1. The document is a daily report from a fire protection project documenting the tasks completed and materials used on January 5, 2013.
2. It details the installation of pipe supports, cutting and threading of pipes, installation of sprinkler system branches and fittings, and pressure testing of the sprinkler network.
3. A variety of tools were used including grinders, wrenches, drills, and different sizes of pipes, elbows, tees, and other sprinkler system components were installed.
1. The document is a daily report from a fire protection project documenting the tasks completed and materials used on January 5, 2013.
2. It details the installation of pipe supports, cutting and threading of pipes, installation of sprinkler system branches and fittings, and pressure testing of the sprinkler network.
3. A variety of tools were used including grinders, wrenches, drills, and different sizes of pipes, elbows, tees, and other sprinkler system components were installed.
1. The document is a daily report from a fire protection project documenting the tasks completed and materials used on January 5, 2013.
2. It details the installation of pipe supports, cutting and threading of pipes, installation of sprinkler system branches and fittings, and pressure testing of the sprinkler network.
3. A variety of tools were used including grinders, wrenches, drills, and different sizes of pipes, elbows, tees, and other sprinkler system components were installed.
Date: 05 Jan 2013 Day: Sat Project Name: 062 - 016 Location: Chemical Store - Fertil 2
Group No: Technician Names: 1 Nizamu Uddien 3 Manjur Alam 5
Supervisor: Alam 2 Mohammad Jony 4 6 7 OliAllah 8 9 Cutting of Thread Bars 6 Threading Machine Big pc= 1 Small pc= - Drilled Holes in slab/ceiling for Thread Bars 20 Grinder Big pc= - Small pc= - Fastening the Hangging clamp-clamp for Pipe support 20 Pipe Wrench Big pc= - Small pc= - Ladder Big pc= 1 Medium pc= - Small pc= Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc= 8" pc= - 6" pc= - 4" pc= - 3" pc= - Grooving Machine pc= 1 Tape Meter pc= Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc= 8" pc= - 6" pc= - 4" pc= - 3" pc= - Spanner Size - pc= 2 Halk Saw Frame pc= Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc= 2" pc= - 1" pc= 20 1" pc= - 1" pc= - Level Gauge pc= 0 Chipping Tool pc= Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc= 2" pc= - 1" pc= 20 1" pc= - 1" pc= - Philip Screw Driver (+) pc= 0 Test Pen pc= Electric Fan pc= 0 Hammer pc= Installed Main/Riser Pipe per Branches w/ Fittings Risers pc= 2 pc= Location Underground8" pc= - 6" pc= - 4" pc= 3 3" pc= - pc= pc= Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - pc= pc= Main Line / Branches pc= pc= Location Underground8" pc= 5 6" pc= - 4" pc= - 3" pc= - Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - Installed Sprinkler Pipe Branches w/ Fittings Risers / Main Line / Branches Location High Level 6" pc= - 4" pc= - 3" pc= - 2" pc= - Location Low level 6" pc= - 4" pc= - 3" pc= - 2" pc= - Main Line / Branches Location High Level 2" pc= - 1" pc= 20 1" pc= - 1" pc= - Location Low Level 2" pc= - 1" pc= - 1" pc= - 1" pc= - Installation of Fire Hose Cabinet & Breaching Inlet Mounting of Fire Hose Cabinet pc= - Installation of Fire Hose Reels pc= - with nozzle? pc= - Breaching Inlet pc= - Pressure Red Valve pc= - w/ lockshield pc= - w/ Landing V. pc= - D Powder Fire Ext. pc= - Co2 Fire Ext. pc= - Sprinkler Drops pc= - Upright Sprinkler pc= - Pendent Sprinkler pc= - Recessed Sprinkler pc= - Extended Coverage pc= - Zone Control Valve Station pc= - Drain Valve pc= - Prepared By: Non-Rising Stem Gate Valve pc= - Air release Valve pc= - Pressure Reducing Valve Station pc= - Non-Return Valve pc= - Name: Ahmed I. AbuRadi OS & Y Gate Valve pc= - w/ Supervisory Switch? pc= - Date: 05 Jan 2013 Covering openings by stop plugs before Pressure Test pc= - Preparation of (Manual) Pump and Pressure Gauge x Applied pressure x Taken Readings on time intervals x Approved By: Mounting Electrical Pump pc= - Diesel pc= - Jockey pc= - Name: Tested Fire Pump Set x Diesel x Jockey x Date: Interconnecting Pump Set to Sprinkler Network x Installation of FirePump Set Follow Ups for Materials etc: (Optional) Installation of Valves Pressure Test for Sprinkler Network Installation of Sprinkler Heads Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) Installation of Service Pipes for Sprinkler System 2- 22mm Spanner 6 3- 18 mm Spanner 7 4 8 Cutting, Threading Grooving of Pipes Installation of Service Pipes for Wet System others tools/equipments not mention above: (optional) 1- Hitachi Drill 5 DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable" Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day: - 0 2 0 0 0 0 0 0 1 Follow Ups for Materials etc: (Optional) Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) others tools/equipments not mention above: (optional) DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable" Tools & Equipments Used for the day: Date: 05 /JAN /2013 Day: Project Name: 62 - 12 Location: Chemical Store Group No: Technician Names: 1 Nizamu Uddien 4 Manjur Alam Supervisor: BADIUL ALAM 2 Mohammad Jony 5 3 OliAllah 6 Cutting of Thread Bars pc= 6 Threading Machine Big pc= 1 Small pc= 0 Drilled Holes in slab/ceiling for Thread Bars pc= 20 Grinder Big pc= 0 Small pc= 0 Fastening the Hangging-clamp for Pipe support pc= 20 Pipe Wrench Big pc= 0 Small pc= 0 Ladder Big pc= 1 Medium pc= 0 Small pc= Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc= 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Grooving Machine pc= 1 Tape Meter pc= Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc= 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Spanner Size - pc= 2 Halk Saw Frame pc= Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc= 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Level Gauge pc= 0 Chipping Tool pc= Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc= 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Philip Screw Driver (+) pc= 0 Test Pen pc= Electric Fan pc= 0 Hammer pc= Installed Main/Riser Pipe per Branches w/ Fittings Pipes 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 1 pc= Elbows 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc= Tee 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc= Coupling 8" pc= 0 6" pc= 0 4" pc= 2 3" pc= 0 pc= pc= Reducer Tee Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0 Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0 Mechanical Tee Size 0 X 0 pc= 0 ;Size 4" X 1" pc= 8 Installed Sprinkler Pipe Branches w/ Fittings Pipes 2" pc= 0 1" pc= 20 1" pc= 0 1" pc= 0 Elbows 2" pc= 0 1" pc= 5 1" pc= 0 1" pc= 0 Tee 2" pc= 0 1" pc= 0 1" pc= 0 1" pc= 0 Coupling 2" 0 1" pc= 0 1" pc= 0 1" pc= 0 Reducer Tee Size 1" X 1" pc= 20 ;Size 0 X 0 pc= 0 Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0 Reducer Bush Size 1" X 1" pc= 20 ;Size 0 X 0 pc= 0 Mounting of Fire Hose Cabinet pc= 0 Installation of Fire Hose Reels pc= 0 with nozzle? pc= 0 Breaching Inlet pc= 0 Pressure Red Valve pc= 0 w/ lockshield pc= 0 w/ Landing V. pc= 0 D Powder Fire Ext. pc= 0 Co2 Fire Ext. pc= 0 Upright Sprinkler pc= 0 Pendent Sprinkler pc= 0 Recessed Sprinkler pc= 0 Extended Coverage pc= 0 Zone Control Valve Station pc= 0 Drain Valve pc= 0 Prepared By: Non-Rising Stem Gate Valve pc= 0 Air release Valve pc= 0 Pressure Reducing Valve Station pc= 0 Non-Return Valve pc= 0 Name: AHMED I. ABURADI OS & Y Gate Valve pc= 0 w/ Supervisory Switch? pc= 0 Date: 05 /01 /2013 Covering openings by stop plugs before Pressure Test pc= 0 Preparation of (Manual) Pump and Pressure Gauge x Applied pressure x Taken Readings on time intervals x Approved By: Mounting Electrical Pump pc= 0 Diesel pc= 0 Jockey pc= 0 Name: Tested Fire Pump Set x Diesel x Jockey x Date: Interconnecting Pump Set to Sprinkler Network x Installation of Fire Hose Cabinet & Breaching Inlet Installation of Valves Installation of Sprinkler Service Pipes Pressure Test for Sprinkler Network Installation of FirePump Set Installation of Sprinkler Heads Follow Ups for Materials etc: (Optional) Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) others tools/equipments not mention above: (optional) 1- Hitachi Drill 2- 22mm Spanner 3- 18 mm Spanner 7 DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day: 6 5 " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable" Installation of Main/Riser Service Pipes Cutting, Threading Grooving of Pipes 4 8 0 0 2 0 0 0 0 0 0 1 Follow Ups for Materials etc: (Optional) Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) others tools/equipments not mention above: (optional) DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING Tools & Equipments Used for the day: " CHECK the box with () if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2" x 1" for (size) ; leave blank if not applicable"