You are on page 1of 17

Leighton - OSE JV Indore - Khalghat Highway

:
Mould No.1
Weight of Mould 5722gm
Trial 1 Trial 2 Trial 3 Trial 4 Averge
Volume in
CC
Acctual
Volume
in CC
Diameter in mm
150 150.24 150.2 150.16 150.15
Height in mm
127.2 127.2 127.2 127.4 127.25
Mould No.2
Weight of Mould 5708gm
Trial 1 Trial 2 Trial 3 Trial 4 Averge
Volume in
CC
Acctual
Volume
in CC
Diameter in mm
150.7 149.8 150 150.1 150.15
Height in mm
127.26 127.8 127.2 127.36 127.41
Mould No.3
Weight of Mould 5722gm
Trial 1 Trial 2 Trial 3 Trial 4 Averge
Volume in
CC
Acctual
Volume
in CC
Diameter in mm
150 150.6 150 150.1 150.18
Height in mm
127.24 127.16 127.22 127.3 127.23
Mould No.4
Weight of Mould 5872gm
Trial 1 Trial 2 Trial 3 Trial 4 Averge
Volume in
CC
Acctual
Volume
in CC
Diameter in mm
150.12 150.8 149.88 150.1 150.225
Height in mm
126.94 127.12 126.8 127.2 127.02
___________ _________
Technician
2254.79
_________ __________
Laboratory
Manager
Material
Engineer
Consultant
ITL
CALIBRATION OF PROCTOR ( 2250CC )
Date of Calibrating
2252.0505 2250
2250.00
2252.45 2250.00
2250.14 2250
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Leighton - OSE JV Indore - Khalghat Highway
Sample Ref. No. : Date Sampled :
Description of Sample : Date Tested :
Source of Materials :
Sample Location :
IS Sieve Designation
Weight of Sample
Retained
(gms)
Cumulative
Weight Retained
(gms)
Percentage of Passing
(%)
Remarks
20
12.5
10
4.75
2.36
0.600
0.425
0.075
PAN
Remarks
___________
Technician
GRAIN SIZE ANALYSIS (WET)
_______________
Material Engineer Laboratory Manager
_________________
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Name of the Project
Name of the Employer
Name of the Concessionaire
Name of Independent Consultant
Name of the EPC Contractor
Name of the EPC Sub-Contractor
Description of Sample : Date Sampled :
Source of Materials : Date Tested :
Sample Location : Ref. No. :
Depth of Sample :
Type of Compaction :
Type of Method : No of Blows :
Weight of Rammer : No of Layers :
1 2 3 4 5 6 7 8
Mould No.
Volume of Mould (v) (cc)
Mass of Mould (m1) (gm)
Mass of Mould + Compacted Soil (m2) (gm)
Mass of Compacted Soil (m3 = m2 - m1) (gm)
Wet Density of Soil (Dw) = m3 / v (gm / cc)
Container No.
Mass of Container (gm)
Mass of Wet Soil +Container (gm)
Mass of Conatiner + Oven Dry Soil (gm)
Mass of Water (gm)
Mass of Oven Dry Soil (gm)
Water Content (%)
Dry Density of Soil (Dd) = 100 x Dw / (100 +w) (gm / cc)
MDD (gm/cc) :
OMC (%) :
Remarks:
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
: Oriental Structural Engineers Pvt. Ltd.
: LEIGHTON - OSE JV
OBSERVATION SHEET
Determination No.
: Four Laning of Indore - Khalghat section of NH-3 in MP on BOT
: National Highways Authority of India
: Oriental Pathways (Indore) Pvt. Ltd.
: Sheladia Associate Inc.- Feedback JV
Leighton - OSE JV Indore - Khalghat Highway
Description of Sample Date Sampled :
Source of Materials Date Tested :
Sample Location Ref. No. :
Depth of Sample :
Type of Compaction
Type of Method No of Blows :
Weight of Rammer No of Layers :
1 2 3 4 5 6 7 8
Mould No.
Volume of Mould (v) (cc)
Mass of Mould (m1) (gm)
Mass of Mould + Compacted Soil (m2) (gm)
Mass of Compacted Soil (m3 = m2 - m1) (gm)
Wet Density of Soil (Dw) = m3 / v (gm / cc)
Container No.
Mass of Container (gm)
Mass of Wet Soil +Container (gm)
Mass of Conatiner + Oven Dry Soil (gm)
Mass of Water (gm)
Mass of Oven Dry Soil (gm)
Water Content (%)
Dry Density of Soil (Dd) = 100 x Dw / (100 +w) (gm / cc)
MDD (gm/cc) :
OMC (%) :
Remarks:
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
PROCTOR TEST
OBSERVATION SHEET
Determination No.
:
:
:
:
:
:
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Name of the Project
Name of the Employer
Name of the Concessionaire
Name of Independent Consultant
Name of the EPC Contractor
Name of the EPC Sub-Contractor
Layer : Date Tested :
Chainage : Bulk Density of Sand (d) :
Source of Material : Mass of Sand in Cyclinder Cone (m) :
MDD : Ref. No. :
OMC :
Cylinder No.
Hole Chainage
Mass of Wet Soil from hole (m1) (gm)
Mass of Cyclinder + Sand before pouring (m2) (gm)
Mass of Cyclinder + remaining Sand after pouring (m3) (gm)
Mass of Sand in hole (Ms) = m2 - m3 - m (gm)
Volume of sand in the hole (v) = m / d (cc)
Wet Density of Material = m1 / v (gm / cc)
Container No.
Mass of Container (gm)
Mass of Wet Soil +Container (gm)
Mass of Conatiner + Oven Dry Soil (gm)
Mass of Water (gm)
Mass of Oven Dry Soil (gm)
Water Content (%)
Dry Density of Soil (Dd) = 100 x Dw / (100 +w) (gm / cc)
Average Dry density
Remarks:
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
IN - SITU DENSITY BY SAND REPLACEMENT METHOD (IS: 2720, PART 28)
: LEIGHTON - OSE JV
: Oriental Structural Engineers Pvt. Ltd.
: Four Laning of Indore - Khalghat section of NH-3 in MP on BOT
: National Highways Authority of India
: Oriental Pathways (Indore) Pvt. Ltd.
: Sheladia Associate Inc.- Feedback JV
Leighton - OSE JV Indore - Khalghat Highway
Sample Ref. No. : :
Description of Sample : :
Sample Location :
Source of Material :
1 2 3
1 Mass of Dry Soil Passing 425 Sieve (gm) 10 10 10
2 Volume in water after 24hrs swell (Vd) (cc)
3 Volume in Kerosene after 24hrs (Vk) (cc)
4 Free Swell Index [(Vd - Vk) / Vk] 100 (%)
Remarks
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
FREE SWELL INDEX (IS: 2720, PART 40)
Observation Sheet
Determination No.
Date Sampled
Date Tested
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Name of the Project
Name of the Employer
Name of the Concessionaire
Name of Independent Consultant
Name of the EPC Contractor
Name of the EPC Sub-Contractor
Sample Ref. No. : :
Description of Sample : :
Sample Location :
Source of Material :
1 2 3
1 Mass of Dry Soil Passing 425 Sieve (gm) 10 10 10
2 Volume in water after 24hrs swell (Vd) (cc)
3 Volume in Kerosene after 24hrs (Vk) (cc)
4 Free Swell Index [(Vd - Vk) / Vk] 100 (%)
Remarks
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
FREE SWELL INDEX (IS: 2720, PART 40)
Observation Sheet
Determination No.
Date Sampled
Date Tested
: Four Laning of Indore - Khalghat section of NH-3 in MP on BOT
: National Highways Authority of India
: Oriental Pathways (Indore) Pvt. Ltd.
: Sheladia Associate Inc.- Feedback JV
: Oriental Structural Engineers Pvt. Ltd.
: LEIGHTON - OSE JV
Sample Ref. No. : :
Description of Sample : :
Sample Location : :
Source of Material :
1 2 3 4 1 2
1. No of Drops (gm)
2. Container No (gm)
3. Mass of Container (gm)
4. Mass of Wet Soil + Container (gm)
5. Mass of Container + Oven dry soil (gm)
6. Mass of Water (gm)
7. Mass of Oven dry soil (gm)
8. Water content (%)
Average PL
Remarks:
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
Plastic Limit
Determination No.
Liquid Limit
Observation Sheet
ATTERBERG LIMITS (IS : 2720, Part - 5)
Date Sampled
Date Tested
Leighton - OSE JV Indore - Khalghat Highway
Sample Ref. No. : :
Description of Sample : :
Sample Location : :
Source of Material :
1 2 3 4 1 2
1. No of Drops (gm)
2. Container No (gm)
3. Mass of Container (gm)
4. Mass of Wet Soil + Container (gm)
5. Mass of Container + Oven dry soil (gm)
6. Mass of Water (gm)
7. Mass of Oven dry soil (gm)
8. Water content (%)
Average PL
Remarks:
___________ _________________
Technician Laboratory Manager
Observation Sheet
Plasticity Index (Liquid Limit - Plastic Index)=
_______________
Material Engineer
ATTERBERG LIMITS (IS : 2720, Part - 5)
Date Sampled
Date Tested
Plastic Limit
Determination No.
Liquid Limit
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Name of the Project
Name of the Employer
Name of the Concessionaire
Name of Independent Consultant
Name of the EPC Contractor
Name of the EPC Sub-Contractor
Sample Ref No : :
Sample Location : :
Source of Materials : :
Description of Sample :
Type of Compaction : Mass of Original Sample :
Type of Method : Soaking Period :
Weight of Rammer : MDD :
No. of Layers : OMC :
Surcharge Weight :
Determination No.
No. of Blows
Mould No.
Volume of Mould (v) (cc)
Mass of Mould (m1) (gm)
Mass of Mould + Compacted Soil (m2) (gm)
Mass of Compacted Soil (m3 = m2 - m1) (gm)
Wet Density of Soil (Dw)= (m3 / v) (gm/cc)
Container No.
Mass of Container (gm)
Mass of Wet Soil + Container (gm)
Mass of Container + Oven dry soil (gm)
Mass of Water (gm)
Mass of Oven dry soil (gm)
Water content (%)
Dry Densiy of soil (Dd) = 100 x Dw / (100 + w) (gm/cc)
Surcharge Weight used
Swelling Data
Initial Reading at 0 hours (mm)
Final Dial Reading at 96 hours (mm)
Percentage Swelling (%)
Remarks
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
CALIFORNIA BEARING RATON (CBR) TEST SOAKED (IS: 2720, PART 16)
Observation Sheet
Date Sampled
Date Tested
Depth of Sample
: Four Laning of Indore - Khalghat section of NH-3 in MP on BOT
: National Highways Authority of India
: Oriental Pathways (Indore) Pvt. Ltd.
: Sheladia Associate Inc.- Feedback JV
: Oriental Structural Engineers Pvt. Ltd.
: LEIGHTON - OSE JV
Leighton - OSE JV Indore - Khalghat Highway
Sample Ref No :
Sample Location :
Source of Materials :
Description of Sample
Type of Compaction Mass of Original Sample :
Type of Method Soaking Period :
Weight of Rammer MDD :
No. of Layers OMC :
Surcharge Weight
Determination No.
No. of Blows
Mould No.
Volume of Mould (v) (cc)
Mass of Mould (m1) (gm)
Mass of Mould + Compacted Soil (m2) (gm)
Mass of Compacted Soil (m3 = m2 - m1) (gm)
Wet Density of Soil (Dw)= (m3 / v) (gm/cc)
Container No.
Mass of Container (gm)
Mass of Wet Soil + Container (gm)
Mass of Container + Oven dry soil (gm)
Mass of Water (gm)
Mass of Oven dry soil (gm)
Water content (%)
Dry Densiy of soil (Dd) = 100 x Dw / (100 + w) (gm/cc)
Remarks
___________ _______________ _________________
Technician Material Engineer Laboratory Manager
CALIFORNIA BEARING RATON (CBR) TEST SOAKED (IS: 2720, PART 16)
Observation Sheet
Date Sampled
Date Tested
Depth of Sample
:
:
:
:
:
:
:
:
:
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Name of the Project
Name of the Employer
Name of the Concessionaire
Name of Independent Consultant
Name of the EPC Contractor
Name of the EPC Sub-Contractor
Proving Ring No : Sample Ref No : :
Proving Ring Constant : Sample Location : :
Penetration Rate : Source of Materials : :
Description of Sample :
Load Dial
Guage (Div)
Load (Kg)
Corrected Load
(Kg)
Load Dial
Guage (Div)
Load
(Kg)
Corrected Load
(Kg)
Load Dial
Guage (Div)
Load
(Kg)
Corrected Load
(Kg)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
7.50
10.00
12.50
:
:
:
:
Remarks
___________
Technician
2 3
: Sheladia Associate Inc.- Feedback JV
: Oriental Structural Engineers Pvt. Ltd.
: LEIGHTON - OSE JV
CBR of Specimen at 5.00mm
Determination No.
_______________
Material Engineer
_________________
Laboratory Manager
CBR Vaue
Result of repeated test (If Conducted)
: Four Laning of Indore - Khalghat section of NH-3 in MP on BOT
: National Highways Authority of India
: Oriental Pathways (Indore) Pvt. Ltd.
CBR of Specimen at 2.50mm
Penetration (mm)
CALIFORNIA BEARING RATIO (CBR) PENETRATION TEST (SOAKED)
Date Sampled
Date Tested
Depth of Sample
1
Leighton - OSE JV Indore - Khalghat Highway
Proving Ring No : Sample Ref No : :
Proving Ring Constant : Sample Location : :
Penetration Rate : Source of Materials : :
Description of Sample :
Load Dial
Guage (Div)
Load (Kg)
Corrected Load
(Kg)
Load Dial
Guage (Div)
Load
(Kg)
Corrected Load
(Kg)
Load Dial
Guage (Div)
Load
(Kg)
Corrected Load
(Kg)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
7.50
10.00
12.50
:
:
:
:
Remarks
___________
Technician
_______________
Material Engineer
_________________
Laboratory Manager
CALIFORNIA BEARING RATIO (CBR) PENETRATION TEST (SOAKED)
Date Sampled
Date Tested
Depth of Sample
CBR Vaue
Result of repeated test (If Conducted)
2 3
CBR of Specimen at 5.00mm
CBR of Specimen at 2.50mm
Penetration (mm)
1
Determination No.
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station,
Indore - 452009
Consultant :
Contractor :
Location / Source :
Description of Sample : Dense Bituminous Macadam
Sp.Gr. of Asp. Cem. (Gsa) : 1.032 Date Sampled
Penetration Grade : 60 / 70 Date Tested
1 2 3
1 Sample Height, mm
- - -
2 Wt. of Sample in Air, g
3 Wt.of SSD Sample in Air, g
4 Wt. of Sample in Water, g
5 Bulk Volume, cc 0.0 0.0 0.0
6 Bulk Density(Gmb), g/cc #DIV/0! #DIV/0! #DIV/0! #DIV/0!
7 Asp. Cem, by Wt. of Mix, %
8 Bulk Sp.G. Aggregate(Gsb)
9 Effective Sp.G. Aggregate(Gse)
10 Max Sp.G. Aggregate(Gmm) 100/((Pa/Gse)+(Pb/sp of Bitu.) #DIV/0!
11 Vol. of Voids(VIM), % 100 - (100*Gmb)/Gmm #DIV/0!
12 Voids in Mineral Aggr.(VMA), %
100 - (Ps*Gmb)/Gsb
#DIV/0!
13 Voids Filled w/ Asp.(VFB), % 100(VMA-VIM)/VMA #DIV/0!
14 Stability ( Measured), kg
15 Correl. Ratio, 1.00 1.00 1.00
16 Stability (Adjusted), kg 0.0 0.0 0.0 0.0
17 Loss of Stability, %
18 Flow, mm 0.00
19 Rigidity Ratio #DIV/0! #DIV/0! #DIV/0! #DIV/0!
20 Swell, %
Remarks :
PROJECT NAME
HOT - MIX DATA BY THE MARSHALL METHOD
Asphalt Institute MS - 2, ASTM D 1559
SI.No SAMPLE
SET I
Average






Submitted by: Checked by:
Material Engineer Material Engineer
Contractor Representative Consultant Representative
:
:
3.6% to 4.2%
3% to 5%
Min 13%
65% to 75%
Min 820kg
2mm to 4mm
PROJECT NAME
HOT - MIX DATA BY THE MARSHALL METHOD
Asphalt Institute MS - 2, ASTM D 1559
Specifications
Checked by:
Material Engineer
Consultant Representative

You might also like