You are on page 1of 7

1.

It is important to identify the details of network sections and devices


that will be affected or involved in a new design. This information is
included in which section of the Network Design Requirements
Document?
• Project Goal
• Project Scope
• Technical Requirements
• Current State of the Network

2. Which two pieces of information does the network designer need to


determine if the Cisco IOS of a router requires an upgrade? (Choose
two.)
• amount of NVRAM installed
• model number of the router
• number of interfaces and installed HWICs
• installed Cisco IOS feature set and version
• error statistics for each interface

3. Which three pieces of information need to be considered when


selecting the proper Cisco IOS version for an upgrade? (Choose three.)
• processor ID
• interface type
• amount of DRAM
• bootstrap version
• device make and model
• size of system flash memory

4. What are two practices a network technician should follow when


installing a new interface card in a router? (Choose two.)
• Be sure the interface card faceplate does not touch the chassis rear
panel.
• Do not tighten the captive screws until the router has been powered
on and recognizes the card.
• Store the blank faceplate inside the card slot to be used if the card is
removed.
• Handle the interface card by the edges to avoid static discharge.
• Push the interface card into place until the edge connector is seated
securely

5. The new serial interface card for the router arrives and the network
technician reads that it is hotswappable. What does this mean?
• The card cannot be installed while the router is powered on because
static discharge could damage the card.
• The card cannot be installed until the router is powered off and
completely cooled down.
• The card can be installed while the router is powered on if the router
supports this technology.
• The card is a replacement and must be installed in the same slot as
the card it is replacing.

6. Refer to the exhibit. A network administrator issues the command


shown to gain knowledge about a poorly documented network. Which
two pieces of information can the network administrator discover from
the command output? (Choose two.)
• One connected device has router capability.
• The entire network contains a total of five Cisco devices with CDP
enabled.
• None of the directly connected network devices have been
configured with an IP address.
• Device EDGE_2811 is connected to port Fast Ethernet 0/0 on device
C3750-24_MDF.
• Five Cisco devices with CDP enabled are directly connected to
device C3750-24_MDF

7. Refer to the exhibit. Which of the three Cisco IOS images shown
will load into RAM?
• The router selects an image depending on the value of the
configuration register.
• The router selects the third Cisco IOS image because it is the most
recent IOS image.
• The router selects the second Cisco IOS image because it is the
smallest IOS image.
• The router selects an image depending on the boot system command
in the configuration.
• The router selects the third Cisco IOS image because it contains the
advipservicesk9 image.

8. An administrator wants to download a new Cisco IOS software


version to the local router. Which command performs this task?
• copy tftp flash
• copy flash run
• copy start tftp
• copy flash tftp
• copy tftp start

9. Refer to the exhibit. The top of the output shows the Cisco Feature
Navigator regarding a Cisco IOS image that the administrator wants to
install on a router. Below it is the output from the show version
command for that router. Which statement is true regarding the
capacity of the router to run this Cisco IOS image?
• There is not enough DRAM and flash.
• There is enough DRAM and flash.
• There is enough DRAM but not enough flash.
• There is enough flash but not enough DRAM.

10. Which two items are objectives of a WLAN design site survey?
(Choose two.)
• identify coverage areas
• determine primary AP locations
• determine what AP equipment should be purchased
• determine how many users will access the WLAN
• identify the bottleneck of the LAN infrastructure

11. Refer to the exhibit. Which two actions improve the weaknesses of
the topology shown, assuming that each access layer segment is in its
own subnet? (Choose two.)
• Implement redundant links to each server by adding additional NICs.
• Implement a reduntant link from all access layer switches to Admin,
Dist, and Server Farm.
• Implement a backup firewall with a link to a secondary ISP and
implement a redundant link to the DMZ.
• Implement reduntant links from the existing firewall to all access
layer switches.
• Implement redundant links from the DMZ to Admin and Dist.

12. A company is beginning to analyze their new Cisco IOS upgrade


requirements. What is one of the router components that a network
administrator must consider when selecting a new Cisco IOS version?
• processor type
• storage space in NVRAM
• interfaces and modules to be supported
• compatibility of the bootstrap version with the new Cisco IOS
software

13. An employee at a company notices that the wireless signal


strength indicator on his laptop fluctuates from good to low. The
network administrator decides to do a site survey of that area. Which
three factors need to be included in the survey? (Choose three.)
• type and model number of the WNIC of the laptop
• number of users in the area
• location of the AP
• list of MAC addresses filtered by the AP
• number of simultaneous applications running on the laptop of the
employee
• location of walls and filing cabinets in the office

14. The new network design for AnyCompany must include support of
voice and video traffic. Before upgrading, the network designer checks
whether the existing devices can support the new requirements. Which
three items does the designer need to check? (Choose three.)
• number of routers and switches owned by AnyCompany
• routers that will support extra ASICs and WWICs
• size of DRAM and flash on each device
• routers that will support HWICs and VWICs
• system bootstrap version on each router and switch
• modules supported on the loaded Cisco IOS

15. A new Cisco IOS version has been copied into flash from a TFTP
server. When a reload is issued to upgrade the Cisco IOS, the router
freezes part of the way through the loading process. What could be the
problem?
• There is enough flash but not enough RAM in the router.
• The new HWIC cards have not been installed yet.
• The TFTP server needs to be present during a reload.
• The new Cisco IOS should have been loaded into NVRAM.
• The new bootstrap version is not compatible with the original version
on the router.

16. Refer to the exhibit. A network designer has no documentation


and is attempting to create a logical diagram of the network using the
output from show commands. What can be determined from the
output shown?
• The device with the ID of ISP is a router on the Internet.
• The attached switch is a VTP server in the Toronto domain.
• The designer cannot telnet to the attached switch.
• The Cisco router IOS supports enterprise-level voice and video
technologies.

17. A production router is reloaded and finishes with a Router>


prompt. What three facts can be determined? (Choose three.)
• POST occurred normally.
• The boot process was interrupted.
• There is not enough RAM or flash on this router.
• A full version of the Cisco IOS was located and loaded.
• A configuration file was not located in NVRAM or from a TFTP
server.
• The router did not locate the Cisco IOS in flash, so it defaulted to
ROM.

18. During a site survey, the network designer noticed that people
were accessing the company wireless network from the parking lot.
What should be done to stop the wireless signal from radiating out
into the parking lot?
• change the channel on the wireless AP
• connect the wireless AP to a firewall
• change the type of antenna attached to the AP
• move the wireless AP to a secure VLAN
• move the wireless AP to a port on a Layer 3 switch

19. A network design project includes a review of the existing


network. What is the purpose of this phase of the project?
• eliminate the need for a site survey
• shorten the timeframe of the project
• lower the cost of the project by removing redundant links and
devices
• determine if the number of applications used within the company can
be reduced
• To determine what existing network devices require upgrades to
meet the new

20. Refer to the exhibit. Based upon the Cisco IOS file naming
convention, what is represented by the value ipvoicek9 listed in the
IOS filename?
• version
• file format
• feature set
• hardware platform

21. Refer to the exhibit. What two items can be determined from the
output? (Choose two.)
• R2 is a Cisco 2600 device.
• R2 has 22 MB of RAM installed.
• The version of the IOS is 12.3.
• Over 8 MB of NVRAM is installed.
• A new 36 MB IOS file can be installed on the device.

22. During a wireless site survey, a consultant is determining the hours


of peak usage and the estimated number of users in each location. The
consultant is currently in what step of the site survey process?
• the defining of customer requirements
• the identification of coverage areas
• the determining of preliminary AP locations
• the measurement of signal strength

23. Refer to the exhibit. The network administrator is attempting to


install a new version of the IOS on R2. Based on the exhibited output,
what are two possible reasons that the transfer failed?(Choose two.)
• The administrator did not enable TFTP on R2.
• There is not enough flash available to store the new IOS.
• Connectivity between R2 and the TFTP server was not verified.
• The copy command was incorrectly entered.
• The administrator did not verify that the TFTP server is running.

24. In which section of the Network Design Requirements document


would a network consulting team detail names and IP addresses of
important networking components and servers, provide network
diagrams and topologies, and define strengths and weaknesses of the
network?
• network requirements
• project scope
• overall project goal
• state of the network

2.

You might also like