You are on page 1of 27

PT.

INDO MINERAL PRIMA


Ged. Pesona 5th Floor, Suite 503. Jl. Ciputat Raya No. 20. Tanah Kusir

GENERAL EXPLORATION REPORT


IN TUMBANG TANGOI AREA,
CENTRAL KALIMANTAN, INDONESIA

10th–20th October 2009

Geologist Team
PT Indo Mineral Prima – PT MP Treasure

PT. MP TREASURE
Simprung Gallery Block-S. Jl. Teuku Nyak Arief No. 10. Jakarta Selatan
General Exploration Report – Tangoi Project

Contents

I. Introduction ……………………………………………………………………………. 2

II. General Condition ……………………………………………………………………. 4


2.1. Location and Access ………………………………………………………. 4
2.2. Topography, Inhabitants, Animals and Plants …………………… 5
2.3. Weather Condition …………………………………………………………. 6

III. Regional Geology …………………………………………………………………….. 7


3.1. Physiographic ………………………………………………………………… 7
3.2. Stratigraphy ………..………………………………………………………… 7

IV. General Survey ….……………………………………………………………………. 12


4.1. Genesis of Metal Minerals ……………………………………………….. 12
4.2. Field Survey Results ……………………………………………………….. 12
4.3. Calculation of Geological Resources …………………………………. 15

V. Work Plan ……………………………………………………………………………….. 16


5.1. Geophysic Survey ………………………………………………………….. 16
5.2. Plan and Time Schedule …………………………………………………. 17

VI. Appendix
Map 1. Satellite Image of Exploration Area
Map 2. Exploration Map
Map 3. Forest Map
Map 4. Work Plan Map
Map 5. Geophysics Plan Map
Table of Work Plan

1 October 2009
General Exploration Report – Tangoi Project

I. INTRODUCTION

The iron exploration was carried out by Geologist Team in concession


area of PT. Mulia Permata Treasure. The concession area is located in
Tumbang Tangoi village, Petak Malai subdistrict, Katingan district,
Central Kalimantan province, Indonesia. The Regional Location Map is
shown in Figure 1.1 at below this.

Figure 1.1. Regional Location Map

The main objectives of the exploration is to explore and to assess the


iron ore potential in 7,036 Ha exploration area located about 300 Km
NorthWest of Palangkaraya town (Capital City of Central Kalimantan
province).

The general field survey was started on October 10th, 2009 and
completed on October 20th, 2009, conducted by 5 Geologists from PT
Indo Mineral Prima and PT MP Treasure. They are:
• Mr. Chrismastono : Sr. Geologist of PT. MP Treasure
• Mr. Setiyarso : Jr. Geologist of PT. MP Treasure
• Mr. David : Sr. Geologist of PT. Indo Mineral Prima
• Mr. Endri : Jr. Geologist of PT. Indo Mineral Prima
• Mr. Sulastri : Jr. Geologist of PT. Indo Mineral Prima

The field survey was conducted with fly camp in the jungle.

2 October 2009
General Exploration Report – Tangoi Project

Our camp in Tisoi. The field survey was


conducted with fly camp in the Jungle.

Table 1. List of Exploration Area Coordinates. Total Area : 7,036 Ha

===================================================
No. Longitude Latitude
Coord. --------------------------------------------
o o
Point ' " ' "
===================================================
1. 113 07 15.00 -0 45 37.00
2. 113 09 03.00 -0 45 37.00
3. 113 09 03.00 -0 47 49.00
4. 113 13 05.00 -0 47 49.00
5. 113 13 05.00 -0 50 39.00
6. 113 07 15.00 -0 50 39.00
===================================================

Table 2. Time Schedule of General Exploration

3 October 2009
General Exploration Report – Tangoi Project

The survey equipments that used are as follows:


• Geological Hammer (Igneous Rock) • Digital Camera
• GPS Map 60 CSX • Magnetic Pen
• Compass • Plastic Sample Bag

II. GENERAL CONDITION

2.1. Location and Access

The exploration area is located in logging company area


(PT. Fitamaya Asmapara) which conducting logging activity. All of
the road access in site made by that logging company.

Private Logging Road in Exploration Area.

The way to reach the exploration area from Palangkaraya town is


by using land access and river access. We used 184 Km
government road (asphalt road) from Palangkaraya to Tumbang
Samba. It can be reached during 3.5 hours journeys. In Tumbang
Samba, we have to cross River Samba to reach Samba Katuk
during 20 minutes. Continued by using 117 Km logging road
access (laterite road) to reach western exploration area during
4 hours journeys. To reach eastern exploration area, we have to
use 12Km river access by using small boat during 2 days journeys.

4 October 2009
General Exploration Report – Tangoi Project

Vehicle & Passangers Cross River Samba

2.2. Topography, Inhabitants, Plants, and Animals

Topography

The relief of exploration area is steep hills with the height 400 m –
850 m above sea level. The steep hills will be shown in Satellite
Image Map (Appendix). There are 3 main river which control the
topography of exploration area, e.g, River Parahoi, River Roha,
and River Tisoi. (Appendix).

Inhabitants

About 100 people lives in Tumbang Tangoi village. This village is


nearest village in exploration area. The majority of inhabitants are
Dayak origin who are generally believe Christian. Most of
inhabitants work as farmer, gardener, trader, craftsman, civil
servant, gold miner, and small business owner.

Plants

60% of exploration area is covered by big trees such as Benglis,


Meranti, and Uring. All the kind of these woods taken by logging
company for processed like ”Benglis” for Pulp, ”Meranti” for Ply
Wood and ”Uring” for Timber. Trees of Jackfruit, coconut, mango,
papaya and so on are usually planted around residences of the
inhabitants.

5 October 2009
General Exploration Report – Tangoi Project

Animals

So many wild animals were met in exploration area, such as


Snake, Wild Boar, Monkey, Deer, Bear, Mousedeer, Big Lizard and
Leech.

Mousedeer became our dinner in the camp

2.3. Weather Condition

The study area belong to tropical rain forest climate which


characterized by north-east monsoon from October to May as
rainy season and by south-west monsoon from May to September
as dry season.

In accordance with the observation of Meteorology in


Palangkaraya from 2006 to 2008, average rainfall per annum is
2.691 mm, average rainfall per day is 94 mm, average
temperature in a day is 310 C in daytime and 230 C at night, and
the humidity is vary widely from 40% to 90% by day.

6 October 2009
General Exploration Report – Tangoi Project

III. REGIONAL GEOLOGY

3.1. Physiographic

Based on Regional Geological Setting of Kalimantan, The


exploration area is located in Schwaner Mountains (Herman
Darman & F. Hasan Sidi, 2000) that predominated by body of
granodiorite tonalite batholite, a small part of basaltic rocks, and
granite intrusive which making regional metamoprhism.

Tecto-stratigraphy of Kalimantan island are formed by Paleozoic


and Mesozoic sediment rocks, volcanic rocks that infiltrated by
cretaceous granite rocks which is part of continent plate.
Subduction zone has been formed, the elements consist of Folding
and Faulting at turbidite sediment rocks, ofiolite, and mélange
that having Kapur – Eosen age. At lower Oligocene – upper
Miocene was happened magma activity at western, central, and
eastern Kalimantan whereas in centre of Kalimantan formed gold
deposit zone that associate with volcanic rocks or sub-volcanic
intrusive with andesitic composition. Magma activity is still
continued till end of Miocene, whereas the younger one was
happened at Pliocene – Pleistocene.

There are 3 orogenesis activity that influence geological of


Kalimantan island, they are orogenesis of centre part Kalimantan,
orogenesis of Meratus line and orogenesis of Sabah. Based on
aerophotograph analysis, the geological structure that grew up at
edge of NorthEast Sunda Self with Pre-Tertiary bedrock shows its
structure straightness direction have NorthEast–SouthWest
pattern till North–South, whereas eastern Melawi basin expands
syncline structure with tinder direction East–West and structure
straightness towards NorthWest–SouthEast.

7 October 2009
General Exploration Report – Tangoi Project

3.2. Stratigraphy

The Regional Stratigraphy of exploration area is made base on


name set of litostratigraphy that is set of formation. The set of
this formation is determined base on characteristics of rock that
observed in the field. That is consisted of rock type, uniformity of
rock type, and stratigraphy position between rocks.

The Boundary of relative age spreading and precipitation


environment for each set of different formation is characteristics
of the rocks lithology from formation compiler that met at the
field.

Determination of relative age and precipitation environment from


each set of formation conducted by using two ways, the first is
based on relation between formation until known relative age
from each set of formation, and this condition are supported by
research to fossil content from limestone. Whereas for rock that
not contain foraminifera fossil, its age determination is conducted
with the proportion of previous research results which based on
the similarity of physical features at the field, by using reference
from Geological Map of Tumbang Hiram sheet (1615), scale 1 :
250.000 (Geological Research and Development Centre – P3G, U.
Margono, T. Soejitno, T. Santosa, 1995).

Based on Regional Geological Map, then exploration area has 6


set of formation, that is Pinoh Metamorphic (PzTrp), Sepauk
Tonalit (Kls), Selangkai Formation (Kse), Malasan Volcanic Rock
(Tomv), Sintang Intrusive (Toms), and Alluvium (Qa).

1. Pinoh Metamorphic

Biotite-Muscovite Schist, Hornblenda Schist, Biotite Gneiss,


Phylite, Slate and Quartzite. This rock intruded and thermally
metamorphosed by the Sepauk Tonalite and The Sintang

8 October 2009
General Exploration Report – Tangoi Project

Intrussive. Its presumed Permo-Carboniferous in age, and it


can be correlated with same rock from Schwaner Mountain (50
km west sheet border) and in Mangkiang (north of Sanggau)
which contain of Fusulinidae, Echinoid and Bryozoa within
limestone (van Emmichoven, 1939).

2. Sepauk Tonalit

Biotite granite, Hornblende and Muscovite Granite. Foliated in


contact with metamorphics rock and intruded by Sintang
Intrusive Rock. Age dating of the same unit from Samba River
(Tewah Sheet) showing 76 Ma (Late Cretaceous).

3. Selangkai Formation

Mudstone, Shale, Sandstone, Silstone, Minor pebbly


sandstone, Conglomerate, Limestone; rare Coal, locally basal
pebble to boulder conglomerate; commonly calcareous and
carboniferous. Fossil content consist of planktonic to benthic
foraminiferas, Algae, Coal, Echinoids, Gastropods, Radiolarian
and Ostracods, shown Valaginian to Cenomian. The unit was
deposited in a shallow to open marine environment. Thickness
approximately 1,000 m (Pieters et al., 1993). This formation
has a faulted contact with the Haloq Sandstone.

4. Malasan Volcanic Rock

Volcanic Breccia, Tuff, Aglomerate and Andesite Lava. Breccia


components mainly consists of andesite compositions. Malasan
Volcanic Rock interfingers with lower part of the Tanjung
Formation. It is probably Early Miocene age and it was
deposited in a litoral environments.

9 October 2009
General Exploration Report – Tangoi Project

5. Sintang Intrusive

Intrusions form as dykes and silts of andesite and basalt with


areal coverage of several metres to kilometers. Andesite is
commonly prophyritic texture, Dense, Brownish Green and
composed of altered plagioclase and orthoclase consisting of
sericite, hornblende, pyroxene, chlorite calcite and ore
minerals. Basalt is generally aphanitic texture, consisting of
plagioclase, pyroxene, glass, ore minerals and chlorite. The
andesite and basalt intrusive is probably Early Miocene in age.

6. Alluvium

Gravel, Sand, Silt, Clay and Organic matters are found as river
deposits.

10 October 2009
General Exploration Report – Tangoi Project

Table 3. Stratigraphy of Exploration Area

11 October 2009
General Exploration Report – Tangoi Project

IV. GENERAL SURVEY

4.1. Genesis of Metal Minerals

In exploration area was found varies igneous rocks that identify


growing of magma activity that bring iron ore mineralization.
Existence of granitic rocks and andesitic rocks identifies that ever
happened magma activity which is the key of metal minerals
forming.

Based on the process of metal forming, there are 4 types of iron


ore deposit. The types are:
- Iron ore deposit of contact metasomatism,
- Iron ore deposit of placer,
- Iron ore deposit of laterite,
- Iron ore deposit of sediment.

The iron ore deposit in exploration area is contact metasomatism


type. In megascopic, the characteristics are: blackish red, fine-
medium grain size, bad sorting, closed fabric, predominated by
ore minerals, predicted as magnetite/hematite.

4.2. Field Survey Results

Field survey was carried out by a scale of 1 to fifty thousand to


get geological information such as iron ore exposures, lithography
and geological structure in exploration area. The survey method
which used is stream mapping to looking for the iron ore
exposures. The exploration team is divided into 3 teams to
conducting observation in River Parahoi, River Roha, and River
Tisoi.

The exploration team found Hematite float at downstream and


Magnetite float at upstream. Also found Magnetite exposure at
upstream of River Tisoi. The magnetite exposure is iron vein zone
with width about 4 – 7 m. Vein zone means there are some iron

12 October 2009
General Exploration Report – Tangoi Project

vein with varies dimension. Based on the field survey result,


obtained the prospect area which is northern exploration area.
Some parts of the prospect area are outside exploration area. It
means the owner KP (PT. MP Treasure) has to submit the KP
coordinates changing towards North to Mining Department of
Katingan district.

Iron Vein Zone exposure at Magnetite Float at River Tisoi.


upstream of River Tisoi. Good quality, approximately grade
65% - 70% Fe, Density 4.2 T/M3.

Hematite Float at downstream Hematite float at Upstream


of River Tisoi, approximately of River Parahoi.
grade 52% Fe.

The list of KP coordinates changing is shown in Table 4 at with total area


become 5,787 Ha.

13 October 2009
General Exploration Report – Tangoi Project

==================================================
No. Longitude Latitude
Coord. -------------------------------------------
o o
Point ' " ' "
==================================================
1. 113 08 51.94 -0 49 14.05
2. 113 09 44.15 -0 49 14.05
3. 113 09 44.15 -0 49 29.57
4. 113 11 00.21 -0 49 29.57
5. 113 11 00.21 -0 49 51.75
6. 113 12 22.79 -0 49 51.75
7. 113 12 22.79 -0 50 38.89
8. 113 13 51.13 -0 50 38.89
9. 113 13 51.13 -0 49 53.80
10. 113 13 45.58 -0 49 53.80
11. 113 13 45.58 -0 49 40.15
12. 113 13 27.75 -0 49 40.15
13. 113 13 27.75 -0 48 47.49
14. 113 13 20.06 -0 48 47.49
15. 113 13 20.06 -0 48 22.57
16. 113 13 12.87 -0 48 22.57
17. 113 13 12.87 -0 48 02.33
18. 113 13 05.61 -0 48 02.33
19. 113 13 05.61 -0 47 13.69
20. 113 12 49.42 -0 47 13.69
21. 113 12 49.42 -0 46 54.88
22. 113 12 41.43 -0 46 54.88
23. 113 12 41.43 -0 46 33.33
24. 113 12 35.19 -0 46 33.33
25. 113 12 35.19 -0 46 14.56
26. 113 12 18.35 -0 46 14.56
27. 113 12 18.35 -0 46 35.84
28. 113 12 08.00 -0 46 35.84
29. 113 12 08.00 -0 46 56.18
30. 113 11 54.72 -0 46 56.18
31. 113 11 54.72 -0 47 05.78
32. 113 11 42.53 -0 47 05.78
33. 113 11 42.53 -0 47 17.32
34. 113 11 28.13 -0 47 17.32
35. 113 11 28.13 -0 47 30.06
36. 113 11 11.55 -0 47 30.06
37. 113 11 11.55 -0 47 39.32
38. 113 10 56.51 -0 47 39.32
39. 113 10 56.51 -0 47 49.00
40. 113 09 03.00 -0 47 49.00
41. 113 09 03.00 -0 45 37.00
42. 113 07 15.00 -0 45 37.00
43. 113 07 15.00 -0 48 57.80
44. 113 08 51.94 -0 48 57.80
===================================================
14 October 2009
General Exploration Report – Tangoi Project

The Forest using status of new exploration area is:


- HPT : 2,123 Ha,
- HP : 471 Ha,
- KPPL : 3,193 Ha.

The forest using status map is shown in appendix (Forest Status


Map).

The field survey results have been combined with the desk study
and presented in 3 Maps.
• Map 1 shows satellite image of exploration area,
• Map 2 shows the changing of exploration area,
• Map 3 shows forest using status,
• Map 4 shows work plan in the new exploration area.

4.3. Calculation of Geological Resources

The calculation of geological resources is based on the invention


of iron ore vein zone with direction N 280 E and width 4 – 7
metres that located at upstream of Rive Tisoi. And then, found
magnetite float with dimension 30 x 40 x 25 centimeters at
upstream of River Tosa with distance 2 km from vein zone at river
tisoi.

Based on field survey, the characteristic of iron ore deposit in


exploration area is primary iron ore deposit that formed as vein.
The straightness direction of vein zone at upstream tisoi and
boulder location at upstream tosa is similar. So, the calculation of
geology resource is as follows:

Resources = Volume x Density


Volume = Vein length x Vein Width x Depth of Mine Target
= 2,000 m x 1 m x 30 m
= 60,000 m3.
Resources = 60,000 m3 x 4.2 t/m3 = 252,000 t.

15 October 2009
General Exploration Report – Tangoi Project

Total Vein = 10
Estimation Value = 40%
Resources = 252,000 t x 10 x 40%
= 1,008,000 t

This calculation is just for eastern prospect area in 290.1 Ha.

V. WORK PLAN

5.1. Geophysics Survey

To follow up exploration result previously then planned to conduct


geophysics survey for 23 days. The geophysics survey methods
that will be conducted are Resistivity/Geoelectric, IP and
Geomagnetic.

Based on exploration result then determined some blocks that will


be conducted geophysics survey. These blocks are determined
base iron vein zone and also magnetite float that found in river
tisoi and river tosa.

The geophysics blocks are:

• Block 1
This Block has 290.1 Ha. Geophysics methods that will be
conducted in this block are Resistivity/Geoelectric, IP, and
Geomagnetic. Distance of each line for geoelectric and IP is 50
meters. Distance of each electrode is 5 meters. For
geomagnetic, distance of each observation point is 10 meters,
with space between geomagnetic line 10 meters.

• Block 2
This Block has 455 Ha. Geophysics method that will be
conducted is Geomagnetic. Distance of each observation point

16 October 2009
General Exploration Report – Tangoi Project

is 10 meters, and the space between geomagnetic line is 10


meters.

• Block 3
This Block has 505 Ha. Geophysics method that will be
conducted is Geomagnetic. Distance of each observation point
is 10 meters, and the space between geomagnetic lines is 10
meters.

5.2. Plan and Time Schedule

All of the explanation about Plan and Time Schedule of


Geophysics survey will be shown in Table of Work Plan
(Appendix).

17 October 2009
112º48' 112º52' 112º56' 113º 113º04' 113º08' 113º12' 113º16' 113º20' 113º24' 113º28' 113º32' 113º36'
SATELLITE IMAGE
OF EXPLORATION AREA

0º36'
0º36'

Tumbang Tangoi village,


Petak Malai subdistrict,
Katingan district,
Central Kalimantan province
Indonesia

0º40'
0º40'

0º44'
0º44'

Scale 1 : 500,000

Map Index

0º48'
0º48'

0º52'
0º52'

: Exploration Area

0º56'
0º56'

Explanation:
-1º

-1º
Exploration Area.
Total Area = 7,036 Ha.
The area is located at steep hills.

-1º04'
-1º04'

-1º08'
Image Source : Satellite Imaging Corporation - USA
-1º08'

Map No. 1

Date 21 October 2009

112º48' 112º52' 112º56' 113º 113º04' 113º08' 113º12' 113º16' 113º20' 113º24' 113º28' 113º32' 113º36' Created by David Siregar
113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14'
EXPLORATION MAP

Tumbang Tangoi village,


Petak Malai subdistrict,

0º46'
0º46'

Katingan district,
Central Kalimantan province
Indonesia

Scale 1 : 65,000
800 Map Index

0º47'
0º47'

850

900

725

0º48'
0º48'

450 : Exploration Area

550

Explanation:
650
R. Tosa R. Tisoi
R. Parahoi Exploration area before due diligence.
350 Total Area = 7,036 Ha.
550
Exploration area after due diligence.

0º49'
0º49'

Total Area = 5,787 Ha.

Contour Line
750 650 Elevation Point
River
675
Private Logging Road
Camp Fitamaya
$
$
$
$
$
550 R. Roha 425
R. Rungoi

0º50'
0º50'

400

R. Tisoi
400
Map No.

Date 21 October 2009

113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14' Created by David Siregar
113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14'
FOREST STATUS MAP

Tumbang Tangoi village,


Petak Malai subdistrict,

0º46'
0º46'

Katingan district,
Central Kalimantan province
Indonesia

HL
HP

Scale 1 : 65,000

Map Index

0º47'
0º47'

HPT

0º48'
0º48'

: Exploration Area

Explanation:

Exploration area before due diligence.


KPPL Total Area = 7,036 Ha.

Exploration area after due diligence.

0º49'
0º49'

Total Area = 5,787 Ha.

HL (Protected Forest)
HPT (Fixed Production Forest)
HP (Production Forest)
PPH (Animals Protection Area)
KPPL (Housing & Others Using Area)

Forest Using Status :

0º50'
0º50'

HPT : 2,123 Ha.


HP : 471 Ha.
KPPL : 3,193 Ha.

Map No.
PPH
Date 21 October 2009

113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14' Created by David Siregar
113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14'
WORK PLAN MAP

Tumbang Tangoi village,


Petak Malai subdistrict,
Katingan district,
0º46'

0º46'
Central Kalimantan province
R. Parahoi Indonesia

Scale 1 : 65,000
800
Map Index
0º47'

0º47'
850

900
R. Tisoi
725
0º48'

0º48'
450
550
R. Tosa
R. Parahoi Explanation:
650
Exploration area after due diligence.
350 Total Area = 5,787 Ha.
550
Contour Line
0º49'

0º49'
Elevation Point
R. Rungoi
River
750 650 Private Logging Road

Block - 1 (290.1 Ha)


675 Resistivity, IP, Geomagnet.

Block - 2 (455 Ha)


Camp Fitamaya$
$
$
$
$ R. Roha Geomagnet.
550 425
0º50'

0º50'
400 Block - 3 (505 Ha)
R. Tisoi Geomagnet.

400
Map No.

Date 21 October 2009

113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14'


Created by David Siregar
113º10'30" 113º11' 113º11'30" 113º12' 113º12'30" 113º13' 113º13'30"
GEOPHYSIC PLAN MAP
Tumbang Tangoi village,
Petak Malai subdistrict,
Katingan district,

0º46'30"
0º46'30"

Central Kalimantan province


Indonesia

Scale 1 : 30,000
R. Parahoi
Map Index
800
113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14'
0º47'

0º47'

0º46'
0º46'

0º47'
0º47'

0º48'
0º48'
850

0º49'
0º49'

0º50'
0º50'
82°

0º47'30"
0º47'30"

113º07' 113º08' 113º09' 113º10' 113º11' 113º12' 113º13' 113º14'

MV
900
Explanation:
R. Tisoi Contour Line
Elevation Point
River
Private Logging Road

Iron Vein Direction (Strike & Dip)


82°
0º48'

0º48'
Geoelectric Base Line (NE-SW)

Block - 1 (290.1 Ha)


Resistivity, IP, Geomagnet.
R. Rungoi 450
Block - 2 (455 Ha)
Geomagnet.

MF Block - 3 (505 Ha)


Geomagnet.
R. Tosa
HF

0º48'30"
0º48'30"

Map No.

Date 21 October 2009

113º10'30" 113º11' 113º11'30" 113º12' 113º12'30" 113º13' 113º13'30" Created by David Siregar
COORDINATES LIST OF GEOPHYSICS BLOCKS

BLOCK – 1
(290.1 Ha)
===================================================
No. Longitude Latitude
Coord. --------------------------------------------
o o
Point ' " ' "
===================================================
001. 113 12 31.67 -0 47 13.69
002. 113 13 05.61 -0 47 13.69
003. 113 13 05.61 -0 48 02.33
004. 113 13 12.87 -0 48 02.33
005. 113 13 12.87 -0 48 22.57
006. 113 13 20.06 -0 48 22.57
007. 113 13 20.06 -0 48 34.06
008. 113 12 31.67 -0 48 34.06
===================================================

BLOCK – 2
(455 Ha)
===================================================
No. Longitude Latitude
Coord. --------------------------------------------
o o
Point ' " ' "
===================================================
001. 113 12 49.42 -0 47 13.69
002. 113 12 49.42 -0 46 54.88
003. 113 12 41.43 -0 46 54.88
004. 113 12 41.43 -0 46 33.33
005. 113 12 35.19 -0 46 33.33
006. 113 12 35.19 -0 46 14.56
007. 113 12 18.35 -0 46 14.56
008. 113 12 18.35 -0 46 35.84
009. 113 12 08.00 -0 46 35.84
010. 113 12 08.00 -0 46 56.18
011. 113 11 54.72 -0 46 56.18
012. 113 11 54.72 -0 47 05.78
013. 113 11 42.53 -0 47 05.78
014. 113 11 42.53 -0 47 17.32
015. 113 11 28.13 -0 47 17.32
016. 113 11 28.13 -0 47 30.06
017. 113 11 11.55 -0 47 30.06
018. 113 11 11.55 -0 47 39.32
019. 113 10 56.51 -0 47 39.32
020. 113 10 56.51 -0 47 49.00
021. 113 12 31.67 -0 47 49.00
022. 113 12 31.67 -0 47 13.69
===================================================
BLOCK – 3
(505 Ha)
===================================================
No. Longitude Latitude
Coord. --------------------------------------------
o o
Point ' " ' "
===================================================
001. 113 10 34.18 -0 47 49.00
002. 113 12 31.67 -0 47 49.00
003. 113 12 31.67 -0 48 34.06
004. 113 10 34.18 -0 48 34.06
===================================================
WORK PLAN OF GEOPHYSICS SURVEY
TANGOI PROJECT - KATINGAN
CENTRAL KALIMANTAN PROVINCE
Period : November 2009

November 2009
No. Activity
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 Road Making 1 2 3 4 5 6 7 8 9 10 11

- To connecting road access from Fitamaya Road to Camp site


- Direct distance 6 Km. Estimated distance : 10 km
- Completed during 11 days by using Dozer D7, rent from Fitamaya
- Supervision from IMP' foreman (Mr. Suyono)

2 Preparation 1 2 3 4 5 6 7 8 9 10 11 12 13

- Making geophysic line (clearing by man power from Tangoi)


- Making Camp at center of geophysics area

3 Geophysics Activity
- Geoelectric team consist of 6 persons. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Operator (1), Helper (4), Geologist (1). Geoelectric team will work in
Block-1 (290.1 Ha). Total geoelectric line : 40 line. Line space : 50 mtrs.
Electrode space : 5 mtrs.
- Geomagnetic team consist of 5 persons. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Operator (1), Helper (3), Geologist (1). Geomagnetic team will work in
Block-1 (290.1 Ha), Block -2 (455 Ha), Block-3 (505 Ha). Observation
point space : 10 mtrs. Geomagnetic line space : 10 mtrs.
November 2009
No. Activity
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

4 Personnel of Geophysics Survey


David, Endri, Sulastri, Christmastono, Suyono, Joko, Ladi/Dodo,
Geophysics Operator (2), Local Worker from Tangoi (7), Local Driver (1).

Total Personnel : 17 persons

BUDGET CALCULATION

1 Logistic during 23 days (Rp 100,000/day) Rp 41,900,000


2 Salary for 8 persons Local Worker (Rp 100,000/day) Rp 19,100,000
3 Solar 15 Ltr/day (retail price Rp 10,000/ltr) for 30 days Rp 4,500,000
3 3
4 Camp Making, 2 M , @ Rp 2,000,000 /M Rp 4,000,000
5 Rent Geophysics Equipment for 23 days Rp 69,000,000
6 Others Rp 20,000,000
7 Rent Excavator, 11 days (Rp 285,000/hour), 10 hrs/day Rp 31,350,000
8 Rent Dozer D7, 11 days (Rp 450,000/hour), 10 hrs/day Rp 49,500,000
9 Solar for Excavator (Estimation : 20 ltr/hr, 10 hrs/day) Rp 22,000,000
10 Solar for Dozer D7 (Estimation : 37 ltr/hr, 10 hrs/day) Rp 40,700,000
11 Salary for Exca Operator for 11 days (Rp 20,000/hr) Rp 2,200,000
12 Salary for Dozer Operator for 11 days (Rp 20,000/hr) Rp 2,200,000
Rp -
TOTAL : Rp 306,450,000