Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 1

Retail Supply Tariff approved by K.E.R.C. in Tariff Order 2014 dated: 12


th
May 2014
For BESCOM
Sl.No
.
Tariff
Category
Category Description Particulars
Existing Tariff
as per
Tariff Order-
2013
Proposed by
BESCOM

Approved as per
Tariff Order 2014
Remarks

Low Tension Supply
1 LT-1
Bhagya Jyothi /
Kutira Jyothi
Fully subsidized by
GOK


Free

Free

Free


Fully subsidized by GOK



Cost of Supply: 536 Ps. / unit


Change in CDT
Increased by 32 Paise

Monthly Min. per
Installation per
Month.
Rs 30/- Rs 30/- Rs 30 /-
CDT(Commission
Determined Tariff)
EC per KWH
504 Ps.


504 Ps.


536 Ps


2 LT-2 (a)(i)
Domestic - Applicable
to Areas under Bruhat
Bangalore Mahangara
Palike (BBMP),
Municipal
Corporations and all
Urban Local Bodies
Sanctioned Load
Fixed Charge (FC)




FC For Ist KW Rs.25/- Rs.25/- FC For 1
st
KW Rs.25/- No Increase
FC For addl. KW Rs.35/- Rs.35/- FC For addl. KW Rs.35/- No Increase
Consumption






Energy Charges
(EC)







0 to 30 KWH

250 Ps
316Ps


0 to 30 KWH

270 Ps
20 Ps Increased
31 to 100 KWH 370 Ps 436 Ps 31 to 100 KWH 400 Ps 30 Ps Increased
101 to 200 KWH 485 Ps 551 Ps 101 to 200 KWH 525 Ps 40 Ps Increased
Above 200 KWH 585 Ps 651 Ps Above 200 KWH 625 Ps 40 Ps Increased
3 LT-2 (a)(ii)
Domestic Applicable
to Areas under Village
Panchayats
Sanctioned Load
Fixed Charge (FC)







FC For Ist KW Rs.15/- Rs.15/- FC For 1
st
KW Rs.15/- No Increase
FC For addl. KW Rs.25/- Rs.25/- FC For addl. KW Rs.25/- No Increase
Consumption
Energy Charges
(EC)







0 to 30 KWH

240 Ps
306 Ps. 0 to 30 KWH

260 Ps
20 Ps Increased
31 to 100 KWH 340 Ps 406 Ps 31 to 100 KWH 370 Ps 30 Ps Increased
101 to 200 KWH 455 Ps 521 Ps 101 to 200 KWH 495 Ps 40 Ps Increased
Above 200 KWH 535 Ps 601 Ps Above 200 KWH 575 Ps 40 Ps Increased
4 LT-2(b)(i)
Pvt. Educational
Institutions & Pvt.
Hospitals and Nursing
Homes:
Applicable to Areas
under Bruhat
Bangalore Mahangara
Palike (BBMP) ,
Municipal
Corporations and all
areas coming under
Urban Local Bodies.


Sanctioned Load
Fixed Charge (FC)







FC per KW Rs.35/- Rs.35/- FC per KW Rs.35/- No Increase
FC Minimum per
Month
Rs.65/- Rs.65/-
FC Minimum per
month
Rs.65/-
No Increase
Consumption
Energy Charges
(EC)




0 to 200 KWH 570 Ps 636 Ps 0 to 200 KWH 600 Ps 30 Ps Increased
above 200 KWH 670 Ps 736 Ps above 200 KWH 720 Ps
50 Ps Increased
5 LT-2(b)(ii)

Pvt. Educational
Institutions and Pvt.
Hospital & Nursing
Homes - Applicable to
Areas coming under
Village Panchayats
Sanctioned Load
Fixed Charge (FC)








FC per KW Rs.25/- Rs.25/- FC per KW Rs.25/- No Increase
FC Minimum per
Month
Rs.50/- Rs.50/-
FC Min. per
month
Rs.50/-
No Increase
Consumption
Energy Charges
(EC)







0 to 200 KWH 520 Ps 586 Ps 0 to 200 KWH 550 Ps 30 Ps Increased
above 200 KWH 620 Ps 686 Ps above 200 KWH 670 Ps 50 Ps Increased
6
LT-3(i)

Commercial:
Applicable to areas
coming under Bruhat
Bangalore Mahangara
Palike (BBMP) ,
Municipal
Corporations and all
Urban Local Bodies


Sanctioned Load
Fixed Charge (FC)
per KW
Rs.40/- Rs.40/- FC per KW Rs.40/- No Increase
Consumption
Energy Charges
(EC)




0 to 50 KWH 645 Ps 711 Ps 0 to 50 KWH 675 Ps 30 Ps Increased
Above 50 KWH 745 Ps 811 Ps Above 50 KWH 775 Ps 30 Ps Increased
Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW
Fixed Charge (FC)
per KW
Rs 55/- Rs 55/- FC per KW Rs55 /- No Increase
Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 2
Consumption
Energy Charges
(EC)
Same as above
7 LT-3(ii)
Commercial
Applicable to Areas
coming under Village
Panchayats
Sanctioned Load
Fixed Charge
(FC)/KW
Rs.30/- Rs.30/- FC per KW Rs.30/- No Increase
Consumption
Energy Charges
(EC)

0 to 50 KWH 595 Ps 661 Ps 0 to 50 KWH 625 Ps 30 Ps Increased
Above 50 KWH 695 Ps 761Ps Above 50 KWH 725 Ps 30 Ps Increased

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW
Fixed Charge (FC)
per KW
Rs 45/- Rs 45/- FC per KW Rs 45 /- No Increase
Consumption
Energy Charges
(EC)
Same as above
8 LT-4(a)
IP Sets
10 HP & below
CDT
(Commission
Determined Tariff)

131 Ps per KWH




FC per HP Nil FC per HP Nil
Free as per GoK order.
(In case, GOK do not
release the subsidy,
CDT shall be collected
from the Consumers)

Change in CDT

52 Ps Increase
151 Ps per
KWH







151 ps per kwh











CDT
(Commission
Determined Tariff)




203 Ps per
KWH



9 LT-4(b)
IP Sets
Above 10 HP
FC per HP Rs 30/- Rs.30/- FC per HP Rs 30/- No Increase
EC per KWH 175 Ps 241Ps EC per KWH 215 Ps 40 Ps Increased
10

LT-4(c)(i)
Private Horticultural.
Nurseries., Coffee, Tea
& Rubber :
10 HP & below
FC per HP Rs.20/- Rs.20/- FC per HP Rs.20/- No Increase
EC per KWH 175 Ps
241Ps

EC per KWH 215 Ps 40 Ps Increased
11 LT-4(c)(ii)
Private Horticultural.
Nurseries, Coffee, Tea
& Rubber:
Above 10 HP
FC per HP Rs.30/- Rs.30/- FC per HP Rs.30/- No Increase
EC per KWH 175 Ps 241 Ps EC per KWH 215 Ps 40 Ps Increased
12 LT-5 (a)
Heating and Motive
Power:
Applicable to Areas
under Bruhat
Bangalore
Mahanagara Palike
and Municipal
Corporations.


Sanctioned Load
Fixed Charge
(FC)/HP




5 HP & below Rs.30/- Rs.30/- 5 HP & below Rs30./- No Increase
Above 5 HP but
below 40 HP
Rs.30/- Rs.30/-
Above 5 HP but
below 40 HP
Rs.30/-
No Increase
40 HP & above but
below 67 HP
Rs.40/- Rs.40/-
40 HP & above
but below 67 HP
Rs.40/-
No Increase
67 HP & above Rs.110/- Rs.110/- 67 HP & above Rs110./- No Increase
Demand Based Tariff (Optional)
No Increase
Above 5 HP but
below 40 HP
Rs.50/- Rs.50/-
Above 5 HP but
below 40 HP
Rs.50/-
40 HP & above but
below 67 HP
Rs.70/- Rs.70/-
40 HP & above
but below 67 HP
Rs.70/-
67 HP & above Rs.160/- Rs.160/- 67 HP & above Rs.160/-
Consumption
Energy Charges
(EC)






0 to 500 KWH 445 Ps 511 Ps 0 to 500 KWH 475 Ps 30 Ps Increased
Above 500 KWH 545 Ps 611 Ps Above 500 KWH 585 Ps 40 Ps Increased


13


LT-5(b)

Heating and Motive
Power Applicable all
Areas other than those
covered under
LT-5(a).

Sanctioned Load
Fixed Charge
(FC)/HP




5 HP & below Rs.25/- Rs.25/- 5 HP & below Rs.25/- No Increase
Above 5 HP but
below 40 HP
Rs.30/- Rs.30/-
Above 5 HP but
below 40 HP
Rs.30/-
No Increase
40 HP & above but
below 67 HP
Rs.35/- Rs.35/-
40 HP & above
but below 67 HP
Rs.35/-
No Increase
67 HP & above Rs.100/- Rs.100/- 67 HP & above Rs.100/- No Increase
Demand Based Tariff (Optional
Above 5 HP but
below 40 HP
Rs.45/- Rs.45/-
Above 5 HP but
below 40 HP
Rs.45/- No Increase
40 HP & above but
below 67 HP
Rs.60/- Rs.60/-
40 HP & above
but below 67 HP
Rs.60/-
No Increase
67 HP & above Rs.150/- Rs.150/- 67 HP & above Rs.150/- No Increase
Consumption
Energy Charges
(EC)




0 to 500 KWH 425 Ps 491 Ps 0 to 500 KWH 455 Ps 30 Ps Increased
501 to 1000 KWH 495 Ps 561 Ps 501 to 1000 KWH 535 Ps 40 Ps Increased

Above 1000 KWH



525 Ps

591 Ps




Above 1000 KWH



565 Ps


40 Ps Increased



14
Time of day
Increase(+)/reduction(-) in energy charges
over the normal tariff applicable

22.00Hrs to 06.00Hrs (-)125 paise per Unit
Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 3
06.00Hrs to18.00Hrs 0
18.00Hrs to 22.00Hrs (+)100 paise per unit
15 LT-6 (a) Water Supply
FC per HP Rs.35/- Rs.35/- FC per HP Rs.35/- No Increase
EC per KWH 320 Ps 386 Ps EC per KWH 330 Ps
10 Ps Increased

16 LT-6 (b) Public Lighting
FC per KW Rs.50/- Rs.50/- FC per KW
Rs.50/-

No Increase
EC per KWH

445 Ps

511 Ps

EC per KWH

485 Ps

40 Ps Increased

17 LT-7 Temporary Supply

Less than 67 HP
Weekly Min. per KW


EC per KWH






Rs.160/-



850 Ps




Rs.160/-



916 Ps




Weekly Min.
per KW


EC per KWH




Rs.160/-



900 Ps







Weekly Min: No Increase


E.C: 50 Ps Increased





High Tension Supply
18
HT-1


HT Water Supply




DC per KVA
Rs.180/- Rs.180/- DC per KVA Rs.180/-
No Increase


EC per KWH






380 Ps






446 Ps






EC per KWH






400 Ps







20 Ps Increased

19 HT-2(a)(i)
HT Industrial:
Applicable to Areas
under Bruhat
Bangalore
Mahanagara Palike
and Municipal
Corporations.
Demand Charges
(DC) per KVA
Rs.180/- Rs.180/- DC per KVA Rs.180/-
No Increase
Consumption
Energy Charges (EC




0 to 1 Lakh KWH 535 Ps 601 Ps 0 to 1 Lakh KWH 575 Ps 40 Ps Increased
Above 1 Lakh KWH 575 Ps 641 Ps
Above 1 Lakh
KWH
615 Ps 40 Ps Increased
20 HT-2(a)(i)
Applicable to
Bangalore
Metropolitan Railway
Corporation Ltd.
(BMRCL).
Demand Charges
(DC) per KVA
Rs.180/-
Rs.180

DC per KVA Rs.180/- No Increase
Consumption
Energy Charges
(EC)



480 Ps

546 Ps

EC per KWH
520 Ps

40 Ps Increased

21 HT-2(a)(ii)
HT Industrial:
Applicable to Areas
other than those
covered under
HT-2(a)(i)

Demand Charges
(DC) per KVA
Rs.170/- Rs.170/- DC per KVA Rs.170/- No Increase
Consumption
Energy Charges
(EC




0 to 1 Lakh KWH 535 Ps 601 Ps 0 to 1 Lakh KWH 570 Ps 35 Ps Increased
Above 1 Lakh KWH 565 Ps 631 Ps
Above 1 Lakh
KWH
600 Ps 35 Ps Increased
22
HT-2(a)(i)
and
HT-2(a)(ii)
Railway Traction
and
Effluent Treatment
Plants
Demand Charges
(DC) per KVA
Rs.180/-
Rs.180

DC per KVA Rs.180/- No Increase
Consumption
Energy Charges
(EC)
Per KWH


500 Ps

566Ps

EC per KWH
540 Ps

40 Ps Increased
23 HT-2(b)(i)
HT Commercial
Areas under
Bruhat Bangalore
Mahanagara Palike
and Municipal
Corporations.

Demand Charges
(DC) per KVA
Rs.200/- Rs.200/- DC per KVA Rs.200/- No Increase
Consumption
Energy Charges
(EC)




0 to 2 Lakhs KWH 695 Ps 761 Ps 0 to 2 Lakhs KWH 735 Ps 40 Ps Increased
Above 2 Lakhs KWH 725 Ps 791Ps
Above 2 Lakhs
KWH
765 Ps 40 Ps Increased

24

HT-2(b)(ii)

HT Commercial
Applicable to Areas
other than those
covered under
HT-2(b)(i)



Demand Charges
(DC) per KVA
Rs.190/- Rs.190/- DC per KVA Rs.190/- No Increase
Consumption



0 to 2 Lakhs KWH 675 Ps 741 Ps 0 to 2 Lakhs KWH 715 Ps 40 Ps Increased
Above 2 Lakhs KWH 705 Ps 771 Ps
Above 2 Lakhs
KWH
745 Ps 40 Ps Increased
25
HT-2(C)(i)

Applicable to
Government Hospitals
Demand Charges
(DC)per KVA

Rs.170/-
Rs.170/- DC per KVA

Rs.170/-

No Increase

40 Ps Increased 0 to 1 Lakh KWH 500 Ps 566 Ps 0 to 1 Lakh KWH 540 Ps
Retail supply Tariff of BESCOM for FY 15 Existing, Proposed & Approved 4
& Hospitals run by
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging
to Govt. , Local Bodies
& Aided Institutions
and Hostels of all
Educational
Institutions,
Above 1 Lakh KWH 550 Ps 616 Ps Above 1 Lakh KWH 590 Ps




40 Ps Increased
26
HT-2(C)(ii)

Applicable to Hospitals
and Educational
Institutions other than
those covered under
HT2(C) (i)
Demand Charges
(DC)per KVA

Rs.170/-

Rs.170/-
DC per KVA

Rs.170/-

No Increase
0 to 1 Lakh KWH 600 Ps 666 Ps 0 to 1 Lakh KWH 640 Ps 40 Ps Increased
Above 1 Lakh KWH 650 Ps 716 Ps Above 1 Lakh KWH 690 Ps 40 Ps Increased
27 HT-3 (a)(i)
HT Lift Irrigation
Schemes under
Government
Depts./Corporations.


EC per KWH
and
Annual Minimum



150 Ps
subject to
Min.
of Rs. 1000/-
per HP per
annum
216 Ps
subject to Min.
of Rs. 1000 per
HP per annum

EC per KWH
and
Annual Minimum




150 Ps
subject to
annual Min.
of Rs.1000 /-
per HP per
annum
No Increase in Annual Minimum
Charges
EC ; No Increased
28 HT-3 (a)(ii)
HT Private Lift Irrigation
Schemes and Lift
Irrigation Societies :
Connected to
Urban / Express
feeders






F.C. per HP /PM





Rs.30/-







Rs.30/-






FC per HP/PM






Rs.30/-








No Increase







110 Ps










176 Ps










EC per KWH












150 Ps










40 Ps Increased









E.C. per KWH










29 HT-3 (a)(iii)
HT Private Lift Irrigation
Schemes and L I
Societies other than
those covered under
HT-3 (a)(ii)
(Not Connected to
Urban / Express
feeders)
F.C. per HP/PM

Rs.10/-


Rs.10/-


FC per HP/PM


Rs.10/-


No Increase

E.C. per KWH







110 Ps







176 Ps







EC per KWH







150 Ps








40 Ps Increased






30 HT-3 (b)
HT supply to
Agriculture/
Horticulture Farms
EC per KWH
and
Annual Minimum


320 Ps
subject to Min.
of
Rs. 1000 per HP
per annum

386 Ps
subject to Min.
of
Rs. 1000 per HP
per annum


EC per KWH
and
Annual Minimum


350 Ps
subject to
Min. of
Rs. 1000 per
HP per annum




No Change in Annual Minimum
Charges

E.C: 30 Ps Increased



31
HT-4








HT Res. Apartments
Applicable to all areas

DC per KVA Rs 100/- Rs 100/- DC per KVA Rs 100/- No Increase



EC per KWH




490 Ps

556 Ps EC per KWH
530 Ps
40 Ps Increased
32 HT-5 Temporary Supply
Fixed Charges/
Demand Charges
Rs.
210/HP/Month
for the entire
sanctioned
load /
Contract
demand
Rs.
210/HP/Month
for the entire
sanctioned
load / Contract
demand
Fixed Charges/
Demand Charges
Rs.
210/HP/Month
for the entire
sanctioned
load /
Contract
demand
No Increase
Energy Charges
850 Ps

916 Ps Energy Charges
900 Ps
50 Ps Increased