Monthly Min. per Installation per Month. Rs 30/- Rs 30/- Rs 30 /- CDT(Commission Determined Tariff) EC per KWH 504 Ps.
504 Ps.
536 Ps
2 LT-2 (a)(i) Domestic - Applicable to Areas under Bruhat Bangalore Mahangara Palike (BBMP), Municipal Corporations and all Urban Local Bodies Sanctioned Load Fixed Charge (FC)
FC For Ist KW Rs.25/- Rs.25/- FC For 1 st KW Rs.25/- No Increase FC For addl. KW Rs.35/- Rs.35/- FC For addl. KW Rs.35/- No Increase Consumption
Energy Charges (EC)
0 to 30 KWH
250 Ps 316Ps
0 to 30 KWH
270 Ps 20 Ps Increased 31 to 100 KWH 370 Ps 436 Ps 31 to 100 KWH 400 Ps 30 Ps Increased 101 to 200 KWH 485 Ps 551 Ps 101 to 200 KWH 525 Ps 40 Ps Increased Above 200 KWH 585 Ps 651 Ps Above 200 KWH 625 Ps 40 Ps Increased 3 LT-2 (a)(ii) Domestic Applicable to Areas under Village Panchayats Sanctioned Load Fixed Charge (FC)
FC For Ist KW Rs.15/- Rs.15/- FC For 1 st KW Rs.15/- No Increase FC For addl. KW Rs.25/- Rs.25/- FC For addl. KW Rs.25/- No Increase Consumption Energy Charges (EC)
0 to 30 KWH
240 Ps 306 Ps. 0 to 30 KWH
260 Ps 20 Ps Increased 31 to 100 KWH 340 Ps 406 Ps 31 to 100 KWH 370 Ps 30 Ps Increased 101 to 200 KWH 455 Ps 521 Ps 101 to 200 KWH 495 Ps 40 Ps Increased Above 200 KWH 535 Ps 601 Ps Above 200 KWH 575 Ps 40 Ps Increased 4 LT-2(b)(i) Pvt. Educational Institutions & Pvt. Hospitals and Nursing Homes: Applicable to Areas under Bruhat Bangalore Mahangara Palike (BBMP) , Municipal Corporations and all areas coming under Urban Local Bodies.
Sanctioned Load Fixed Charge (FC)
FC per KW Rs.35/- Rs.35/- FC per KW Rs.35/- No Increase FC Minimum per Month Rs.65/- Rs.65/- FC Minimum per month Rs.65/- No Increase Consumption Energy Charges (EC)
Pvt. Educational Institutions and Pvt. Hospital & Nursing Homes - Applicable to Areas coming under Village Panchayats Sanctioned Load Fixed Charge (FC)
FC per KW Rs.25/- Rs.25/- FC per KW Rs.25/- No Increase FC Minimum per Month Rs.50/- Rs.50/- FC Min. per month Rs.50/- No Increase Consumption Energy Charges (EC)
Commercial: Applicable to areas coming under Bruhat Bangalore Mahangara Palike (BBMP) , Municipal Corporations and all Urban Local Bodies
Sanctioned Load Fixed Charge (FC) per KW Rs.40/- Rs.40/- FC per KW Rs.40/- No Increase Consumption Energy Charges (EC)
0 to 50 KWH 645 Ps 711 Ps 0 to 50 KWH 675 Ps 30 Ps Increased Above 50 KWH 745 Ps 811 Ps Above 50 KWH 775 Ps 30 Ps Increased Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Rs 55/- Rs 55/- FC per KW Rs55 /- No Increase Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 2 Consumption Energy Charges (EC) Same as above 7 LT-3(ii) Commercial Applicable to Areas coming under Village Panchayats Sanctioned Load Fixed Charge (FC)/KW Rs.30/- Rs.30/- FC per KW Rs.30/- No Increase Consumption Energy Charges (EC)
Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Rs 45/- Rs 45/- FC per KW Rs 45 /- No Increase Consumption Energy Charges (EC) Same as above 8 LT-4(a) IP Sets 10 HP & below CDT (Commission Determined Tariff)
131 Ps per KWH
FC per HP Nil FC per HP Nil Free as per GoK order. (In case, GOK do not release the subsidy, CDT shall be collected from the Consumers)
Change in CDT
52 Ps Increase 151 Ps per KWH
151 ps per kwh
CDT (Commission Determined Tariff)
203 Ps per KWH
9 LT-4(b) IP Sets Above 10 HP FC per HP Rs 30/- Rs.30/- FC per HP Rs 30/- No Increase EC per KWH 175 Ps 241Ps EC per KWH 215 Ps 40 Ps Increased 10
LT-4(c)(i) Private Horticultural. Nurseries., Coffee, Tea & Rubber : 10 HP & below FC per HP Rs.20/- Rs.20/- FC per HP Rs.20/- No Increase EC per KWH 175 Ps 241Ps
EC per KWH 215 Ps 40 Ps Increased 11 LT-4(c)(ii) Private Horticultural. Nurseries, Coffee, Tea & Rubber: Above 10 HP FC per HP Rs.30/- Rs.30/- FC per HP Rs.30/- No Increase EC per KWH 175 Ps 241 Ps EC per KWH 215 Ps 40 Ps Increased 12 LT-5 (a) Heating and Motive Power: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.
Sanctioned Load Fixed Charge (FC)/HP
5 HP & below Rs.30/- Rs.30/- 5 HP & below Rs30./- No Increase Above 5 HP but below 40 HP Rs.30/- Rs.30/- Above 5 HP but below 40 HP Rs.30/- No Increase 40 HP & above but below 67 HP Rs.40/- Rs.40/- 40 HP & above but below 67 HP Rs.40/- No Increase 67 HP & above Rs.110/- Rs.110/- 67 HP & above Rs110./- No Increase Demand Based Tariff (Optional) No Increase Above 5 HP but below 40 HP Rs.50/- Rs.50/- Above 5 HP but below 40 HP Rs.50/- 40 HP & above but below 67 HP Rs.70/- Rs.70/- 40 HP & above but below 67 HP Rs.70/- 67 HP & above Rs.160/- Rs.160/- 67 HP & above Rs.160/- Consumption Energy Charges (EC)
Heating and Motive Power Applicable all Areas other than those covered under LT-5(a).
Sanctioned Load Fixed Charge (FC)/HP
5 HP & below Rs.25/- Rs.25/- 5 HP & below Rs.25/- No Increase Above 5 HP but below 40 HP Rs.30/- Rs.30/- Above 5 HP but below 40 HP Rs.30/- No Increase 40 HP & above but below 67 HP Rs.35/- Rs.35/- 40 HP & above but below 67 HP Rs.35/- No Increase 67 HP & above Rs.100/- Rs.100/- 67 HP & above Rs.100/- No Increase Demand Based Tariff (Optional Above 5 HP but below 40 HP Rs.45/- Rs.45/- Above 5 HP but below 40 HP Rs.45/- No Increase 40 HP & above but below 67 HP Rs.60/- Rs.60/- 40 HP & above but below 67 HP Rs.60/- No Increase 67 HP & above Rs.150/- Rs.150/- 67 HP & above Rs.150/- No Increase Consumption Energy Charges (EC)
0 to 500 KWH 425 Ps 491 Ps 0 to 500 KWH 455 Ps 30 Ps Increased 501 to 1000 KWH 495 Ps 561 Ps 501 to 1000 KWH 535 Ps 40 Ps Increased
Above 1000 KWH
525 Ps
591 Ps
Above 1000 KWH
565 Ps
40 Ps Increased
14 Time of day Increase(+)/reduction(-) in energy charges over the normal tariff applicable
22.00Hrs to 06.00Hrs (-)125 paise per Unit Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 3 06.00Hrs to18.00Hrs 0 18.00Hrs to 22.00Hrs (+)100 paise per unit 15 LT-6 (a) Water Supply FC per HP Rs.35/- Rs.35/- FC per HP Rs.35/- No Increase EC per KWH 320 Ps 386 Ps EC per KWH 330 Ps 10 Ps Increased
16 LT-6 (b) Public Lighting FC per KW Rs.50/- Rs.50/- FC per KW Rs.50/-
No Increase EC per KWH
445 Ps
511 Ps
EC per KWH
485 Ps
40 Ps Increased
17 LT-7 Temporary Supply
Less than 67 HP Weekly Min. per KW
EC per KWH
Rs.160/-
850 Ps
Rs.160/-
916 Ps
Weekly Min. per KW
EC per KWH
Rs.160/-
900 Ps
Weekly Min: No Increase
E.C: 50 Ps Increased
High Tension Supply 18 HT-1
HT Water Supply
DC per KVA Rs.180/- Rs.180/- DC per KVA Rs.180/- No Increase
EC per KWH
380 Ps
446 Ps
EC per KWH
400 Ps
20 Ps Increased
19 HT-2(a)(i) HT Industrial: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations. Demand Charges (DC) per KVA Rs.180/- Rs.180/- DC per KVA Rs.180/- No Increase Consumption Energy Charges (EC
Applicable to Government Hospitals Demand Charges (DC)per KVA
Rs.170/- Rs.170/- DC per KVA
Rs.170/-
No Increase
40 Ps Increased 0 to 1 Lakh KWH 500 Ps 566 Ps 0 to 1 Lakh KWH 540 Ps Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 4 & Hospitals run by Charitable Institutions & ESI Hospitals and Educational Institutions belonging to Govt. , Local Bodies & Aided Institutions and Hostels of all Educational Institutions, Above 1 Lakh KWH 550 Ps 616 Ps Above 1 Lakh KWH 590 Ps
40 Ps Increased 26 HT-2(C)(ii)
Applicable to Hospitals and Educational Institutions other than those covered under HT2(C) (i) Demand Charges (DC)per KVA
Rs.170/-
Rs.170/- DC per KVA
Rs.170/-
No Increase 0 to 1 Lakh KWH 600 Ps 666 Ps 0 to 1 Lakh KWH 640 Ps 40 Ps Increased Above 1 Lakh KWH 650 Ps 716 Ps Above 1 Lakh KWH 690 Ps 40 Ps Increased 27 HT-3 (a)(i) HT Lift Irrigation Schemes under Government Depts./Corporations.
EC per KWH and Annual Minimum
150 Ps subject to Min. of Rs. 1000/- per HP per annum 216 Ps subject to Min. of Rs. 1000 per HP per annum
EC per KWH and Annual Minimum
150 Ps subject to annual Min. of Rs.1000 /- per HP per annum No Increase in Annual Minimum Charges EC ; No Increased 28 HT-3 (a)(ii) HT Private Lift Irrigation Schemes and Lift Irrigation Societies : Connected to Urban / Express feeders
F.C. per HP /PM
Rs.30/-
Rs.30/-
FC per HP/PM
Rs.30/-
No Increase
110 Ps
176 Ps
EC per KWH
150 Ps
40 Ps Increased
E.C. per KWH
29 HT-3 (a)(iii) HT Private Lift Irrigation Schemes and L I Societies other than those covered under HT-3 (a)(ii) (Not Connected to Urban / Express feeders) F.C. per HP/PM
Rs.10/-
Rs.10/-
FC per HP/PM
Rs.10/-
No Increase
E.C. per KWH
110 Ps
176 Ps
EC per KWH
150 Ps
40 Ps Increased
30 HT-3 (b) HT supply to Agriculture/ Horticulture Farms EC per KWH and Annual Minimum
320 Ps subject to Min. of Rs. 1000 per HP per annum
386 Ps subject to Min. of Rs. 1000 per HP per annum
EC per KWH and Annual Minimum
350 Ps subject to Min. of Rs. 1000 per HP per annum
No Change in Annual Minimum Charges
E.C: 30 Ps Increased
31 HT-4
HT Res. Apartments Applicable to all areas
DC per KVA Rs 100/- Rs 100/- DC per KVA Rs 100/- No Increase
EC per KWH
490 Ps
556 Ps EC per KWH 530 Ps 40 Ps Increased 32 HT-5 Temporary Supply Fixed Charges/ Demand Charges Rs. 210/HP/Month for the entire sanctioned load / Contract demand Rs. 210/HP/Month for the entire sanctioned load / Contract demand Fixed Charges/ Demand Charges Rs. 210/HP/Month for the entire sanctioned load / Contract demand No Increase Energy Charges 850 Ps