Professional Documents
Culture Documents
To,
The Secretary to Government of NWFP,
Sports, Culture, Tourism, Archaeology
& Museums and Youth Affairs Department,
Peshawar.
SUBJECT:
PC-1
OF
THE
UMBRELLA
SCHEME
NAMELY
TOURISM
DEVELOPMENT ACTIVITIES IN NWFP PHASE-IX FOR THE YEAR 2003-04
REFLECTED IN ADP 2K3-2K4 AT SERIAL# 1157 WITH CODE#961013 HAVING
AN ESTIMATED COST OF RS.6.500M WITH AN ALLOCATION OF RS.6.000M
ON THE REVENUE SIDE FOR SMALL SCALE STC ACTIVITIES.
Dear Sir,
Reference the ADP 2003-2004 regarding the captioned subject.
This Corporation has prepared its PC-I in light of the allocation in the
ADP 2003-2004 for the 9th phase of the umbrella Scheme namely TOURISM
DEVELOPMENT ACTIVITIES IN NWFP PHASE-IX for an amount of Rs. 6 million for
consideration by the
The PC-I is
enclosed herewith for signature and forwarding the same to PE&D and Finance Departments
respectively alongwith working paper. After signatures of the Administrative Secretary the
PC-I and Working Paper is to be photocopied by this corporation for distribution among
members of the DDWP please.
Yours faithfully
Encl: as above.
(ABDUS SAMAD)
GENERAL MANAGER (FA)
Endorsement No. and date even.
i.
ii.
iii.
iv.
UMBRELLA PC-I
FOR THE SCHEME NAMELY
Name of Project:
2.
3.
4.
(ii)
(iii) If the project is proposed to be financed out of block provision for a program indicates:
Rs in Million
5.
Amount Already
committed
6.000
6.000
Amount proposed
for the project
6.000
Balance
Available
00.000
Relationship of the project with the objectives of the sector. Indicate the contribution of
the project, quantified it possible, to the targets in the Five-Year Plan.
The proposed scheme is in line with the tourism policy of the Federal Government, it
also encompasses the directives of the provincial government. The project aims to
sensitize and raise the awareness level of general public besides involving the private
sector in making tourism a viable source of income at the grass root and small
entrepreneur level. The projects in Tourism Sector are sub-divided into three
categories namely small, medium and large. The STC directly implements the small
scale tourism promotional activities while medium and large are offered to the private
sector on partnership basis.
6.
7.
8.
Rs. 6.000M
NONE
-------------------Total: Rs. 6.000M
-------------------Exchange rate adjustment, if any, on the basis of latest information.
Not for seen or expected as apparently no foreign exchange is involved.
Annual recurring (O&M) expenditure after completion and means of financing:
Local
Foreign Exchange
YEAR-I
YEAR-II
Rs. 0.0M
Rs. 0.0M
NONE
NONE
---------------------------------------------Rs. 0.0M
Rs.0.0M
Prepared by:
Checked by:
Approved by:
Date:
(Hayat A. Shah)
Manager Special Projects (P&D)
Sarhad Tourism Corporation, GoNWFP, Peshawar.
i.
(ABDUS SAMAD)
GENERAL MANAGER (F&A)
Sarhad Tourism Corporation, GoNWFP, Peshawar.
ii.
(AMJAD NAZIR)
Secretary Tourism Department
GoNWFP, Peshawar
August 25 2003
PART "II"
PROJECT DESCRIPTION AND FINANCING
10.
b.
11.
Project Status
a.
b.
The sub-projects under this umbrella PC-I are meant for social mobilization and raising
awareness among the general public for taking up tourism as a source of income
generation. The umbrella scheme namely TOURISM DEVELOPMENT ACTIVITIES
IN NWFP PHASE-IX is expected to increase the flow of domestic and international
tourists leading to a substantial raise in the (Gross National Product and Gross
Domestic Product) income level of the people. The proposed scheme is expected to
create job opportunities during the execution of the small scale development activities
besides providing employment during maintenance and operation. The proposed
facilities after completion would provide catering to additional tourists resulting in
additional income and indirectly through multiplier effect employing more work forces
with sale of more local produce of the local tourism industry. The entrepreneurs and
the communities both would be brought together through the small scale
demonstrative and catalytic activities that are proposed under the scheme. This would
also inculcate among the local the fact that tourism is a source of income generation
and poverty alleviation, therefore, it is expected that their attitude would be tourist
friendly.
Commercial viability in implementation and operations has been taken into
consideration while devising the cost estimates in August 2003 from open market. No
subsidies are involved. Additional revenue shall accrue due to increased flow of
tourists. The over all impact is not calculate-able at this stage.
12.
The proposed scheme is in line with the tourism policy of the Federal
Government as well as the present provincial government. The project is a
continuation of the previous 8 phases under the umbrella scheme namely
6
priorities for current year and funds available with the Provincial Government for 200304 under the umbrella scheme namely Tourism Development Activities in NWFP
Phase.
(b)
(c)
Relationship with other programs in the same sector and in other sectors.
Indicate whether coordination with other sectors has been ensured.
Where-ever possible the available fora's of different line agencies / programs
would be utilized. The scheme is a developmental one and therefore
coordination and linkage to maximum possible extent is its corner stone.
(d)
13.
Give date when capital expenditure estimates were prepared. If prepared more than
one year a go, confirm if they are still valid.
The estimates in the PC-I are based on a flat open market rate as of August 2003 for
projected estimated amount of Rs. 6 million.
14.
Capital Cost:-
Give year-wise break-down of capital cost covering the whole of the investment period,
as indicated below:
Rs. in million
_________________________________________________________________________
Total at
Item official rate
I year
II year and
of exchange
subsequent years
-------- --------------------------------------------------------------------------Local FEC Import Total
Local FEC Total
Local FEC Total
Duties
NIL
NIL
NIL
NIL
6.000 NIL 6.000
10% Increase over
previous year ADP
Allocation for subsequent
ADP's
15.
16.
---------------------------------------------------------------------------------------------------------------------------I
II
III
IV
V
------------------------------------------------------------------------------------------------------------------------------NIL / NOT APPLICABLE
-------------------------------------Total
=====
17.
=====
=====
=====
======
Unit cost for each category of service or output and how it compares with cost in other
projects, completed.
Unit costs for each category of service or output are on the lower side and by
comparing with costs in other similar projects of Ministry of Tourism or Pakistan
Tourism Development Corporation these are rational. The following is the name of
activity and its cost moved against the allocation of Rs.6.000 million reflected at S#
1157Code#961013 in ADP2003-2004 under Umbrella scheme namely Tourism
Development Activities In NWFP Phase-IX with a projected total estimated cost of
Rs.6.500M for 2003-04 and for subsequent phases an increase @ 10% over the years
in future /ADP:
S. NO
Acquisition of 05 kanal of land each at Shahi & Bin Shahi Valley for tourism
promotion @ Rs. 200,000/- per kanal respectively.
Acquisition of 05 kanal of land at Laramsar Top for Huts, Camping & Trekking
@ Rs. 200,000/- per kanal.
Shandoor Polo Festival 7-9 July
Kalash Autumn & Spring Festivals.
Establishment of Tourist Complex at Dongagali Base Camp
Jashn-e-Chitral to be celebrated in collaboration with local tourism industry.
Kumrat Festival to be celebrated in collaboration with local tourism industry.
Kalam Festival to be celebrated in collaboration with local tourism industry.
Commissioning of Tourist Complex on plot of the STC / Tourism Deptt located
on main GT Road at Kund.
World Tourism Day
Promotion of Winter Sports through skiing at Malam Jabba.
One week exhibition of Handicrafts at Kund Park
Arrangement of Food Festival at Sardaryab.
Boat Cruising in Lower Swat Canal.
Quarterly Newsletter / Magazine
Camping / trekking at Naran / Lake Saifulmaluk / Lalazar.
TOTAL Rs.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
18.
ACTIVITIES
(a)
COST (RS)
2003-04
1,870,000.00
1,000,000.00
195,000.00
200,000.00
885,000.00
100,000.00
100,000.00
100,000.00
885,000.00
65,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
6,000,000.00
Give expected income statement (profit and loss accounts) for five years with
realistic assumptions. Rate of depreciation and salvage value of property
should be given.
The sub-projects under this umbrella PC-I not profit oriented but are meant for social
mobilization and raising awareness among the general public for taking up tourism as
a source of income generation. Therefore it is expected that proposed investment will
result in increase the flow of domestic and international tourists leading to a
substantial raise in the level of the people. The proposed scheme is expected to create
job opportunities during the execution of the small scale development activities
besides providing employment during maintenance and operation. The proposed
facilities after completion would provide catering to additional tourists resulting in
9
additional income and indirectly through multiplier effect employing more work forces
with sale of more local produce of the local tourism industry. The entrepreneurs and
the communities both would be brought together through the small scale
demonstrative and catalytic activities that are proposed under the scheme. This would
also inculcate among the local the fact that tourism is a source of income generation
making then more tourist friendly.
(b)
Acquisition of 05 kanal of land each at Shahi & Bin Shahi Valley for
tourism promotion @ Rs. 200,000/- per kanal respectively.
COSTS (Rs.)
2003-2004
NAME OF COMPONENT
1.1
935,000.00
1.2
935,000.00
Total
2.0
NAME OF COMPONENT
2.1
3.0
1,870,000.00
1,000,000.00
1,000,000.00
10
NAME OF COMPONENT
2003-2004
3.1.
Publicity
20,000.00
3.2.
Transportation
65,000.00
3.3.
Souvenirs
10,000.00
3.4.
65,000.00
3.5.
15,000.00
3.6.
20,000.00
195,000.00
Total:
4.0
NAME OF COMPONENT
4.1.0
4.1.1
Publicity
25,000.00
4.1.2
Transportation
20,000.00
4.1.3
25,000.00
4.1.4
15,000.00
4.1.5
Mini Exhibition
15,000.00
Sub Total
100,000.00
4.2.0
4.2.1
Publicity
25,000.00
4.2.2
Transportation
20,000.00
4.2.3
25,000.00
4.2.4
15,000.00
4.2.5
Mini Exhibition
15,000.00
th
th
Sub Total
100,000.00
TOTAL Rs.
5.
70,000.00
COSTS (Rs.)
2003-2004
5.1.
312,500
5.2
96,000
5.3
84,000
5.4
Kitchen 12'x12'=144'@500
72,000
5.5
Bathrooms(5nos) 5(5'x7')=175'@500
87,500
5.6
108,000
5.7
5.8
Leveling/Dressing lumsump
Electrification, Sanitation, water supply, installation and distribution
25,000
100,000
11
Sewerage ETC.
(The PER SFT Rate of Rs.500 includes Electrification, Sanitation, water
supply, installation and distribution etc. and the land is the owned by the
Corporation
Total:
6.
885,000.00
NAME OF COMPONENT
6.1.
Publicity
20,000.00
6.2.
Transportation
25,000.00
6.3.
10,000.00
6.5.
Souvenirs
Establishment & Operation of Tent village & Information Center
during the Jashn-e-Chitral Festival
Prizes for the players
6.6.
15,000.00
6.4.
Total:
7.
15,000.00
15,000.00
100,000.00
NAME OF COMPONENT
7.1.
Publicity
20,000.00
7.2.
Transportation
25,000.00
7.3.
10,000.00
7.5.
Souvenirs
Establishment & Operation of Tent village & Information Center
during the Kumrat Festival
Prizes for the players
7.6.
15,000.00
7.4.
Total:
8.
15,000.00
15,000.00
100,000.00
NAME OF COMPONENT
8.1.
Publicity
8.2.
Transportation
25,000.00
8.3.
10,000.00
8.5.
Souvenirs
Establishment & Operation of Tent village & Information Center
during the Kalam Festival
Prizes for the players
8.6.
15,000.00
8.4.
Total:
9.
15,000.00
15,000.00
100,000.00
COSTS (Rs.)
2003-2004
NAME OF COMPONENT
5.1.
312,500
5.2
96,000
5.3
84,000
5.4
Kitchen 12'x12'=144'@500
72,000
5.5
Bathrooms(5nos) 5(5'x7')=175'@500
5.6
87,500
108,000
5.7
Leveling/Dressing lumsump
Electrification, Sanitation, water supply, installation and distribution
5.8
Sewerage ETC.
(The PER SFT Rate of Rs.500 includes Electrification, Sanitation, water
supply, installation and distribution etc. and the land is the owned by the
Corporation
Total:
25,000
100,000
885,000.00
NAME OF COMPONENT
10.1.
Publicity
10,000.00
10.2.
10,000.00
10.3.
40,000.00
10.4.
5,000.00
Total:
65,000.00
COSTS (Rs.)
2003-2004
20,000.00
NAME OF COMPONENT
Publicity
25,000.00
10,000.00
11.5
Transportation
Souvenirs
Establishment & Operation of Tent village & Information Center
during the Winter Sports Skiing
Prizes for the players
11.6
15,000.00
11.4.
15,000.00
15,000.00
Total:
12.
100,000.00
NAME OF COMPONENT
12.1 Publicity
12.2. Transportation
25,000.00
25,000.00
12.4 Souvenirs for the gusts and Prizes for the participants
15,000.00
15,000.00
Total:
13.
100,000.00
COSTS (Rs.)
2003-2004
13
13.1 Publicity
20,000.00
13.2. Transportation
25,000.00
25,000.00
13.4 Souvenirs for the guests and Prizes for the participants
15,000.00
15,000.00
Total:
14.
NAME OF COMPONENT
13.1 Publicity
20,000.00
13.2. Transportation
25,000.00
25,000.00
13.4 Souvenirs for the gusts and Prizes for the participants
15,000.00
15,000.00
Total:
15
14.2.
COSTS (Rs.)
2003-2004
20,000.00
Printing of 5-6 pages color Newsletter / Magazine @ Rs. 50/- per copy for
400 nos for each quarter.(50x400x4)
Total:
16.
100,000.00
NAME OF COMPONENT
14.1 Designing Composing & Editing including Photography
80,000.00
100,000.00
NAME OF COMPONENT
13.1 Publicity
13.2. Transportation
25,000.00
40,000.00
13.5
15,000.00
19.
100,000.00
100,000.00
6,000,000.00
6.000
Financial Plan
Rs. in million
-----------
14
(I)
Amount for
Amount for
Capital
Recurring
Sources
Expenditure
------------
(a)
Government sources:
(Federal/Provincial)
Provincial
(i)
(ii)
(iii)
(iv)
(b)
II
20.
Grant
Loan
Equity Investment
Direct Government
Expenditure
Rs.6.000M
Establishment, O&M expenses will be born by STC
from other funds provided by the GoNWFP through
Finance Department GoNWFP.
(c)
Private Investment
NONE
(d)
NONE
(e)
Non-Government borrowing.
NONE
(f)
Other sources
(E.g. Recoveries)
NONE
(a)
(b)
21.
NONE
NONE
NONE
OthersTotal
Risk Analysis:
(a)
15
(b)
A detailed review of the project cycle and likely events which may delay the
project and means of addressing those delays.
The non availability of resources would result in bringing the developmental
activities of the tourism sector at stand still as has been partially the case in
1996-97 & 97-98. However the in time release of funds even in piecemeal
would contribute towards the sustainable tourism promotion strategy of the
NWFP for making tourism a successful industry in years to come.
(c)
Likely events which may delay the project and measures to meet these events.
Being committed to encourage public private partnership there are favorable
signs of collaboration and examples are also there however in time release of
funds, approval of schemes would certainly boast up the developmental
activities for making tourism a source of income in the small scale or micro level
projects. It is note worthy that in case of war, natural calamites, law & order
situation etc. the industry to suffer the most would be tourism.
22.
Annual phasing of physical work and financial requirements for the project.
Physical work
Financial requirements
Acquisition of 05 kanal of land each at Shahi & Bin Shahi Valley for tourism
promotion @ Rs. 200,000/- per kanal respectively.
Acquisition of 05 kanal of land at Laramsar Top for Huts, Camping & Trekking
@ Rs. 200,000/- per kanal.
Shandoor Polo Festival 7-9 July
Kalash Autumn & Spring Festivals.
Establishment of Tourist Complex at Dongagali Base Camp
Jashn-e-Chitral to be celebrated in collaboration with local tourism industry.
Kumrat Festival to be celebrated in collaboration with local tourism industry.
Kalam Festival to be celebrated in collaboration with local tourism industry.
Commissioning of Tourist Complex on plot of the STC / Tourism Deptt located
on main GT Road at Kund.
World Tourism Day
Promotion of Winter Sports through skiing at Malam Jabba.
One week exhibition of Handicrafts at Kund Park
Arrangement of Food Festival at Sardaryab.
Boat Cruising in Lower Swat Canal.
Quarterly Newsletter / Magazine
Camping / trekking at Naran / Lake Saifulmaluk / Lalazar.
TOTAL Rs.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
23.
ACTIVITIES
COST (RS)
2003-04
1,870,000.00
1,000,000.00
195,000.00
200,000.00
885,000.00
100,000.00
100,000.00
100,000.00
885,000.00
65,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
6,000,000.00
(ii)
24.
Beneficiary Participation:
(i)
(ii)
If so, please provide detailed mechanism for involving the beneficiary of the
completed project output.
As in (i) above.
25.
26.
Future Expansion.
(Has provision been made for future expansion?)
Yes Please. The principles of carrying on these small scale activities slowly in the
17
short term through medium term with more and more involvement on the part of
communities, the entrepreneurs, the private sector and the tourism corporation /
department as well as others have been taken into consideration.
18
PART-C
27.
(a)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
PROJECT REQUIREMENTS
Manpower required by gender.
For Execution
Total
Man-Months
and Number
----------Professional
and Technical
Administrative
Executive and
Management.
Clerical
Service
Skilled
Unskilled
Others.
For Operation
First Number
Year of
execution only
-------- ---------
The present staff strength of STC would take care of the execution and operation
except contractual/ daily wages staff required for the execution of the sub components
wherever the need is.
(b)
(c)
(d)
28.
29.
19
The Details are given at serial No. 18-b above and the abstract is given below:
S. NO
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
ACTIVITIES
Acquisition of 05 kanal of land each at Shahi & Bin Shahi Valley for tourism
promotion @ Rs. 200,000/- per kanal respectively.
Acquisition of 05 kanal of land at Laramsar Top for Huts, Camping & Trekking
@ Rs. 200,000/- per kanal.
Shandoor Polo Festival 7-9 July
Kalash Autumn & Spring Festivals.
Establishment of Tourist Complex at Dongagali Base Camp
Jashn-e-Chitral to be celebrated in collaboration with local tourism industry.
Kumrat Festival to be celebrated in collaboration with local tourism industry.
Kalam Festival to be celebrated in collaboration with local tourism industry.
Commissioning of Tourist Complex on plot of the STC / Tourism Deptt located
on main GT Road at Kund.
World Tourism Day
Promotion of Winter Sports through skiing at Malam Jabba.
One week exhibition of Handicrafts at Kund Park
Arrangement of Food Festival at Sardaryab.
Boat Cruising in Lower Swat Canal.
Quarterly Newsletter / Magazine
Camping / trekking at Naran / Lake Saifulmaluk / Lalazar.
TOTAL Rs.
COST (RS)
2003-04
1,870,000.00
1,000,000.00
195,000.00
200,000.00
885,000.00
100,000.00
100,000.00
100,000.00
885,000.00
65,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
6,000,000.00
A-II Materials, Spares and Supplies and equipment for operation of the Project.
---------------------------------------------------------------------------------------------------------------Local
Foreign
Quantity
Rate
Cost
Quantity
Rate
Cost
per unit
Per unit
---------------------------------------------------------------------------------------------------------------The Materials, Spares , Supplies and equipment for the projects, sub-schemes will be
obtained on case to case basis which does not involve more the 10% of the total cost
of the project at a given time.
30
20