You are on page 1of 3

To,

Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Pile Work 2 56 9 20 40 40
Excavation 7 7
Beam 6 6
Pile Cap/Pad 3 3
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Pile Work 56
Excavation 7 7
Pile Cap/Beam 5 5
Pedestals
Backfilling
Switch Yard Path Culverts (21
Nos.)
Contractor: NEIE
Auto Transformer (7 Nos.)
Line Gantry (5 Nos.)
(20+10.75+9.25m)
ATB Gantry (5 Nos.)
(20+10.75+9.25m)
Disconnector (24 Sets) Circuit Breaker (9 Sets)
High Level Gantry (10 Nos.)
(30.75+9.25m)
Activities
C.V.T (22 Nos)
Activities
Switch Yard Path (1208 m) Current Trasnsformer (27 Nos)
NEIE
Al-Husain Traders & Contractors
Dated: 28/02/2014
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE
EXISTING 220 KV SHIKARPUR SUBSTATION TO 500 KV LEVEL.
Daily Progress Report
Fire Wall (7 Nos.)
500 kV Switch Yard
1 2 3 4 5 6 7
8 9 10 11 12 13 14
Post Insulator (72 Nos)
Low Level Gantry (10 Nos.)
(20m)
Surge Arrestor (18 Nos.)
S.SS. Errection
Equip. Erection
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Excavation
Lean Concrete
Steel Work
Form Work
Conrete Work
Bitumen Coating
Backfilling
3- Surface Preparation for Firewall-6 Bes is in Progress
4- Surface preparation for lean concrete is in progress.
TYPE-iv (510 m)
Today Activities Perfomed:
1- Bitumen Coating and Back Filling of Fire wall(pile cap) And Auto Transformer (walls) are in Progress.
2- Placement of M.s Rails and Levelling is in Progress
15
TYPE-ii (450 m)
Activities
TYPE-iii (620 m)
Trenches (m)
TYPE-i (140 m)
To,
NEIE
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV SHIKARPUR SUBSTATION TO 500
KV LEVEL.
To,
Al-Husain Traders & Contractors
Daily Progress Report
Activities
Surge Arrestor (12 Nos.)
High Level (4 Nos.)
(13+5.5+4m)
High Level (8 Nos.)
(18.5+4m)
Low Level (12 Nos.)
(13+4m)
C.V.T Line (12 Nos.)
Dated: 28/02/2014
Contractor: NEIE
220 kV Switch Yard
Post Insulator (26 Nos.)
1 2 5 6 7
Current Transformer (18 Nos.)
3 4
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Pile Work 32 48 16 6 6 6 6 4 4
Excavation
Pile Cap/Beam
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
Activities
Today
Equip. Erection
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Activity Today
This
Month
To Date Today
This
Month
To Date Activity Today This Month To Date
Pile Work 12 12 3 3 3 Sub Base 146.7 146.7 76.65 88.65
Brick
Work/Stone
Masonry
Activities
12 8 9 10 11
Disconnector (16 sets) Transformer Way(111 m) Fencing (335m)
13
Circuit Breaker (6 Sets) Path Way (257 m) Bitumen Road (250 m)
Excavation Base 146.7 146.7 Copping
Pile Cap/Beam Carpet Fence Work
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
17
Trenches (m)
15 14 16
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation 100% 100% Excavation 100% 100%
Lean Concrete 100% 100% Lean Concrete 92.7 92.7
Steel Work 100% 100% Steel Work
Form Work 100% 100% Form Work
Transformer Moving Area (118.7 M)
Trenches (m)
Path Way Culverts (7 Nos)
Activities
Transformer Way Culvert
(01 No.) TYPE-iii (260 m)
Activities
TYPE-i (126 m) TYPE-iv (257 m)
Form Work 100% 100% Form Work
Conrete Work 100% 100% Conrete Work
Bitumen Coating 100% 100%
Backfilling
Today Activities Perfomed:
2- Back Filling of Bitumen Road shoulders is completed
1- Laying of base material of Bitumen Road is completed
7- Steel Cutting and Bending of 11kV Feeder Trench is in Progress
5- Compaction of Bitumen Road dis in Progress
6- Lean Concrete of 11kV Feeder Trench is completed
4- Pile Work of 220Kv Equipment Piles is in Progress
3- Surface Preparation of Moving Area is in Progress.
2- Back Filling of Bitumen Road shoulders is completed
NEIE
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220
To,
Dated:28/02/2014
Daily Progress Report
Control House Building
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220
KV SHIKARPUR SUBSTATION TO 500 KV LEVEL
Contractor: NEIE
AL-HUSSAIN TRADERS
Sr. No. Status
1 Completed
2 Completed
Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level
Excavation Work for Foundation Beams And Pile Caps
Descripition of Activities
Pile Work
3 In Progress
4 In Progress
5 In Progress
6 In Progress
Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level
Concrete Work of Pile Caps and Foundation Beams
Form Work of Pile Caps and Foundation Beams
Form Work of Columns upto Plinth Level 6 In Progress
7
8
Today Activities Performed
Form Work of Columns upto Plinth Level
3- Form Work of Columns upto Plinth Level is in Progress
4- Steel Fixing of Stair Case Foundation is in Progress
1- Steel Work of Foundation Beams Axis (5-8) is in progress
2- Form Work of Foundation Beams Axis (5-8) is in progress.
7- Bitumen Coating on Foundation Beams is in Progress
4- Steel Fixing of Stair Case Foundation is in Progress
5- Concrete Work of Pile Caps and Foundation Beams Axis (1~5- A~D) is completed
6- Opening & Shifting of Form work is in progress.
8- Bar Bending Schedule of Stair Case Submitted on 09-02-2014
9- Bar Bending Schedule of Columns ( Plinth Level upto 1st Floor ) Submitted on 09-02-2014
10- Bar Bending Schedule of 1st Floor Beams Submitted on 21-02-2014