- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r !IRECT COST ALATA STATION ELECTRICAL EQUIPMENT Mounting, Connections and Marking ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&.F&)#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&S/&)#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&MC&)#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0.&)#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0P&)#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&UP&)#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&AC&)#) Supply, Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&FA&)#) Supply, Mounting, Connections and Marking Glb 1 ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&/E&)#) Mounting, Connections and Marking Glb 1 OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE Supply, Installation, Mounting and Testing ELECTRICAL EQUIPMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 POLE ERECTION SERVICE Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 1$ $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# % $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# % $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# $ $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) Installation of 'ry Transfor(er 1)* k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F01,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,1 and 5,1&0C)0111,01*50,,1 Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG01,1, according to dra3ings4 5,1&0C)0111,01*E0 ,,1 and 5,1&0C)0111,01*50,,1 Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC01,1, according to dra3ings4 5,1&0C)0 111,01*E0,,1 and 5,1&0C)0111,01*50,,1 Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,06201,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,06801,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0 111,01*50,,1 Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,09801,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 'esign, Supply and Installation of #ir Conditioning $., +, Tag C)0111,0#C01,1, include supply and installation of all ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 !T7e si:e of t7e ;+#C is by contractor" Supply and Installation of Fan Motor $.,+, Tag C)0111,0F#01,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0 C)0111,01*50,,1 !T7e si:e of t7e ;+#C is by Contractor" Installation of GE/ SET 1,, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE01,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,1 and 5,1&0C)0111,01*50,,1, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0 TS01,1 and daily tank Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 Include Supply, Instalation, Mounting, Cabling and Testing only by SE#64 0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0),1
0 Metering >ox ;'G 0 Trip7asic Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,) 8ole (ounting asse(bly #) !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly #$ !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation" Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" +ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1$ MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1*, $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1, $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 ), $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 * MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION POWER CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( %, $$)# xxxx $$)#!xxxx ( %, $$)# xxxx $$)#!xxxx ( $, $$)# xxxx $$)#!xxxx ( 1* $$)# xxxx $$)#!xxxx ( %, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod, connector, bentonite, and all necessary for t7e rig7t installation" 8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector" &,(() 'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F01,1 See Section # in dra3ing 5,1&0C)0111,01*50 ,,1-,,1 !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t installation *C Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<1,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F1,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 #6#T# Station Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC1,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC1,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'81,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'81,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'81,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'81,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'81,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?1,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?1,)08 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,#C1,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,F#1,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,621,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, $-c, tag4 C)0111,681,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx ( * CONTROL CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting $$)# xxxx $$)#!xxxx '9CT >#/5S I/ST#66#TI=/ !including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc" Supply and Mounting $$)# xxxx $$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,1 $C Supply and Mounting ( $ 1).,, $$)# xxxx $$)#!xxxx Supply and Mounting ( $ 1,,, $$)# xxxx $$)#!xxxx Supply and Mounting ( $ 1,,, $$)# xxxx $$)#!xxxx Supply and Mounting ( 1, 1,,, $$)# xxxx $$)#!xxxx Supply and Mounting G6> 1 1,, $$)# xxxx $$)#!xxxx Supply and Mounting G6> ) ),, JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0&1%,01*F0,,1 !include (aterials and accessories" /-# Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections BARE COPPER CONDUCTORS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M *), $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M $, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# %, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# )B $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1% $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# )* Teck B,, 1 k+, )-c, tag4 C)0111,981,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F1,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C1,10C Cable fro( t7e $., + MCC to #ir Conditioning Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#1,10C Cable fro( t7e $., + MCC to Fan Motor Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent 'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0 1*50,,1 )C 'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0 111,01*50,,1 %0)C - %0 )C 'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'801,1-1,)-1,%-1,$-1,* po3er and control cables See dra3ing 5,1&0C)0111,01*50,,1 10)C - % 0 )C Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-# Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J, furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-# Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-# >are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation $-, #<G >are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation )-, #<G Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-# BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) GROUND ROD TEST WELL Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ) CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# & $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# )% $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTING SSTEM AND ACCESSORIES $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# B $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# 1. $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# * $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( ), $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( 1), TIABAA STATION ELECTRICAL EQUIPMENT Mounting, Connections and Marking ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&.F&'#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&S/&'#) Mounting, Connections and Marking Glb 1 Installation 'etail for ground rod test 3ell !include (aterials and accessories" 'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-# Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories" 'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-# Installation 'etail for typical substation fence ground connection !include (aterials and accessories" 'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-# Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-# Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories" 'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-# Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories" 'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-# Installation 'etail for transfor(er grounding detail !include (aterials and accessories" 'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-# Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories" 'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-# Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation $,, Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial necessary for t7e rig7t installation )),+ x 1,,< Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation %1, x 1) x ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C0.#<G @ G" Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C01)#<G @ G" Installation of 'ry Transfor(er 1,, k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0),1, according to dra3ings4 5,1&0C)0111,0 1*E0,,) and 5,1&0C)0111,01*50,,) Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0),1, according to dra3ings4 5,1&0C)0111,01*E0 ,,) and 5,1&0C)0111,01*50,,) BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx C'&$$)#&MC&'#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0.&'#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0P&'#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&UP&'#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&AC&'#) Supply, Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&FA&'#) Supply, Mounting, Connections and Marking Glb 1 ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: $$)# xxxx C'&$$)#&/E&'#) Mounting, Connections and Marking Glb 1 OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE ELECTRICAL EQUIPMENT $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 POLE ERECTION SERVICE Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# B $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# ) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# ) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# ) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# $ $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1$ MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 *1, Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0),1, according to plans4 5,1&0C)0111,0 1*E0,,) and 5,1&0C)0111,01*50,,) Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620),1, according to plans45,1&0C)0111,01*E0,,) and 5,1&0C)0111,01*50,,) Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680),1, according to plans45,1&0C)0111,01*E0,,) and 5,1&0C)0 111,01*50,,) Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980),1, according to plans4 5,1&0C)0111,01*E0,,) and 5,1&0C)0111,01*50,,) 'esign, Supply and Installation of #ir Conditioning $., +, &* ;8, Tag C)0111,0#C0),1, include supply and installation of all ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to plans4 5,1&0C)0111,01*E0,,) and 5,1&0C)0111,01*50,,) !T7e si:e of t7e ;+#C is by contractor" Installation of Fan Motor $.,+, 1;8, Tag C)0111,0F#0),1, according to plans4 5,1&0C)0111,01*E0,,) and 5,1&0C)0111,0 1*50,,) !T7e si:e of t7e ;+#C is by contractor" Installation of GE/ SET B, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0),1, according to dra3ings4 5,1&0C)0111,0 1*E0,,) and 5,1&0C)0111,01*50,,), Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0 TS0),1 and daily tank Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,) and 5,1&0C)0111,01*50,,) Include Supply, Instalation, Mounting, Cabling and Testing by SE#64 0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0),1
0 Metering >ox ;'G 0 Trip7asic Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,) 8ole (ounting asse(bly #1 !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly #) !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly #. !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation" Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" +ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod, connector, bentonite, and all necessary for t7e rig7t installation" 8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector" &,(() BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1, $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 )* $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 * MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( %, $$)# xxxx $$)#!xxxx ( %, $$)# xxxx $$)#!xxxx ( $* $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( %, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * CONTROL CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * 'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0),1 See Section # in dra3ing 5,1&0C)0111,01*50 ,,1-,,1 !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t installation *C Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<),108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F),108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 TI#>#L# Station Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC),1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC),108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8),108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8),)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8),%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8),$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8),*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?),108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?),108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,#C),108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,F#),108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,62),108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, $-c, tag4 C)0111,68),108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, )-c, tag4 C)0111,98),108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F),10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C),10C Cable fro( t7e $., + MCC to #ir Conditioning Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx ( * DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting DUCT BANKS INSTALLATION !"#$%&'"#( )*$+,+-".#, $.#$/)-), $.#'&"- PVC, 01+$)/0, /)2"%%, 0"(#+% -+1), )-$3 Supply and Mounting $$)# xxxx $$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,) $C Supply and Mounting ( $ %.,, $$)# xxxx $$)#!xxxx Supply and Mounting ( $ %.,, $$)# xxxx $$)#!xxxx Supply and Mounting ( $ %.,, $$)# xxxx $$)#!xxxx Supply and Mounting ( 1, %.,, $$)# xxxx $$)#!xxxx Supply and Mounting G6> 1 1,, $$)# xxxx $$)#!xxxx Supply and Mounting G6> ) ),, JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,) !include (aterials and accessories" /-# Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections BARE COPPER CONDUCTORS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M %$, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M 1* $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1. $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ). $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# * $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1* GROUND ROD TEST WELL Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ) CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#),10C Cable fro( t7e $., + MCC to Fan Motor Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent 'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0 1*50,,) )C 'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0 111,01*50,,) %0)C - %0 )C 'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80),1-),)-),%-),$-),* po3er and control cables See dra3ing 5,1&0C)0111,01*50,,) 10)C - % 0 )C Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-# Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J, furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-# Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-# >are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation $-, #<G >are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation )-, #<G Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-# Installation 'etail for ground rod test 3ell !include (aterials and accessories" 'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-# Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories" 'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-# Installation 'etail for typical substation fence ground connection !include (aterials and accessories" 'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-# BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1B $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# % $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# * $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# 1) $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# % $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( ), $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( B, HUARANGUILLO STATION ELECTRICAL EQUIPMENT Mounting, Connections and Marking ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&.F&1#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&S/&1#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&MC&1#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0.&1#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0P&1#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&UP&1#) Mounting, Connections and Marking Glb 1 Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-# Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories" 'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-# Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories" 'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-# Installation 'etail for transfor(er grounding detail !include (aterials and accessories" 'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-# Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories" 'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-# Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation $,, Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial necessary for t7e rig7t installation )),+ x 1,,< Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation %1, x 1) x ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C0.#<G @ G" Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C01)#<G @ G" Installation of 'ry Transfor(er 1,, k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0%,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,% and 5,1&0C)0111,01*50,,% Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0%,1, according to dra3ings4 5,1&0C)0111,01*E0 ,,% and 5,1&0C)0111,01*50,,% Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0%,1, according to dra3ings4 5,1&0C)0 111,01*E0,,% and 5,1&0C)0111,01*50,,% Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620%,1, according to dra3ings45,1&0C)0111,01*E0,,% and 5,1&0C)0111,01*50,,% Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680%,1, according to dra3ings45,1&0C)0111,01*E0,,% and 5,1&0C)0 111,01*50,,% Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980%,1, according to dra3ings4 5,1&0C)0111,01*E0,,% and 5,1&0C)0111,01*50,,% BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx C'&$$)#&AC&1#) Supply, Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&FA&1#) Supply, Mounting, Connections and Marking Glb 1 ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&/E&1#) Mounting, Connections and Marking Glb 1 $$)# xxxx $$)#!xxxx Mounting, Connections and Marking Glb 1 OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE Supply, Installation, Mounting and Testing ELECTRICAL EQUIPMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 POLE ERECTION SERVICE Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# ) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1$ MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 )., $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1, 'esign, Supply and Installation of #ir Conditioning $., +, Tag C)0111,0#C0%,1, include supply and installation of all ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to dra3ings4 5,1&0C)0111,01*E0,,% and 5,1&0C)0111,01*50,,% !T7e si:e of t7e ;+#C is by contractor" Supply and Installation of Fan Motor $.,+, Tag C)0111,0F#0%,1, according to dra3ings4 5,1&0C)0111,01*E0,,% and 5,1&0 C)0111,01*50,,% !T7e si:e of t7e ;+#C is by contractor" Installation of GE/ SET B, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0%,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,% and 5,1&0C)0111,01*50,,%, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0 TS0%,1 and daily tank Installation of Syste( 8anelboard according to plans4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 Include4 0 Multi ?ake >ar Screen Syste( 8anelboard $.,+, 1, k<, Tag C)0111,0'801,1 0 Step Screen Syste( 8anelboard $.,+, )% k<, Tag C)0111,0'801,) 0 >iofilter 8anelboard $.,+, ))$ k<, Tag C)0111,0'801,% 0 ;idropneu(atic 8anelboard $.,+, 1, k<, Tag C)0111,0'801,$ 0 Gate 8anelboard $.,+, 1, k<, Tag C)0111,0'801,* 0 <elding ?eceptacle 1,#, $.,+, %) k<, Tag C)0111,0<?01,1-1,) Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,% and 5,1&0C)0111,01*50,,% Include Supply, Instalation, Mounting, Cabling and Testing only by SE#64 0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0%,1
0 Metering >ox ;'G 0 ,% 87ase Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,) 8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly #$ !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly #. !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials necessary for t7e rig7t installation" 8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation" Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" +ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod, connector, bentonite, and all necessary for t7e rig7t installation" 8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector" &,(() 'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0%,1 See Section # in dra3ing 5,1&0C)0111,01*50 ,,1-,,1 !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t installation *C BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 )* $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 * MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION POWER CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( ), $$)# xxxx $$)#!xxxx ( ), $$)# xxxx $$)#!xxxx ( ), $$)# xxxx $$)#!xxxx ( 1* $$)# xxxx $$)#!xxxx ( ), $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * CONTROL CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<%,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F%,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 ;9#?#/G9I66= Station Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC%,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC%,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8%,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8%,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8%,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8%,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8%,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?%,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?%,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,#C%,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,F#%,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,62%,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, $-c, tag4 C)0111,68%,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, )-c, tag4 C)0111,98%,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F%,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C%,10C Cable fro( t7e $., + MCC to #ir Conditioning Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx ( * DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting DUCT BANKS INSTALLATION excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc $$)# xxxx $$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,% $C excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ .,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ )&,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ )&,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( 1, )&,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> 1 1,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> ) ),, JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,% !include (aterials and accessories" /-# Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking 9/' GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections 9/' 1 $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx 8oste de %, ft taper )CM (etalico ref standard C511CC ,,,0)1*01%11 Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections BARE COPPER CONDUCTORS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M %), $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M %, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1& $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#%,10C Cable fro( t7e $., + MCC to Fan Motor Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent 'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0 1*50,,% )C 'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0 111,01*50,,% %0)C - %0 )C 'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80%,1-%,)-%,%-%,$-%,* po3er and control cables See dra3ing 5,1&0C)0111,01*50,,% 10)C - % 0 )C Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-# Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J, furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-# Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-# EKuipo para alu(brado de e(ergencia con ) la(paras 7alogenas de )* <, 1) +'C, autono(ia de B, (inutos, bateria plo(o0acido, libre de (anteni(iento, ali(entacion )), +#C ) x )*< 'etalle constructivo de puesta a tierra a la barra de eKuipos !incluye (ateriales (enores" standard CG1)0>1C ,,,0)1*0 1$,) /-# MontaNe de pararrayos tipo ioni:ante no radioactivo !8'C", Ono, +n4 )&* k+, InA 1,k#, $),, (sn(, MC=+4)11k+, 1 kE-k+, si(ilar a 8revectron ), incluye air ter(inal y support socket for caulking or 3elding for 8revectron S%$, lig7tning or Si(ilar 'etalle constructivo de proteccion contra descargas ad(osfericas !incluye (ateriales (enores" standard C511CC ,,,0)1*0 1%11 >are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation $-, #<G >are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation )-, #<G Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-# BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1) GROUND ROD TEST WELL Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ) CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# , $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# B $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# % $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# 1) $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# % $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( ), $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( B, ARANCOTA STATION ELECTRICAL EQUIPMENT Mounting, Connections and Marking ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&.F&+#) Mounting, Connections and Marking Glb 1 Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-# Installation 'etail for ground rod test 3ell !include (aterials and accessories" 'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-# Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories" 'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-# Installation 'etail for typical substation fence ground connection !include (aterials and accessories" 'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-# Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-# Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories" 'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-# Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories" 'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-# Installation 'etail for transfor(er grounding detail !include (aterials and accessories" 'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-# Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories" 'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-# Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation $,, Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial necessary for t7e rig7t installation )),+ x 1,,< Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation %1, x 1) x ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C0.#<G @ G" Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C01)#<G @ G" Installation of 'ry Transfor(er 1)* k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0$,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,* and 5,1&0C)0111,01*50,,* BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx C'&$$)#&S/&+#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&MC&+#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0.&+#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0P&+#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&UP&+#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&AC&+#) Supply, Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&FA&+#) Supply, Mounting, Connections and Marking Glb 1 ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: $$)# xxxx C'&$$)#&/E&+#) Mounting, Connections and Marking Glb 1 $$)# xxxx $$)#!xxxx Mounting, Connections and Marking Glb 1 OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE ELECTRICAL EQUIPMENT $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 POLE ERECTION SERVICE Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 0 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1$ MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1, Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0$,1, according to dra3ings4 5,1&0C)0111,01*E0 ,,* and 5,1&0C)0111,01*50,,* Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0$,1, according to plans4 5,1&0C)0111,0 1*E0,,* and 5,1&0C)0111,01*50,,* Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620$,1, according to plans45,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680$,1, according to plans45,1&0C)0111,01*E0,,* and 5,1&0C)0 111,01*50,,* Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980$,1, according to plans4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* 'esign, Supply and Installation of #ir Conditioning $., +, &* ;8, Tag C)0111,0#C0$,1, include supply and installation of all ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to plans4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* !T7e si:e of t7e ;+#C is by contractor" Installation of Fan Motor $.,+, 1;8, Tag C)0111,0F#0$,1, according to plans4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,0 1*50,,* !T7e si:e of t7e ;+#C is by contractor" Installation of GE/ SET 1,, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0$,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,* and 5,1&0C)0111,01*50,,*, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0 TS0$,1 and daily tank Installation of Syste( 8anelboard according to plans4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 Include4 0 Multi ?ake >ar Screen Syste( 8anelboard $.,+, 1, k<, Tag C)0111,0'801,1 0 Step Screen Syste( 8anelboard $.,+, )% k<, Tag C)0111,0'801,) 0 >iofilter 8anelboard $.,+, ))$ k<, Tag C)0111,0'801,% 0 ;idropneu(atic 8anelboard $.,+, 1, k<, Tag C)0111,0'801,$ 0 Gate 8anelboard $.,+, 1, k<, Tag C)0111,0'801,* 0 <elding ?eceptacle 1,#, $.,+, %) k<, Tag C)0111,0<?01,1-1,) Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* Include Supply, Instalation, Mounting, Cabling and Testing by SE#64 0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0$,1
0 Metering >ox ;'G 0 ,% Trip7ase Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,) 8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation" Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" +ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod, connector, bentonite, and all necessary for t7e rig7t installation" 8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector" &,(() BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1, $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 )* $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 * MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION POWER CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( ), $$)# xxxx $$)#!xxxx ( $, $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * CONTROL CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( * 'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0$,1 See Section # in dra3ing 5,1&0C)0111,01*50 ,,*-,,B !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t installation *C Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<$,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F$,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 #?#/C=T# Station Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC$,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC$,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8$,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8$,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8$,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8$,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8$,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?$,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?$,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,#C$,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,F#$,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,62$,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, $-c, tag4 C)0111,68$,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, )-c, tag4 C)0111,98$,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F$,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting $$)# xxxx $$)#!xxxx DUCT BANKS INSTALLATION including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc $$)# xxxx $$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,% $C including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ %,,, $$)# xxxx $$)#!xxxx including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ %B,, $$)# xxxx $$)#!xxxx including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ %B,, $$)# xxxx $$)#!xxxx including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( 1, %B,, $$)# xxxx $$)#!xxxx including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> 1 1,, $$)# xxxx $$)#!xxxx including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> ) ),, JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,% !include (aterials and accessories" /-# Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking 9/' GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections 9/' 1 $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx 8oste de %, ft taper )CM (etalico ref standard C511CC ,,,0)1*01%11 Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections BARE COPPER CONDUCTORS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M %*, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M ), $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ), Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C$,10C Cable fro( t7e $., + MCC to #ir Conditioning Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#$,10C Cable fro( t7e $., + MCC to Fan Motor Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent 'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0 1*50,,% )C 'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0 111,01*50,,% %0)C - %0 )C 'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80%,1-%,)-%,%-%,$-%,* po3er and control cables See dra3ing 5,1&0C)0111,01*50,,% 10)C - % 0 )C Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-# Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J, furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-# Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-# EKuipo para alu(brado de e(ergencia con ) la(paras 7alogenas de )* <, 1) +'C, autono(ia de B, (inutos, bateria plo(o0acido, libre de (anteni(iento, ali(entacion )), +#C ) x )*< 'etalle constructivo de puesta a tierra a la barra de eKuipos !incluye (ateriales (enores" standard CG1)0>1C ,,,0)1*0 1$,) /-# MontaNe de pararrayos tipo ioni:ante no radioactivo !8'C", Ono, +n4 )&* k+, InA 1,k#, $),, (sn(, MC=+4)11k+, 1 kE-k+, si(ilar a 8revectron ), incluye air ter(inal y support socket for caulking or 3elding for 8revectron S%$, lig7tning or Si(ilar 'etalle constructivo de proteccion contra descargas ad(osfericas !incluye (ateriales (enores" standard C511CC ,,,0)1*0 1%11 >are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation $-, #<G >are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation )-, #<G Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-# BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# %) $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# * $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1. GROUND ROD TEST WELL Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ) CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1B $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# % $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# 1) $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# % $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( ), $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( B, CONGATA PUMP STATION ELECTRICAL EQUIPMENT Mounting, Connections and Marking Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-# Installation 'etail for ground rod test 3ell !include (aterials and accessories" 'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-# Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories" 'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-# Installation 'etail for typical substation fence ground connection !include (aterials and accessories" 'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-# Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-# Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories" 'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-# Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories" 'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-# Installation 'etail for transfor(er grounding detail !include (aterials and accessories" 'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-# Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories" 'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-# Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation $,, Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial necessary for t7e rig7t installation )),+ x 1,,< Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation %1, x 1) x ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C0.#<G @ G" Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C01)#<G @ G" BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&.F&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&S/&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&MC&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0.&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&0P&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&UP&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&AC&(#) Supply, Mounting, Connections and Marking Glb 1 $$)# xxxx C'&$$)#&FA&(#) Supply, Mounting, Connections and Marking Glb 1 ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: Mounting, Connections and Marking $$)# xxxx C'&$$)#&/E&(#) Mounting, Connections and Marking Glb 1 $$)# xxxx $$)#!xxxx Mounting, Connections and Marking Glb 1 OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE Supply, Installation, Mounting and Testing ELECTRICAL EQUIPMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 POLE ERECTION SERVICE Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 11 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# & $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1 Installation of 'ry Transfor(er )*, k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0*,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,* and 5,1&0C)0111,01*50,,* Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0*,1, according to dra3ings4 5,1&0C)0111,01*E0 ,,* and 5,1&0C)0111,01*50,,* Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0*,1, according to dra3ings4 5,1&0C)0 111,01*E0,,* and 5,1&0C)0111,01*50,,* Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620*,1, according to dra3ings45,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680*,1, according to dra3ings45,1&0C)0111,01*E0,,* and 5,1&0C)0 111,01*50,,* Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980*,1, according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* 'esign, Supply and Installation of #ir Conditioning $., +, Tag C)0111,0#C0*,1, include supply and installation of all ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* !T7e si:e of t7e ;+#C is by contractor" Supply and Installation of Fan Motor $.,+, Tag C)0111,0F#0*,1, according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0 C)0111,01*50,,* !T7e si:e of t7e ;+#C is by contractor" Installation of GE/ SET ))* k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0*,1, according to dra3ings4 5,1&0C)0111,0 1*E0,,* and 5,1&0C)0111,01*50,,*, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0 TS0*,1 and daily tank Installation of Syste( 8anelboard according to plans4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1 Include4 0 Multi ?ake >ar Screen Syste( 8anelboard $.,+, 1, k<, Tag C)0111,0'801,1 0 Step Screen Syste( 8anelboard $.,+, )% k<, Tag C)0111,0'801,) 0 >iofilter 8anelboard $.,+, ))$ k<, Tag C)0111,0'801,% 0 ;idropneu(atic 8anelboard $.,+, 1, k<, Tag C)0111,0'801,$ 0 Gate 8anelboard $.,+, 1, k<, Tag C)0111,0'801,* 0 <elding ?eceptacle 1,#, $.,+, %) k<, Tag C)0111,0<?01,1-1,) Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,* Include Supply, Instalation, Mounting, Cabling and Testing only by SE#64 0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0*,1
0 Metering >ox ;'G 0 ,% p7ase Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,) 8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly #$ !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary (aterials for t7e rig7t installation" 8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation" BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1& $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing E# 1$ MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1., $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 1, $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 )* $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing M6 * $$)# MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing $$)# xxxx $$)#!xxxx Supply, Installation, Mounting and Testing Glb 1 CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION POWER CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( &, $$)# xxxx $$)#!xxxx ( 1* $$)# xxxx $$)#!xxxx ( )* $$)# xxxx $$)#!xxxx ( $* $$)# xxxx $$)#!xxxx ( $* $$)# xxxx $$)#!xxxx ( $* $$)# xxxx $$)#!xxxx ( 1, Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" +ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire, anc7or block, and all necessary for t7e rig7t installation" Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod, connector, bentonite, and all necessary for t7e rig7t installation" 8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector" &,(() 'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0*,1 See Section # in dra3ing 5,1&0C)0111,01*50 ,,*-,,B !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t installation *C Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<*,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F*,108 !Include cable laying, installation of ;eat S7rinkeable Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for t7e rig7t installation %x1-C0)*, MCM Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 C=/G#T# 8u(p Station Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC*,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,MC*,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8*,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8*,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8*,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8*,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'8*,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,8<B,$08 Cable fro( t7e $., + MCC to 8u(p 1 Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C ) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,8<B,*08 Cable fro( t7e $., + MCC to 8u(p ) Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C ) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,8<B,108 Cable fro( t7e $., + MCC to 8u(p % Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C ) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,<?*,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx ( 1, $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( ), $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * CONTROL CABLES INSTALLATION $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * $$)# xxxx $$)#!xxxx ( * DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting DUCT BANKS INSTALLATION excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc $$)# xxxx $$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,* $C excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ 1%,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ $*,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ $*,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( 1, $*,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> 1 1,, $$)# xxxx $$)#!xxxx excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> ) ),, JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# * $$)# xxxx $$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,* !include (aterials and accessories" /-# Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking E# ) $$)# xxxx $$)#!xxxx Include Supply, Mounting, Connections and Marking 9/' Teck B,, 1 k+, %-c, tag4 C)0111,<?*,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,#C*,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,F#*,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,'#*,108 Cable fro( t7e $., + MCC to 'esander Contractor (ust supply all (aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, %-c, tag4 C)0111,62*,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, $-c, tag4 C)0111,68*,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1 k+, )-c, tag4 C)0111,98*,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G" Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F*,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C*,10C Cable fro( t7e $., + MCC to #ir Conditioning Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#*,10C Cable fro( t7e $., + MCC to Fan Motor Control Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable Ter(inals and ?esistance Measure(ent 'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0 1*50,,* )C 'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0 111,01*50,,* %0)C - %0 )C 'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80%,1-%,)-%,%-%,$-%,* po3er and control cables See dra3ing 5,1&0C)0111,01*50,,* 10)C - % 0 )C Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-# Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J, furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-# Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-# EKuipo para alu(brado de e(ergencia con ) la(paras 7alogenas de )* <, 1) +'C, autono(ia de B, (inutos, bateria plo(o0acido, libre de (anteni(iento, ali(entacion )), +#C ) x )*< BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections 9/' 1 $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx 8oste de %, ft taper )CM (etalico ref standard C511CC ,,,0)1*01%11 Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections BARE COPPER CONDUCTORS Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M **, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections M *, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ). $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# %% $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# & $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# )$ GROUND ROD TEST WELL Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# ) CONNECTION TO EQUIPMENT AND METALLIC PARTS $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1, $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# & $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1B $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTNING PROTECTION Include Supply, Mounting and Connections $$)# xxxx $$)#!xxxx Include Supply, Mounting and Connections E# 1 LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ 'etalle constructivo de puesta a tierra a la barra de eKuipos !incluye (ateriales (enores" standard CG1)0>1C ,,,0)1*0 1$,) /-# MontaNe de pararrayos tipo ioni:ante no radioactivo !8'C", Ono, +n4 )&* k+, InA 1,k#, $),, (sn(, MC=+4)11k+, 1 kE-k+, si(ilar a 8revectron ), incluye air ter(inal y support socket for caulking or 3elding for 8revectron S%$, lig7tning or Si(ilar 'etalle constructivo de proteccion contra descargas ad(osfericas !incluye (ateriales (enores" standard C511CC ,,,0)1*0 1%11 >are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation $-, #<G >are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare conductor and all (aterial necessary for t7e rig7t installation )-, #<G Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-# Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories" 'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-# Installation 'etail for ground rod test 3ell !include (aterials and accessories" 'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-# Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories" 'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-# Installation 'etail for typical substation fence ground connection !include (aterials and accessories" 'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-# Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-# Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories" 'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-# Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories" 'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-# Installation 'etail for transfor(er grounding detail !include (aterials and accessories" 'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-# Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories" 'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-# Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation $,, BILL OF QUANTITIES - (Electrical) Cerro Verde Production Unit Expansion CONTRACTOR: NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+ , T E M
- WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r FLUOR COST ELEENT FLUOR WBS(COST ELEENT CLIENT CO!IN) $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# B $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# 1. $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# * $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# $ $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking E# 1 $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( ), $$)# xxxx $$)#!xxxx Supply, Mounting, Connections and Marking ( B, &,B,, Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories" 'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial necessary for t7e rig7t installation )),+ x 1,,< Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation %1, x 1) x ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" 'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial necessary for t7e rig7t installation ) Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories" Industrial Fluorescent 6ig7ting Fixture Electronic >allast 1),+ 0 )&&+, Explosion 8roof Mounting 'etail Contractor (ust supply all (aterial necessary for t7e rig7t installation ) x %) Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C0.#<G @ G" Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial necessary for t7e rig7t installation 1 x !)-C01)#<G @ G" La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() La*#r (S+() S- ,,,