive generating plants
(2) Banking allowed only during the period 17 hrs to 22 hrs; Withdrawl allowed only during the period other
than the period 17 hrs to 22 hrs.
(3) A Generating Station shall be allowed to withdraw power that was banked during a
particular financial year in the same year or during the following financial year.
(4) Banking charges shall be 12.5% of the energy banked
(5) The banked power remaining unutilized on the expiry of the following financial
year would be treated as sale and the financial settlement shall be made at the
generic tariff for the year during which the power was banked. No banking charges
shall be deducted from such unutilized banked energy.
(6) Banking charges shall be 12.5% of the energy banked
N.A N.A
Third Party Sale from renewable energy sources shall be exempted
from the crosssubsidy
surcharge determined by the Commission from time to time.
(Wind TO) Cross-subsidy surcharge for RE power shall be 50% as
that applicable for the conventional power source
(Wind Tariff Order) The Commission has decided to fix 40% of
the
transmission charges and 40% of the wheeling charges as
applicable to the conventional power to the Wind power. Apart
from these charges, the WEGs
shall have to bear the actual line losses in kind as specified in the
respective orders of the Commission and amended from time to
time.
(Biomass Tariff Order) The Commission has decided to fix 50% of
the
transmission charges and 50% of the wheeling charges as
applicable to the conventional power to other non-conventional
sources of poewr. Apart from these charges, the generators
shall have to bear the actual line losses in kind as specified in the
respective orders of the Commission and amended from time to
time.
(wind TO) Banking Period: April1st to March 31st of the following year.
Banking charge: Rs. 0.94 Rs/kWh for FY 2012-13 = Difference of Average cost of purchase from trader for
past two financial years as published by CERC (Rs 4.45 per kWh) and the maximum preferential tariff (Rs
3.51 per kWh)- applicable till 31st March 2013. From 1st April 2013, banking charges to be computed and
published by TANGEDCO on the same principle.
Treatment of excess unutilised banked energy: Considered as sale to Discom @ 75% of the retail tariff. For
REC based projects, such excess energy left unutilised at end of banking period get lapsed
N.A N.A
Renewable Energy transactions exempted from payment of Cross
Subsidy Surcharge (as per RERC Tariff Regulations)
Wheeling Charge & loss:
EHV- 0.01 Rs/kWh & 0% loss
33 kV - 0.11 Rs/kWH & 3.80% loss
11 kV - 0.32 Rs/kWh & 0.32% loss
(As per RERC Tariff Regulations)
(2) Period of banking;
(a) In respect of third party sale and/or captive use of non firm energy, the banking
and drawal shall be on six monthly basis i.e. April to September and October to
March.
However, during the months of December, January & February utilisation of the banked energy
shall not be permitted.
(b) For firm energy from biomass power plants banking and drawal be accounted for
in the same month.
(Wind Tariff Order) The Commission has decided to fix 40%
of the
transmission charges and 40% of the wheeling charges as
applicable to the conventional power to the Wind power.
Apart from these charges, the WEGs
shall have to bear the actual line losses in kind as specified
in the respective orders of the Commission and amended
from time to time.
(Biomass Tariff Order) The Commission has decided to fix
50% of the
transmission charges and 50% of the wheeling charges as
applicable to the conventional power to other non-
conventional sources of poewr. Apart from these charges,
the generators
shall have to bear the actual line losses in kind as specified
in the respective orders of the Commission and amended
from time to time.
Transmission Charges:
Long Term Charges: 146.61 Rs/kW/month
Short term charges: 32.07 paise/kWh
Transmission Loss: 4.20%
CESU/NESCO/WESCO/SOUTHCO- Rs 1500/MW/day or
Rs 62.5 MWh
Losses-3.8%
For HT consumers:
CESU-101 paisa/unit
NESCO-55 paisa/unit
WESCO-76 paisa/unit
SOUTHCO-165 paisa/unit
For EHT concumers:
CESU-197 paisa/unit
NESCO-157 paisa/unit
WESCO-158 paisa/unit
SOUTHCO-276 paisa/unit
(No cross-subsidy surcharge for purchase from Renewable
sources)
Wheeling charges: CESU-78.09paisa/unit
NESCO-81.29paisa/unit
WESCO-61.3 paisa/unit
SOUTHCO-99.94 paisa/unit
Wheeling losses:8%
No specific Provision as per RE Regulations
Transmission and Wheeling charges: In case of
wheeling of power generated from NRSE project,
transmission and wheeling charges shall be levied @ 2% of
the energy injected into the State Grid, irrespective of the
distance i.e. additional 2% of the total energy shall be
injected at injection point(s). 10% of the average revenue
realized by distribution licensee from such additional
injection shall be passed on to the STU/Transmission
licensee for compensating on account of transmission
charges.
Transmisssion losses:
at 132/220 kV-2.5%
at 66/33 kV-2.5%
at 11 kV-2.5%
Note: As per draft amendment proposed as published on
November 12, 2012 the above provision of wheeling
charges are applicable to RE sale within the State. For RE
sale outside the State, full wheeling and transmission
charges shall apply
Large supply - 88 paisa/unit
Domestic supply - 85 paisa/unit
Non-Residential supply - 107 paisa/unit
Bulk supply - 63 paisa/unit
Railway traction - 107 paisa/unit
Wheeling charges: In case of wheeling of power generated from
NRSE project, transmission and wheeling charges shall be levied
@ 2% of the energy injected into the State Grid, irrespective of the
distance i.e. additional 2% of the total energy shall be injected at
injection point(s). 10% of the average revenue realized by
distribution licensee from such additional injection shall be passed
on to the STU/Transmission licensee for compensating on
account of transmission charges.
Distribution losses:
at 132/220 kV-Nil
at 66/33 kV-2.39%
at 11 kV-6.36%
Note: As per draft amendment proposed as published on
November 12, 2012 the above provision of wheeling charges are
applicable to RE sale within the State. For RE sale outside the
State, full wheeling and transmission charges shall apply
No specific Provision as per RE Regulations
Rs 7768/MW/day which shall be
equivalent to paise 32.40 per Kwh.
Not specified Not specified Banking has been defined in the RE Regulations. No specic period specified Provision as in RE Regulations
A person, who has established the RE based Generating
Stations or Co-generating Stations, shall have right to non-
discriminatory open access to the State Transmission
System for carrying electricity from his plant by using
transmission lines and associated facilities subject to
payment of transmission charges and adjustment of
average Transmission Losses in kind as determined by the
Commission.
(Transmission Charges and losses yet to be determined)
The cross subsidy surcharge for IEHT is @ paise 41 per Kwh.
The Cross subsidy surcharge for IHT consumers is @ paise 68
per Kwh.
Rs 23008/MW/Day. No Provisions specified yet
Prepared by ABPS Infra Page71/123
OPEN ACCESS
Transmission charges and losses Cross-subsidy surcharge Wheeling charges Banking provisions
Applicable Charges and losses
The CSS surcharge for HT Industrial Tariff for various DISCOMs
are:
1. At 11 kV-
a) CPDCL-Rs 1.88 /unit
b) EPDCL- Rs 2.18/unit
c) NPDCL-Rs 1.71/unit
d) SPDCL-Rs 1.58/unit
2. At 33 kV
a) CPDCL-Rs 1.72 /unit
b) EPDCL- Rs 2..00/unit
c) NPDCL-Rs 1.78/unit
d) SPDCL-Rs 1.69/unit
3. At 132 kV and above
a) CPDCL-Rs 1.43 /unit
b) EPDCL- Rs 2..26/unit
c) NPDCL-Rs 1.70/unit
d) SPDCL-Rs 2.28/unit
(Detailed list of charges for various consumers are summarised
under Page 20 of the Reference Order
SOLAR :
(Extract of Solar Policy):There will be no wheeling and
transmission charges for wheeling of powergenerated from the
Solar Power Projects , to the desired location/s for captive
use/third party sale within the state through 33 KV system subject
to industries maintaining their demand within its contracted
demand.
However, wheeling and transmission charges for wheeling of
power generated from the Solar Power Projects for sale outside
the state will be as per APERC regulations
The Wind Power Projects are not eligible for Banking of Energy. The Energy generated by captive
generating plants, if not consumed during the billing month, would be deemed to have been sold to
respective DISCOM and the DISCOM may pay for such unutilized energy at the rate of 85% of the tariff as
amended
a) For FY 2012-13- Rs 65.50/kW/month
Transmission losses (in kind)= 4.06%
b) For FY 2013-14- Rs 61.03/kW/month
Losses-4.02%
Yet to be specified Yet to be specified Yet to be specified Yet to be specified
Yet to be specified
Yet to be specified Yet to be specified Yet to be specified Yet to be specified
Yet to be specified Yet to be specified
Yet to be specified Yet to be specified Yet to be specified
Yet to be specified Yet to be specified Yet to be specified
Yet to be specified Yet to be specified
Yet to be specified
Yet to be specified Yet to be specified Yet to be specified
Yet to be specified Yet to be specified Yet to be specified
Yet to be specified
Wheeling charges applicable for use of distribution system or
associated facilities
of a licensee by open access customers for conveyance of
electricity from
cogeneration and renewable energy sources shall be either one-
third of the
wheeling charges calculated as per tariff order under Tariff
Regulations or cost of
7.5% of the energy fed to the grid irrespective of the distance of
wheeling,
whichever is higher
Yet to be specified
Transmission Charges
Long term:
At 132 kV level : 0.176 Rs/kWh
above 132 kV level: 0.132 Rs/kWh
Short Term:
At 132 kV level : 0.05 Rs/kWh
above 132 kV level: 0.04 Rs/kWh
Transmission Loss : 3.63% (FY 2012-13)
NIL as per retail Tariff Orders Common for all DISCOMs
Connected at 11 kV:
Long term - Rs. 0.527 / kWh
Short term - Rs 0.132 /kWh
Connected above 11 kV:
Long term - Rs. 0.329 / kWh
Short term - Rs 0.082 /kWh
a) Banking of energy upto 100%, as agreed between the plant and the distribution licensee, shall
be allowed during the the period 17:00 hrs. to 22:00 Hrs. (specified as peak hours for this purpose).
b. Withdrawal of power shall be allowed only during the period other than
17:00 hrs. to 22:00 Hrs.
c. The plants shall provide ABT compliant Special Energy Meters and the monthly settlement of energy
sales shall be done based on:
i. Power supplied during the peak hours as per SEM meter readings
ii. Power banked as per daily schedules given for banking of power during the month.
The lower of the two shall be considered as banked power and monthly
settlement shall be done for the balance energy supplied by the plant at the
rate specified for supply of electricity to distribution licensee.
Provided that till implementation of intra-state ABT in the state of Uttar Pradesh, lower of the
Power supplied during the peak hours as per SEM meter readings and the power banked as per the
declaration given by the generating plant shall be considered as banked power.
d. Upon introduction of intra-state ABT in the state of Uttar Pradesh, the banking as well as withdrawal of
banked energy shall be subject to day ahead scheduling.
e. The power withdrawn by the plant as ascertained by SEM readings, which could not be considered as
withdrawal from banked power, shall be considered as power purchased by the plant.
A Generating Plant shall be allowed to withdraw power that was banked during a particular
financial year in the same year or during the following financial year.
(RE Regulations, 2010) Transmission charges payable for
open access availed by cogeneration and
renewable energy sources shall be two-third of the rate of
such charges applicable
for open access customers for long term and short term
open access as
determined in relevant tariff order
Prepared by ABPS Infra Page72/123
OPEN ACCESS
Reference Open Access
Regulation
Reference for Open Access
Charges
Reference for Banking
provisions
GJ98R05010611 GJ98O05070412
GJ01O05080812
GJ03O05270112
GJ01O05080812
GJ03O05270112
DL98R05030111 DL98R05011012
DL98O05130712
DL98R05011012
CG98R05040311 CG98O05280412 CG98R05040311
BR98R05200506 BR98O05300312
AS98R05010805 AS98O05160511
AS98O05160511
AS08Z05000312
AR98A05170812 AR08Z99240108
AP98R05080605 AP98O05261012
AP03Z05260912
AP98O05200309
AP01Z05110408
Prepared by ABPS Infra Page73/123
OPEN ACCESS
Reference Open Access
Regulation
Reference for Open Access
Charges
Reference for Banking
provisions
AP98R05080605 AP98O05261012
AP03Z05260912
AP98O05200309
AP01Z05110408
MP03O05060710
MP01O05140510
MH99R05210405 MH98O05210512 MH01O05241103
MH99R05210605 MH98O05090911

MN98R05020710 MN99O05250712
ML98R05270412 ML99O05050912
MP98R05160605 MP03O05060710
MP01O05140510
MP98O05170412
JH01R05230610
JH03R05230610
KA98R05121104 KA98O05300412
KA98O05031012
KA98O05300412
KA98O05300412
KA98O05300412
KA98O05300412
KA98O05300412
KL98R05021105 KL98O05250712 KL99R05060807
JH98R05270605 JH01R05230610
JH03R05230610
JK01A05200810 JK98R05250106 JK98Z05110712
HP98R05020510 HP98O05260612 HP08Z05000006
HR98R05110112 HR98O05290312
HR98O05310312
HR98Z05290310
GJ98R05010611 GJ98O05070412
GJ01O05080812
GJ03O05270112
GJ01O05080812
GJ03O05270112
Prepared by ABPS Infra Page74/123
OPEN ACCESS
Reference Open Access
Regulation
Reference for Open Access
Charges
Reference for Banking
provisions
AP98R05080605 AP98O05261012
AP03Z05260912
AP98O05200309
AP01Z05110408
NL98R05000112 NL98R01300811
OR98R05060605 OR99O05130712
PB98R05010711 PB98R05010711
PB98R05121112
RJ98R05260504 RJ99O05270312 RJ99O05310310
RJ99O05080812 RJ98R01230109
RJ99Z05010210
TN98R05130411 TN01O05310712 TN01O05310712
TN04O05310712
TR98R05290410 TR98R05160910
UA99R05281010 UA98R05060710
UP98R05070605 UP99O05191012 UP01R01220310
UP99O05191012
N.A
Prepared by ABPS Infra Page75/123
OPEN ACCESS
Reference Open Access
Regulation
Reference for Open Access
Charges
Reference for Banking
provisions
AP98R05080605 AP98O05261012
AP03Z05260912
AP98O05200309
AP01Z05110408
WB99R05120407 WB98R05100810
Prepared by ABPS Infra Page76/123
Notification
No./
Case No.
Determination of Tariff for Procurement of Power by the Distribution Licensees and Others from Wind Power Projects. Order No.2 of 2012 8/8/2012
Central Code
Code Body 01
CE CERC 02
ME MNRE 03
PM Ministry of Power 04
FR FOR 05
CA CEA 06
Code State 07
AP Andhra Pradesh 08
AR Arunachal Pradesh 09
AS Assam 10
BR Bihar 11
CG Chattisgarh 12
DL Delhi 13
GJ Gujarat 14
HR Haryana ..
HP Himachal Pradesh ..
JK Jammu & Kashmir ..
JH Jharkhand 97
KA Karnataka 98
KL Kerala 99
MP Madhya Pradesh
MH Maharashtra
List of Centre/States/UTs and
respective Codes
RE Technology
G J 0 1
State/Central
RE Technology
Type of Notification
MN Manipur
MZ Mizoram
ML Meghalaya
NL Nagaland
OR Orissa
PB Punjab
RJ Rajasthan
SK Sikkim
TN Tamil Nadu
TR Tripura
UA Uttarakhand
UP Uttar Pradesh
WB West Bengal
GA Goa
Union Territories
Code UT
AN Andaman & Nicobar
CH Chandigarh
DN Dadra and Nagar Haveli
DD Daman & Diu
LD Lakshadweep
PY Pondicherry
GT Goa and UTs combined
Technology Code Notification
Wind R Regulation
Solar Thermal O Order
Solar PV A Draft Regulations
Biomass-Rankine Cycle B Draft Order
Biomass-Gassifier C Discussion Paper
Biogas Z Others
Bagasse Co-gen
SHP
MSW
Geothermal
Wind Offshore
Wind Repowering
Solar Hybrid
Tidal
Off-Grid RE
All RE combined
Other
RE Technology Type of Notification
O 1 0 8 0
Data of Issuance/
Notification (DD/MM/YY)

Matter of notification
Denotation of each Parameters listed below of
8 1 2 0
Code Matter
01 Tariff
02 RPO-REC
03 APPC-State Agency
04 Grid Connectivity
05 Open Access
06 Grid Code
07 Competitive Bidding

99 Other
Matter of the Notification
Sl.No. State/ Centre Tech
Tech Code based on Technology
covered in the document
1 Andhra Pradesh Wind 01
2 Arunachal Pradesh Wind 98
3 Assam Wind 98
4 Chattisgarh Wind 01
5 Gujarat Wind 01
6 Haryana Wind 98
7 Himachal Pradesh Wind 08
8 Jammu & Kashmir Wind 98
9 Jharkhand Wind 01
10 Karnataka Wind 98
11 Kerala Wind 98
12 Madhya Pradesh Wind 01
13 Maharashtra Wind 98
14 Manipur Wind 98
15 Nagaland Wind 98
16 Orissa Wind 98
17 Punjab Wind 98
18 Rajasthan Wind 98
19 Rajasthan Wind 01
20 Tamil Nadu Wind 01
21 Tripura Wind 98
22 Uttarakhand Wind 98
23 Uttar Pradesh Wind 98
24 West Bengal Wind 98
25 Andhra Pradesh Solar PV 02
26 Assam Solar PV 98
27 Bihar Solar PV 02
28 Bihar Solar PV 02
29 Chattisgarh Solar PV 98
30 Gujarat Solar PV 02
31 Haryana Solar PV 98
32 Jammu & Kashmir Solar PV 98
33 Jharkhand Solar PV 02
34 Karnataka Solar PV 02
35 Madhya Pradesh Solar PV 02
36 Maharashtra Solar PV 98
37 Manipur Solar PV 98
38 Mizoram Solar PV 98
39 Nagaland Solar PV 98
40 Orissa Solar PV 03
41 Punjab Solar PV 98
43 Rajasthan Solar PV 03
44 Tamil Nadu Solar PV 03
45 Tripura Solar PV 03
46 Uttarakhand Solar PV 98
47 Uttar Pradesh Solar PV 98
48 West Bengal Solar PV 98
49 Andhra Pradesh Solar Thermal 02
50 Assam Solar Thermal 98
51 Bihar Solar Thermal 02
52 Bihar Solar Thermal 02
53 Chattisgarh Solar Thermal 98
54 Gujarat Solar Thermal 02
55 Haryana Solar Thermal 98
56 Jammu & Kashmir Solar Thermal 98
57 Jharkhand Solar Thermal 02
58 Karnataka Solar Thermal 02
59 Madhya Pradesh Solar Thermal 02
60 Maharashtra Solar Thermal 98
61 Manipur Solar Thermal 98
62 Mizoram Solar Thermal 98
63 Nagaland Solar Thermal 98
64 Orissa Solar Thermal 02
65 Punjab Solar Thermal 98
66 Rajasthan Solar Thermal 02
67 Tamil Nadu Solar Thermal 02
68 Tripura Solar Thermal 02
69 Uttarakhand Solar Thermal 98
70 Uttar Pradesh Solar Thermal 98
71 Andhra Pradesh Bagasse Co-gen 98
72 Andhra Pradesh Bagasse Co-gen 98
73 Assam Bagasse Co-gen 98
74 Arunachal Pradesh Bagasse Co-gen 98
75 Bihar Bagasse Co-gen 07
76 Chattisgarh Bagasse Co-gen 98
77 Gujarat Bagasse Co-gen 07
78 Haryana Bagasse Co-gen 98
79 Himachal Pradesh Bagasse Co-gen 98
80 Jammu & Kashmir Bagasse Co-gen 98
81 Jharkhand Bagasse Co-gen 07
82 Karnataka Bagasse Co-gen 98
83 Kerala Bagasse Co-gen 07
84 Madhya Pradesh Bagasse Co-gen 07
85 Maharashtra Bagasse Co-gen 98
86 Maharashtra Bagasse Co-gen 98
87 Manipur Bagasse Co-gen 98
88 Mizoram Bagasse Co-gen 98
89 Nagaland Bagasse Co-gen 98
90 Orissa Bagasse Co-gen 98
91 Punjab Bagasse Co-gen 98
92 Rajasthan Bagasse Co-gen 98
93 Tamil Nadu Bagasse Co-gen 07
94 Uttarakhand Bagasse Co-gen 98
95 Uttar Pradesh Bagasse Co-gen 98
96 West Bengal Bagasse Co-gen 98
97 Andhra Pradesh SHP 98
98 Arunachal Pradesh SHP 98
99 Assam SHP 98
100 Chattisgarh SHP 98
101 Haryana SHP 98
102 Himachal Pradesh SHP 98
103 Jammu & Kashmir SHP 98
104 Karnataka SHP 98
105 Kerala SHP 08
106 Madhya Pradesh SHP 08
107 Maharashtra SHP 98
108 Manipur SHP 98
109 Mizoram SHP 98
110 Nagaland SHP 98
111 Orissa SHP 98
112 Punjab SHP 98
113 Rajasthan SHP 98
114 Tamil Nadu SHP 08
115 Uttarakhand SHP 98
116 Uttar Pradesh SHP 98
117 West Bengal SHP 98
118 Andhra Pradesh MSW 98
119 Arunachal Pradesh MSW 98
120 Assam MSW 98
121 Chattisgarh MSW 98
122 Delhi MSW 09
123 Gujarat MSW 09
124 Haryana MSW 98
125 Himachal Pradesh MSW 98
126 Jammu & Kashmir MSW 98
127 Karnataka MSW 09
128 Maharashtra MSW 98
129 Manipur MSW 98
130 Mizoram MSW 98
131 Nagaland MSW 98
132 Orissa MSW 98
133 Punjab MSW 98
134 Rajasthan MSW 98
135 Uttarakhand MSW 98
136 Uttar Pradesh MSW 98
137 West Bengal MSW 98
138 Andhra Pradesh Biomass-Rankine Cycle
98
139 Arunachal Pradesh Biomass-Rankine Cycle
98
140 Assam Biomass-Rankine Cycle
98
141 Bihar Biomass-Rankine Cycle
4
142 Chattisgarh Biomass-Rankine Cycle
98
143 Gujarat Biomass-Rankine Cycle
04
144 Haryana Biomass-Rankine Cycle
98
145 Haryana Biomass-Rankine Cycle
98
146 Himachal Pradesh Biomass-Rankine Cycle
98
147 Jammu & Kashmir Biomass-Rankine Cycle
98
148 Jharkhand Biomass-Rankine Cycle
04
149 Karnataka Biomass-Rankine Cycle
98
150 Kerala Biomass-Rankine Cycle
07
151 Madhya Pradesh Biomass-Rankine Cycle
04
152 Maharashtra Biomass-Rankine Cycle
98
153 Maharashtra Biomass-Rankine Cycle 98
154 Manipur Biomass-Rankine Cycle
98
155 Mizoram Biomass-Rankine Cycle
98
156 Nagaland Biomass-Rankine Cycle
98
157 Orissa Biomass-Rankine Cycle
98
158 Punjab Biomass-Rankine Cycle
98
159 Rajasthan Biomass-Rankine Cycle
98
160 Rajasthan Biomass-Rankine Cycle
04
161 Tamil Nadu Biomass-Rankine Cycle
4
162 Uttarakhand Biomass-Rankine Cycle
98
163 Uttar Pradesh Biomass-Rankine Cycle
98
164 West Bengal Biomass-Rankine Cycle
98
165 CERC All RE 98
166 CERC All RE 98
167 Jharkhand SHP 08
168 Andhra Pradesh All RE 98
169 Andhra Pradesh All RE 98
170 Andhra Pradesh Solar PV 02
171 Assam All RE 98
172 Bihar All RE 98
173 Bihar Solar PV 02
174 Chattisgarh All RE 98
175 Delhi All RE 98
176 Goa and Union
Territories
All RE 98
177 Gujarat All RE 98
178 Haryana All RE 98
179 Himachal Pradesh All RE 98
180 Himachal Pradesh All RE 98
181 Jammu & Kashmir All RE 98
182 Jharkhand All RE 98
183 Karnataka All RE 98
184 Kerala All RE 98
185 Madhya Pradesh All RE 98
186 Maharashtra All RE 98
187 Manipur All RE 98
188 Mizoram All RE 98
189 Meghalaya All RE 98
190 Nagaland All RE 98
191 Orissa All RE 98
192 Punjab All RE 98
193 Rajasthan All RE 98
194 Tamil Nadu All RE 98
195 Tripura All RE 98
196 Uttarakhand All RE 98
197 Uttar Pradesh All RE 98
198 West Bengal All RE 98
199 Andhra Pradesh All RE 98
200 Assam All RE 98
201 Bihar All RE 98
202 Chattisgarh All RE 98
203 Delhi All RE 98
204 Gujarat All RE 98
205 Haryana All RE 98
206 Himachal Pradesh All RE 98
207 Jammu & Kashmir All RE 98
208 Jharkhand All RE 98
209 Karnataka All RE 98
210 Kerala All RE 98
211 Madhya Pradesh All RE 98
212 Maharashtra All RE 98
213 Manipur All RE 98
214 Mizoram All RE 98
215 Meghalaya All RE 98
216 Nagaland All RE 98
217 Orissa All RE 98
218 Punjab All RE 98
219 Rajasthan All RE 98
220 Tamil Nadu All RE 98
221 Tripura All RE 98
222 Uttarakhand All RE 98
223 Uttar Pradesh All RE 98
224 Andhra Pradesh All RE 98
225 Assam All RE 98
226 Bihar All RE 98
227 Chattisgarh All RE 98
228 Delhi All RE 98
229 Gujarat All RE 98
230 Haryana All RE 98
231 Himachal Pradesh All RE 98
232 Jammu & Kashmir All RE 98
233 Jharkhand All RE 98
234 Karnataka All RE 98
235 Kerala All RE 98
236 Madhya Pradesh All RE 98
237 Maharashtra All RE 98
238 Manipur All RE 98
239 Mizoram All RE 98
240 Meghalaya All RE 98
241 Orissa All RE 98
242 Punjab All RE 98
243 Rajasthan All RE 98
244 Tamil Nadu All RE 98
245 Tripura All RE 98
246 Uttarakhand All RE 98
247 Uttar Pradesh All RE 98
248 Andhra Pradesh All RE 98
249 Chattisgarh All RE 98
250 Himachal Pradesh All RE 98
251 Karnataka All RE 98
252 Rajasthan All RE 98
253 Tamil Nadu All RE 98
254 Uttarakhand All RE 98
255 Haryana Biomass-Rankine Cycle 98
256 Haryana Bagasse Co-gen 98
257 Haryana Solar PV 98
258 Haryana Solar Thermal 98
259 Haryana Wind 98
260 Andhra Pradesh All RE 98
261 Andhra Pradesh All RE 98
262 Andhra Pradesh Solar PV 03
263 Andhra Pradesh All RE 98
264 Andhra Pradesh Wind 01
265 Arunachal Pradesh All RE 98
266 Arunachal Pradesh SHP 08
267 Assam All RE 98
268 Assam All RE 98
269 Assam All RE 98
270 Assam SHP 08
271 Bihar All RE 98
272 Bihar All RE 98
273 Chattisgarh All RE 98
274 Chattisgarh All RE 98
275 Chattisgarh All RE 98
276 Delhi All RE 98
277 Delhi All RE 98
278 Delhi All RE 98
279 Gujarat All RE 98
280 Gujarat All RE 98
281 Gujarat Wind 01
282 Gujarat Solar PV 03
283 Haryana All RE 98
284 Haryana All RE 98
285 Haryana All RE 98
286 Haryana All RE 98
287 Himachal Pradesh All RE 98
288 Himachal Pradesh All RE 98
289 Himachal Pradesh SHP 08
290 Jammu & Kashmir All RE 98
291 Jammu & Kashmir WIND 01
292 Jammu & Kashmir All RE 98
293 Jharkhand All RE 98
294 Jharkhand Wind 01
295 Jharkhand Solar PV 03
296 Karnataka All RE 98
297 Karnataka All RE 98
298 Karnataka All RE 98
299 Karnataka All RE 98
300 Karnataka All RE 98
301 Karnataka All RE 98
302 Karnataka All RE 98
303 Karnataka All RE 98
304 Kerala All RE 98
305 Kerala All RE 98
306 Kerala Others 99
307 Madhya Pradesh All RE 98
308 Madhya Pradesh Solar PV 03
309 Madhya Pradesh Wind 01
310 Madhya Pradesh All RE 98
311 Maharashtra Others 99
312 Maharashtra Others 99
313 Maharashtra All RE 98
314 Maharashtra All RE 98
315 Maharashtra wind 01
316 Manipur All RE 98
317 Manipur Others 99
318 Meghalaya All RE 98
319 Meghalaya Others 99
320 Nagaland All RE 98
321 Nagaland All RE 98
322 Orissa All RE 98
323 Orissa Others 99
324 Punjab All RE 98
325 Rajasthan All RE 98
326 Rajasthan Others 99
327 Rajasthan Others 99
328 Rajasthan Others 99
329 Rajasthan Others 99
330 Rajasthan Wind 01
331 Tamil Nadu All RE 98
332 Tamil Nadu Wind 01
333 Tamil Nadu Biomass-Rankine Cycle 01
334 Tripura All RE 98
335 Tripura All RE 98
336 Uttarakhand Others 99
337 Uttarakhand All RE 98
338 Uttar Pradesh All RE 98
339 Uttar Pradesh All RE 99
340 Uttar Pradesh Others 99
341 Uttar Pradesh Others 01
342 West Bengal Others 99
343 West Bengal Others 98
344 CERC All RE 98
345 Punjab All RE 98
346 Bihar Biomass-Rankine Cycle 04
347 Bihar Bagasse Co-gen 07
348 Meghalaya All RE 98
349 Arunachal Pradesh All RE 98
350 Delhi Solar PV 03
351 Rajasthan Biomass-Rankine Cycle 04
352 Chattisgarh All RE 98
353 Himachal Pradesh All RE 98
Type Matter Date Code
O 01 010509 AP01O01010509
R 01 090412 AR98R01090412
A 01 130112 AS98A01130112
R 01 020412 CG01R01020412
O 01 080812 GJ01O01080812
O 01 250112 HR98O01250112
A 01 250712 HP08A01250712
A 01 080812 JK98A01000012
R 01 230610 JH01R01230610
O 01 111209 KA98O01111209
R 01 221110 KL98R01221110
O 01 140510 MP01O01140510
O 01 300312 MH98O01300312
R 01 150410 MN98R01150410
R 01 300811 NL98R01300811
O 01 140910 OR98O01140910
O 01 190712 PB98O01190712
R 01 230109 RJ98R01230109
B 01 080612 RJ01B01080612
O 01 310712 TN01O01310712
R 01 230309 TR98R01230309
R 01 060710 UA98R01060710
R 01 220310 UP98R01220310
A 01 100812 WB98A01100812
O 01 140610 AP02O01140610
A 01 130112 AS98A01130112
R 01 020810 BR02R01020810
O 01 290512 BR02O01290512
R 01 020412 CG98R01020412
O 01 270112 GJ02O01270112
Z 01 000612 HR98Z01000612
A 01 000012 JK98A01000012
R 01 230610 JH02R01230610
O 01 130710 KA02O01130710
O 01 010812 MP02O01010812
R 01 300312 MH98R01300312
R 01 150410 MN98R01150410
R 01 150410 MZ98R01150410
R 01 300811 NL98R01300811
O 01 10212 OR03O0110212
O 01 90712 PB98O0190712
O 01 300512 RJ03O01300512
O 01 270510 TN03O01270510
R 01 230309 TR03R01230309
R 01 60710 UA98R01060710
R 01 220310 UP98R01220310
A 01 100812 WB98A01100812
O 01 140610 AP02O01140610
A 01 130112 AS98A01130112
R 01 020810 BR02R01020810
O 01 290512 BR02O01290512
R 01 020412 CG98R01020412
O 01 270112 GJ02O01270112
Z 01 000612 HR98Z01000612
A 01 000012 JK98A01000012
R 01 230610 JH02R01230610
O 01 130710 KA02O01130710
O 01 010812 MP02O01010812
R 01 300312 MH98R01300312
R 01 150410 MN98R01150410
R 01 150410 MZ98R01150410
R 01 300811 NL98R01300811
O 01 10212 OR02O0110212
O 01 90712 PB98O0190712
O 01 300512 RJ02O01300512
O 01 080710 TN02O01080710
R 01 230309 TR02R01230309
R 01 060710 UA98R01060710
R 01 220310 UP98R01220310
O 01 310309 AP98O01310309
O 01 120911 AP98O01120911
A 01 130112 AS98A01130112
R 01 090412 AR98R01090412
C 01 000712 BR07C01000712
R 01 120412 CG98R01120412
O 01 310510 GJ07O01310510
R 01 030211 HR98R01030211
A 01 240712 HP98A01240712
A 01 000712 JK98A01000712
R 01 270110 JH07R01270110
O 01 111209 KA98O01111209
R 01 191108 KL07R01191108
O 01 130908 MP07O01130908
R 01 070610 MH98R01070610
O 01 300312 MH98O01300312
R 01 150410 MN98R01150410
R 01 150410 MZ98R01150410
R 01 300811 NL98R01300811
O 01 140910 OR98O01140910
O 01 190712 PB98O01190712
R 01 230109 RJ98R01230109
O 01 310712 TN07O01310712
R 01 060710 UA98R01060710
R 01 220310 UP98R01220310
A 01 100812 WB98A01100812
O 01 310309 AP98O01310309
R 01 090412 AR98R01090412
A 01 130112 AS98A01130112
A 01 020412 CG98A01020412
O 01 250112 HR98O01250112
R 01 240712 HP98R01240712
A 01 000712 JK98A01000712
O 01 111209 KA98O01111209
R 01 221110 KL08R01221110
O 01 300608 MP08O01300608
R 01 070610 MH98R01070610
R 01 150410 MN98R01150410
R 01 150410 MZ98R01150410
R 01 300811 NL98R01300811
O 01 140910 OR98O01140910
O 01 190712 PB98O01190712
R 01 230109 RJ98R01230109
Z 01 000310 TN08Z01000310
R 01 060710 UA98R01060710
R 01 220310 UP98R01220310
A 01 100812 WB98A01100812
O 01 310309 AP98O01310309
R 01 090412 AR98R01090412
A 01 130112 AS98A01130112
A 01 020412 CG98A01020412
O 01 200111 DL09O01200111
O 01 300711 GJ09O01300711
R 01 030211 HR98R01030211
A 01 240712 HP98A01240712
A 01 000712 JK98A01000712
O 01 280212 KA09O01280212
R 01 070610 MH98R01070610
R 01 150410 MN98R01150410
R 01 150410 MZ98R01150410
R 01 300811 NL98R01300811
O 01 140910 OR98O01140910
O 01 190712 PB98O01190712
R 01 230109 RJ98R01230109
R 01 060710 UA98R01060710
R 01 220310 UP98R01220310
A 01 100812 WB98A01100812
O 01 20911 AP98O0120911
R 01 90412 AR98R0190412
A 01 130112 AS98A01130112
C 01 010712 BR4C01010712
A 01 020412 CG98A01020412
O 01 170510 GJ04O01170510
O 01 250112 HR98O01250112
R 01 030211 HR98R01030211
A 01 240712 HP98A01240712
A 01 010712 JK98A01000712
R 01 270110 JH04R01270110
O 01 111209 KA98O01111209
R 02 191108 KL07R02191108
O 01 20312 MP04O0120312
R 01 070610 MH98R01070610
O 01 300312 MH98O01300312
R 01 150410 MN98R01150410
R 01 150410 MZ98R01150410
R 01 300811 NL98R01300811
O 01 140910 OR98O01140910
O 01 190712 PB98O01190712
R 01 230109 RJ98R01230109
O 01 091211 RJ04O01091211
O 01 310712 TN4O01310712
R 01 060710 UA98R01060710
R 01 220310 UP98R01220310
A 01 100812 WB98A01100812
R 01 060212 CE98R01060212
O 01 270312 CE98O01270312
R 01 030707 JH08R01030707
R 02 210312 AP98R02210312
O 02 310309 AP98O02310309
O 02 060710 AP02O02060710
R 02 011210 AS98R02011210
R 02 161110 BR98R02161110
O 02 290512 BR02O02290512
R 02 040311 CG98R02040311
R 02 011012 DL98R02011012
R 02 301110 GT98R02301110
R 02 170410 GJ98R02170410
R 02 030211 HR98R02030211
R 02 260510 HP98R02260510
R 02 031011 HP98R02031011
R 02 110311 JK98R02110311
R 02 210710 JH98R02210710
R 02 160311 KA98R02160311
R 02 231110 KL98R02231110
R 02 191110 MP98R02191110
R 02 070610 MH98R02070610
R 02 050510 MN98R02050510
R 02 050510 MZ98R02050510
R 02 211210 ML98R02211210
R 02 290811 NL98R02290811
R 02 300910 OR98R02300910
R 02 030611 PJ98R02030611
R 02 240511 RJ98R02240511
R 02 100811 TN98R02100811
R 02 080910 TR98R02160910
R 02 060710 UK98R02060710
O 02 170810 UP98O02170810
A 02 100812 WB98A02100812
A 02 210312 AP98R02210312
R 02 011210 AS98R02011210
R 02 161110 BR98R02161110
R 02 040311 CG98R02040311
R 02 011012 DL98R02011012
R 02 170410 GJ98R02170410
R 02 030211 HR98R02030211
R 02 260510 HP98R02260510
R 02 110311 JK98R02110311
R 02 210710 JH98R02210710
R 02 160311 KA98R02160311
R 02 231110 KL98R02231110
R 02 191110 MP98R02191110
R 02 070610 MH98R02070610
R 02 050510 MN98R02050510
R 02 050510 MZ98R02050510
R 02 211210 ML98R02211210
R 02 290811 NL98R02290811
R 02 300910 OR98R02300910
R 02 030611 PJ98R02030611
R 02 301210 RJ98R02301210
R 02 100811 TN98R02100811
R 02 160910 TR98R02160910
R 02 060710 UK98R02031110
O 02 170810 UP98O02170810
O 03 210312 AP98R03210312
O 03 041110 AS98Z03041110
O 03 241110 BR98Z03241110
O 03 091110 CG98O03091110
O 03 181111 DL98O03181111
O 03 160710 GJ98Z03160710
O 03 061010 HR98Z03061010
O 03 190610 HP98Z03190610
O 03 030111 JK98Z03030111
O 03 210810 JH98Z03210810
O 03 010411 KA98Z03010411
O 03 031210 KL98O03031210
O 03 070211 MP98O03070211
O 03 010710 MH98O03010710
O 03 070910 MN98O03070910
O 03 070910 MZ98O03070910
O 03 201211 ML98O03201211
O 03 030211 OR98O03030211
O 03 301110 PJ98O03301110
O 03 160610 RJ98O03160610
O 03 071210 TN98O03071210
O 03 080910 TR98O03080910
O 03 020512 UK98O03020512
O 03 040211 UP98O03040211
O 03 210312 AP98R03210312
O 03 220611 CH98O03220611
O 03 160712 HP98O03160712
O 03 270612 KA98O03270612
O 03 131011 RJ98O03131011
O 03 030912 TN98O03030912
O 03 290512 UK98O03290512
O 01 030912 HR98O01030912
O 01 030912 HR98O01030912
O 01 030912 HR98O01030912
O 01 030912 HR98O01030912
O 01 030912 HR98O01030912
R 05 080605 AP98R05080605
O 05 261012 AP98O05261012
Z 05 260912 AP03Z05260912
O 05 200309 AP98O05200309
O 05 110408 AP01Z05110408
A 05 170812 AR98A05170812
Z 05 240108 AR08Z99240108
R 05 010805 AS98R05010805
O 05 160511 AS98O05160511
O 05 160511 AS98O05160511
Z 05 000307 AS08Z05000312
R 05 200506 BR98R05200506
O 05 300312 BR98O05300312
R 05 040311 CG98R05040311
O 05 280412 CG98O05280412
R 05 040311 CG98R05040311
R 05 030111 DL98R05030111
R 05 011012 DL98R05011012
O 05 130712 DL98O05130712
R 05 010611 GJ98R05010611
O 05 070412 GJ98O05070412
O 05 080812 GJ01O05080812
O 05 270112 GJ03O05270112
R 05 110112 HR98R05110112
O 05 290312 HR98O05290312
O 05 310312 HR98O05310312
Z 05 290310 HR98Z05290310
R 05 020510 HP98R05020510
O 05 260612 HP98O05260612
Z 05 000006 HP08Z05000006
R 05 250106 JK98R05250106
A 05 200810 JK01A05200810
Z 05 110712 JK98Z05110712
R 05 270605 JH98R05270605
R 05 230610 JH01R05230610
R 05 2306010 JH03R05230610
R 05 121104 KA98R05121104
O 05 300412 KA98O05300412
O 05 031012 KA98O05031012
O 05 300412 KA98O05300412
O 05 300412 KA98O05300412
O 05 300412 KA98O05300412
O 05 300412 KA98O05300412
O 05 300412 KA98O05300412
R 05 021105 KL98R05021105
O 05 250712 KL98O05250712
R 05 060807 KL99R05060807
R 05 160605 MP98R05160605
O 05 060710 MP03O05060710
O 05 140510 MP01O05140510
O 05 170412 MP98O05170412
R 05 210405 MH99R05210405
R 05 210605 MH99R05210605
O 05 210512 MH98O05210512
O 05 090911 MH98O05090911
O 05 241103 MH01O05241103
R 05 020710 MN98R05020710
R 05 250712 MN99O05250712
R 05 270412 ML98R05270412
O 05 50912 ML99O05050912
R 01 300811 NL98R01300811
R 05 000112 NL98R05000112
R 05 060605 OR98R05060605
O 05 130712 OR99O05130712
O 05 010711 PB98R05010711
R 05 260504 RJ98R05260504
O 05 270312 RJ99O05270312
O 05 080812 RJ99O05080812
O 05 010210 RJ99Z05010210
O 05 310310 RJ99O05310310
O 01 230109 RJ01R01230109
R 05 130411 TN98R05130411
O 05 310712 TN01O05310712
O 05 310712 TN04O05310712
R 05 290410 TR98R05290410
R 05 160910 TR98R05160910
R 05 281010 UA99R05281010
R 05 060710 UA98R05060710
R 05 070605 UP98R05070605
O 05 191012 UP99O05191012
O 05 191012 UP99O05191012
R 01 191012 UP01R01220310
R 05 120407 WB99R05120407
R 05 100810 WB98R05100810
B 01 251012 CE98B01251012
R 05 121112 PB98R05121112
O 01 301112 BR04O01301112
O 01 301112 BR07O01301112
A 01 050912 ML98A01050912
R 02 110412 AR98R02110412
R 01 121212 DL03R01121212
O 01 211212 RJ04O01211212
O 03 141212 CH98O03141212
R 01 171212 HP98R01171212
Name of the Regulation/Case as in the Reference Doc
Notification No./
Case No.
Reference
Document Link
Determination of Tariff/power purchase Price in respect of "New wind
Based power projects"
O.P No. 6/2009 &
O.P.No 7 of 2009
Click Here
Regulations on Terms and Conditions for Tariff determination from
Renewable energy sources
APSERC/Notification/7/20
12
Click Here
Regulations onTerms and Conditions for Tariff determination from
Renewable energy sources
AERC.25/2012
Click Here
Regulations on Terms and Conditions for determination of generation
tariff and related matters for electricity generated by plants based on
renewable energy sources.
N.A
Click Here
Order on Determination of tariff for procurement by distribution
licensees and others from wind power projects
Order No. 2 of 2012
Click Here
Order on Suo-moto petition for determination of levellised generic tariff
of renewable energy projects to be commissioned during FY 2011-12
Case No. 20 of 2011
Click Here
Draft Regulations on promotion of generation from renewable energy
sources and terms and conditions for tariff determination
No. HPERC/428
Click Here
Draft Regulations on terms and conditions for determination from
renewable energy sources
N.A
Click Here
Regulations on determination of tariff for procurement of power from
wind electric generators
Notification No. 27
Click Here
Order in the matter of determination of Tariff in respect of renewable
energy sources
Case No. OP/28/2008
Click Here
Second Amendment Regulations on power procurement from
renewable sources by distribution licensee
NO. 1163/CT/2010/KSERC
Click Here
Order for procurement of power from wind electric generators SMP-20/2010 Click Here
Order for determination of Generic Tariff for third year of first control
period
Case No. 10 of 2012
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms
and Conditions for Tariff determination from Renewable
Energy Sources) Regulations, 2010.
No. H.13011/17/10
Click Here
Nagaland Electricity Regulatory Commission (Terms and Conditions for
Determination of Generation Tariff for Renewable Energy) Regulations,
2011
No.NERC/REGN/2011
Click Here
Suo-motu proceeding initiated by the Commission for finalization of
Policy on Harnessing of Power from Renewable Energy Sources including
Co-generation
Petition No. 37/2008
Click Here
Order on adoption of CERC RE Tariff Regulation and determination of
generic RE Tariff for FY 2012-13
Petition No. 35 of 2012
Click Here
RERC (Terms and Conditions of Tariff) Regulations, 2009, No. RERC/Secy/ Reg. -76
Click Here
Draft Tariff Order on Wind Projects for FY 2012-13 Click Here
Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated
July 31, 2012
Order No 6 of 2012
Click Here
TERC (Cogeneration and Generation of Electricity from renewable
source of Energy) regulation 2009
No.F.25/TERC/2009/415
Click Here
Uttarakhand Electricity Regulatory Commission
(Tariff and Other Terms for Supply of Electricity from Renewable Energy
Sources and non-fossil fuel based Co-generating Stations) Regulations,
2010
No.F-
9(21)/RG/UERC/2010/ 697
Click Here
UPERC - CNCE Regulations, 2009 UPERC / Secy / CNCE
Regulation, 2009
Click Here
Draft WBERC(Cogeneration and Generation of
Electricity from Renewable Sources of Energy) Regulations, 2012
WBERC/Regulation/34/10-
11/0647 Click Here
Order on Solar Power Tariff In. I.A.No.17 of 2010
Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources Regulations, 2012 (Draft)
No. AERC.25/2012
Click Here
Terms and Conditions for Tariff Determination from Solar Energy
Sources
Regulations, 2010
No. BERC-Regl/Solar-
2/2010-03 Click Here
Order on Determination of long term solar RPO and Solar tariff Order No. 12 of 2012 Click Here
Terms and conditions for determination of generation tariff and related
matters for electricity generated by plants based on renewable energy
sources Regulations, 2012
-
Click Here
Determination of tariff for Procurement by the Distribution Licensees
and others from Solar Energy Projects
Order No 1 of 2012
Click Here
Public Notice for Inviting Objections/Suggestions on the Suo Moto
Petition for Determination of Levellised Tariff in Respect of Renewable
Energy Projects to be Commissioned during FY 2012-13
-
Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources Regulations, 2012
-
Click Here
Terms and conditions for determination of generation tariff for
Procurement of Power from Solar PV and Solar Thermal Power Project
Regulation 2010
No 26/2010
Click Here
Determination of tariff for grid connected Solar PV, Solar Thermal power
plants (other than demonstration projects) and Rooftop Solar
Photovoltaic and other small solar power Plants connected to
Distribution network at voltage levels below 33KV.
No.S/03/1
Click Here
Tariff Order for Solar Energy Based Power Generation in Madhya
Pradesh
SMP 25/2012
Click Here
Order for determination of Generic Tariff for third year of first control
period
No.MERC/Legal/2010/482
/
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Nagaland Electricity Regulatory Commission (Terms and Conditions for
Determination of Generation Tariff for Renewable Energy) Regulations,
2011
No.NERC/REGN/2011
Click Here
Suo-motu proceeding for re-determination of generic tariff in respect of
Solar PV and Solar Thermal power.
Case No.01/2012
Click Here
Adoption of CERC (Terms & Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012 and Determination of
generic levellised generation tariff for Renewable Energy Power Projects
for FY 2012-13
Petition No. 35 of 2012
Click Here
In the matter of Determination of Benchmark Capital Cost for Solar PV
and Solar Thermal Power Projects and resultant Generic Levellised Tariff
Order No.
Click Here
Tariff Order for projects covered by Jawaharlal Nehru National Solar
Mission
Order No 1 of 2010
Click Here
RE Regulations, 2009 - Click Here
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms
for Supply of Electricity from Renewable Energy Sources and non-fossil
fuel based Co-generating Stations) Regulations, 2010
No.F-
9(21)/RG/UERC/2010/ 697
Click Here
UPERC (Captive and Non-Conventional Energy Generating Plants)
Regulations, 2009
Notification no. UPERC /
Secy / CNCE Regulation,
2009/ 696
Click Here
Draft West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2012 (For replacing existing Regulation)
No.
WBERC/Regulation/34/10-
11/0647
Click Here
Order on Solar Power Tariff In. I.A.No.17 of 2010
Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources Regulations, 2012 (Draft)
No. AERC.25/2012
Click Here
Terms and Conditions for Tariff Determination from Solar Energy
Sources
Regulations, 2010
No. BERC-Regl/Solar-
2/2010-03 Click Here
Order on Determination of long term solar RPO and Solar tariff Order No. 12 of 2012 Click Here
Terms and conditions for determination of generation tariff and related
matters for electricity generated by plants based on renewable energy
sources Regulations, 2012
-
Click Here
Determination of tariff for Procurement by the Distribution Licensees
and others from Solar Energy Projects
Order No 1 of 2012
Click Here
Public Notice for Inviting Objections/Suggestions on the Suo Moto
Petition for Determination of Levellised Tariff in Respect of Renewable
Energy Projects to be Commissioned during FY 2012-13
-
Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources Regulations, 2012
-
Click Here
Terms and conditions for determination of generation tariff for
Procurement of Power from Solar PV and Solar Thermal Power Project
Regulation 2010
No 26/2010
Click Here
Determination of tariff for grid connected Solar PV, Solar Thermal power
plants (other than demonstration projects) and Rooftop Solar
Photovoltaic and other small solar power Plants connected to
Distribution network at voltage levels below 33KV.
No.S/03/1
Click Here
Tariff Order for Solar Energy Based Power Generation in Madhya
Pradesh
SMP 25/2012
Click Here
Order for determination of Generic Tariff for third year of first control
period
No.MERC/Legal/2010/482
/ Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Nagaland Electricity Regulatory Commission (Terms and Conditions for
Determination of Generation Tariff for Renewable Energy) Regulations,
2011
No.NERC/REGN/2011
Click Here
Suo-motu proceeding for re-determination of generic tariff in respect of
Solar PV and Solar Thermal power.
Case No.01/2012
Click Here
Adoption of CERC (Terms & Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012 and Determination of
generic levellised generation tariff for Renewable Energy Power Projects
for FY 2012-13
Petition No. 35 of 2012
Click Here
In the matter of Determination of Benchmark Capital Cost for Solar PV
and Solar Thermal Power Projects and resultant Generic Levellised Tariff
Order No.
Click Here
Tariff Order for Solar Thermal Projects covered by Jawaharlal Nehru
National Solar Mission
Order No 2 of 2010
Click Here
RE Regulations, 2009 - Click Here
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms
for Supply of Electricity from Renewable Energy Sources and non-fossil
fuel based Co-generating Stations) Regulations, 2010
No.F-
9(21)/RG/UERC/2010/ 697
Click Here
UPERC (Captive and Non-Conventional Energy Generating Plants)
Regulations, 2009
Notification no. UPERC /
Secy / CNCE Regulation,
2009/ 696
Click Here
Determination of Tariff / Power Purchase Price (Variable Cost or Single
Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of
the New and Renewable Sources of Energy in the State of Andhra
Pradesh covered by the Commission Order Dated 20-03-2004.
O.P. No. 5 /2009
Click Here
Order in the matter of power purchase from non-conventional sources
of energy
O.P no. 1075/2000
Click Here
Draft-Assam Electricity Regulatory Commission (Terms and Conditions
for Tariff determination from Renewable Energy Sources) Regulations,
2012
-
Click Here
Terms and Conditions for tariff determination from renewable energy
sources regulation - 2012
APSERC/NOTIFICATION/7/
2012
Click Here
Discussion paper on Benchmarks For Tariff Determination
For Biomass And Bagasse Based Cogeneration Plants
To Be Commissioned In 2012-13 And 2013-14.
-
Click Here
CSERC (Terms and conditions for determination of generation tariff and
related matters for electricity generated by plants based on renewable
energy sources) Regulations, 2012
-
Click Here
Order on Determination of tariff for Procurement of Power by
Distribution Licensees from Bagasse based co-generation
Power Plants and Other Commercial Issues
No. 4 of 2010
Click Here
HERC(Terms and Conditions for determination of Tariff from
Renewable Energy Sources, Renewable Purchase Obligation and
Renewable Energy Certificate) Regulations, 2010
-
Click Here
Draft Himachal Pradesh Electricity Regulatory Commission (Promotion
of Generation from the Renewable Energy Sources and Terms and
Conditions for Tariff Determination) Regulations, 2012
-
Click Here
Jammu and Kashmir State Electricity Regulatory Commission (Terms and
Conditions for Tariff determination from Renewable Energy Sources)
Regulations, 2012
-
Click Here
Jharkhand State Electricity Regulatory
Commission (Terms and Conditions for Tariff Determination for Biomass
and nonfossil fuel based co-generation projects) Regulations, 2010
-
Click Here
In the matter of Determination of Tariff in respect of Renewable Sources
of Energy
-
Click Here
Kerala State Electricity Regulatory Commission (Power Procurement
from Cogeneration Plants by Distribution Licensees) Regulations, 2008
-
Click Here
Tariff Order for procurement of power from Bagasse based
cogeneration Plants in Madhya Pradesh
-
Click Here
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND
CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010
No.MERC/Legal/2010/482
/ Click Here
MERC Generic Tariff for FY 2012-13 - Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2011
No. H.13011/17/10- JERC
Click Here
Terms and Conditions for Determination of Generation Tariff for
Renewable Energy
No.NERC/REGN/2011
Dated Kohima, the 30th
August, 2011
Click Here
Suo-motu proceeding initiated by the Commission for finalization of
Policy on Harnessing of Power from Renewable Energy Sources including
Co-generation
Petition No. 37/2008
Click Here
Adoption of Central Electricity Regulatory Commission (Terms &
Conditions for Tariff determination from Renewable Energy Sources)
Regulations, 2012 and Determination of generic levellised generation
tariff for Renewable Energy Power Projects for FY 2012-13
Petition No. 35 of 2012
Click Here
The Rajasthan Electricity Regulatory Commission (Terms and Conditions
for
Determination of Tariff) Regulations, 2009
No. RERC/Secy/ Reg. -76
Click Here
Power procurement by Distribution Licensee from Bagasse based Co-
generation plants and allied issues relating to captive use and third party
sale
Order No. 7 of 2012
Click Here
UERC (Tariff and Other Terms for Supply of Electricity from Renewable
Energy Sources and non-fossil fuel based Co-generating Stations)
Regulations, 2010
No.F-
9(21)/RG/UERC/2010/ 697 Click Here
UPERC (Captive and Non-Conventional Energy Generating Plants)
Regulations, 2009
Notification no. UPERC /
Secy / CNCE Regulation,
2009/ 696
Click Here
Draft West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2012 (For replacing existing Regulation)
No.
WBERC/Regulation/34/10-
11/0647
Click Here
Determination of Tariff / Power Purchase Price (Variable Cost or Single
Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of
the New and Renewable Sources of Energy in the State of Andhra
Pradesh covered by the Commission Order Dated 20-03-2004.
O.P. No. 5 /2009
Click Here
Terms and Conditions for tariff determination from renewable energy
sources regulation - 2012
APSERC/NOTIFICATION/7/
2012
Click Here
Draft-Assam Electricity Regulatory Commission (Terms and Conditions
for Tariff determination from Renewable Energy Sources) Regulations,
2012
-
Click Here
Terms and conditions for determination of generation tariff and related
matters for electricity generated by plants based on renewable energy
sources Regulations, 2012
-
Click Here
Petition filed by Haryana Power Generation Corporation Limited
(HPGCL), Panchkula vide letter No. 781 / GMP 321 dated 7th June,
2011 for determination of tariff for supply of electricity from 6.5 MW
solar power project to be set up by HPGCL at Powerhouse D, WYC
Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011).
-
Click Here
Promotion of Generation from the Renewable Energy Sources and
Terms and Conditions for Tariff Determination) Regulations, 2012
No. HPERC/428 Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2012.
-
Click Here
Determination of Tariff in respect of Renewable Sources of Energy
-
Click Here
KSERC (Power Procurement from Renewable Sources by Distribution
Licensee) Second Amendment Regulations, 2010
No. 1163/CT/2010/KSERC Click Here
Tariff Order for Procurement of Power by Distribution Licensees from
Small Hydro Based Generation
SMP-77/2011 Click Here
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND
CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010
No.MERC/Legal/2010/482
/ Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2011
No. H.13011/17/10- JERC
Click Here
Terms and Conditions for Determination of Generation Tariff for
Renewable Energy
No.NERC/REGN/2011
Dated Kohima, the 30th
August, 2011
Click Here
Suo-motu proceeding initiated by the Commission for finalization of
Policy on Harnessing of Power from Renewable Energy Sources including
Co-generation
Petition No. 37/2008
Click Here
Adoption of Central Electricity Regulatory Commission (Terms &
Conditions for Tariff determination from Renewable Energy Sources)
Regulations, 2012 and Determination of generic levellised generation
tariff for Renewable Energy Power Projects for FY 2012-13
Petition No. 35 of 2012
Click Here
The Rajasthan Electricity Regulatory Commission (Terms and Conditions
for
Determination of Tariff) Regulations, 2009
No. RERC/Secy/ Reg. -76
Click Here
Consultative Paper on Procurement of Power from small hydro power
(up to 5 MW)
-
Click Here
UERC (Tariff and Other Terms for Supply of Electricity from Renewable
Energy Sources and non-fossil fuel based Co-generating Stations)
Regulations, 2010
No.F-
9(21)/RG/UERC/2010/ 697 Click Here
UPERC (Captive and Non-Conventional Energy Generating Plants)
Regulations, 2009
Notification no. UPERC /
Secy / CNCE Regulation,
2009/ 696
Click Here
Draft West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2012 (For replacing existing Regulation)
No.
WBERC/Regulation/34/10-
11/0647
Click Here
Determination of Tariff / Power Purchase Price (Variable Cost or Single
Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of
the New and Renewable Sources of Energy in the State of Andhra
Pradesh covered by the Commission Order Dated 20-03-2004.
O.P. No. 5 /2009
Click Here
Terms and Conditions for tariff determination from renewable energy
sources regulation - 2012
APSERC/NOTIFICATION/7/
2012
Click Here
Draft Assam Electricity Regulatory Commission (Terms and Conditions
for Tariff determination from Renewable Energy Sources) Regulations,
2012
No. AERC.25/2012/
Click Here
Chhattisgarh State ElectricityRegulatory Commission (Terms and
conditions for determination of generation tariff and related matters for
electricity generated by plants based renewable energy sources)
Regulations, 2012
-
Click Here
Petition for adoption of Tariff and approval of energy purchase entered
between Timarpur Okhla Waste Management Company Private Limited
and BSES Rajdhani Power Limited, for purchase of 16 MW of Power by
BSES on Long-term basis from power station to be set up at Okhla.
Petition No.18/2010
Click Here
Approval of tariff for power generated from RDF based power
generation plant for sale to Distribution Licensees in the State of
Gujarat.
Petition No.1052/2010
Click Here
Haryana Electricity Regulatory Commission ( Terms and Conditions for
Determination of Tariff from Renewable Energy Sources, Renewable
Purchase Obligation and Renewable Energy Certificate ) Regulations
2010
Regulation No.
HERC/23/2010
Click Here
Himachal Pradesh Electricity Regulatory Commission (Promotion of
Generation from the Renewable Energy Sources and Terms and
Conditions for Tariff Determination) Regulations, 2012
No. HPERC/428-
Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2012.
-
Click Here
Case between Srinivasa Gayathri Resource Recovery Ltd., and BESCOM,
& Govt. of Karnataka, Urban Development and KPTCL
Case No. OP 14/2011
Click Here
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND
CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010
No.MERC/Legal/2010/482
/ Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2010
No. H.13011/17/10- JERC
Click Here
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms
and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2011
No. H.13011/17/10- JERC
Click Here
Terms and Conditions for Determination of Generation Tariff for
Renewable Energy
No.NERC/REGN/2011
Dated Kohima, the 30th
August, 2011
Click Here
Suo-motu proceeding initiated by the Commission for finalization of
Policy on Harnessing of Power from Renewable Energy Sources including
Co-generation
Petition No. 37/2008
Click Here
Adoption of Central Electricity Regulatory Commission (Terms &
Conditions for Tariff determination from Renewable Energy Sources)
Regulations, 2012 and Determination of generic levellised generation
tariff for Renewable Energy Power Projects for FY 2012-13
Petition No. 35 of 2012
Click Here
The Rajasthan Electricity Regulatory Commission (Terms and Conditions
for
Determination of Tariff) Regulations, 2009
No. RERC/Secy/ Reg. -76
Click Here
UERC (Tariff and Other Terms for Supply of Electricity from Renewable
Energy Sources and non-fossil fuel based Co-generating Stations)
Regulations, 2010
No.F-
9(21)/RG/UERC/2010/ 697 Click Here
UPERC (Captive and Non-Conventional Energy Generating Plants)
Regulations, 2009
Notification no. UPERC /
Secy / CNCE Regulation,
2009/ 696
Click Here
Draft West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2012 (For replacing existing Regulation)
No.
WBERC/Regulation/34/10-
11/0647
Click Here
In the matter of purchase of power from Non-Conventional Energy
Projects
Order dated September
02, 2011
Click Here
TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM
RENEWABLE ENERGY SOURCES, REGULATIONS, 2012
APSERC/NOTIFICATION/7/
2012
Click Here
TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM
RENEWABLE ENERGY SOURCES, REGULATIONS, 2012
AERC.25/2012 Click Here
Benchmarks For Tariff Determination For Biomass And Bagasse Based
Cogeneration Plants To Be Commissioned In 2012-13 And 2013-14.
a Discussion paper issued
for comments
Click Here
Chhattisgarh State Electricity Regulatory Commission (Terms and
conditions for determination of generation tariff and related matters for
electricity generated by plants based on renewable energy sources)
Regulations, 2012
-
Click Here
Determination of tariff for Procurement of Power by Distribution
Licensees from Biomass based Power Generator and Other Commercial
Issues
Order No. 5 of 2010 Click Here
Petition filed by Haryana Power Generation Corporation Limited
(HPGCL), Panchkula vide letter No. 781 / GMP 321 dated 7th June,
2011 for determination of tariff for supply of electricity from 6.5 MW
solar power project to be set up by HPGCL at Powerhouse D, WYC
Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011).
-
Click Here
Terms and Conditions for determination of Tariff from Renewable
Energy Sources, Renewable Purchase Obligation and Renewable Energy
Certificate) Regulations, 2010.
Regulation No. HERC/ 23 /
2010
Click Here
Draft Promotion of Generation from the Renewable Energy Sources and
Terms and Conditions for Tariff Determination) Regulations, 2012
No. HPERC/428 Click Here
Terms and Conditions for Tariff determination from Renewable Energy
Sources) Regulations, 2012.
-
Click Here
Terms and Conditions for Tariff Determination for Biomass and nonfossil
fuel based co-generation projects) Regulations, 2010.
No. 24 Click Here
Determination of Tariff in respect of Renewable Sources of Energy
-
Click Here
Power Procurement from Cogeneration Plants by Distribution Licensees)
Regulations, 2008
-
Click Here
Tariff Order for procurement of power from Biomass based Power
Projects
SMP-77/2011 Click Here
MERC RE Tariff Regulations 2010
No/MERC/Legal/2010/482
/
Click Here
Suo Moto Order by MERC dated March 30, 2012 Case 10 of 2012 Click Here
Joint Electricity Regulatory Commission for
Manipur & Mizoram (Terms and Conditions for Tariff determination
from Renewable
Energy Sources) Regulations, 2010
No. H.13011/17/10- JERC
Dated Aizawl, the 15th
April, 2010
Click Here
Joint Electricity Regulatory Commission for
Manipur & Mizoram (Terms and Conditions for Tariff determination
from Renewable
Energy Sources) Regulations, 2010
No. H.13011/17/10- JERC
Dated Aizawl, the 15th
April, 2010
Click Here
Terms and Conditions for
Determination of Generation Tariff for Renewable Energy
REGULATION
No.NERC/REGN/2011
Dated Kohima, the 30th
August, 2011
Click Here
Suo-motu proceeding initiated by the Commission for finalization of
Policy on Harnessing of Power from Renewable Energy Sources including
Co-generation
Petition No 37/2010 (Suo
Motu Order)
Click Here
PSERC Suo Motu Order on RE Generic Tariff by adopting CERC Tariff Petition No 35 of 2012 Click Here
RERC Tariff Regulation 2009
No. RERC/Secy/ Reg. -76
January 23, 2009
Click Here
Revised tariff for sale of electricity by Bio-mass based power plants in
the State to distribution licensees commissioned during FY 2011-12 of
the control period 2009-14.
Order No 14 Click Here
Comprehensive Tariff Order for Biomass Power Plants
Order No 8 of 2012 dated
July 31 ,2012
Click Here
UERC(Tariff and Other Terms for Supply of Electricity from Renewable
Energy Sources and non-fossil fuel based Co-generating Stations)
Regulations, 2010
UERC notification No.F-
9(21)/RG/UERC/2010/
697: dated July 06, 2010
Click Here
UPERC (Captive and Non- Conventional Energy Generating Plants)
Regulations, 2009 (hereinafter referred to as CNCE Regulations, 2009).
Notification dated March
22, 2010 and Notification
no. UPERC / Secy / CNCE
Regulation, 2009/ 696
Click Here
West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2010.
Notification No.
47/WBERC dated August
10, 2012
Click Here
CERC RE Regulations, 2012 L-1/94/CERC/2011 Click Here
CERC RE generic Tariff Order for FY 2012-13 Petition No. 35/2012
(SuoMotu)
Click Here
JSERC (Terms and Conditions of tariff determination,
Small Hydropower Generation) Regulation, 2007
No. 360
Click Here
Renewable Power
Purchase Obligation (Compliance by purchase of Renewable Energy /
Renewable Energy Certificates) Regulations, 2012
1 of 2012
Click Here
Suo-Motu Order on RPPO O. P. No. 16 of 2008 Click Here
Solar RPO Order O. P. No. 10 of 2010 Click Here
AERC (Renewable Purchase Obligation and its
Compliance) Regulations, 2010
Click Here
(Renewable Purchase Obligation, its Compliance and REC Framework
Implementation) Regulations, 2010.
Click Here
Solar RPO amended vide Order on Case 12 of 2012 dated May 29, 2012
Click Here
RPO Regulation (No. 36/CSERC/2011) March 04, 2011 Click Here
DERC RPO Regulations No:
F.3(292)/Tariff/DERC/2010-
11/3026/
Click Here
Joint Electricity Regulatory Commission for
state of Goa & Union Territories (Procurement of Renewable energy)
Regulations, 2010.
JERC-14/2010
Click Here
GERC (Procurement of Energy from Renewable
Sources) Regulations, 2010.
Notification No. 3 of 2010
Click Here
HERC(Terms and Conditions for determination of Tariff from Renewable
Energy Sources, Renewable Purchase Obligation and Renewable Energy
Certificate) Regulations, 2010
Reg 23/2010
Click Here
HPERC (Renewable Power Purchase Obligation and its Compliance)
Regulations, 2010
HPERC/438
Click Here
HPERC RPO Ammendment Regulations HPERC/438 Click Here
J&KSERC (Renewable Power Purchase obligation, its compliance and
REC frame work implementation) Regulations, 2011.
JKSERC/10
Click Here
Jharkhand State Electricity Regulatory Commission (Renewable purchase
obligation and its compliance) Regulations, 2010
No.28
Click Here
KERC (Power Procurement from Renewable Sources by Distribution
Licensee and Renewable Energy Certificate Framework) Regulations,
2011
Notification No. S/03/1
dated 16th March 2011 Click Here
KSERC (Renewable Purchase Obligation and its Compliance) Regulations,
2010
No. 1517/CT/2010/KSERC
Click Here
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2010 (Revision-I)
RG-33(I) of 2010
Click Here
Maharashtra Electricity Regulatory Commission (Renewable Purchase
Obligation, its compliance and REC framework Implementation)
Regulations, 2010
No.MERC/Legal/2010/483
Click Here
Manipur & Mizoram (Renewable Purchase Obligation and its
Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC
Dated Aizawl, the 5th May,
2010
Click Here
Manipur & Mizoram (Renewable Purchase Obligation and its
Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC
Dated Aizawl, the 5th May,
2010
Click Here
Meghalaya State Electricity Regulatory
Commission (Renewal Energy Purchase Obligation and its Compliance)
Regulations, 2010
2 of 2010
Click Here
Nagaland Electricity Regulatory Commission (Renewable Purchase
Obligation and its Compliance) Regulations, 2011
No.NERC/REGN/2011
Click Here
OERC (Renewable and Co-generation
Purchase Obligation and its Compliance) Regulations, 2010.
No. OERC-Engg-02/2010
Click Here
PSERC (Renewable Purchase Obligation and its compliance) Regulations,
2011
No.PSERC/Secy./Reg./55
Click Here
Rajasthan Electricity Regulatory Commission (Power Purchase &
Procurement Process of Distribution Licensee) (2nd Amendment)
Regulations, 2011.
No.RERC/Secy./Regulation -
85 Click Here
Amendment to Renewable Energy Purchase Obligation Regulations,
2010.
Notification No. TNERC /
RPO / 19 / 2, dated 29-07-
2011
Click Here
T.E.R.C. (Procurement of Energy from
Renewable Sources) Regulations, 2010.
No.F.25/TERC/2009/415
Click Here
Uttarakhand Electricity Regulatory Commission
(Tariff and Other Terms for Supply of Electricity from Renewable Energy
Sources and non-fossil fuel based Co-generating Stations) Regulations,
2010.
No.F-
9(21)/RG/UERC/2010/ 697
Click Here
Uttar Pradesh Electricity Regulatory Commission (Promotion of Green
Energy through Renewable Purchase
Obligation) Regulations, 2010
No.
UPERC/Secy/Regulation/1
0 - 787
Click Here
Draft West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2012 (For replacing existing Regulation).
WBERC/Regulation/34/10-
11/0647
Click Here
APERC - Renewable Power Purchase Obligation (Compliance by
purchase of Renewable Energy /
Renewable Energy Certificates) Regulations, 2012
Reg No. 1 of 2012
Click Here
AERC (Renewable Purchase Obligation and its
Compliance) Regulations, 2010
No. AERC/21/2010
Click Here
Bihar Electricity Regulatory Commission
(Renewable Purchase Obligation, its Compliance and REC Framework
Implementation) Regulations, 2010.
BERCRegl01/1005
Click Here
Chhattisgarh State Electricity Regulatory Commission (Renewable
Purchase Obligation and REC framework Implementation) Regulations,
2011.
No. 36/CSERC/2011
Click Here
DERC RPO Regulations No:
F.3(292)/Tariff/DERC/2010-
11/3026/
Click Here
GERC (Procurement of Energy from Renewable
Sources) Regulations, 2010.
Notification No. 3 of 2010
Click Here
HERC(Terms and Conditions for determination of Tariff from Renewable
Energy Sources, Renewable Purchase Obligation and Renewable Energy
Certificate) Regulations, 2010
Reg 23/2010
Click Here
HPERC (Renewable Power Purchase Obligation and its Compliance)
Regulations, 2010
HPERC/438
Click Here
J&KSERC (Renewable Power Purchase obligation, its compliance and
REC frame work implementation) Regulations, 2011.
JKSERC/10
Click Here
Jharkhand State Electricity Regulatory Commission (Renewable purchase
obligation and its compliance) Regulations, 2010
No.28
Click Here
KERC (Power Procurement from Renewable Sources by Distribution
Licensee and Renewable Energy Certificate Framework) Regulations,
2011
Notification No. S/03/1
dated 16th March 2011 Click Here
KSERC (Renewable Purchase Obligation and its Compliance) Regulations,
2010
No. 1517/CT/2010/KSERC
Click Here
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2010 (Revision-I)
RG-33(I) of 2010
Click Here
Maharashtra Electricity Regulatory Commission (Renewable Purchase
Obligation, its compliance and REC framework Implementation)
Regulations, 2010
No.MERC/Legal/2010/483
Click Here
Manipur & Mizoram (Renewable Purchase Obligation and its
Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC
Dated Aizawl, the 5th May,
2010
Click Here
Manipur & Mizoram (Renewable Purchase Obligation and its
Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC
Dated Aizawl, the 5th May,
2010
Click Here
Meghalaya State Electricity Regulatory
Commission (Renewal Energy Purchase Obligation and its Compliance)
Regulations, 2010
2 of 2010
Click Here
Nagaland Electricity Regulatory Commission (Renewable Purchase
Obligation and its Compliance) Regulations, 2011
No.NERC/REGN/2011
Click Here
OERC (Renewable and Co-generation
Purchase Obligation and its Compliance) Regulations, 2010.
No. OERC-Engg-02/2010
Click Here
PSERC (Renewable Purchase Obligation and its compliance) Regulations,
2011
No.PSERC/Secy./Reg./55
Click Here
Rajasthan Electricity Regulatory Commission(Renewable Energy
Certificate and Renewable Purchase Obligation Compliance Framework)
Regulations, 2010.
No.RERC/Secy./Regulation -
82 Click Here
Amendment to Renewable Energy Purchase Obligation Regulations,
2010.
Notification No. TNERC /
RPO / 19 / 2, dated 29-07-
2011
Click Here
T.E.R.C. (Procurement of Energy from
Renewable Sources) Regulations, 2010.
No.F.25/TERC/2009/415
Click Here
UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 No.F-
9(21)/RG/UERC/2010/ 697 Click Here
Uttar Pradesh Electricity Regulatory Commission (Promotion of Green
Energy through Renewable Purchase
Obligation) Regulations, 2010
No.
UPERC/Secy/Regulation/1
0 - 787
Click Here
Renewable Power Purchase Obligation (Compliance by purchase of
Renewable Energy / Renewable Energy Certificates) Regulations, 2012
Reg No. 1 of 2012
Click Here
Notification of State agency for REC AERC/341/2010/138 Click Here
Notification of State agency for REC PT No. 40 Click Here
Notification of State agency for REC No. 1370 Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Notification of State agency for REC Click Here
Order for APPC Click Here
Order for APPC Click Here
Order for APPC Click Here
Order for APPC Click Here
Order for APPC Click Here
Order for APPC Click Here
Order for APPC Click Here
Suo motu petition for determination of generic tariff for renewable
energy generation projects to be commissioned during FY 2012-13
10 of 2012
Click Here
Suo motu petition for determination of generic tariff for renewable
energy generation projects to be commissioned during FY 2012-13
10 of 2012
Click Here
Suo motu petition for determination of generic tariff for renewable
energy generation projects to be commissioned during FY 2012-13
10 of 2012
Click Here
Suo motu petition for determination of generic tariff for renewable
energy generation projects to be commissioned during FY 2012-13
10 of 2012
Click Here
Suo motu petition for determination of generic tariff for renewable
energy generation projects to be commissioned during FY 2012-13
10 of 2012
Click Here
Terms and Conditions of Open Access to intra-state transmission system 2 of 2005
Click Here
Determination of Surcharge and Additional surcharge for FY 2012-13 77 of 2012
Click Here
Andhra Pradesh Solar policy Go Ms No 39 Click Here
APERC Transmission tariff Order for FY 2009-14 Click Here
Andhra Pradesh Wind policy Click Here
Arunachal Pradesh open access regulation Click Here
Arunachal Pradesh Small hydro Policy Click Here
Assam open Access Regulations Click Here
Transmission Tariff Order for FY 2010-13 Petition 7/2010 Click Here
Distribution Tariff Order for FY 2010-13 Petition 6/2010 Click Here
Assam Small Hydro Policy Click Here
Bihar Open Access Regulations Click Here
Tariff Order For FY 2012-13 Click Here
Chhatisgarh Open Access Regulation Click Here
Tariff Order FY 2012-13 Click Here
Chattisgarh RPO & REC Regulation Click Here
Delhi Open Access Regulation Click Here
Delhi RPO/REC Regulation Click Here
Tariff Order for TPDDL Petition 05/2012 Click Here
Gujarat Open Access Regulation Notification 3/2011 Click Here
Tariff Order Case 1152/2011 Click Here
GERC Wind Tariff Order Order No. 2 of 2012 Click Here
GERC Solar Tariff Order Order No.1 of 2012 Click Here
Haryana Open Access Regulation 25/2012 Click Here
Tariff Order 34 of 2011 Click Here
Tariff Order 30 of 2011 Click Here
Haryana RE Policy Click Here
Himachal Pradesh Open Access Regulation Click Here
Transmission, Wheeling , open access charges Order Click Here
Himachal Hydro Policy Click Here
J&K Open Access Regulation Click Here
J&K Wind Tariff order 24 of 2010 Click Here
Open Access Charges Click Here
Jharkhand Open Access Regulation Regulation/199 Click Here
Jharkhand procurement of power from wind Regultions Order Click Here
Jharkhand procurement of power from Solar Regultions Click Here
Karnataka Open Access Regulation Y/03/4 Click Here
Tariff Order for CESC Click Here
Tariff Order for Hukerri Click Here
Tariff Order for BESCOM Click Here
Tariff Order for MESCOM Click Here
Tariff Order for HESCOM Click Here
Tariff Order for GESCOM Click Here
Transmision Tariff order for KPTCL Click Here
KSERC Open Access Regulation Click Here
Tariff Order O.P.23 of 2012 Click Here
KSERC (Power Procurement from Captive Generating stations to
Distribution Licensees) Regulation 2007
Click Here
MPERC Open Access Regulation Click Here
MPERC Solar Tariff Order SMP-45/2010 Click Here
MPERC Wind Tariff Order SMP-20/2010 Click Here
MPERC Transmission Tariff order FY 2012-13 Petition 21/2012 Click Here
MERC Transmission OA Regulations Click Here
MERC Distribution OA Regulations Click Here
MERC InSTS Order for FY 2012-13 Click Here
MERC Order on cross subsidy surcharge Click Here
MERC Wind Tariff Order Click Here
Joint Electricity Regulatory
Commission for Manipur and Mizoram (Terms and Conditions for Open
Access) Regulations, 2010.
Click Here
Retail Tariff Order Power & Electricity Department,
Government of Mizoram
Click Here
Meghalaya State Electricity Regulatory
Commission (Terms and Conditions of Open Access) Regulations, 2012 Click Here
Meghalaya SCHEDULE OF RATES & CHARGES FOR OPEN ACCESS
Click Here
Terms and Conditions for
Determination of Generation Tariff for Renewable Energy Click Here
Nagaland Electricity Regulatory Commission (Terms and Conditions for
IntraState Open Access) Regulations, 2012
Click Here
Orissa Electricity Regulatory Commission (Terms and Conditions for
Open Access) Regulation, 2005
Click Here
OERC Order on Open Access Charges Click Here
Punjab State Electricity Regulatory Commission (Terms and Conditions
for Intra-state Open Access) Regulations, 2011.
Click Here
Rajasthan Electricity Regulatory Commission (Terms
and Conditions for Open Access) Regulations, 2004
Click Here
Order In the matter of petition filed by RVPN for determination of Tariff
for FY 2012-13.
Click Here
ARR of FY 2012-13 of Discoms of Rajasthan Click Here
POLICY FOR PROMOTING GENERATION OF ELECTRICITY FROM
BIOMASS, 2010
Click Here
Determination of Wheeling Charges &
Cross Subsidy Surcharge for FY 2010-11.
Click Here
The Rajasthan Electricity Regulatory Commission (Terms and Conditions
for Determination of Tariff) Regulations, 2009
Click Here
TNERC Open Access Regulations Click Here
TNERC Wind Tariff Order Click Here
TNERC Biomass Tariff Order Click Here
Tripura (Terms and Condition of Open Access)Regulations, 2010
Click Here
T.E.R.C. (Procurement of Energy from
Renewable Sources) Regulations, 2010.
Click Here
UERC (Terms & Conditions of Intra-State Open Access) Regulations,
2010
Click Here
Uttarakhand Electricity Regulatory Commission
(Tariff and Other Terms for Supply of Electricity from Renewable Energy
Sources and
non-fossil fuel based Co-generating Stations) Regulations, 2010
Click Here
Uttar Pradesh Electricity Regulatory
Commission (Terms and Conditions for Open Access) Regulations, 2004 Click Here
UPPTCLTariff_Order for FY 2012-13 Click Here
Kanpur Electricity Supply Company Limited ARR for FY 2012-13 Click Here
UPERC (Captive and Non-Conventional Energy Generating Plants)
Regulations, 2009
Click Here
West Bengal Electricity Regulatory Commission (Open Access)
Regulations, 2007
Click Here
West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2010
Click Here
CERC Draft RE generic Tariff Order for FY 2013-14 Petition No. 243/SM/2012
(SuoMotu) Click Here
Draft Amendment to Intra-State Open Access Regulations Click Here
Order on Tariff Determination for Biomass Plants to be commissioned in
2012-13 to 2016-17
Click Here
Order on Tariff Determination for Bagasse base Co-gen Plants to be
commissioned in 2012-13 to 2016-17
Click Here
Draft RE Tariff Regulations, 2012 Click Here
RPO Regulation 2012 Click Here
Solar PV Tariff Regulations 2012 Click Here
Tariff for sale of electricity from Bio-mass based power plants in the
State to distribution licensees commissioned during FY 2012-13 of the
control period 2009-14
Click Here
APPC Order for FY 2012-13 Click Here
HPERC (Promotion of Generation from the Renewable Energy Sources
and Terms and Conditions for Tariff Determination) Regulations, 2012. Click Here