You are on page 1of 1

TELEPHONE AT&S PROGRAM

5-Day
Workshop
Presents
Audience:
This class is intended for indi-
viduals who work in a data net-
work environment and have had
CCNA Bootcamp
hands-on experience with Cisco
IOS devices. January 26-30, 2009
Equipment needed:
Attendees need laptop com-
8:00 a.m. - 5:00 p.m.
puters.

Course Introduction  Medium-Sized Switch Network Con-


Students will get:
Exam Voucher, CCNA Certifica-  Building a Simple Network struction
tion Self-Study Book, and a USB  Ethernet Local Area Networks (LANs)  Medium-Sized Routed Network Con-
Flash Drive with additional study  Wireless LANs struction
aids.  LAN Connections  Single Area OSPF Implementation
 WANs  EIGRP Implementation
Date & Time:  Network Environment Management  Access Control Lists
January 26-30, 2009  Small Network Implementation  Address Space Management
8:00 a.m. - 5:00 p.m.  LAN Extensions into a WAN
Fee:
Member $2795.00
Non-Member $2995.00
Objectives:
Early registration discount of  Describe how networks functions, identifying major components function of net-
$120 if registered by December work components and the Open System Interconnection (OSI) reference model.
17, 2009.  Using the host-to-host packet deliver process, describe issues related to increasing
traffic on a Ethernet LAN and identify switched LAN technology solutions to
Location: Ethernet networking issues.
Training Room  Describes the reasons for extending the reach of a LAN and the methods that can be
Dakota Carrier Network used with a focus on RF wireless access.
Bismarck, ND  Describe the reasons for connecting networks with routers and how routed networks
transmit data through networks using TCP/IP.
Motel Reservations:  Describe the function of WANs, the major devices of WANs, and configure PPP
Kelly Inn 701.223.8001 encapsulation, static and dynamic routing, PAT and RIP routing.
Doublewood Inn 701.258.7000  Use the command-lind interface to discover neighbors on the network and managing
Registration: the router’s startup and configuration
Please complete registration form  Expand the switched network form a small LAN to a medium-sized network and
by January 2, 2009. Late registra- discuss considerations when implementing routing on the network
tion will be accepted, if space  Describe routing concepts as they apply to a medium-sized network and discuss con-
available. siderations when implementing routing on the network
 Configure, verify and troubleshoot OSPF & EIGRP
Contact Person:  Determine how to apply ACLs based on network requirements, and to configure,
Tammy or Bob 701.250.7911 or verify, and troubleshoot ACLs on a medium-sized network
theick@telephone-ats.com.  Describe when to use NAT and PAT on a medium-sized network, and configure
NAT or PAT routers
TELEPHONE AT&S  Identify and implement the appropriate WAN technology based on network require-
PROGRAM ments.
1615 Capitol Way, Suite 204
Bismarck, ND 58501
Phone: 701.250.7911 “Your Customized Training & Safety Resource”
Fax: 701.250.7913
E-mail: theick@telephone-ats.com

You might also like