W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
7-Nov-13
14-Nov-13
21-Nov-13
28-Nov-13
5-Dec-13
12-Dec-13
19-Dec-13
26-Dec-13
2-Jan-14
9-Jan-14
16-Jan-14
23-Jan-14
30-Jan-14
6-Feb-14
13-Feb-14
20-Feb-14
27-Feb-14
6-Mar-14
13-Mar-14
20-Mar-14
27-Mar-14
3-Apr-14
10-Apr-14
Duration
(WKS)
31-Oct-13
Activities
Manhours
Project Kick off Meeting
1.00
100.00
0.00
4.00
80.00
3.00
80.000
Division of Pipeline Sectioning with respect to the route conditions & length
of the pipeline, with help of allignment/layout drawings
3.00
3.00
2.00
2.00
2.00
2.00
1.00
2.00
2.00
0.00
2.00
4.00
2.00
2.00
Internal review
2.00
2.00
2.00
0.00
Basic Pipeline data incorporate into VAIL Plant template sheets and loading
into VAIL-Plant Software
4.00
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
1.00
0.64
1.00
0.64
1.00
0.64
1.00
0.64
1.00
1.20
0.64
1.00
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
4.00
3.20
3.00
2.40
3.00
0.00
3.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
1.00
0.00
2.00
0.00
2.00
0.00
0.00
0.00
2.00
0.00
4.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
0.00
0.00
4.00
0.00
Activities
% age
Progress
Duration
(WKS)
Manhours
100.00
100.00
100.00
Data Collection and Review
80.00
Basic Pipeline engineering data population into mechanical 100.00
assessment sheet
80.00
Division of Pipeline Sectioning with respect to the route
100.00
conditions & length of the pipeline, with help of
0.00
100.00
Identification of Damage mechanism's & 3rd party threats
0.00
100.00
To perform RBI initial assessment
0.00
Calculation of corrosion rates (if inspection history
100.00
available)
0.00
100.00
Identification of POF & COF
0.00
100.00
Review & Updating of Mechanical Assessment Sheet
0.00
100.00
Submission of Pipeline Mechanical Assessment Sheet
0.00
100.00
Review & Comments by Client
0.00
100.00
Incorporation of Client Comments (if any)
0.00
100.00
Final Submission of Pipeline Mechanical Assessment Sheet
#DIV/0!
100.00
Preparation of Corrosion & Inspection Strategy Document
0.00
100.00
Preparation of Draft RBI Report Including RBI Methodology
0.00
Preparation of Inspection Reference Plan (IRP) for the
100.00
Pipelines
0.00
Preparation of Design, Fabrication, Installation (DFI)
100.00
Dossier document
0.00
100.00
Internal review
0.00
1.00
100.00
4.00
80.00
3.00
66.667
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
3.00
3.00
2.00
2.00
2.00
2.00
1.00
2.00
2.00
0.00
2.00
4.00
2.00
2.00
2.00
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
100.00
0.00
100.00
Incorporation of Client Comments
0.00
100.00
Final Submission of Reports to Client
#DIV/0!
Basic Pipeline data incorporate into VAIL Plant template
100.00
sheets and loading into VAIL-Plant Software
0.00
Incorporation of client comments in VAIL-Plant software (if 100.00
any)
0.00
100.00
VAIL Plant Software Final Submission
#DIV/0!
Planned Progress (Weekly)
Planned Progress (Commulative)
Actual Progress (Weekly)
Actual Progress (Commulative)
Planned Progress %
Actual Progress %
2.00
20
2.00
21
22
23
24
0.00
4.00
1.00
0.00
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
48.00
5602.04
1.00
0.64
1.00
0.64
1.00
1.20
0.64
1.00
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2-Jan-14 W-10
1.00
1.00
8-Jan-14
1.00
0.64
1.00
1.00
1.00
0.64
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.64
1.64
4.17
3.42
4.17
3.42
1.00
3.00
0.64
2.28
2.08
1.33
2.08
1.33
1.00
4.00
0.64
2.92
2.08
1.33
2.08
1.33
2.00
6.00
1.84
4.76
4.17
3.83
4.17
3.83
1.00
7.00
1.84
6.60
2.08
3.83
2.08
3.83
2.00
9.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
11.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
13.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
15.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
17.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
19.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
21.00
0.00
6.60
4.17
0.00
4.17
0.00
3.00
24.00
0.00
6.60
6.25
0.00
6.25
0.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
3.20
3.00
2.40
3.00
0.00
3.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
1.00
0.00
2.00
0.00
2.00
0.00
0.00
0.00
2.00
0.00
4.00
0.00
2.00
0.00
2.00
0.00
2.00
0.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
2.00
26.00
0.00
6.60
4.17
0.00
4.17
0.00
3.00
29.00
0.00
6.60
6.25
0.00
6.25
0.00
2.00
31.00
0.00
6.60
4.17
0.00
4.17
0.00
1.00
32.00
0.00
6.60
2.08
0.00
2.08
0.00
2.00
34.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
36.00
0.00
6.60
4.17
0.00
4.17
0.00
3.00
39.00
0.00
6.60
6.25
0.00
6.25
0.00
4.00
43.00
0.00
6.60
8.33
0.00
8.33
0.00
2.00
45.00
0.00
6.60
4.17
0.00
4.17
0.00
1.00
46.00
0.00
6.60
2.08
0.00
2.08
0.00
2.00
48.00
0.00
6.60
4.17
0.00
4.17
0.00
2.00
0.00
2.00
0.00
0.00
0.00
4.00
0.00
1.00
0.00
0.00
0.00
48.00
6.60
100.00
100.00
100.00
0.00
100.00
80.00
100.00
50.00
100.00
0.00
100.00
0.00
100.00
0.00
100.00
#DIV/0!
100.00
0.00
100.00
0.00
100.00
0.00
100.00
0.00
100.00
0.00
100.00
0.00
100.00
0.00
100.00
#DIV/0!
100.00
0.00
100.00
0.00
100.00
0.00
100.00
0
4
80.00
50.00
2
2
2
0
4
4
2
2
2
2
2
0
4
2
1
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
0.00
1.00
0.64
1.00
0.64
1.00
0.64
1.00
0.64
1.00
1.00
0.64
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
Manhours
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2-Jan-14 W-10
8-Jan-14
Duration
(WKS)
% age
Progress
Activities
2.27
100.00
9.09
30.00
9.09
0.00
4.55
4.55
4.55
0.00
9.09
9.09
4.55
4.55
4.55
4.55
4.55
0.00
9.09
4.55
2.27
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
Manhours
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.64
1.00
1.00
1.00
0.64
1.00
1.00
2-Jan-14 W-10
1.00
0.64
8-Jan-14
1.00
0.64
1.00
1.00
1.00
0.64
Duration
Weightage
(WKS)
Activities
Activities
Mandays
Kick off meeting
Mob / De-mob
Collection of relevant engineering data, P & IDs, specifications, OEM manuals
etc.
Preparation of Asset Register (12000 Assets)
Identification & Evaluation of collected data
Review and verification of KPOC Asset register
Identification of assets, Description, System and development of equipment
hierarchy
Populate of data in the asset register template of CMMS
Identify & populate cost, category, make & model Nos. etc.
Identify & Collection of missing information
Populate missing information in the template
Submission of Loading Template
Review & comments by client
Incorporation of comments
Final submission for data loading template
FMECA based RCM Analysis and PMRs development
Preparation of data base for RCM study
Identification of applicable failure modes
Conduct FMECA study analysis for KPOC Platform.
Electric &
Reliabilty
Engineer(38)
Instrument &
Control
Engineer(38)
Rotating
Equipment
Reliabilty
Engineer(38)
Safety
Engineer(38)
Lifting
Engineer(37)
Activities
Technical
Manager (6)
Operatation
Integrity
Engineer (16)
Technical
Corrosion
assistant/Data
Engineer(38)
processor(62)
Mandays
48.00
128.00
304.00
304.00
304.00
304.00
296.00
304.00
496.00
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.96
2.56
6.08
6.08
6.08
6.08
3.36
8.96
21.28
21.28
21.28
2.40
6.40
15.20
15.20
4.80
12.80
30.40
10.08
26.88
0.96
Weightage
(out of 100)
For checking
Weightage
(out of 100)
for working
Planned Start
Date
Duration
(Days)
9.92
2.09
2.00
11-Mar-14
0.00
0.00
0.00
0.00
11-Mar-14
5.92
6.08
9.92
2.09
2.00
11-Mar-14
21
21.28
20.72
21.28
34.72
7.32
7.00
1-Apr-14
14
15.20
15.20
14.80
15.20
24.80
5.23
5.00
8-Apr-14
28
30.40
30.40
30.40
29.60
30.40
49.60
10.46
10.00
29-Apr-14
56
63.84
63.84
63.84
63.84
62.16
63.84
104.16
21.97
21.00
24-Jun-14
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
1-Jul-14
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
8-Jul-14
1.44
3.84
9.12
9.12
9.12
9.12
8.88
9.12
14.88
3.14
3.00
14-Jul-14
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
15-Jul-14
21
2.40
6.40
15.20
15.20
15.20
15.20
14.80
15.20
24.80
5.23
5.00
24-Jun-14
63
10.08
26.88
63.84
63.84
63.84
63.84
62.16
63.84
104.16
21.97
21.00
19-Aug-14
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
26-Aug-14
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
2-Sep-14
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
8-Sep-14
2.40
6.40
15.20
15.20
15.20
15.20
14.80
15.20
24.80
5.23
5.00
26-Aug-14
14
2.40
6.40
15.20
15.20
15.20
15.20
14.80
15.20
24.80
5.23
5.00
2-Sep-14
21
0.96
2.56
6.08
6.08
6.08
6.08
5.92
6.08
9.92
2.09
2.00
22-Sep-14
Technical
Manager (12)
Operatation
Integrity
Engineer (31)
Electric &
Reliabilty
Engineer(75)
Instrument &
Control
Engineer(74)
Rotating
Equipment
Reliabilty
Engineer(75)
Safety
Engineer(74)
Lifting
Engineer(74)
Technical
Corrosion assistant/Data
Engineer(74) processor(123
)
1.92
4.96
12.00
11.84
12.00
11.84
11.84
11.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.92
4.96
12.00
11.84
12.00
11.84
9.60
24.80
60.00
59.20
60.00
1.92
4.96
12.00
11.84
30.72
79.36
192.00
1.92
4.96
1.92
Final Submission of Maintenance Job plans for 150 object Object types
Weightage
(out of 100)
for working
Planned Start
Date
Duration
(Days)
19.68
2.00
8-May-14
0.00
0.00
0.00
8-May-14
11.84
11.84
19.68
2.00
8-May-14
21
59.20
59.20
59.20
98.40
10.00
22-May-14
12.00
11.84
11.84
11.84
19.68
2.00
22-May-14
77
189.44
192.00
189.44
189.44
189.44
314.88
32.00
7-Aug-14
12.00
11.84
12.00
11.84
11.84
11.84
19.68
2.00
14-Aug-14
4.96
12.00
11.84
12.00
11.84
11.84
11.84
19.68
2.00
21-Aug-14
1.92
4.96
12.00
11.84
12.00
11.84
11.84
11.84
19.68
2.00
27-Aug-14
4.80
12.40
30.00
29.60
30.00
29.60
29.60
29.60
49.20
5.00
21-Aug-14
70
4.80
12.40
30.00
29.60
30.00
29.60
29.60
29.60
49.20
5.00
30-Oct-14
30.72
79.36
192.00
189.44
192.00
189.44
189.44
189.44
314.88
32.00
6-Nov-14
1.92
4.96
12.00
11.84
12.00
11.84
11.84
11.84
19.68
2.00
13-Nov-14
Final Submission of Maintenace Job plans for 150 object Object types
1.92
4.96
12.00
11.84
12.00
11.84
11.84
11.84
19.68
2.00
19-Nov-14
Activities
100.00
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
9-Jan-14
16-Jan-14
23-Jan-14
30-Jan-14
6-Feb-14
13-Feb-14
20-Feb-14
27-Feb-14
6-Mar-14
13-Mar-14
20-Mar-14
27-Mar-14
3-Apr-14
10-Apr-14
17-Apr-14
24-Apr-14
1-May-14
8-May-14
15-May-14
22-May-14
29-May-14
5-Jun-14
12-Jun-14
19-Jun-14
26-Jun-14
3-Jul-14
10-Jul-14
17-Jul-14
24-Jul-14
W-7
12-Dec-13
W-9
W-6
5-Dec-13
W-10
W-5
28-Nov-13
2-Jan-14
W-4
21-Nov-13
1.00
W-8
W-3
14-Nov-13
1.00
Actual
26-Dec-13
W-2
7-Nov-13
Planned
19-Dec-13
W-1
31-Oct-13
Duration (WKS)
1
0.00
0.00
0.00
Planned
0.00
0
0.00
Actual
6
80.00
60.00
Planned
1.00
1.00
1.00
1.00
1.00
Actual
0.96
0.96
0.96
0.96
0.96
Planned
1.00
1.00
1.00
1.00
Actual
1.05
1.05
1.05
1.05
1.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
Planned
0.00
Actual
8
40.00
40.00
Planned
1.00
1.00
1.00
1.00
1.00
Actual
0.64
0.64
0.64
0.64
0.64
1.00
0.64
0.64
0.64
0.64
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
Planned
Actual
1.00
0.00
0.64
0.00
Planned
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
23
0.00
Actual
1.00
Planned
1.00
0.00
2
0.00
Actual
1.00
Planned
0.00
1
0.00
Actual
1.00
Planned
0.00
1
0.00
Actual
1.00
Planned
1.00
1.00
1.00
1.00
5.00
5
0.00
Actual
0.00
Planned
0.00
0
0.00
Actual
0.00
Planned
0.00
Actual
6
60.00
20.00
Planned
1.00
1.00
Actual
1.80
1.80
Planned
1.00
1.00
1.00
0.60
0.00
0.00
1.00
Planned
Actual
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.60
0.00
1.00
1.00
4
0.00
Actual
Planned
1.00
1.00
1
0.00
Actual
1.00
Planned
1.00
2.00
2
0.00
Actual
1.00
Planned
1.00
2.00
2
0.00
Actual
0.00
Planned
0.00
0
0.00
Actual
0.00
Planned
0
0.00
Actual
1.00
Planned
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
7
0.00
Actual
Planned
1.00
7
0.00
Actual
Planned
2.00
5
0.00
Actual
Planned
2.00
6
0.00
Actual
Planned
2.00
6
0.00
Actual
Planned
5.00
5
0.00
Actual
Planned
5.00
5
0.00
Actual
Planned
1.00
6.00
6
0.00
Actual
0.00
Planned
0.00
Actual
Planned
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12.00
12
0.00
Actual
Planned
1.00
1.00
7.00
14
0.00
Actual
1.00
Planned
1.00
0.00
2
0.00
Actual
1.00
Planned
0.00
1
0.00
Actual
1.00
Planned
1.00
0.00
2
0.00
Actual
1.00
Planned
1.00
0.00
2
0.00
Actual
0.00
Planned
0.00
0
0.00
Actual
0.00
Planned
0
0.00
Actual
Planned
1.00
1.00
1.00
3.00
3
0.00
Actual
Planned
1.00
1.00
1.00
3.00
3
0.00
Actual
Planned
1.00
1.00
1.00
3.00
3
0.00
Actual
Planned
1.00
1.00
2.00
2
0.00
Actual
1.00
Planned
0.00
1
0.00
Actual
1.00
Planned
0.00
1
0.00
Actual
1.00
Planned
1.00
0.00
2
0.00
Actual
0.00
Planned
0.00
0
0.00
Actual
0.00
Planned
0.00
Actual
Planned
1.00
1.00
2.00
2
0.00
Actual
Planned
1.00
1.00
2.00
2
0.00
Actual
Planned
1.00
1.00
1.00
1.00
2.00
2
0.00
Actual
Planned
2.00
2
0.00
Actual
Planned
1.00
1.00
1.00
1.00
2.00
2
0.00
Actual
Planned
0.00
2
0.00
Actual
Planned
1.00
0.00
1
0.00
Actual
Planned
1.00
1.00
0.00
2
0.00
Actual
Planned
1.00
0.00
1
0.00
Actual
1.00
Planned
1.00
1
0.00
Actual
0.00
Planned
0
0.00
Actual
Planned
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
8
0.00
Actual
Planned
5.00
8
Actual
0.00
1-May-14 W-27
7-May-14
3-Apr-14 W-23
9-Apr-14
27-Feb-14 W-18
5-Mar-14
6-Feb-14 W-15
12-Feb-14
30-Jan-14 W-14
5-Feb-14
23-Jan-14 W-13
1.00
29-Jan-14
1.00
16-Jan-14 W-12
1.00
1.20
22-Jan-14
1.00
1.20
9-Jan-14 W-11
1.00
1.20
15-Jan-14
1.00
2-Jan-14 W-10
1.00
8-Jan-14
1.00
26-Dec-13 W-9
1.00
1.02
1.00
1.28
1-Jan-14
1.00
1.02
1.00
1.28
1.00
1.02
1.00
1.28
11-Dec-13
W-6
1.00
1.02
1.00
1.28
5-Dec-13
W-2
31-Oct-13 W-1
6-Nov-13
13-Nov-13 7-Nov-13
Duration (WKS)
Activities
Mandays
Project kick off Meeting
100
85
85
0
30
12
8
6
6
6
11
Electronic marking of CUI/PFP, including WHRU (Inlet and outlet Gas Ducts) and Gas
1.12
Turbine exhaust ducts on Isometric drawings
1.13 Electronic marking of Chemical Injection and Mix Point Injection, on Isometric drawings
9
9
0
12
10
3.00 Identify the Risk Rating/ Criticality for each of the Corrosion Loop
5.20 Final reviews and Validation as per agreed correction (if any)
0
205.00
423831
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
1.00
1.02
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3.00
3.00
3.00
3.00
5.00
1.00
0.00
0.00
0.00
2.00
3.00
3.00
6.00
8.00
8.00
8.00
0.00
1.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4.00
#REF!
#REF!
0.00
5.00
0.00
7.00
0.00
6.00
0.00
6.00
0.00
2.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
0.00
5.00
0.00
1.00
0.00
1.00
0.00
2.00
0.00
1.00
0.00
2.00
2.00
2.02
2.02
0.98
0.99
2.00
4.00
2.30
4.32
0.98
1.12
3.00
7.00
3.50
7.81
1.46
1.70
3.00
10.00
3.50
11.31
1.46
1.70
3.00
13.00
3.50
14.80
1.46
1.70
4.00
17.00
0.00
14.80
1.95
0.00
3.00
20.00
0.00
14.80
1.46
0.00
2.00
22.00
0.00
14.80
0.98
0.00
4.00
26.00
0.00
14.80
1.95
0.00
4.00
30.00
0.00
14.80
1.95
0.00
5.00
35.00
0.00
14.80
2.44
0.00
5.00
40.00
0.00
14.80
2.44
0.00
8.00
48.00
0.00
14.80
3.90
0.00
14.00
62.00
0.00
14.80
6.83
0.00
14.00
76.00
0.00
14.80
6.83
0.00
15.00
91.00
0.00
14.80
7.32
0.00
15.00
106.00
0.00
14.80
7.32
0.00
16.00
122.00
0.00
14.80
7.80
0.00
13.00
135.00
0.00
14.80
6.34
0.00
11.00
146.00
0.00
14.80
5.37
0.00
12.00
158.00
0.00
14.80
5.85
0.00
10.00
168.00
0.00
14.80
4.88
0.00
6.00
174.00
0.00
14.80
2.93
0.00
6.00
180.00
0.00
14.80
2.93
0.00
6.00
186.00
0.00
14.80
2.93
0.00
6.00
192.00
0.00
14.80
2.93
0.00
5.00
197.00
0.00
14.80
2.44
0.00
4.00
201.00
0.00
14.80
1.95
0.00
2.00
203.00
0.00
14.80
0.98
0.00
2.00
205.00
0.00
14.80
0.98
0.00
0.00
0.00
205.00
14.80
Activities
Technical
Manager (2
days)
Operatation
Integrity
Engineer (7
days)
Corrosion
Engineer (54
days)
Technical
Assistant/Data Weightage (out
Processor (116
of 100) for
days)
working
Planned Start
Date
Duration
(Days)
Planned Finish
Date
Actual Start Actual Finish
Date
Date
% age
Progress
per
per
per
deliverable
deliverable
deliverable
cost (Paste
cost
%age
value)
Duration
(WKS)
W-4
2-Jun-14 W-12
9-Jun-14 W-13
8-Jun-14
15-Jun-14
6-Jul-14
30-Jun-14 W-16
######## W-11
1-Jun-14
13-Apr-14 7-Apr-14
Weightage
W-6
W-5
W-4
Weightage
Duration
(WKS)
per
per
per
deliverable
deliverable
deliverable
cost (Paste
cost
%age
value)
1-Sep-14 W-7
% age
Progress
########
Actual
Finish Date
7-Sep-14
Actual
Start Date
########
Planned Finish
Date
31-Aug-14
Duration
(Days)
########
Planned Start
Date
24-Aug-14
Weightage
(out of 100)
for working
17-Aug-14
Technical
InspectionEngi Assistant/Dat
neer (46 days) a Processor
(101 days)
Operatation
Integrity
Engineer (6
days)
Technical
Manager (2
days)
Activities
1.00
1.00
1.00
1.00
1.00
1.00
1.00
W52
W51
W50
W49
W48
W47
W46
W45
W44
W43
1.00
29-Oct-14 23-Oct-14
1.00
W42
W41
1.00
22-Oct-14 16-Oct-14
1.00
W40
W39
1.00
15-Oct-14 9-Oct-14
1.00
2-Oct-14
1.00
8-Oct-14
1.00
1-Oct-14 25-Sep-14
1.00
24-Sep-14 18-Sep-14
1.00
17-Sep-14 11-Sep-14
1.00
10-Sep-14 4-Sep-14
1.00
3-Sep-14 28-Aug-14
1.00
27-Aug-14 21-Aug-14
1.00
20-Aug-14 14-Aug-14
1.00
W38
W37
W36
W35
W34
W33
W32
W31
W30
W29
W28
W27
1.00
13-Aug-14 7-Aug-14
1.00
6-Aug-14 31-Jul-14
1.00
30-Jul-14 24-Jul-14
1.00
23-Jul-14 17-Jul-14
1.00
16-Jul-14 10-Jul-14
1.00
3-Jul-14
1.00
9-Jul-14
1.00
2-Jul-14 26-Jun-14
1.00
25-Jun-14 19-Jun-14
1.00
18-Jun-14 12-Jun-14
1.00
11-Jun-14 5-Jun-14
1.00
4-Jun-14 ########
1.00
######## ########
1.00
######## ########
1.00
######## 8-May-14
1.00
7-May-14 1-May-14
W26
30-Apr-14 24-Apr-14
W25
23-Apr-14 17-Apr-14
W24
16-Apr-14 10-Apr-14
W23
1.00
3-Apr-14
9-Apr-14
W22
2-Apr-14 ########
W21
######## ########
W20
######## ########
W19
######## 6-Mar-14
W18
5-Mar-14 27-Feb-14
W17
26-Feb-14 20-Feb-14
W16
19-Feb-14 13-Feb-14
W15
12-Feb-14 6-Feb-14
W14
5-Feb-14 30-Jan-14
W13
1.00
29-Jan-14 23-Jan-14
1.00
W12
1.00
22-Jan-14 16-Jan-14
1.00
W11
1.00
15-Jan-14 9-Jan-14
0.90
W10
0.90
2-Jan-14
0.90
8-Jan-14
0.56
1.00
0.56
1.00
0.56
1.00
0.56
1.00
Duration (WKS)
Activities
1.00
1.00
Mandays
1 Kick off meeting
Collection of relevant piping isometrics,
2
equipment GA drawings and P&IDs
Evaluation of present piping isos & Equipment
3
GA drawings
Conversion of provided drawings into Autocad
4
(if not available) (Part-1 & Part 2)
100
70
60
18
12
11
12
18
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
0.56
1.00
0.36
0.36
0.36
0.90
1.00
1.00
0.36
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
8.00
24.00
24.00
24.00
24.00
96.00
0.16
0.16
0.48
0.48
0.48
0.48
1.92
2.00
17-Mar-14
24-Mar-14
0.80
0.80
2.40
2.40
2.40
2.40
9.60
10.00
17-Mar-14
14
31-Mar-14
0.16
0.16
0.48
0.48
0.48
0.48
1.92
2.00
24-Mar-14
31-Mar-14
0.96
0.96
2.88
2.88
2.88
2.88
11.52
12.00
24-Mar-14
21
14-Apr-14
0.96
0.96
2.88
2.88
2.88
2.88
11.52
12.00
7-Apr-14
21
28-Apr-14
0.48
0.48
1.44
1.44
1.44
1.44
5.76
6.00
21-Apr-14
14
5-May-14
0.32
0.32
0.96
0.96
0.96
0.96
3.84
4.00
28-Apr-14
5-May-14
Submission of draft Inspection Work Pack with Inspection Drawings for 14"
Oil Pipeline to Client
0.48
0.48
1.44
1.44
1.44
1.44
5.76
6.00
5-May-14
14
19-May-14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12-May-14
14
26-May-14
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25-May-14
21
15-Jun-14
11
0.16
0.16
0.48
0.48
0.48
0.48
1.92
2.00
15-Jun-14
15-Jun-14
12
0.16
0.16
0.48
0.48
0.48
0.48
1.92
2.00
28-Apr-14
5-May-14
13
0.96
0.96
2.88
2.88
2.88
2.88
11.52
12.00
28-Apr-14
21
19-May-14
14
0.96
0.96
2.88
2.88
2.88
2.88
11.52
12.00
12-May-14
21
2-Jun-14
15
0.48
0.48
1.44
1.44
1.44
1.44
5.76
6.00
26-May-14
14
9-Jun-14
16
0.32
0.32
0.96
0.96
0.96
0.96
3.84
4.00
2-Jun-14
9-Jun-14
17
Submission of draft Inspection Work Pack with Inspection Drawings for 24"
Gas Pipeline to Client
0.48
0.48
1.44
1.44
1.44
1.44
5.76
6.00
9-Jun-14
14
23-Jun-14
18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16-Jun-14
14
30-Jun-14
19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23-Jun-14
14
7-Jul-14
20
0.16
0.16
0.48
0.48
0.48
0.48
1.92
2.00
6-Jul-14
6-Jul-14
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
#DIV/0!
100.00
0.00
100.00
#DIV/0!
1180
2.78
3541
8.33
3541
8.33
2361
5.56
1180
2.78
2361
5.56
2361
5.56
3541
8.33
0.00
23609
56
1180
2.78
3541
8.33
3541
8.33
2361
5.56
1180
2.78
2361
5.56
2361
5.56
2361
5.56
0.00
18887
44
1.00
W-11
W-10
W-4
W-3
W-2
W-9
1.00
30-Jun-14 W-16
5.56
6-Jul-14
2361
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
2.78
2-Jun-14 W-12
1180
8-Jun-14
Weightage
########
Duration
(WKS)
1-Jun-14
per
per
per
deliverable
deliverable
deliverable
cost (Paste
cost
%age
value)
######## ########
% age
Progress
######## ########
8.00
Actual
Actual
Start Date Finish Date
5-May-14 W-8
Planned Finish
Date
########
Duration
(Days)
Planned Start
Date
Weightage
(out of 100)
for working
Technical
Assistant/Dat
a Processor
(12 days)
13-Apr-14 7-Apr-14
Pipeline RBI
Engineer (3
Days)
########
Corrosion
Engineer (3
days)
6-Apr-14
Pipeline RBI
Engineer (3
Days)
########
Corrosion
Engineer (3
days)
30-Mar-14
Operatation
Integrity
Engineer (1
days)
########
W-1
Manhours
Technical
Manager (1
days)
23-Mar-14
Activities
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
W24
11-May-14
17-May-14
W23
4-May-14
10-May-14
W22
27-Apr-14
3-May-14
W21
20-Apr-14
26-Apr-14
W20
13-Apr-14
19-Apr-14
W19
6-Apr-14
12-Apr-14
W18
30-Mar-14
5-Apr-14
W17
23-Mar-14
29-Mar-14
W16
16-Mar-14
22-Mar-14
W15
9-Mar-14
15-Mar-14
W14
2-Mar-14
8-Mar-14
W13
23-Feb-14
1-Mar-14
W12
16-Feb-14
22-Feb-14
W11
9-Feb-14
15-Feb-14
W10
2-Feb-14
8-Feb-14
W-9
26-Jan-14
1-Feb-14
W-8
19-Jan-14
25-Jan-14
W-7
12-Jan-14
18-Jan-14
W-6
5-Jan-14
11-Jan-14
W-5
29-Dec-13
4-Jan-14
W-4
22-Dec-13
28-Dec-13
W-3
15-Dec-13
21-Dec-13
W-2
8-Dec-13
1.20
14-Dec-13
W-1
1.00
1-Dec-13
Weightage
7-Dec-13
Activities
Manhours
1
0.00
0.00
Planned
1.00
1.00
Actual
1.00
1.00
Planned
0.00
Actual
2
2.00
3.00
3.00
2.41
3.61
0.00
Planned
1.00
Actual
1.00
Planned
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
Actual
2.00
3.61
2.41
0.00
Planned
1.00
Actual
1.00
3.00
1.00
Planned
1.00
1.00
2.00
Actual
6
2.00
2.41
0.00
Planned
1.00
1.00
1.00
1.00
2.00
Actual
2.00
2.00
2.00
2.41
0.00
Planned
2.00
Actual
2.41
0.00
Planned
1.00
1.00
1.00
1.00
2.00
Actual
2.41
0.00
Planned
2.00
Actual
10
2.00
2.41
0.00
Planned
1.00
1.00
2.00
Actual
11
2.00
12
2.00
13
2.41
0.00
Planned
1.00
1.00
1.00
1.00
2.00
Actual
2.41
0.00
Planned
2.00
Actual
1.00
1.20
0.00
Planned
1.00
1.00
Actual
14
2.00
2.41
0.00
Planned
1.00
1.00
2.00
Actual
15
2.00
2.41
0.00
Planned
1.00
1.00
2.00
Actual
16
0.00
0.00
0.00
Planned
0.00
0.00
Actual
17
18
19
4.00
0.00
Planned
1.00
1.00
1.00
1.00
4.00
Actual
1.00
0.00
4.82
1.20
0.00
Planned
1.00
1.00
Actual
0.00
0.00
0.00
0.00
Planned
0.00
0.00
Actual
0.00
Planned
0.00
Actual
20
21
22
23
24
25
26
27
4.00
1.00
0.00
Planned
1.00
1.00
1.00
1.00
4.00
Actual
1.20
0.00
Planned
1.00
1.00
Actual
3.00
4.00
3.61
0.00
Planned
1.00
1.00
1.00
3.00
Actual
4.82
0.00
Planned
1.00
1.00
1.00
1.00
4.00
Actual
1.00
3.00
3.00
4.82
1.20
0.00
Planned
1.00
1.00
Actual
3.61
0.00
Planned
1.00
1.00
1.00
2.00
Actual
3.61
0.00
Planned
1.00
1.00
1.00
0.00
Actual
1.00
1.20
0.00
Planned
1.00
0.00
Actual
28
2.00
2.41
0.00
Planned
1.00
1.00
2.00
Actual
29
2.00
2.41
0.00
Planned
1.00
1.00
2.00
Actual
30
0.00
0.00
0.00
Planned
0.00
0.00
Actual
Stage 3 SIL Verification and Analysis
0.00
0.00
0.00
Planned
0.00
Actual
31
32
33
34
35
3.00
3.61
0.00
Planned
1.00
1.00
1.00
2.00
Actual
2.00
2.41
0.00
Planned
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
Actual
3.00
3.61
0.00
Planned
0.00
Actual
4.00
1.00
4.82
0.00
Planned
1.00
1.00
0.00
Actual
1.20
0.00
Planned
1.00
0.00
Actual
36
2.00
2.41
0.00
Planned
1.00
1.00
0.00
Actual
37
2.00
2.41
0.00
Planned
1.00
1.00
0.00
Actual
38
0.00
0.00
0.00
Planned
0.00
0.00
Actual
39
40
3.00
2.00
3.61
0.00
Planned
1.00
1.00
1.00
0.00
Actual
2.41
0.00
Planned
1.00
1.00
0.00
Actual
41
2.00
2.41
0.00
Planned
1.00
1.00
Actual
42
0.00
83.00
0.00
0.00
0.00
Planned
0.00
0.00
83.00
Actual
0.00
3.00
3.00
3.00
4.00
2.00
4.00
5.00
6.00
8.00
5.00
4.00
3.00
2.00
2.00
3.00
3.00
4.00
3.00
2.00
2.00
4.00
4.00
3.00
1.00
3.00
6.00
9.00
13.00
15.00
19.00
24.00
30.00
38.00
43.00
47.00
50.00
52.00
54.00
57.00
60.00
64.00
67.00
69.00
71.00
75.00
79.00
82.00
83.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
Planned Progress %
3.61
3.61
3.61
4.82
2.41
4.82
6.02
7.23
9.64
6.02
4.82
3.61
2.41
2.41
3.61
3.61
4.82
3.61
2.41
2.41
4.82
4.82
3.61
1.20
Actual Progress %
3.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
100
70
100
60
100
1
0
10
11
Identification of Gaps
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
81
1.00
1.00
1.00
1.00
1.00
1.00
W-25
17-Apr-14
23-Apr-14
W-24
10-Apr-14
W-23
3-Apr-14
W-22
27-Mar-14
W-21
20-Mar-14
W-20
13-Mar-14
W-19
6-Mar-14
W-18
W-17
20-Feb-14
W-16
13-Feb-14
27-Feb-14
5-Mar-14
1.00
26-Feb-14
1.00
19-Feb-14
W-15
6-Feb-14
W-14
30-Jan-14
W-13
23-Jan-14
W-12
16-Jan-14
22-Jan-14
W-11
9-Jan-14
15-Jan-14
W-10
2-Jan-14
8-Jan-14
W-9
26-Dec-13
1-Jan-14
W-8
19-Dec-13
25-Dec-13
W-7
12-Dec-13
18-Dec-13
W-6
5-Dec-13
11-Dec-13
W-5
28-Nov-13
4-Dec-13
W-4
21-Nov-13
27-Nov-13
W-3
14-Nov-13
20-Nov-13
W-2
7-Nov-13
13-Nov-13
1.00
16-Apr-14
9-Apr-14
2-Apr-14
26-Mar-14
19-Mar-14
Mob / De-mob
12-Mar-14
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
12-Feb-14
5-Feb-14
100
29-Jan-14
Manhours
Kick off meeting would be arranged in KPOC office
and this meeting would be attended by Velosi project
31-Oct-13
W-1
1
6-Nov-13
Activities
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
0.1750
1.00
1.00
Actual
0.1750
0.1750
0.1750
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.47
2.47
3.00
5.00
2.18
4.18
3.70
2.69
1.00
6.00
1.18
5.35
1.23
1.45
1.00
7.00
1.18
6.53
1.23
1.45
1.00
8.00
1.18
7.70
1.23
1.45
1.00
9.00
0.00
7.70
1.23
0.00
1.00
10.00
0.00
7.70
1.23
0.00
1.00
11.00
0.00
7.70
1.23
0.00
1.00
12.00
0.00
7.70
1.23
0.00
2.00
14.00
0.00
7.70
2.47
0.00
2.00
16.00
0.00
7.70
2.47
0.00
2.00
18.00
0.00
7.70
2.47
0.00
1.00
19.00
0.00
7.70
1.23
0.00
1.00
20.00
0.00
7.70
1.23
0.00
1.00
21.00
0.00
7.70
1.23
0.00
2.00
23.00
0.00
7.70
2.47
0.00
2.00
25.00
0.00
7.70
2.47
0.00
2.00
27.00
0.00
7.70
2.47
0.00
1.00
28.00
0.00
7.70
1.23
0.00
1.00
29.00
0.00
7.70
1.23
0.00
1.00
30.00
0.00
7.70
1.23
0.00
1.00
31.00
0.00
7.70
1.23
0.00
1.00
32.00
0.00
7.70
1.23
0.00
1.00
33.00
0.00
7.70
1.23
0.00
2.00
35.00
0.00
7.70
2.47
0.00
0.00
17
26.15
1.54
3.08
3.08
0.00
0.00
17
26.15
1.54
3.08
3.08
0.00
65
100.00
21
1.00
######### W-25
1.00
######### W-24
1.00
29-Mar-14 W-17
1.00
W-9
1.00
######### W-23
0.00
1.00
3-May-14 W-22
1.00
26-Apr-14 W-21
3.08
1.00
19-Apr-14 W-20
1.00
12-Apr-14 W-19
1.00
5-Apr-14 W-18
3.08
1.00
22-Mar-14 W-16
1.00
15-Mar-14 W-15
8-Mar-14 W-14
1.54
1-Mar-14 W-13
22-Feb-14 W-12
21.54
15-Feb-14 W-11
14
8-Feb-14 W-10
0.00
1-Feb-14
25-Jan-14 W-8
18-Jan-14 W-7
1.54
11-Jan-14 W-6
W-5
4-Jan-14
0.00
28-Dec-13 W-4
21-Dec-13 W-3
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
14-Dec-13 W-2
1.54
W-1
Weightage
Manhours
7-Dec-13
Duration Weeks
new
Activities
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 1.00
2.00
19.00
0.00
0.00
3.08
0.00
3.00
22.00
0.00
0.00
4.62
0.00
2.00
24.00
0.00
0.00
3.08
0.00
1.00
25.00
0.00
0.00
1.54
0.00
1.00
26.00
0.00
0.00
1.54
0.00
1.00
27.00
0.00
0.00
1.54
0.00
1.00
28.00
0.00
0.00
1.54
0.00
1.00
29.00
0.00
0.00
1.54
0.00
1.00
30.00
0.00
0.00
1.54
0.00
1.00
31.00
0.00
0.00
1.54
0.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
3.00
3.00
0.00
0.00
4.62
0.00
1.00
4.00
0.00
0.00
1.54
0.00
1.00
5.00
0.00
0.00
1.54
0.00
1.00
6.00
0.00
0.00
1.54
0.00
1.00
7.00
0.00
0.00
1.54
0.00
1.00
8.00
0.00
0.00
1.54
0.00
1.00
12.00
0.00
0.00
1.54
0.00
1.00
13.00
0.00
0.00
1.54
0.00
1.00
14.00
0.00
0.00
1.54
0.00
1.00
15.00
0.00
0.00
1.54
0.00
2.00
17.00
0.00
0.00
3.08
0.00
1.00
####
0.00
0.00
1.54
0.00
W-22
########
W-21
3-Apr-14 W-23
9-Apr-14
2-Apr-14
######## ########
W-20
######## ########
6-Mar-14 W-19
########
2-Jan-14 W-10
8-Jan-14
W-5
########
W-4
4-Dec-13
######## ########
W-3
######## ########
7-Nov-13 W-2
########
Duration (WKS)
Activities
Manhours
Operation Manual for Oil Transporation Pipeline
1 Kick-Off Meeting
100.0
1.0
0.0
3 Data Collection
90.0
2.0
90.0
1.0
0.0
90.0
1.5
0.5
0.0
0.5
0.5
0.5
0.8
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
21 Disciplinary Check
0.5
22 Inter-disciplinary Check
0.5
23 Final QA/QC
0.5
0.3
2.0
0.0
2.0
28 Disciplinary Check
0.3
29 Inter-disciplinary Check
0.3
30 Final QA/QC
0.3
0.3
32 Step-6:Final Submission
0.0
0.5
0.5
100.0
1.0
0.0
37 Data Collection
90.0
2.0
90.0
1.0
0.0
90.0
1.5
0.5
0.0
0.5
0.5
0.5
0.8
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
55 Disciplinary Check
0.5
56 Inter-disciplinary Check
0.5
57 Final QA/QC
0.5
0.3
2.0
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
1.00
1.00
1.00
0.36
1.00
0.36
0.36
1.00
0.32
0.36
0.36
0.32
0.32
1.00
0.68
0.50
0.68
0.50
0.50
0.50
0.50
0.50
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
1.00
1.00
1.00
1.00
0.25
0.25
0.25
0.25
0.50
0.50
1.00
1.00
1.00
0.36
1.00
0.36
0.36
1.00
0.32
0.36
0.36
0.32
0.32
1.00
0.68
0.50
0.68
0.50
0.50
0.50
0.50
0.50
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
0.25
0.50
0.25
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.25
0.00
0.25
0.00
0.25
0.00
0.25
0.00
0.00
0.00
#REF!
0.00
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31-May-14
14-Jun-14
21-Jun-14
21-Jun-14
23-Aug-14
23-Aug-14
6-Sep-14
13-Sep-14
13-Sep-14
8-Nov-14
8-Nov-14
22-Nov-14
W-9
W-5
31-May-14
29-Mar-14
29-Mar-14
29-Mar-14
15-Mar-14
8-Mar-14
4-Jan-14
4-Jan-14
1-Feb-14
7-Feb-14
21-Dec-13
7-Dec-13
4-Jan-14
10-Jan-14
30-Jan-14
7-Dec-13
Activities
2.00
20.00
0.00
0.00
3.28
0.00
2.00
22.00
0.00
0.00
3.28
0.00
1.00
23.00
0.00
0.00
1.64
0.00
1.00
24.00
0.00
0.00
1.64
0.00
1.00
25.00
0.00
0.00
1.64
0.00
1.00
26.00
0.00
0.00
1.64
0.00
1.00
27.00
0.00
0.00
1.64
0.00
1.00
28.00
0.00
0.00
1.64
0.00
1.00
####
0.00
0.00
1.64
0.00
Manhours
61
0.00
1
1
1
2.00
2.00
0.00
0.00
3.28
0.00
1.00
3.00
0.00
0.00
1.64
0.00
2.00
5.00
0.00
0.00
3.28
0.00
1.00
6.00
0.00
0.00
1.64
0.00
1.00
7.00
0.00
0.00
1.64
0.00
1.00
8.00
0.00
0.00
1.64
0.00
1.00
12.00
0.00
0.00
1.64
0.00
1.00
13.00
0.00
0.00
1.64
0.00
1.00
14.00
0.00
0.00
1.64
0.00
1.00
15.00
0.00
0.00
1.64
0.00
1.00
16.00
0.00
0.00
1.64
0.00
1.00
17.00
0.00
0.00
1.64
0.00
1.00
18.00
0.00
0.00
1.64
0.00
Main Activities
Provision of Technical Coordinators(CTR-14)
Mobilization for Engineers
Plan
Start
31-Oct-13
31-Oct-13
Plan End
27-Nov-14
27-Nov-14
Actual
Start
Activity
Actual Plan
End Duratio
n
52 wks
52 wks
%
Comple
tion
Planned
Actual
Sum
100
52.00
#DIV/0!
Planned Progress Weekly
Actual Progress Weekly
Planned Commulative Progress
Actual Commulative Progress
Planned Progress %
Actual Progress %
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.92
1.92
1.00
1.00
2.00
2.00
1.92
1.92
1.00
1.00
3.00
3.00
1.92
1.92
1.00
1.00
4.00
4.00
1.92
1.92
10
11
12
13
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
5.00
1.92
1.92
1.00
6.00
5.00
1.92
0.00
1.00
7.00
5.00
1.92
0.00
1.00
8.00
5.00
1.92
0.00
1.00
9.00
5.00
1.92
0.00
1.00
10.00
5.00
1.92
0.00
1.00
11.00
5.00
1.92
0.00
1.00
12.00
5.00
1.92
0.00
1.00
13.00
5.00
1.92
0.00
14
15
16
17
18
19
20
21
22
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
14.00
5.00
1.92
0.00
1.00
15.00
5.00
1.92
0.00
1.00
16.00
5.00
1.92
0.00
1.00
17.00
5.00
1.92
0.00
1.00
18.00
5.00
1.92
0.00
1.00
19.00
5.00
1.92
0.00
1.00
20.00
5.00
1.92
0.00
1.00
21.00
5.00
1.92
0.00
1.00
22.00
5.00
1.92
0.00
23
24
25
26
27
28
29
30
31
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
23.00
5.00
1.92
0.00
1.00
24.00
5.00
1.92
0.00
1.00
25.00
5.00
1.92
0.00
1.00
26.00
5.00
1.92
0.00
1.00
27.00
5.00
1.92
0.00
1.00
28.00
5.00
1.92
0.00
1.00
29.00
5.00
1.92
0.00
1.00
30.00
5.00
1.92
0.00
1.00
31.00
5.00
1.92
0.00
32
33
34
35
36
37
38
39
40
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
32.00
5.00
1.92
0.00
1.00
33.00
5.00
1.92
0.00
1.00
34.00
5.00
1.92
0.00
1.00
35.00
5.00
1.92
0.00
1.00
36.00
5.00
1.92
0.00
1.00
37.00
5.00
1.92
0.00
1.00
38.00
5.00
1.92
0.00
1.00
39.00
5.00
1.92
0.00
1.00
40.00
5.00
1.92
0.00
41
42
43
44
45
46
47
48
49
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
41.00
5.00
1.92
0.00
1.00
42.00
5.00
1.92
0.00
1.00
43.00
5.00
1.92
0.00
1.00
44.00
5.00
1.92
0.00
1.00
45.00
5.00
1.92
0.00
1.00
46.00
5.00
1.92
0.00
1.00
47.00
5.00
1.92
0.00
1.00
48.00
5.00
1.92
0.00
1.00
49.00
5.00
1.92
0.00
50
51
52
1.00
1.00
1.00
1.00
50.00
5.00
1.92
0.00
1.00
51.00
5.00
1.92
0.00
1.00
52.00
5.00
1.92
0.00
CTR
Start
End
CTR-1A
CTR-1B
CTR-2A
CTR-2B
CTR-3A
4.17
3.42
4.17
3.42
4.55
3.73
4.55
3.73
2.30
1.33
2.08
1.33
2.08
1.33
2.27
1.45
2.27
1.45
2.30
2.77
2.08
1.33
2.08
1.33
2.27
1.45
2.27
1.45
1.15
2.77
4.17
3.83
4.17
3.83
4.55
3.73
4.55
3.73
1.15
2.77
2.08
3.83
2.08
3.83
2.27
3.73
2.27
3.73
1.15
2.77
1.28
1.38
0.98
0.99
1.28
1.40
0.98
1.12
1.28
1.40
1.46
1.70
1.70
2.42
1.46
1.70
1.70
2.42
1.46
1.70
2.90
2.26
1.45
2.64
1.45
2.64
1.45
2.64
1.45
2.64
CTR-3B
CTR-3C
CTR-4
CTR-5
CTR-6A
CTR-6B
CTR-6C
CTR-6D
CTR-7
CTR-8
2.47
2.47
3.70
2.69
1.23
1.45
1.23
1.45
3.61
3.61
1.23
1.45
10.00
6.80
5.00
1.80
5.00
3.38
5.00
6.76
5.00
6.76
0.00
0.00
1.92
1.92
0.00
0.00
1.92
1.92
0.00
0.00
1.92
1.92
0.00
0.00
1.92
1.92
0.00
0.00
1.92
1.92
39.27
31.44
39.27
25.34
19.91
64.61
22.21
20.85
86.81
31.35
34.79
118.16
26.25
38.40
144.41
CTR-9
CTR-11
CTR-12
CTR-13
CTR-14
Overall Plan
Overall Achieved
Overall Commulative Plan
10
11
12
13
14
4.17
0.00
4.17
0.00
2.27
0.00
2.27
0.00
2.30
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
4.17
0.00
4.17
0.00
6.82
0.00
6.82
0.00
1.15
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
6.25
0.00
6.25
0.00
2.27
0.00
2.27
0.00
2.30
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
1.70
0.00
1.95
0.00
2.13
0.00
1.46
0.00
2.13
0.00
0.98
0.00
1.70
0.00
1.95
0.00
1.28
0.00
1.95
0.00
1.28
0.00
2.44
0.00
1.70
0.00
2.44
0.00
1.70
0.00
3.90
0.00
1.70
0.00
6.83
0.00
1.45
0.00
1.45
0.00
1.45
0.00
2.90
0.00
2.90
0.00
1.45
0.00
1.45
0.00
1.45
0.00
1.45
0.00
3.61
0.00
1.23
0.00
4.62
0.00
5.00
0.00
3.28
0.00
0.00
0.00
1.92
0.00
3.61
0.00
1.23
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
4.82
0.00
1.23
0.00
1.54
0.00
5.00
0.00
3.28
0.00
0.00
0.00
1.92
0.00
2.41
0.00
1.23
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
4.82
0.00
2.47
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
6.02
0.00
2.47
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
7.23
0.00
2.47
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
9.64
0.00
1.23
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
6.02
0.00
1.23
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
36.67
0.00
181.08
36.92
0.00
218.00
37.64
0.00
255.64
41.78
0.00
297.42
40.45
0.00
337.87
40.69
0.00
378.56
42.32
0.00
420.89
45.73
0.00
466.62
44.27
0.00
510.89
145.38
145.38
145.38
145.38
10.05978 12.11115 14.20235 16.52328
145.38
145.38
145.38
145.38
145.38
18.7705 21.03124 23.38256 25.92327 28.38297
15
16
17
18
19
20
21
22
23
6.25
0.00
6.25
0.00
4.55
0.00
4.55
0.00
2.30
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
2.08
0.00
2.08
0.00
4.55
0.00
4.55
0.00
1.15
0.00
4.17
0.00
4.17
0.00
6.82
0.00
6.82
0.00
3.45
0.00
4.17
0.00
4.17
0.00
4.55
0.00
4.55
0.00
1.15
0.00
7.14
0.00
6.25
0.00
6.25
0.00
2.27
0.00
2.27
0.00
3.45
0.00
2.38
0.00
8.33
0.00
8.33
0.00
4.55
0.00
4.55
0.00
2.30
0.00
2.38
0.00
4.17
0.00
4.17
0.00
6.82
0.00
6.82
0.00
3.45
0.00
2.38
0.00
2.08
0.00
2.08
0.00
4.55
0.00
4.55
0.00
2.30
0.00
4.76
0.00
0.85
0.00
6.83
0.00
1.28
0.00
7.32
0.00
2.13
0.00
7.32
0.00
3.40
0.00
7.80
0.00
2.55
0.00
6.34
0.00
2.98
0.00
5.37
0.00
5.88
0.00
2.55
0.00
5.85
0.00
8.82
0.00
4.26
0.00
4.88
0.00
2.94
0.00
4.26
0.00
2.93
0.00
5.88
0.00
1.45
0.00
1.45
0.00
1.45
0.00
1.45
0.00
1.45
0.00
4.82
0.00
1.23
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.61
0.00
2.47
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
2.41
0.00
2.47
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
2.41
0.00
2.47
0.00
1.54
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.61
0.00
1.23
0.00
3.08
0.00
5.00
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.45
0.00
5.56
0.00
3.61
0.00
1.23
0.00
3.08
0.00
1.45
0.00
8.33
0.00
4.82
0.00
1.23
0.00
4.62
0.00
1.45
0.00
2.78
0.00
3.61
0.00
1.23
0.00
3.08
0.00
1.45
0.00
5.56
0.00
2.41
0.00
1.23
0.00
1.54
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.28
0.00
0.00
0.00
1.92
0.00
3.28
0.00
0.00
0.00
1.92
0.00
47.53
0.00
558.43
43.16
0.00
601.59
38.64
0.00
640.23
51.42
0.00
691.65
50.91
0.00
742.56
53.96
0.00
796.51
70.04
0.00
866.56
53.95
0.00
920.51
47.49
0.00
968.00
145.38
145.38
31.02379 33.42166
145.38
145.38
145.38
145.38
145.38
145.38
145.38
35.5684 38.42488 41.25319 44.25072 48.14197 51.13917 53.77769
24
25
26
4.17
0.00
4.17
0.00
2.27
0.00
2.27
0.00
2.30
0.00
2.38
0.00
1.15
0.00
2.38
0.00
1.15
0.00
4.76
0.00
5.96
0.00
2.93
0.00
2.94
0.00
5.11
0.00
2.93
0.00
5.88
0.00
1.45
0.00
2.78
0.00
2.41
0.00
1.23
0.00
1.54
0.00
27
28
29
30
31
32
5.53
0.00
2.93
0.00
11.76
0.00
1.15
0.00
2.38
0.00
9.09
0.00
5.53
0.00
2.44
0.00
5.88
0.00
1.15
0.00
2.38
0.00
3.03
0.00
3.40
0.00
1.95
0.00
11.76
0.00
1.15
0.00
2.38
0.00
9.09
0.00
2.13
0.00
0.98
0.00
5.88
0.00
1.15
0.00
2.38
0.00
3.03
0.00
2.13
0.00
0.98
0.00
8.82
0.00
1.15
0.00
2.38
0.00
3.03
0.00
2.98
0.00
1.15
0.00
2.38
0.00
3.03
0.00
4.26
0.00
5.88
0.00
2.94
0.00
1.45
0.00
5.56
0.00
4.82
0.00
2.47
0.00
1.54
0.00
2.90
0.00
11.11
0.00
4.82
0.00
2.47
0.00
1.54
0.00
1.45
0.00
5.56
0.00
3.61
0.00
2.47
0.00
1.54
0.00
1.45
0.00
11.11
0.00
1.20
0.00
2.47
0.00
1.54
0.00
1.45
0.00
5.56
0.00
1.45
0.00
8.33
0.00
1.45
0.00
8.33
0.00
1.45
0.00
5.56
0.00
2.47
0.00
1.54
0.00
2.47
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.28
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
40.72
0.00
1008.72
35.20
0.00
1043.92
50.89
0.00
1094.81
43.02
0.00
1137.84
43.38
0.00
1181.21
34.54
0.00
1215.75
34.20
0.00
1249.95
29.90
0.00
1279.86
25.46
0.00
1305.31
145.38
145.38
56.03974 57.99534
145.38
145.38
145.38
60.8228 63.21306 65.62287
145.38
145.38
145.38
145.38
67.5419 69.44194 71.10308 72.51742
33
34
35
2.30
0.00
2.38
0.00
3.03
0.00
3.83
0.00
2.30
0.00
4.76
0.00
3.03
0.00
2.98
0.00
3.45
0.00
4.76
0.00
3.03
0.00
2.55
0.00
5.88
0.00
5.88
0.00
2.94
0.00
36
2.30
0.00
4.76
0.00
3.03
0.00
2.13
0.00
37
38
39
40
41
2.30
0.00
4.76
0.00
3.03
0.00
2.13
0.00
2.30
0.00
4.76
0.00
3.03
0.00
2.13
0.00
3.45
0.00
4.76
0.00
3.03
0.00
0.43
0.00
2.30
0.00
2.38
0.00
3.03
0.00
3.45
0.00
2.38
0.00
3.03
0.00
8.57
0.00
2.90
0.00
2.86
0.00
2.90
0.00
5.71
0.00
2.90
0.00
2.90
0.00
5.56
0.00
2.90
0.00
5.56
0.00
2.90
0.00
2.78
0.00
2.90
0.00
2.90
0.00
5.71
0.00
2.90
0.00
1.23
0.00
1.54
0.00
2.47
0.00
1.54
0.00
2.47
0.00
1.54
0.00
2.47
0.00
1.54
0.00
1.23
0.00
3.08
0.00
1.23
0.00
3.08
0.00
1.23
0.00
4.62
0.00
4.94
0.00
3.08
0.00
4.94
0.00
1.54
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.28
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
30.57
0.00
1335.89
33.34
0.00
1369.22
28.34
0.00
1397.56
21.05
0.00
1418.61
21.35
0.00
1439.96
27.07
0.00
1467.03
30.91
0.00
1497.94
23.40
0.00
1521.34
25.87
0.00
1547.22
145.38
145.38
145.38
145.38
145.38
74.21589 76.06794 77.64249 78.81182 79.99803
145.38
145.38
81.5017 83.21887
145.38
145.38
84.5191 85.95644
42
43
44
45
46
47
48
49
50
2.30
0.00
4.76
0.00
6.06
0.00
2.30
0.00
4.76
0.00
3.03
0.00
2.30
0.00
7.14
0.00
3.03
0.00
2.30
0.00
2.38
0.00
3.03
0.00
2.30
0.00
2.38
0.00
3.03
0.00
2.30
0.00
1.15
0.00
1.15
0.00
1.15
0.00
3.03
0.00
3.03
0.00
3.03
0.00
3.03
0.00
2.86
0.00
2.90
0.00
5.71
0.00
2.90
0.00
11.43
0.00
2.90
0.00
5.71
0.00
2.90
0.00
11.43
0.00
1.45
0.00
8.57
0.00
1.45
0.00
8.57
0.00
1.45
0.00
5.71
0.00
1.45
0.00
2.86
0.00
1.45
0.00
4.94
0.00
1.54
0.00
3.70
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.28
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
3.28
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
0.00
0.00
1.92
0.00
27.28
0.00
1574.49
25.87
0.00
1600.36
31.50
0.00
1631.86
21.02
0.00
1652.88
25.28
0.00
1678.16
20.05
0.00
1698.21
18.90
0.00
1717.10
16.04
0.00
1733.14
13.18
0.00
1746.32
145.38
87.47182
145.38
145.38
145.38
145.38
145.38
88.909 90.65873 91.82646 93.23113 94.34479
145.38
145.38
145.38
95.3946 96.28568 97.01802
51
52
53
54
1.15
0.00
1.15
0.00
1.15
0.00
1.15
0.00
3.03
0.00
3.03
0.00
3.03
0.00
3.03
0.00
5.71
0.00
1.45
0.00
5.71
0.00
1.45
0.00
2.86
0.00
1.23
0.00
1.54
0.00
1.23
0.00
1.54
0.00
1.64
0.00
0.00
0.00
1.92
0.00
16.04
0.00
1762.36
55
56
57
58
59
1.15
0.00
1.54
0.00
1.54
0.00
1.54
0.00
3.08
0.00
1.54
0.00
1.64
0.00
0.00
0.00
1.92
0.00
1.64
0.00
3.28
0.00
1.64
0.00
1.64
0.00
1.64
0.00
16.04
0.00
1778.40
8.58
0.00
1786.98
5.72
0.00
1792.70
2.69
0.00
1795.38
3.08
0.00
1798.46
1.54
0.00
1800.00
0.00
0.00
1800.00
0.00
0.00
1800.00
145.38
145.38
145.38
145.38
145.38
145.38
97.9091 98.80018 99.27659 99.59426 99.74359 99.91453
145.38
100
145.38
100
145.38
100
60
0.00
0.00
1800.00
61
0.00
0.00
1800.00
62
0.00
0.00
1800.00
63
0.00
0.00
1800.00
64
0.00
0.00
1800.00
65
1800.00
145.38
100
145.38
100
145.38
100
145.38
100
145.38
100
120
100
Axis Title
80
60
40
20
0
Overall Plan %
10
11
12
13
14
15
2.18 3.59 4.82 6.56 8.02 10.1 12.1 14.2 16.5 18.8 21 23.4 25.9 28.4 31
Chart Title
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
58 60.8 63.2 65.6 67.5 69.4 71.1 72.5 74.2 76.1 77.6
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
77.6 78.8 80 81.5 83.2 84.5 86 87.5 88.9 90.7 91.8 93.2 94.3 95.4 96.3 97 97.9 98.8 99.3 99.6 99.7 99.9
56
57
CTR
CTR-1A
CTR-1B
CTR-2A
CTR-2B
CTR-3A
5
14.58333333
13.75
14.58333333
13.75
15.90909091
14.09090909
15.90909091
14.09090909
8.045977011
12.4137931
CTR-3B
CTR-3C
CTR-4
CTR-5
7.234042553
9.021276596
6.341463415
7.219512195
CTR-6A
CTR-6B
CTR-6C
8.695652174
12.8115942
CTR-6D
CTR-7
CTR-8
3.614457831
3.614457831
9.87654321
9.50617284
CTR-9
CTR-11
30
25.5
CTR-12
CTR-13
CTR-14
0
0
9.615384615
9.615384615
144.4083693
145.3840096
453.2534012
407.3496371
1.559436305
1.401502584
145.3840096