ELECTRICAL INSTALLATION OF 50 KWp SOLAR POWER SYSTEM

AT RUBBER TRAINING INSTITUTE RUBBER BOARD KOTTAYAM


DETAILED SPECIFICATION & SCHEDULE OF QUANTITIES
Item. Description Qty Unit Rate Amount
1 DRAWINGS
1.01 Preparation of drawings showing site plans, physical layouts 1 Set
line diagram of the equipment, switch boards, sectional details
of switch gear, D.G Set, earthing, solar power plant arrangement etc
and calculations as required by the Kerala State Electrical
Inspectorate/ Electricity Board for the technical approval for
the electrical installation of solar power plant, arranging inspection,
getting sanction for energisation etc complete.
The entire scheme of Rubber Training Centre to be prepared in a book
form. (Statutory fees remitted to Kerala State Electricity Board /
Electrical Inspectorate will be reimbursed by Rubber Board)
2 SOLAR POWER PANNEL BOARD
2.01 Fabricate, supply,erection testing and commissioning of switch 1 set
board, cubicle type with 25X 8 mm aluminium busbar for phases and
neutral with provision for fixing following acessories, interconnections
earthing etc complete as per attached drawing.
2.02 Supply & fixing 200 A Four pole switch L&T make FN200 as 1 No
incommer with 125 A fuses
2.03 Supply and fixing 100 Amp TPN MCCB of 25 KA L&T make 1 No
2.04 Supply and fixing 63 Amp TPN MCCB of 25 KA L&T make 5 Nos
2.05 Supply and fixing 63 Amp TPN MCCB of 16 KA L&T make 1 Nos
2.06 Supply and fixing 40 Amp TPN MCCB of 16 KA L&T make 1 Nos
2.07 Supply and fixing 40 Amp Four pole MCB of reputed make 1 Nos
2.08 Supply and fixing RYB indications. 1 Set
2.09 Supply and fixing digital VAF (voltage, ampere, frequency) meter 1 Set
of conserv or equivalent reputedmake
3.00 MCB DISTRIBUTION BOARD VERTICAL
3.01 Supplying and fixing 8 way TP&N sheet steel ,double door MCB 1 No.
Distribution Board Vertical type complete with tinned cu bus bar,
neutral link, earth bar etc and providing the following
Note: Dummy MCB cover to be provided in the blank space.
3.02 Supply and fixing 100 A Four pole MCCB set at 75/ 63 Amp as incomer 1 No.
3.03 Supply and fixing 63A three phase ELCB 100 ma of reputed make. 1 Set
3.04 Supply and fixing 6/10/16/20/25/ 32 A SPMCB 12 Nos.
3.05 Supply and fixing 40 Amp SPMCB 1 Nos.
3.06 Supply and fixing 32 Amp TP MCB outgoing 1 No
4 Supply and fixing 200 A TPN switch L &T make FN 200 with 125 A 1 No
HRC fuses in place of 125 A switch in the existing switch board
5 LT POWER CABLES- Aluminium
Supply and laying 650/1100 V armoured aluminium under
ground cables of reputed make of the following sizes in built
up trenches, steel members of roof, walls,floors,including
all acessories etc as directed complete.
Note.
1. The quantity shown is only approximate and the successful
tenderer should measure the lengths at site for procurement.
2. Use solid core cables only upto 10 sq.mm.
5.01 3 1/2 x 95 Sq.mm supply 1 RM
5.02 3 1/2 x 95 Sq.mm laying 1 RM
5.03 3 1/2 x 70 Sq.mm cable supply 30 RM
5.04 3 1/2 x 70 Sq.mm cable laying 30 RM
5.05 3 1/2 x 50 Sq.mm supply 70 RM
5.07 3 1/2 x 35 Sq.mm supply 2 RM
5.08 3 1/2 x 50 / 35 Sq.mm cable laying 72 RM
5.09 4 x 25 Sq.mm supply 4 RM
5.10 4 x 16 Sq.mm supply 10 RM
5.11 4 x 10 Sq.mm supply 6 RM
5.12 4 x 25/ 4x16/ 4x10 Sq.mm cable laying 20 RM
5.13 4 x 6 Sq.mm supply 1 RM
5.14 4 x 4 Sq.mm supply 1 RM
5.15 4 x 6/ 4x4 Sq.mm cable laying 2 RM
6 LT POWER CABLES- Copper
Supply & laying 650/1100 V PVC copper under ground cables
of reputed make
6.01 3 X 2.5 Sq.mm copper armoured cable- Supply 10 RM
6.02 4 X 2.5 Sq.mm copper armoured cable- Supply 10 RM

6.03 3X 2.5/ 4 x 2.5 Sq.mm cable - Laying 20 RM
6.04 4 X 25 Sq.mm unarmoured flexible copper cable- Supply 1 RM
6.05 3 1/2 X 35 Sq.mm unarmoured flexible copper cable- Supply 1 RM
6.06 4X 25/ 3 1/2 x 35 / 3 1/2x 50 Sq.mm cable - Laying 2 RM
7 CABLE GLANDING AND TERMINATION

Glanding and termination of the following sizes of power
and control cables including supply of glands, lugs, and all
materials tools and accessories with crimping etc.complete.
7.01 3 1/2 X 95 Sq.mm Aluminium cable glanding 1 Nos.
7.02 3 1/2 X 70 / 3 1/2 x 50 Sq.mm Aluminium cable glanding 4 Nos.
7.03 3 1/2 X 35 / 3 1/2 x 25 Sq.mm Aluminium cable glanding 2 Nos.
7.04 4 x 25/ 4x16/ 4x10 Sq.mm aluminium cable glanding 2 Nos
7.05 4 x 6/ 4x4 Sq.mm aluminium cable glanding 1 Nos
7.06 3 X 2.5 /4 x 2.5 Sq.mm Copper cable glanding 1 Nos.
7.07 4 X 25 / 3 1/2 x 35 Sq.mm Copper cable glanding 1 Nos.
8 EARTHING
Design, fabrication, supply, and erection of earth pit,
earth electrode, copper flat, copper wire etc. according to
the standards of the Tripura state Electrical Inspectrate/ electricity
board and relevant Indian Standards.
Note:
The quantites shown are only approximate and work has to be
done as per the approved scheme.
8.01 Earth pit with copper plate electrode of size 600 X 600 X 3 mm 1 Sets
including earth work excavation, erection of plate electrode,
filling the plate sides with salt and charcol, providing funnel,
pipe, masonry chamber and plastering, CI cover plate etc complete
as per standard including supply of all items.
8.03 - DO - Earth pit with 40 mm dia. GI pipe electrode 3.0 m long 1 Set
including earth work excavation, filling with charcol and
salt, providing funnel, masonry chamber and plastering, CI
cover plate etc. complete including supply of all items.
Supply and laying/fixing of earthing conductor of copper flats/
wires of following sizes including necessary benches, copper
sockets, drilling holes, tinning, fixing , jointing etc. complete as
per approved scheme laid in trenches / walls with finishing
plastering whereever required as directed.

8.04 Copper flat 25 X 3 mm 20 M

8.05 Supply and laying Copper wire SWG 6 50 M
8.06 Supply and laying Copper wire SWG 8 2 M
8.07 Supply and laying Copper wire SWG 10 30 M

8.08 Supply and laying Copper wire SWG 12 1 M
9.01 Fabrication, supply and erection of steel supports made 12 Kg
out of MS angles and flats as supports for starters,switches
push button stations, capacitors, supports for chequred plates and
cables as directed including one coat of metal primer after fabrication
and two or more coats of smoke grey enamel paint after erection.
9.02 Supply and laying 6 mm chequred plate for cable trench covering 1 sq m
9.03 Supply and laying 3 mm chequred plate for cable trench covering 3 sq m
10 Earth work excavation for cable trenches in all classes of 24 M3
soil including backfilling.
11 Laying bricks in cable trenches after laying of cables and 19 M2
covering with 150 mm thick layer fine soil.
11.01 Supply and providing cable route marker in concrete 1 Nos
12.01 Supply and laying class B GI Pipe at road crossing, wall 6 M
crossing, street lighting etc. as directed - size 63 mm dia.
12.02 - DO - 50 mm . dia 6 M
12.03 - DO - 40 mm . dia 3 M
MISCELLANEOUS ITEMS
13.00 Chipping of the floor for laying 25 mm PVC pipe/ 4 x 16 sq mm 3 M
cable and replastering
14.00 Supply and fixing fire bucket with sand on the building walls in 1 Nos
panel board room
15.00 Supply and fixing 6 mm thickness electrical grade rubber mat 3 sq m
infront of MSB and sub switch boards
16.00 Supply and placing 4.5 Kg Carbon dioxide fire extinguisher with 1 No
ISI mark
18.00 Wiring of electrical point (light, fan etc) upto and including ceiling 1 No
rose for independent control using PVC insulated copper cable of
1 sq mm size of finolex make in rigid PVC conduits /ovel conduit/
casing and cappping
19.00 Supply and fixing of 2x18 Watts ordinary CFL street light fittings 1 No
of good finish direct holder type on the walls and connections
including all fixing acessories, suitable fixing pipe, lamps etc
complete.
20.00 Supply and fixing of Angle Battern fitting with 15 W CFL 1 No
21.00 Supply and fixing 1x36 W ordinary tube light fitting with tube 1 No
22.00 Supply and fixing suitable sintex box with connector strip and 6 amp 1 set
MCB on the existing street light pole
23.01 Supply and laying 20 mm ISI marked rigid PVC conduit white. 10 M
23.02 Supply and laying 25 mm ISI marked rigid PVC conduit white. 20 M
23.04 Supply and laying 20 mm ISI marked PVC casing caping. 10 M
23.05 Supply and laying 25 mm ISI marked PVC casing caping. 80 M
23.06 Supply and laying 20 mm PVC ovel conduit. 10 M
23.07 Supply and laying 25 mm PVC ovel conduit. 10 M
24.01 Supply and laying PVC insulated single core 10 sq mm copper cable 2 RM
TWO runs through the above PVC conduit / casing caping/
ovel conduits of item No: 23

24.02 - DO - THREE RUNS 1 M
24.05 - DO - FOUR RUNS 4 M
25.01 Supply and laying PVC insulated single core 6 sq mm copper cable 80 RM
TWO runs through the above PVC conduit / casing caping/
ovel conduits of item No:23

25.02 - DO - THREE RUNS 2 M
25.03 - DO - FOUR RUNS 37 M
25.04 - DO - FIVE RUNS 1 M
25.05 - DO - SIX RUNS 1 M
26.01 Supply and laying PVC insulated single core 4.0 sq mm copper 40 RM
cable TWO runs through the above PVC conduit / casing caping/
ovel conduits of item No: 23
26.02 - DO - THREE RUNS 2 M
26.03 - DO - FOUR RUNS 30 M
26.04 - DO - FIVE RUNS 1 M
26.05 - DO - SIX RUNS 8 M
27.01 Supply and laying PVC insulated single core 2.5 sq mm copper 30 RM
cable ONE runs through the above PVC/ casing caping/
ovel conduits of item No: 23
27.02 - DO - TWO RUNS 20 M
27.03 - DO - THREE RUNS 10 M
27.04 - DO - FOUR RUNS 20 M
27.05 - DO - FIVE RUNS 8 M
27.06 - DO - SIX RUNS 4 M
27.07 - DO - EIGHT 1 M
28.00 Supply and fixing 15 amp power plug 5 in one type on MS Box 2 Nos
29.00 Supply and fixing 32 amp DP switch on MS Box 1 Nos
30.01 Supplying and fixing 4 way TP&N sheet steel ,double door MCB 1 No.
Distribution Board with tinned cu bus bar etc complete.
30.02 Supplying and fixing 12 way single phase double door MCB 1 No.
Distribution Board with tinned cu bus bar etc complete.
30.03 Supply and fixing 63 A Four pole MCB as incomer in item 30.01 1 No.
30.04 Supply and fixing 40 Amp DP MCB as incomer in item 30.02 1 No.
30.05 Supply and fixing 63A three phase ELCB 100 ma of reputed make. 1 Set
30.06 Supply and fixing 40A single phase ELCB 100 ma of reputed make. 1 Set
30.07 Supply and fixing 6/10/16/20/25/ 32 A SPMCB 12 Nos.
31.00 Supply & fixing 63 A Four Pole change over switch L&T or equivalent 1 No.
reputed make in SS enclosure including all fixing accessories etc
complete
32.00 Supply & fixing 100 A Four Pole change over switch L&T or equivalent 1 No.
reputed make in SS enclosure including all fixing accessories etc
complete
Total
I/We hereby tender for the execution of works refered to above
in the aforesaid documents upon the terms and conditions cont-
ained or referred to therein and in accordance in all respects
with the specifications, designs, drawings and other relevant
details at the rates quoted by me/us.
Signature of the Tenderer
Date .........
ES-Solar RTI