You are on page 1of 4

RESUME

NAME : K. H. SHINGRAKHIA

FATHER’S NAME : HARDASBHAI B. SHINGRAKHIA

DATE OF BIRTH : 1ST JUN 1966

ADDRESS OF
CORRESPONDENCE : At:-

PERMANENT ADDRESS : At : keshwa


Via : Bagvadar
Dist : Porbandar
Pin : 360 590
Gujarat

PHONE NO. : 09586218514 - 09726110678

MARITAL STATUS : Married

PASSPORT DETAIL : NO. H 6766011

EDUCATIONAL
QUALIFICATION : High School, Examination in 1983, with Science from
Gujarat Secondary Education Board, Gandhinagar

: Intermediate Examination in 1991 with commerce from


Gujarat Higher Secondary Education Board,
Gandhingar.

: L.T.I Examination in 1988 with SURVEYOUR Trade


First Class in Distinction.

: Completed Training A.T.S.(Advanced total Station


Model – 102) Lawrence & Mayo Bombay. From 1997.

WORKING EXPERIENCE:

1.2009 To Till Date : Worked with “B.G.R.” Energy systems Ltd. Jalwad Rajsthan Power
Project.

INSTRUMENT USED
: Worked with Pentax A.T.S. and layka T.S.

WORK
(a) Co-ordinat and gride line marking of T.G. and Boyalar and Chimney and
L.D.O. etc.
(b) Level Transfard and Travers with T.B.M. work etc.
2.2008 To 2009 : Worked With “Adani Mundra SEZ Infrastructure
Pvt. Ltd, at MMHH Project Mundra-Gujarat.

INSTRUMENT USED

(a) Worked with PENTX Advancel Total Station (ATS-320)


(b) Pentax Auto Level,
(c) Pentax Thedolite “1” Sec.
(d) Soking Level Instrument.
(e) Chaining Total Station.

WORK
1. V.I.P. building centre point & level mark.
2. Pipe line bend and centre line marking for under ground & above ground.
3. S.T.P. plant and road, drain, calvout and carb point marking and level
check.

3.2005 to 2008 :Worked with” Punj Lloyd Ltd’’ at RJ-8 Rajsthan kota.

INSTRUMENT USED
: Worked with PENTX Advancel total Station
(ATS – 101) and PENTX auto levels at given below
a) Marking of PCL and row left and right side.
b) Marking of shoulders V.U.P., CWCT. Pipe Culvert, Major, and minor Brides
layout
c) Marking of Retaining Wall. Wing Wall
d) All types Curve.

4. 2004 to 2005 : worked with “GAMMON INDIA Ltd.” N.P.C.L project


Kaige (Karnatka)

INSTRUMENT USED
ATS – 101 and ATS – 102
a) Reactor Building
d) Turban Building
c) compressor House
d) Dome etc….

5. 2002 to 2004 : Working with “PUNJ LLOYD LTD” as surveyor at


Belgaum Maharashtra Boarder Road Project.

INSTRUMENT USED
: Worked with PENTX Advancel total Station
(ATS – 101) and PENTX auto levels at given below
e) Marking of PCL and row left and right side.
f) Marking of shoulders V.U.P., CWCT. Pipe Culvert, Major, and minor Brides
layout
g) Marking of Retaining Wall. Wing Wall
h) All types Curve.

6. 2000 to 2001 : Worked at Punj Lloyd Ltd.


As Survey Forman in JLPL Gujarat to LONI Pipe
Line Project
INSTRUMENT USED
: Works handed with PANTX Advanced total station
(ATS-101) and PENTX auto levels at given below.
a) Layout of U/G Piping
b) Layout of permanent control building and compound wall
c) Layout of peeving and pipe support
d) Surveyor’s Planning

7. 1997 to 1999 : Worked with DODSAL LTD. As a Sr. Surveyor from


Reliance Petroleum Motikhavdi.

INSTRUMENT USED
: Works handed with PANTAX Advanced total
Station (ATS-102) and PENTAX auto levels are given
Below.

a) Layout of all temporary facility including labour


Colonies
b) Layout of Pipe way sleepers
c) Layout of R.C.C Ring beams for Tank Foundation
d) Layout of Dyke Walls around Tanks.
e) Layout of permanent building like Fire Station, Administration building.
Sub-Station building and P.I.B building.
f) Layout of U/G piping inside and outside the plant.
g) Final co-ordination’s and point Marking etc.

8. 1995 to 1997 : Worked with L & T E.C.C. Construction Group as a


“SURVEYOR” FROM Reliance Petroleum-Motikhawadi

: Responsible for handling site leveling Layout and quality


Calculation.

INSTRUMENT USED
1) Wild T2 theodilite 1 Sec.
2) Auto Levels PENTAX
3) Telting LEVEL.
a) Sounding survey
b) Break water tetra pod placing
c) layout of paling point and levels.
d) layout of water streetment plant etc..

9. 1992 to 1995 : Working with Guj. Ambuja Cement (a unit of Gujarat


Ambuja Cemnt Ltd. For the construction of break water
jetty at Mul – Dwaraka

INSTRUMENT USED
1) PENTEX Tehodilite 1 sec.
2) Engineering Level
3) Echo Sounding Machine
a) Sounding survey
b) Break water tetra pod placing
c) Layout of paling point and levels
10. 1990 to 1991 : worked with Rai’s Costal Survey Consultancy
Services, Mumbai

INSTRUMENT USED
1) PENTEX theodolite 1 sec.
2) Auto Level
a) Topo Graphy Survey.
b) Hydro Graphy Survey.
c) Contouring Survey.

11. 1989 to 1990 : Worked with M/s. Laxman Veja, Govt. Contractor as a
SURVEYOR
a) Building layout
b) Billing Check

12. 1988 to 1989 : Worked with M/s. Vikma Construction Company


Gandhidham (Kutch) as a SURVEYOR.
a) Road Survey
b) Building Work.