You are on page 1of 42

BILL OF QUANTITIES - (Electrical)

Cerro Verde Production Unit Expansion


CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
!IRECT COST
ALATA STATION
ELECTRICAL EQUIPMENT Mounting, Connections and Marking
ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&.F&)#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&S/&)#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&MC&)#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0.&)#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0P&)#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&UP&)#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&AC&)#)
Supply, Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&FA&)#)
Supply, Mounting, Connections and Marking Glb 1
ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&/E&)#)
Mounting, Connections and Marking Glb 1
OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE Supply, Installation, Mounting and Testing
ELECTRICAL EQUIPMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
POLE ERECTION SERVICE Supply, Installation, Mounting and Testing
$$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 1$
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# %
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# %
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# $
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
Installation of 'ry Transfor(er 1)* k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F01,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,1 and 5,1&0C)0111,01*50,,1
Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG01,1, according to dra3ings4 5,1&0C)0111,01*E0
,,1 and 5,1&0C)0111,01*50,,1
Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC01,1, according to dra3ings4 5,1&0C)0
111,01*E0,,1 and 5,1&0C)0111,01*50,,1
Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,06201,1, according to dra3ings4 5,1&0C)0111,01*E0,,1
and 5,1&0C)0111,01*50,,1
Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,06801,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0
111,01*50,,1
Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,09801,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and
5,1&0C)0111,01*50,,1
'esign, Supply and Installation of #ir Conditioning $., +, Tag C)0111,0#C01,1, include supply and installation of all ducts
and cable tray syste( and all (aterial necessary for t7e rig7t installation according to dra3ings4 5,1&0C)0111,01*E0,,1 and
5,1&0C)0111,01*50,,1 !T7e si:e of t7e ;+#C is by contractor"
Supply and Installation of Fan Motor $.,+, Tag C)0111,0F#01,1, according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0
C)0111,01*50,,1 !T7e si:e of t7e ;+#C is by Contractor"
Installation of GE/ SET 1,, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE01,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,1 and 5,1&0C)0111,01*50,,1, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0
TS01,1 and daily tank
Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1
Include Supply, Instalation, Mounting, Cabling and Testing only by SE#64
0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0),1

0 Metering >ox ;'G
0 Trip7asic Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,)
8ole (ounting asse(bly #) !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly #$ !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7,
arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation"
Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or
block, and all necessary for t7e rig7t installation"
+ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire,
anc7or block, and all necessary for t7e rig7t installation"
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1$
MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1*,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 ),
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 *
MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION
POWER CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( %,
$$)#
xxxx
$$)#!xxxx
( %,
$$)#
xxxx
$$)#!xxxx
( $,
$$)#
xxxx
$$)#!xxxx
( 1*
$$)#
xxxx
$$)#!xxxx
( %,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod,
connector, bentonite, and all necessary for t7e rig7t installation"
8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector"
&,(()
'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F01,1 See Section # in dra3ing 5,1&0C)0111,01*50
,,1-,,1 !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t
installation *C
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<1,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F1,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of
licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 #6#T# Station
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC1,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and
all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC1,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'81,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply
of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'81,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'81,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'81,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'81,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?1,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?1,)08 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,#C1,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,F#1,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial
necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,621,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, $-c, tag4 C)0111,681,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of
cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
( *
CONTROL CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting
$$)# xxxx $$)#!xxxx '9CT >#/5S I/ST#66#TI=/ !including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc" Supply and Mounting
$$)#
xxxx
$$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,1 $C
Supply and Mounting ( $ 1).,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting ( $ 1,,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting ( $ 1,,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting ( 1, 1,,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting G6> 1 1,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting G6> ) ),,
JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0&1%,01*F0,,1 !include (aterials and accessories" /-#
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections
BARE COPPER CONDUCTORS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M *),
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M $,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# %,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )B
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1%
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )*
Teck B,, 1 k+, )-c, tag4 C)0111,981,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F1,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C1,10C Cable fro( t7e $., + MCC to #ir Conditioning Control
Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#1,10C Cable fro( t7e $., + MCC to Fan Motor Control Station
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0
1*50,,1 )C
'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0
111,01*50,,1 %0)C - %0 )C
'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'801,1-1,)-1,%-1,$-1,* po3er and control cables See
dra3ing 5,1&0C)0111,01*50,,1 10)C - % 0 )C
Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C
Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%)
!include (aterials and accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-#
Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J,
furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-#
Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-#
>are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation $-, #<G
>are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation )-, #<G
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-#
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
GROUND ROD TEST WELL Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )
CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# &
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )%
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTING SSTEM AND ACCESSORIES
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# B
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# 1.
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# *
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( ),
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( 1),
TIABAA STATION
ELECTRICAL EQUIPMENT Mounting, Connections and Marking
ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&.F&'#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&S/&'#)
Mounting, Connections and Marking Glb 1
Installation 'etail for ground rod test 3ell !include (aterials and accessories"
'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-#
Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories"
'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-#
Installation 'etail for typical substation fence ground connection !include (aterials and accessories"
'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-#
Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-#
Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories"
'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-#
Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories"
'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-#
Installation 'etail for transfor(er grounding detail !include (aterials and accessories"
'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-#
Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories"
'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-#
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation $,,
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle
lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial
necessary for t7e rig7t installation )),+ x 1,,<
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply
all (aterial necessary for t7e rig7t installation )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation %1, x 1) x )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial
necessary for t7e rig7t installation )
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C0.#<G @ G"
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C01)#<G @ G"
Installation of 'ry Transfor(er 1,, k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0),1, according to dra3ings4 5,1&0C)0111,0
1*E0,,) and 5,1&0C)0111,01*50,,)
Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0),1, according to dra3ings4 5,1&0C)0111,01*E0
,,) and 5,1&0C)0111,01*50,,)
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
C'&$$)#&MC&'#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0.&'#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0P&'#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&UP&'#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&AC&'#)
Supply, Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&FA&'#)
Supply, Mounting, Connections and Marking Glb 1
ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM:
$$)#
xxxx
C'&$$)#&/E&'#)
Mounting, Connections and Marking Glb 1
OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE
ELECTRICAL EQUIPMENT
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
POLE ERECTION SERVICE Supply, Installation, Mounting and Testing
$$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# B
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# )
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# )
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# )
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# $
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1$
MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 *1,
Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0),1, according to plans4 5,1&0C)0111,0
1*E0,,) and 5,1&0C)0111,01*50,,)
Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620),1, according to plans45,1&0C)0111,01*E0,,) and
5,1&0C)0111,01*50,,)
Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680),1, according to plans45,1&0C)0111,01*E0,,) and 5,1&0C)0
111,01*50,,)
Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980),1, according to plans4 5,1&0C)0111,01*E0,,) and
5,1&0C)0111,01*50,,)
'esign, Supply and Installation of #ir Conditioning $., +, &* ;8, Tag C)0111,0#C0),1, include supply and installation of all
ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to plans4 5,1&0C)0111,01*E0,,)
and 5,1&0C)0111,01*50,,) !T7e si:e of t7e ;+#C is by contractor"
Installation of Fan Motor $.,+, 1;8, Tag C)0111,0F#0),1, according to plans4 5,1&0C)0111,01*E0,,) and 5,1&0C)0111,0
1*50,,) !T7e si:e of t7e ;+#C is by contractor"
Installation of GE/ SET B, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0),1, according to dra3ings4 5,1&0C)0111,0
1*E0,,) and 5,1&0C)0111,01*50,,), Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0
TS0),1 and daily tank
Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,) and 5,1&0C)0111,01*50,,)
Include Supply, Instalation, Mounting, Cabling and Testing by SE#64
0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0),1

0 Metering >ox ;'G
0 Trip7asic Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,)
8ole (ounting asse(bly #1 !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly #) !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly #. !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7,
arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation"
Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or
block, and all necessary for t7e rig7t installation"
+ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire,
anc7or block, and all necessary for t7e rig7t installation"
Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod,
connector, bentonite, and all necessary for t7e rig7t installation"
8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector"
&,(()
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 )*
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 *
MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( %,
$$)#
xxxx
$$)#!xxxx
( %,
$$)#
xxxx
$$)#!xxxx
( $*
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( %,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
CONTROL CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0),1 See Section # in dra3ing 5,1&0C)0111,01*50
,,1-,,1 !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t
installation *C
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<),108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F),108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of
licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 TI#>#L# Station
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC),1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and
all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC),108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8),108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply
of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8),)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8),%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8),$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8),*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?),108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?),108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,#C),108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,F#),108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial
necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,62),108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, $-c, tag4 C)0111,68),108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of
cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, )-c, tag4 C)0111,98),108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F),10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C),10C Cable fro( t7e $., + MCC to #ir Conditioning Control
Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
( *
DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting
DUCT BANKS INSTALLATION !"#$%&'"#( )*$+,+-".#, $.#$/)-), $.#'&"- PVC, 01+$)/0, /)2"%%, 0"(#+% -+1), )-$3 Supply and Mounting
$$)#
xxxx
$$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,) $C
Supply and Mounting ( $ %.,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting ( $ %.,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting ( $ %.,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting ( 1, %.,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting G6> 1 1,,
$$)#
xxxx
$$)#!xxxx
Supply and Mounting G6> ) ),,
JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,) !include (aterials and accessories" /-#
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections
BARE COPPER CONDUCTORS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M %$,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M 1*
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1.
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# ).
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# *
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1*
GROUND ROD TEST WELL Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )
CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#),10C Cable fro( t7e $., + MCC to Fan Motor Control Station
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0
1*50,,) )C
'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0
111,01*50,,) %0)C - %0 )C
'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80),1-),)-),%-),$-),* po3er and control cables See
dra3ing 5,1&0C)0111,01*50,,) 10)C - % 0 )C
Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C
Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%)
!include (aterials and accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-#
Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J,
furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-#
Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-#
>are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation $-, #<G
>are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation )-, #<G
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-#
Installation 'etail for ground rod test 3ell !include (aterials and accessories"
'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-#
Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories"
'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-#
Installation 'etail for typical substation fence ground connection !include (aterials and accessories"
'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-#
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1B
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# %
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# *
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# 1)
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# %
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( ),
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( B,
HUARANGUILLO STATION
ELECTRICAL EQUIPMENT Mounting, Connections and Marking
ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&.F&1#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&S/&1#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&MC&1#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0.&1#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0P&1#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&UP&1#)
Mounting, Connections and Marking Glb 1
Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-#
Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories"
'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-#
Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories"
'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-#
Installation 'etail for transfor(er grounding detail !include (aterials and accessories"
'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-#
Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories"
'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-#
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation $,,
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle
lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial
necessary for t7e rig7t installation )),+ x 1,,<
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply
all (aterial necessary for t7e rig7t installation )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation %1, x 1) x )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial
necessary for t7e rig7t installation )
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C0.#<G @ G"
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C01)#<G @ G"
Installation of 'ry Transfor(er 1,, k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0%,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,% and 5,1&0C)0111,01*50,,%
Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0%,1, according to dra3ings4 5,1&0C)0111,01*E0
,,% and 5,1&0C)0111,01*50,,%
Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0%,1, according to dra3ings4 5,1&0C)0
111,01*E0,,% and 5,1&0C)0111,01*50,,%
Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620%,1, according to dra3ings45,1&0C)0111,01*E0,,%
and 5,1&0C)0111,01*50,,%
Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680%,1, according to dra3ings45,1&0C)0111,01*E0,,% and 5,1&0C)0
111,01*50,,%
Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980%,1, according to dra3ings4 5,1&0C)0111,01*E0,,% and
5,1&0C)0111,01*50,,%
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
C'&$$)#&AC&1#)
Supply, Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&FA&1#)
Supply, Mounting, Connections and Marking Glb 1
ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&/E&1#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
$$)#!xxxx
Mounting, Connections and Marking Glb 1
OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE Supply, Installation, Mounting and Testing
ELECTRICAL EQUIPMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
POLE ERECTION SERVICE Supply, Installation, Mounting and Testing
$$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# )
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1$
MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 ).,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1,
'esign, Supply and Installation of #ir Conditioning $., +, Tag C)0111,0#C0%,1, include supply and installation of all ducts
and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to dra3ings4 5,1&0C)0111,01*E0,,% and
5,1&0C)0111,01*50,,% !T7e si:e of t7e ;+#C is by contractor"
Supply and Installation of Fan Motor $.,+, Tag C)0111,0F#0%,1, according to dra3ings4 5,1&0C)0111,01*E0,,% and 5,1&0
C)0111,01*50,,% !T7e si:e of t7e ;+#C is by contractor"
Installation of GE/ SET B, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0%,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,% and 5,1&0C)0111,01*50,,%, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0
TS0%,1 and daily tank
Installation of Syste( 8anelboard according to plans4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1
Include4
0 Multi ?ake >ar Screen Syste( 8anelboard $.,+, 1, k<, Tag C)0111,0'801,1
0 Step Screen Syste( 8anelboard $.,+, )% k<, Tag C)0111,0'801,)
0 >iofilter 8anelboard $.,+, ))$ k<, Tag C)0111,0'801,%
0 ;idropneu(atic 8anelboard $.,+, 1, k<, Tag C)0111,0'801,$
0 Gate 8anelboard $.,+, 1, k<, Tag C)0111,0'801,*
0 <elding ?eceptacle 1,#, $.,+, %) k<, Tag C)0111,0<?01,1-1,)
Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,% and 5,1&0C)0111,01*50,,%
Include Supply, Instalation, Mounting, Cabling and Testing only by SE#64
0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0%,1

0 Metering >ox ;'G
0 ,% 87ase Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,)
8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly #$ !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly #. !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all (aterials
necessary for t7e rig7t installation"
8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7,
arrester, insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation"
Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or
block, and all necessary for t7e rig7t installation"
+ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire,
anc7or block, and all necessary for t7e rig7t installation"
Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod,
connector, bentonite, and all necessary for t7e rig7t installation"
8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector"
&,(()
'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0%,1 See Section # in dra3ing 5,1&0C)0111,01*50
,,1-,,1 !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t
installation *C
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 )*
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 *
MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION
POWER CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( ),
$$)#
xxxx
$$)#!xxxx
( ),
$$)#
xxxx
$$)#!xxxx
( ),
$$)#
xxxx
$$)#!xxxx
( 1*
$$)#
xxxx
$$)#!xxxx
( ),
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
CONTROL CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<%,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F%,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of
licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 ;9#?#/G9I66= Station
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC%,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and
all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC%,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8%,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply
of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8%,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8%,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8%,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8%,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?%,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?%,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,#C%,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,F#%,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial
necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,62%,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, $-c, tag4 C)0111,68%,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of
cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, )-c, tag4 C)0111,98%,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F%,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C%,10C Cable fro( t7e $., + MCC to #ir Conditioning Control
Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
( *
DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting
DUCT BANKS INSTALLATION excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc
$$)#
xxxx
$$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,% $C
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ .,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ )&,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ )&,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( 1, )&,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> 1 1,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> ) ),,
JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,% !include (aterials and accessories" /-#
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking 9/'
GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections 9/' 1
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections
$$)# xxxx $$)#!xxxx 8oste de %, ft taper )CM (etalico ref standard C511CC ,,,0)1*01%11 Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections
BARE COPPER CONDUCTORS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M %),
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M %,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1&
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#%,10C Cable fro( t7e $., + MCC to Fan Motor Control Station
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0
1*50,,% )C
'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0
111,01*50,,% %0)C - %0 )C
'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80%,1-%,)-%,%-%,$-%,* po3er and control cables See
dra3ing 5,1&0C)0111,01*50,,% 10)C - % 0 )C
Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C
Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%)
!include (aterials and accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-#
Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J,
furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-#
Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-#
EKuipo para alu(brado de e(ergencia con ) la(paras 7alogenas de )* <, 1) +'C, autono(ia de B, (inutos, bateria
plo(o0acido, libre de (anteni(iento, ali(entacion )), +#C ) x )*<
'etalle constructivo de puesta a tierra a la barra de eKuipos !incluye (ateriales (enores" standard CG1)0>1C ,,,0)1*0
1$,) /-#
MontaNe de pararrayos tipo ioni:ante no radioactivo !8'C", Ono, +n4 )&* k+, InA 1,k#, $),, (sn(, MC=+4)11k+, 1 kE-k+,
si(ilar a 8revectron ), incluye air ter(inal y support socket for caulking or 3elding for 8revectron S%$, lig7tning or Si(ilar
'etalle constructivo de proteccion contra descargas ad(osfericas !incluye (ateriales (enores" standard C511CC ,,,0)1*0
1%11
>are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation $-, #<G
>are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation )-, #<G
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1)
GROUND ROD TEST WELL Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )
CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# ,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# B
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# %
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# 1)
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# %
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( ),
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( B,
ARANCOTA STATION
ELECTRICAL EQUIPMENT Mounting, Connections and Marking
ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&.F&+#)
Mounting, Connections and Marking Glb 1
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-#
Installation 'etail for ground rod test 3ell !include (aterials and accessories"
'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-#
Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories"
'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-#
Installation 'etail for typical substation fence ground connection !include (aterials and accessories"
'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-#
Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-#
Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories"
'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-#
Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories"
'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-#
Installation 'etail for transfor(er grounding detail !include (aterials and accessories"
'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-#
Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories"
'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-#
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation $,,
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle
lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial
necessary for t7e rig7t installation )),+ x 1,,<
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply
all (aterial necessary for t7e rig7t installation )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation %1, x 1) x )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial
necessary for t7e rig7t installation )
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C0.#<G @ G"
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C01)#<G @ G"
Installation of 'ry Transfor(er 1)* k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0$,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,* and 5,1&0C)0111,01*50,,*
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
C'&$$)#&S/&+#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&MC&+#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0.&+#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0P&+#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&UP&+#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&AC&+#)
Supply, Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&FA&+#)
Supply, Mounting, Connections and Marking Glb 1
ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM:
$$)#
xxxx
C'&$$)#&/E&+#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
$$)#!xxxx
Mounting, Connections and Marking Glb 1
OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE
ELECTRICAL EQUIPMENT
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
POLE ERECTION SERVICE Supply, Installation, Mounting and Testing
$$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 0
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1$
MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1,
Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0$,1, according to dra3ings4 5,1&0C)0111,01*E0
,,* and 5,1&0C)0111,01*50,,*
Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0$,1, according to plans4 5,1&0C)0111,0
1*E0,,* and 5,1&0C)0111,01*50,,*
Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620$,1, according to plans45,1&0C)0111,01*E0,,* and
5,1&0C)0111,01*50,,*
Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680$,1, according to plans45,1&0C)0111,01*E0,,* and 5,1&0C)0
111,01*50,,*
Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980$,1, according to plans4 5,1&0C)0111,01*E0,,* and
5,1&0C)0111,01*50,,*
'esign, Supply and Installation of #ir Conditioning $., +, &* ;8, Tag C)0111,0#C0$,1, include supply and installation of all
ducts and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to plans4 5,1&0C)0111,01*E0,,*
and 5,1&0C)0111,01*50,,* !T7e si:e of t7e ;+#C is by contractor"
Installation of Fan Motor $.,+, 1;8, Tag C)0111,0F#0$,1, according to plans4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,0
1*50,,* !T7e si:e of t7e ;+#C is by contractor"
Installation of GE/ SET 1,, k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0$,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,* and 5,1&0C)0111,01*50,,*, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0
TS0$,1 and daily tank
Installation of Syste( 8anelboard according to plans4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1
Include4
0 Multi ?ake >ar Screen Syste( 8anelboard $.,+, 1, k<, Tag C)0111,0'801,1
0 Step Screen Syste( 8anelboard $.,+, )% k<, Tag C)0111,0'801,)
0 >iofilter 8anelboard $.,+, ))$ k<, Tag C)0111,0'801,%
0 ;idropneu(atic 8anelboard $.,+, 1, k<, Tag C)0111,0'801,$
0 Gate 8anelboard $.,+, 1, k<, Tag C)0111,0'801,*
0 <elding ?eceptacle 1,#, $.,+, %) k<, Tag C)0111,0<?01,1-1,)
Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,*
Include Supply, Instalation, Mounting, Cabling and Testing by SE#64
0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0$,1

0 Metering >ox ;'G
0 ,% Trip7ase Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,)
8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester,
insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation"
Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or
block, and all necessary for t7e rig7t installation"
+ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire,
anc7or block, and all necessary for t7e rig7t installation"
Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod,
connector, bentonite, and all necessary for t7e rig7t installation"
8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector"
&,(()
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 )*
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 *
MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION
POWER CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( ),
$$)#
xxxx
$$)#!xxxx
( $,
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
CONTROL CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( *
'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0$,1 See Section # in dra3ing 5,1&0C)0111,01*50
,,*-,,B !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t
installation *C
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<$,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F$,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of
licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 #?#/C=T# Station
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC$,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and
all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC$,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8$,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply
of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8$,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8$,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8$,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8$,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?$,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?$,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,#C$,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,F#$,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial
necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,62$,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, $-c, tag4 C)0111,68$,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of
cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, )-c, tag4 C)0111,98$,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F$,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting
$$)#
xxxx
$$)#!xxxx
DUCT BANKS INSTALLATION including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc
$$)#
xxxx
$$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,% $C
including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ %,,,
$$)#
xxxx
$$)#!xxxx
including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ %B,,
$$)#
xxxx
$$)#!xxxx
including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ %B,,
$$)#
xxxx
$$)#!xxxx
including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( 1, %B,,
$$)#
xxxx
$$)#!xxxx
including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> 1 1,,
$$)#
xxxx
$$)#!xxxx
including excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> ) ),,
JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,% !include (aterials and accessories" /-#
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking 9/'
GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections 9/' 1
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections
$$)# xxxx $$)#!xxxx 8oste de %, ft taper )CM (etalico ref standard C511CC ,,,0)1*01%11 Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections
BARE COPPER CONDUCTORS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M %*,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M ),
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# ),
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C$,10C Cable fro( t7e $., + MCC to #ir Conditioning Control
Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#$,10C Cable fro( t7e $., + MCC to Fan Motor Control Station
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0
1*50,,% )C
'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0
111,01*50,,% %0)C - %0 )C
'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80%,1-%,)-%,%-%,$-%,* po3er and control cables See
dra3ing 5,1&0C)0111,01*50,,% 10)C - % 0 )C
Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C
Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%)
!include (aterials and accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-#
Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J,
furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-#
Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-#
EKuipo para alu(brado de e(ergencia con ) la(paras 7alogenas de )* <, 1) +'C, autono(ia de B, (inutos, bateria
plo(o0acido, libre de (anteni(iento, ali(entacion )), +#C ) x )*<
'etalle constructivo de puesta a tierra a la barra de eKuipos !incluye (ateriales (enores" standard CG1)0>1C ,,,0)1*0
1$,) /-#
MontaNe de pararrayos tipo ioni:ante no radioactivo !8'C", Ono, +n4 )&* k+, InA 1,k#, $),, (sn(, MC=+4)11k+, 1 kE-k+,
si(ilar a 8revectron ), incluye air ter(inal y support socket for caulking or 3elding for 8revectron S%$, lig7tning or Si(ilar
'etalle constructivo de proteccion contra descargas ad(osfericas !incluye (ateriales (enores" standard C511CC ,,,0)1*0
1%11
>are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation $-, #<G
>are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation )-, #<G
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# %)
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# *
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1.
GROUND ROD TEST WELL Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )
CONNECTION TO EQUIPMENT AND METALLIC PARTS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1B
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# %
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# 1)
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# %
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( ),
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( B,
CONGATA PUMP STATION
ELECTRICAL EQUIPMENT Mounting, Connections and Marking
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-#
Installation 'etail for ground rod test 3ell !include (aterials and accessories"
'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-#
Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories"
'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-#
Installation 'etail for typical substation fence ground connection !include (aterials and accessories"
'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-#
Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-#
Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories"
'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-#
Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories"
'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-#
Installation 'etail for transfor(er grounding detail !include (aterials and accessories"
'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-#
Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories"
'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-#
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation $,,
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle
lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial
necessary for t7e rig7t installation )),+ x 1,,<
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply
all (aterial necessary for t7e rig7t installation )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation %1, x 1) x )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial
necessary for t7e rig7t installation )
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C0.#<G @ G"
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C01)#<G @ G"
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
ELECTRICAL EQUIPMENT INSIDE E-ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&.F&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&S/&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&MC&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0.&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&0P&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&UP&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&AC&(#)
Supply, Mounting, Connections and Marking Glb 1
$$)#
xxxx
C'&$$)#&FA&(#)
Supply, Mounting, Connections and Marking Glb 1
ELECTRICAL EQUIPMENT INSIDE GENERATOR ROOM: Mounting, Connections and Marking
$$)#
xxxx
C'&$$)#&/E&(#)
Mounting, Connections and Marking Glb 1
$$)#
xxxx
$$)#!xxxx
Mounting, Connections and Marking Glb 1
OVERHEAD 10 kV LINE AND UNDERGROUND 10 kV LINE Supply, Installation, Mounting and Testing
ELECTRICAL EQUIPMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
POLE ERECTION SERVICE Supply, Installation, Mounting and Testing
$$)# xxxx $$)#!xxxx Excavation, Foundation and Erection for concrete poles Include supply of refill !include concrete pole" Supply, Installation, Mounting and Testing E# 11
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# &
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1
Installation of 'ry Transfor(er )*, k+# 1,-,$. k+, 'yn1, Tag /o C)0111,02F0*,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,* and 5,1&0C)0111,01*50,,*
Installation of Fuse 6oadbreak S3itc7gear 1*k+, ),,#, Tag /o C)0111,0SG0*,1, according to dra3ings4 5,1&0C)0111,01*E0
,,* and 5,1&0C)0111,01*50,,*
Installation of 6+ Motor Control Center ,$. k+, /e(a 1#, 1,, #, Tag C)0111,0MC0*,1, according to dra3ings4 5,1&0C)0
111,01*E0,,* and 5,1&0C)0111,01*50,,*
Installation of 6ig7ting 'ry Transfor(er $.,-$,,0)%,+, Tag C)0111,0620*,1, according to dra3ings45,1&0C)0111,01*E0,,*
and 5,1&0C)0111,01*50,,*
Installation of 6ig7ting 8anel $,,-)%, +, Tag C)0111,0680*,1, according to dra3ings45,1&0C)0111,01*E0,,* and 5,1&0C)0
111,01*50,,*
Installation of 98S Syste( )%,-1), +dc, * k+#, Tag C)0111,0980*,1, according to dra3ings4 5,1&0C)0111,01*E0,,* and
5,1&0C)0111,01*50,,*
'esign, Supply and Installation of #ir Conditioning $., +, Tag C)0111,0#C0*,1, include supply and installation of all ducts
and cable tray syste( and all (aterial necessary for t7e rig7t installation, according to dra3ings4 5,1&0C)0111,01*E0,,* and
5,1&0C)0111,01*50,,* !T7e si:e of t7e ;+#C is by contractor"
Supply and Installation of Fan Motor $.,+, Tag C)0111,0F#0*,1, according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0
C)0111,01*50,,* !T7e si:e of t7e ;+#C is by contractor"
Installation of GE/ SET ))* k<, ,$. k+, %8;, Cos fi ,.,, Tag /o C)0111,0GE0*,1, according to dra3ings4 5,1&0C)0111,0
1*E0,,* and 5,1&0C)0111,01*50,,*, Include Instalation of Manual Transfer Syste(, ),,#, $.,+, 1,;:, Tag /o C)0111,0
TS0*,1 and daily tank
Installation of Syste( 8anelboard according to plans4 5,1&0C)0111,01*E0,,1 and 5,1&0C)0111,01*50,,1
Include4
0 Multi ?ake >ar Screen Syste( 8anelboard $.,+, 1, k<, Tag C)0111,0'801,1
0 Step Screen Syste( 8anelboard $.,+, )% k<, Tag C)0111,0'801,)
0 >iofilter 8anelboard $.,+, ))$ k<, Tag C)0111,0'801,%
0 ;idropneu(atic 8anelboard $.,+, 1, k<, Tag C)0111,0'801,$
0 Gate 8anelboard $.,+, 1, k<, Tag C)0111,0'801,*
0 <elding ?eceptacle 1,#, $.,+, %) k<, Tag C)0111,0<?01,1-1,)
Installation of 8MI according to dra3ings4 5,1&0C)0111,01*E0,,* and 5,1&0C)0111,01*50,,*
Include Supply, Instalation, Mounting, Cabling and Testing only by SE#64
0 Trafo(ix =pen 'elta 1,-,$. k+, )x*,+# and )x%,+#, %8;, C6 ,), ),-*#, Tag /o C)0111,08MI0*,1

0 Metering >ox ;'G
0 ,% p7ase Multinfunction Electronic Meter #1?6@, % <ire, )*0),#, 1),0$.,+, C6A,)
8ole (ounting asse(bly #% !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly #$ !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly #* !Include supply and (ounting of insulators, connectors, crossar(s, conduit, and all necessary
(aterials for t7e rig7t installation"
8ole (ounting asse(bly 8MI See dra3ing 5,1&0C)0111,01*F0,,B !Include supply and (ounting of Trafo(ix, s3itc7, arrester,
insulators, connectors, crossar(s, conduit, and all necessary for t7e rig7t installation"
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1&
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing E# 1$
MOUNTING OF CONDUCTORS, CABLES AND ACCESSORIES Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1.,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 1,
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 )*
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing M6 *
$$)# MANAGEMENT DOCUMENT Supply, Installation, Mounting and Testing
$$)#
xxxx
$$)#!xxxx
Supply, Installation, Mounting and Testing Glb 1
CABLES AND CONDUCTORS OF ELECTRICAL SUBSTATION
POWER CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( &,
$$)#
xxxx
$$)#!xxxx
( 1*
$$)#
xxxx
$$)#!xxxx
( )*
$$)#
xxxx
$$)#!xxxx
( $*
$$)#
xxxx
$$)#!xxxx
( $*
$$)#
xxxx
$$)#!xxxx
( $*
$$)#
xxxx
$$)#!xxxx
( 1,
Inclined Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,,& !include supply and (ounting of insulators, steel 3ire, anc7or
block, and all necessary for t7e rig7t installation"
+ertical Guy asse(bly See dra3ing 5,1&0C)0111,01*F0,1, !include supply and (ounting of insulators, tailstock, steel 3ire,
anc7or block, and all necessary for t7e rig7t installation"
Ground 3ell asse(bly See dra3ing 5,1&0C)0111,01*F0,11 !include excavation, refill, supply and (ounting of ground rod,
connector, bentonite, and all necessary for t7e rig7t installation"
8ulling0=ut, Stringing and Cla(ping of p7ase conductor ###C 3ire !Include supply of conductor, cla(ps and conector"
&,(()
'uct bank 3it7 ,1 conduits *C 8+C08 for po3er supply to C)0111,02F0*,1 See Section # in dra3ing 5,1&0C)0111,01*50
,,*-,,B !Include excavation, concrete, conduit 8+C, ?efill" Contractor (ust supply all (aterial necessary for t7e rig7t
installation *C
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,S<*,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Teck B,, 1* k+, 1%% D Insulator level, 1-c, tag4 C)0111,2F*,108 !Include cable laying, installation of ;eat S7rinkeable
Ter(inals, ter(inal, connection, (arking and resistance (easure(ent" Include supply of cable and all (aterial necessary for
t7e rig7t installation %x1-C0)*, MCM
Manage(ent of t7e tec7nical file for obtaining t7e design point, include4 8resentation and approval of tec7nical file, obteined of
licenses and per(its for construction and co((isioning of =ver7ead 6ine 1,k+ 0 C=/G#T# 8u(p Station
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC*,1081 Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC Include supply of cable and
all (aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,MC*,108) Cable fro( t7e GE/ SET ,$. k+ to $., + MCC Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C )*, MCM @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8*,108 Cable fro( t7e $., + MCC to Multi ?ake >ar Screen 8anelboard Include supply
of cable and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8*,)08 Cable fro( t7e $., + MCC to Step Screen 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8*,%08 Cable fro( t7e $., + MCC to >iofilter 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8*,$08 Cable fro( t7e $., + MCC to ;ydropneu(atic 8anelboard Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'8*,*08 Cable fro( t7e $., + MCC to Gate 8anelboard Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,8<B,$08 Cable fro( t7e $., + MCC to 8u(p 1 Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !%-C ) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,8<B,*08 Cable fro( t7e $., + MCC to 8u(p ) Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !%-C ) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,8<B,108 Cable fro( t7e $., + MCC to 8u(p % Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !%-C ) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,<?*,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
( 1,
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( ),
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
CONTROL CABLES INSTALLATION
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
$$)#
xxxx
$$)#!xxxx
( *
DUCT BANKS, CONDUITS AND ACCESSORIES Supply and Mounting
DUCT BANKS INSTALLATION excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc
$$)#
xxxx
$$)#!xxxx 'uct bank 3it7 ,) conduit $C 8+C08 for $.,+ MCC po3er cables See Section C in dra3ing 5,1&0C)0111,01*50,,* $C
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ 1%,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ $*,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( $ $*,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc ( 1, $*,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> 1 1,,
$$)#
xxxx
$$)#!xxxx
excavation, concrete, conduit 8+C, spacers, refill, signal tape, etc G6> ) ),,
JUNCTIONBOXES, PUSH BUTTON AND RECEPTACLES Include Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# *
$$)#
xxxx
$$)#!xxxx
Eunction boxes for lig7ting syste( according dra3ing 5,1&0C)0111,01*F0,,* !include (aterials and accessories" /-# Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking E# )
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting, Connections and Marking 9/'
Teck B,, 1 k+, %-c, tag4 C)0111,<?*,108 Cable fro( t7e $., + MCC to <elding ?eceptacle Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1 #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,#C*,108 Cable fro( t7e $., + MCC to #ir Conditioning Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,F#*,108 Cable fro( t7e $., + MCC to Fan Motor Contractor (ust supply all (aterial
necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,'#*,108 Cable fro( t7e $., + MCC to 'esander Contractor (ust supply all (aterial
necessary for t7e rig7t installation 1 x !%-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, %-c, tag4 C)0111,62*,108 Cable fro( t7e $., + MCC to 6ig7ting 'ry Transfor(er Include supply of cable
and all (aterial necessary for t7e rig7t installation 1 x !%-C 1, #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, $-c, tag4 C)0111,68*,108 Cable fro( t7e 6ig7ting 'ry Transfor(er to 6ig7ting 8anelboard Include supply of
cable and all (aterial necessary for t7e rig7t installation 1 x !$-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1 k+, )-c, tag4 C)0111,98*,108 Cable fro( t7e 6ig7ting 8anelboard to 98S Include supply of cable and all
(aterial necessary for t7e rig7t installation 1 x !)-C 1) #<G @ G"
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,2F*,10C Cable fro( t7e transfor(er 1,-,$. k+ to $., + MCC
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,#C*,10C Cable fro( t7e $., + MCC to #ir Conditioning Control
Station Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
Teck B,, 1$ #<G, 1,, +, (ulticonductor, tag4 C)0111,F#*,10C Cable fro( t7e $., + MCC to Fan Motor Control Station
Include supply of cable and all (aterial necessary for t7e rig7t installation 1x&-C /G 1$ #<G
Supply, Mounting, Connection, Marking, installation of ;eat S7rinkeable
Ter(inals and ?esistance Measure(ent
'uct bank 3it7 ,) conduit )C 8+C08 for ;ydroneu(atic 8anelboard po3er cables See Section C in dra3ing 5,1&0C)0111,0
1*50,,* )C
'uct bank 3it7 ,1 conduits )C 8+C08 for po3er and control cables to feed 8anelboardHs See Section > in dra3ing 5,1&0C)0
111,01*50,,* %0)C - %0 )C
'uct bank 3it7 ,B conduits )C 8+C08 for panelboards C)0111,0'80%,1-%,)-%,%-%,$-%,* po3er and control cables See
dra3ing 5,1&0C)0111,01*50,,* 10)C - % 0 )C
Installation 'etail of typical conduit bank Stub09p #ccording 'etail 1& of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T 1& )C and $C
Installation 'etail of typical (otor and control 3iring I installation asse(bly #ccording 'etail *$ of )$,50C)0,,,,01*F0,%)
!include (aterials and accessories"
'etail 1& of )$,50C)0,,,,01*F0,%)0S;T *$ /-#
Station /EM# %?, %0devices %,(( 4 Start, Stop, 8ilot 6ig7t, front operated, factory sealed, t7roug7 feed 7ubs %-$C J,
furnis7ed 3it7 stainless steel asse(bly 7ard3are !include (aterials and accessories" /-#
Installation 'etail of $.,+ <elding ?eceptacle #ccording 'etail *1 of )$,50C)0,,,,01*F0,%) !include (aterials and
accessories"
'etail *1 of )$,50C)0,,,,01*F0,%)0S;T *1 !include (aterials and accessories" /-#
EKuipo para alu(brado de e(ergencia con ) la(paras 7alogenas de )* <, 1) +'C, autono(ia de B, (inutos, bateria
plo(o0acido, libre de (anteni(iento, ali(entacion )), +#C ) x )*<
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
GROUNDING SSTEM AND LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections 9/' 1
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections
$$)# xxxx $$)#!xxxx 8oste de %, ft taper )CM (etalico ref standard C511CC ,,,0)1*01%11 Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections
BARE COPPER CONDUCTORS Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M **,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections M *,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# ).
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# %%
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# &
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )$
GROUND ROD TEST WELL Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# )
CONNECTION TO EQUIPMENT AND METALLIC PARTS
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1,
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# &
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1B
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E#
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTNING PROTECTION Include Supply, Mounting and Connections
$$)#
xxxx
$$)#!xxxx
Include Supply, Mounting and Connections E# 1
LIGHTING SSTEM AND ACCESSORIES Supply, Mounting, Connections and Marking
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
'etalle constructivo de puesta a tierra a la barra de eKuipos !incluye (ateriales (enores" standard CG1)0>1C ,,,0)1*0
1$,) /-#
MontaNe de pararrayos tipo ioni:ante no radioactivo !8'C", Ono, +n4 )&* k+, InA 1,k#, $),, (sn(, MC=+4)11k+, 1 kE-k+,
si(ilar a 8revectron ), incluye air ter(inal y support socket for caulking or 3elding for 8revectron S%$, lig7tning or Si(ilar
'etalle constructivo de proteccion contra descargas ad(osfericas !incluye (ateriales (enores" standard C511CC ,,,0)1*0
1%11
>are Copper Conductor Installation, /G $-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation $-, #<G
>are Copper Conductor Installation, /G )-, #<G, soft dra3n, 1B 3ires !Include excavation, fill, supply and refill of bare
conductor and all (aterial necessary for t7e rig7t installation )-, #<G
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %# of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %> of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail %C of )$,50C)0,,,,01*F0,1)0S;T ,% /-#
Installation 'etail for typical 7eavy duty tee connections !include (aterials and accessories"
'etail *# of )$,50C)0,,,,01*F0,1)0S;T ,* /-#
Installation 'etail for ground rod test 3ell !include (aterials and accessories"
'etail )1 of )$,50C)0,,,,01*F0,1)0S;T )1 /-#
Installation 'etail for peri(eter ground to building steel connection !include (aterials and accessories"
'etail $) of )$,50C)0,,,,01*F0,1)0S;T $) /-#
Installation 'etail for typical substation fence ground connection !include (aterials and accessories"
'etail $& of )$,50C)0,,,,01*F0,1)0S;T $& /-#
Installation 'etail for typical (etal tank or eKuip(ent ground connection !include (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,1)0S;T *1 /-#
Installation 'etail for electrical eKuip(ent roo( ground bus bar !include (aterials and accessories"
'etail *$ of )$,50C)0,,,,01*F0,1)0S;T *$ /-#
Installation 'etail for neutral grounding resistor ground connection !include (aterials and accessories"
'etail *& of )$,50C)0,,,,01*F0,1)0S;T *& /-#
Installation 'etail for transfor(er grounding detail !include (aterials and accessories"
'etail *. of )$,50C)0,,,,01*F0,1)0S;T *. /-#
Installation 'etail for structural lig7tning rod connection !include pole, ligt7ning rod, (aterials and accessories"
'etail $1 of )$,50C)0,,,,01*F0,1)0S;T $1 /-#
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail ,* of )$,50C)0,,,,01*F0,))0S;T ,* 'ual Floodligt7 8ole Mounted 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation $,,
BILL OF QUANTITIES - (Electrical)
Cerro Verde Production Unit Expansion
CONTRACTOR:
NAME OF THE CONTRACT: K139 - WASTE WATER COLLECTION SYSTE
Scope Of Wor No! "#$%&C'&SW&(#&(#)&Re*!C+
,
T
E
M

-
WBS !ESCRI"TION N#te$ UNIT QTY a%-&#'r
FLUOR COST
ELEENT
FLUOR
WBS(COST
ELEENT
CLIENT
CO!IN)
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# B
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# 1.
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# *
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# $
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking E# 1
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( ),
$$)#
xxxx
$$)#!xxxx
Supply, Mounting, Connections and Marking ( B,
&,B,,
Installation 'etails 6i7gting Syste( !include pole, lig7ting fixture and (aterials and accessories"
'etail 1, of )$,50C)0,,,,01*F0,))0S;T 1, Include a do(e reflector 3it7 1,, <atts 7ig7 pressure sodiu( )* deg angle
lu(inaire 3it7 (ulti0tap 1, ;# integral ballast, %-$C 7ub si:e or sa(e for eac7 detail Contractor (ust supply all (aterial
necessary for t7e rig7t installation )),+ x 1,,<
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %, of )$,50C)0,,,,01*F0,))0S;T %, Industrial Fluorescent 6ig7ting Fixture Mounting 'etail Contractor (ust supply
all (aterial necessary for t7e rig7t installation )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail %* of )$,50C)0,,,,01*F0,))0S;T %* E(ergency 6ig7t 8ack Mounting 'etail Contractor (ust supply all (aterial
necessary for t7e rig7t installation %1, x 1) x )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
'etail *1 of )$,50C)0,,,,01*F0,))0S;T *1 Industrial Type <eat7erproof ?eceptacle Contractor (ust supply all (aterial
necessary for t7e rig7t installation )
Installation 'etails 6i7gting Syste( !include lig7ting fixture and (aterials and accessories"
Industrial Fluorescent 6ig7ting Fixture Electronic >allast 1),+ 0 )&&+, Explosion 8roof Mounting 'etail Contractor (ust supply
all (aterial necessary for t7e rig7t installation ) x %)
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C0.#<G @ G"
Teck B,, Copper conductor, 2;;<0) TC, 268, cover 3it7 8+C, B, GC, 1,,+ Include supply of cable and all (aterial
necessary for t7e rig7t installation 1 x !)-C01)#<G @ G"
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
La*#r (S+()
S- ,,,