CONSTRUCTION UPDATE CONSTRUCTION UPDATE APR/MAY 2014 APR/MAY 2014

In construction, the progress made on site


depends heavily on the sites logistical
performance.
If a site is not logistically sound, then
the productivity of the workers and
subcontractors, the reliability of suppliers,
the state of the weather, and all the other
factors that result in progress being
made undergo a signicant increase
in pressure. Since our last update, two
The months of April and May bore witness
to the most difcult part of construction:
the changeover from excavation to
construction. While the team was still
excavating, the access around the site
was restricted due to heavy machinery
and truck movements.
cranes on Sevanas logistical map have
been raised and have been integral to the
project reaching its milestones. Having
two cranes on a project dramatically
increases the speed at which materials
can be brought in and distributed
throughout the site.
These two cranes have been strategically
placed inside the lift shafts of two of
Sevanas seven lifts.
Also, until the cranes were raised in late
April there was limited ability to have
materials delivered.
The site team has managed the task at
hand seamlessly, still managing to pour
1,600 cubic metres of concrete in May,
Two Cranes, Twice The Productivity
Blocks A, B & C are all off the ground;
having had two suspended slabs
poured, Sevana is shooting up at an
incredible pace. The project team
is proud to inform you that the rst
residential apartments have started
to take shape in Block A. By the next
update, expect the three towers to
begin taking shape.
Sevana Achieves
Major Milestone
1,600 Cubic Metres Of Concrete Poured During The Month Of May
Meet Philip Dicks. He is our Senior Draftsman specialising in
Civil, Structural, Hydraulic and Stormwater drafting. Philip
studied Building Services and Civil Engineering in the United
Kingdom. Philip has been with Hyecorp for nearly two years,
bringing over 15 years of experience in the eld to his role. This
experience has brought with it a wealth of knowledge to the
company.
Within the United Kingdom, Philip has been involved with many
large scale multi-million dollar projects, which range across
disciplines and sectors. Having been involved with commercial
and residential drafting, nuclear power plant detailing and
projects such as the 3G Telecommunication network 2002 and
Her Majestys prisons upgrade project in 2007. When we asked
him what his objectives were in Hyecorp projects, he responded:
Providing consistency and quality design solutions within our
projects is my main priority. I thrive to keep our design projects
running like clockwork by providing immediate and efcient
design solutions both in the ofce and to the team on site.
Meet The Team
The site is alive with productivity Excavators rest after a days work
A view to the North West
A view of the sites two tower cranes
A slab nearing completion
A view of Sevanas leafy aspect as each block begins to rise
Boom pumps are used to increase concrete pouring speed and reach
The base of the crane is set in the reinforced
concrete as per engineers requirements
which has formed the rst two levels of
Block A and Block Bs carpark.
In the coming months, expect this gure
to be trumped as momentum is gained
and the progress continues to ramp up
following the completion of all excavation.
B
R
A
N
D

N
E
W

R
E
L
E
A
S
E
CONSTRUCTION
UPDATE
ISSUE NO. 3 - APRIL/MAY 2014
I didnt plan on purchasing a Sevana apartment as I walked into the display suite, I was only there to support a friend
who ultimately purchased an apartment within the development. However as I started to get a taste of what was on offer
Sevanas unique location relative to other Lane Cove developments along with the polished architecture, optimised oor
plans and high quality ttings typical of all Hyecorp developments I couldnt resist but to purchase an apartment myself.

Positive word of mouth speaks volumes and that certainly rings true for Hyecorp. Hyecorp have clearly raised the bar relative
to other developers simply seeking to take advantage of the booming property market in Lane Cove and its surrounding
suburbs. Im sure Sevana will live up to my expectations and the expectations of my future neighbours. Looking forward to
moving in!
First Home Buyer Age: 29
Profession: Treasury Manager, Sydney Airport
BUYER PROFILE
Michael Momdjian
DISPLAY SUITE
NOW OPEN
56 FRENCHS RD, WILLOUGHBY
SAT/SUN 1PM-4PM & WED/THURS 12PM-2PM
9967 9862
2 BED 2 BATH
F
R
O
M
$785,000
THE ONLY BRAND
NEW APARTMENTS
IN WILLOUGHBY

You might also like