You are on page 1of 4

1500 MW

Rev
A 12/15/2010
Chapt. Designation Number Rev.
Total Weight
Tonnes
BILL OF QUANTITIES
1 ERECTION BILL OF QUANTITIES A
DOCUMENT and DRAWINGS
2 SKIDS & FABRICATED EQUIP W01 EB 030 A 289.7
3 ROTATING MACHINES W01 EB 040 A 290.7
4 MAIN COOLING WATER EQUIPMENT W01 EB 131 A 7.6
5 COOLING WATER FILTRATION W01 EB 133 A 35.0
6 WATER TREATMENT PLANT W01 EB 134 A 10.8
A 633.8
Remarks:
The Erection Standard Specification /EG.../GS... will be provide later
SUR
Oman
MECHANICAL EQUIPMENT
TOTAL WEIGHT ROP - Mech. Equip. (Tonnes) :
2 x KA26-2 MS DC
REST OF PLANT
PARTICULAR TECHNICAL SPECIFICATIONS - DRAWINGS & BILLS OF QUANTITY
SUMMARY
ABCD
Power Turbo Systems
ERECTION TECHNICAL DOCUMENT
232992579.xls.ms_office 6/8/2014
BOQ for Erection, Valid for 1xKA26-2 MS-DC
SUR
Mechanical Equipment ROP
28 31 32 33 34 35 36 36 Bis 37 38 39 40 41 44 45 48 49 50 58
Rev Sorter Scope Item
No.
Item Description Nb of
block
Qty /
block
Degree of
Pre-assembly
Equipment Dimensions Unit Net
Weight
Total weight for
all plant
Site Assembly Remarks
Rev EB ES Length Width Height Diam. (empty) General
Installation
Specification
Particular
Installation
Specification
Equipment Drawing
No. I No. II y [m] [m] [m] [m] [Kg] [Kg]
A EB30 y SKIDS AND FABRICATED EQUIPMENT 289,700 EB030
A EB30 H10 y COMPRESSED AIR PLANT - 16,000 1AHA 039169
A EB30 H10 y Air compressors 1 2 Container 10.0 2.5 3.0 8000 16,000
A EB30 H10 y Auxiliaries (in Container) 1 2 Loose parts
A EB30 G50 y LABORATORY EQUIPMENT - - 12,000 1AHA 029940
A EB30 G50 y Laboratory equipment 1 1 Set 2,000 2,000
A EB30 G50 y Laboratory furniture 1 1 Set 10.0 7.0 3.0 10,000 10,000 local
A EB30 F30 y 8,100
A EB30 F30 y
Pump skid (incl. coupling, hose, strainer, valves, instruments,
local panel)
1 2 Skid 2.3 1.0 1.5 2,000 4,000 1AHA030177
A EB30 F30 y Cabinet for LV MCC, control panel 1 2 Cabinet 0.6 0.6 2.2 100 200 1AHA030177
A EB30 F30 y FUEL OIL FLOW METER UNIT 1 1 Skid 3.7 1.7 2.6 3,500 3,500 1AHA030178
A y INSTRUMENTS TO FUEL OIL TANKS 1 2 Loose parts 200 400
A EB30 F36 y 24,100 1AHA031808
A EB30 F36 y Separators 1 2 Skid 11.0 2.8 3.0 12000 24,000
A EB30 F36 y Cabinet for LV MCC, control panel 1 1 Cabinet 0.6 0.6 2.2 100 100
A EB30 F35 y 10,800 1AHA031046
A EB30 F35 y
Pump skid (incl. headers, strainers, valves, instruments, local
panel)
1 1 Skid 4.5 4.0 2.0 4,300 4,300
A EB30 F35 y Cabinet for LV MCC, control panel 1 1 Cabinet 0.6 0.6 2.2 100 100
A EB30 F35 y FUEL OIL FLOW METER UNIT 1 4 Skid 3.0 2.2 2.0 1,600 6,400
A EB30 F22 y 13,200 1AHA030171
A EB30 F22 y Preheater 1 4 Pre-assembled 5.1 1.0 1.0 3,300 13,200
A EB30 F22 y FUEL GAS PREHEATER FOR DEW POINT 150,000
A EB30 F22 y Fuel gas preheater 1 3 Skid 8.0 5.0 5.0 50000 150,000 1AHA030172
A EB30 F22 y FUEL GAS PRESSURE CONTROL 30,000 1AHA 031814
A EB30 F22 y FUEL GAS PRESSURE CONTROL UNIT for GT24/26 1 1 Skid 10.0 5.0 1.5 30000 30,000
A EB30 F20 y FUEL GAS SCRUBBING DEVICE for GT24/26 - - 22,000 1AHA030174
A EB30 F20 y Scrubber 1 1 Skid 5.5 5.5 5.0 21,000 21,000
A EB30 F20 y Condensate collecting vessel 1 1 Loose parts 2.0 1.0 1.0 1,000 1,000
GT FUEL GAS PREHEATER (FOR EFFICIENCY INCREASE) for
GT24/26
FUEL OIL TREATMENT PLANT (PHYSICAL)
FUEL OIL UNLOADING STATION
FUEL OIL TRANSFER STATION
SYSTEM ENG. & PROCESS EQUIPM. TO MAIN COOL WATER
DOSING STATION INCL. LOCAL MCC/CONTR
232992579.xls.ms_office 1 / 4 Print Date 6/8/2014
BOQ for Erection, Valid for 1xKA26-2 MS-DC
SUR
Mechanical Equipment ROP
28 31 32 33 34 35 36 36 Bis 37 38 39 40 41 44 45 48 49 50 58
Rev Sorter Scope Item
No.
Item Description Nb of
block
Qty /
block
Degree of
Pre-assembly
Equipment Dimensions Unit Net
Weight
Total weight for
all plant
Site Assembly Remarks
Rev EB ES Length Width Height Diam. (empty) General
Installation
Specification
Particular
Installation
Specification
Equipment Drawing
No. I No. II y [m] [m] [m] [m] [Kg] [Kg]
A EB30 C45 y - - 3,500 1AHA 029939
A EB30 C45 y Biocide dosing unit 1 1 Skid 1.2 0.8 1.5 500 500
A EB30 C45 y Biocide storage tank 1 1 Pre-assembled 2.4 2.0 500 500
A EB30 C45 y Acid dosing unit 1 1 Skid 1.2 0.8 1.5 500 500
A EB30 C45 y Acid storage tank, 10 m3 1 1 Pre-assembled 3.3 1.6 2,000 2,000
A EB40 y ROTATING MACHINES 290,700 EB040
A EB40 C10 y 275,000 1AHA 030176
A EB40 C10 y Pump 1 5 Pre-assembled 15.0 3.0 3.0 25000 125,000
A EB40 C10 y Motor 1 5 Pre-assembled 4.0 4.0 7.0 30000 150,000
A EB40 y SECONDARY-COOLING WATER PUMPS - 8,000 1AHA034288
A EB40 y Pump 1 2 Pre-assembled 5.0 2.0 2.0 3,000 6,000
A EB40 y Motor 1 2 Pre-assembled 1.0 1.0 2.0 1,000 2,000
A EB40 J15 y 6,200 1AHA 029942
A EB40 J15 y DEMI WATER SUPPLY PUMPS 1 1 Skid 2.6 1.5 1.5 1,300 1,300
A EB40 J15 y NOX WATER SUPPLY PUMPS 1 1 Skid 2.6 1.5 1.5 1,300 1,300
A y
POTABLE WATER PUMP STATION COMPLETE INCL. DET.
ARRANGEMENT
1 1 Skid 3.0 1.5 2.0 1,200 1,200
A EB40 J35 y OILY WASTE WATER SUMP PUMPS INCL. E&C SYSTEM 1 4 Skid 4.0 0.5 1.0 600 2,400 1AHA 031812
A EB40 J35 y 1,500
A EB40 J35 y
WASTE WATER DISCHARGE PUMP UNIT INCL. E&C SYSTEM, DET.
ARRANGEMENT
1 1 Pre-assembled 0.3 0.3 0.8 100 100 1AHA 031812
MAIN-COOLING WATER PUMPS
MISCELLANEOUS CENTRIFUGAL PUMPS
SYSTEM ENG. & PROCESS EQUIPM. TO MAIN COOL WATER
DOSING STATION INCL. LOCAL MCC/CONTR
MISCELLANEOUS SUMP OR SUBMERSIBLE PUMPS
232992579.xls.ms_office 2 / 4 Print Date 6/8/2014
BOQ for Erection, Valid for 1xKA26-2 MS-DC
SUR
Mechanical Equipment ROP
28 31 32 33 34 35 36 36 Bis 37 38 39 40 41 44 45 48 49 50 58
Rev Sorter Scope Item
No.
Item Description Nb of
block
Qty /
block
Degree of
Pre-assembly
Equipment Dimensions Unit Net
Weight
Total weight for
all plant
Site Assembly Remarks
Rev EB ES Length Width Height Diam. (empty) General
Installation
Specification
Particular
Installation
Specification
Equipment Drawing
No. I No. II y [m] [m] [m] [m] [Kg] [Kg]
A EB40 J35 y Oper.WASTE WATER SUMP PUMPS incl. E&C Syst. 1 14 Pre-assembled 0.3 0.3 0.8 100 1,400 1AHA 031812
A EB131 y MAIN COOLING WATER EQUIPMENT 7,600 EB131
A EB131 M15 y
COOLING WATER COMBINED CHECK/CONTROL VALVES,
DN 1500
1 2 Pre-assembled 3.1 2.0 2.2 3,800 7,600 1AHA029 937
A EB133 y COOLING WATER FILTRATION 35,000 EB133
A EB133 y 35,000 1AHA 035179
A EB133 y Coarse bar screen (raked / unraked) 1 4 Pre-fabricated 1.0 2.0 2.0 1,000 4,000
A EB133 y Band screen 1 4 Pre-fabricated 14.0 2.0 2.0 5000 20,000
A EB133 y Stop gate 1 4 Loose parts 4.0 4.0 4.0 2000 8,000
A EB133 y Cabinet for LV MCC, control panel 1 1 Cabinet 4.0 1.0 2.0 2,000 2,000
A EB133 y Backwash system (USF Johnson type or equivalent) 1 1 Skid 1.0 1.0 1.0 1,000 1,000
A EB134 y WATER TREATMENT PLANT 10,800 EB134
A EB 134 y
TREATMENT UNIT FOR DOMESTIC WASTE
WATER,SEPTIC TANK INCL. DET. ARRANGEM.
500 1AHA 031811
A EB134 y
TREATMENT UNIT FOR DOMESTIC WASTE
WATER,SEPTIC TANK INCL. DET. ARRANGEM.
1 1 Pre-fabricated 4.0 2.0 2.0 500 500
A y
POTABLE WATER PLANT COMPLETE INCL. DET.
ARRANGEM.
1,200
A y
POTABLE WATER PLANT COMPLETE INCL. DET.
ARRANGEM.
1 1 Container 3.0 1.5 2.0 1,200 1,200
A EB134 D50 y
OIL SEPARATORS & OIL STOP VALVES TO WASTE
WATER SYSTEM
8,100
A EB134 D50 y Oil separator 1 3 Pre-fabricated 5.6 1.8 1.8 2,500 7,500 1AHA 031810
A EB134 D50 y Oil stop valve 1 4 Loose parts 1.0 0.5 1.0 100 400
A EB134 D50 y Sampling station to cooling water 1 1 Rack 1.1 0.5 2.0 200 200 1AHA 031809
A EB134 D50 y

WEATHER STATION 1,000
A
y Weather Station, compl. Incl. Detail arrangement 1 1 Pre-assembled 1 1 4 1000 1,000
A
y 633,800 TOTAL WEIGHT ROP MECH. EQUIPMENT (Kg) :
MECHANICAL COOLING WATER CLEANING DEVICE INCL. DET.
ARRANGEM.
232992579.xls.ms_office 3 / 4 Print Date 6/8/2014

You might also like