You are on page 1of 24

1

5
4
Projects
Indian Edition: Annual Subscription Rates: Online Edition: `3500/-,
Frequency: Fortnightly (1st & 15th of every month)
Indias Project Database
Vol. 9 No. 20 l April 15, 2014
Waiting for Revival
Road Sector:
Contents: Database of more
than 300 central PSUs in India
and contact numbers, email ids
of over 5000 key executives.
Te SCOPE directory, thus
is a highly useful data source
for companies wanting to sell
to the cash-rich PSUs
PSUS ARE GOING TO SPEND
`1,00,000 CRORES MAKING THEM
BIGGEST INSTITUTIONAL BUYERS IN INDIA
For India to achieve its 8-8.5% growth target, the government has
directed the PSUs to bail the country out of the investment arrears. With
combined profts at record-level of Rs. 1 lakh crore and Rs. 2.5 lakh crore
investible surpluses, PSUs have been asked to invest heavily.
Tus the PSUs have now become highly important target sector for con-
tractors, utility providers, banks and other organizations.
To get a copy of the SCOPE Directory call at +91 24193000 or
022 65267837/838 email at subscriber@ASAPPmedia.com
SCOPE, the regulatory body of PSUs in India, has launched the latest
edition of its directory.
To order online : www.ASAPPmedia.com/subscribe
Project Reporter 3 April 15, 2014
Highlights
PROJECT SNO. SECTOR
Indias Project Database
PROJECTS ARE CLASSIFIED AS FOLLOWS:
Conceptual / Planning Stage (1 to 46)
Contract Award (47 to 63)
Project Update / Commissioned Project (64 to 79)
Under Implementation Stage (80 to 90)
Realty Projects (91 to 103)
Consultancy Bids (104 to 117)
B2B Opportunities (118 to 154)
To subscribe digital edition of
Project Reporter log on to:
www.ProjectReporter.co.in/Magzter
Realty Zone....................................Pg 12-14
www.ProjectReporter.co.in
Published by:
ASAPP Media Pvt Ltd, A-303, Navbharat Estates,
Zakaria Bunder Road, Sewri (West), Mumbai-400 015.
Tel: 022-24193000. Fax: 022-2417 5734.
Editor-in-Chief
Pratap Vijay Padode
E-mail: Pratap@ASAPPmedia.com
Editor@ProjectReporter.co.in
Executive Editor
Sandeep Sharma*
Sandeep@ASAPPmedia.com
Sub@ProjectReporter.co.in
Tel.: 022-2419 3000 / 6526 7838
Branch Offces
Delhi: Tel: 011 - 4131 5000 / 4656 1818
Bangalore: Tel: 080 - 4556 4556
Pune: Tel: 020 - 2605 2987 / 020-6602 5990
Chennai: 044 - 4299 1234
Representative Offces
UAE: Ikan Media
E-mail: World@ASAPPmedia.com
*Responsible for selection of news under the PRB
Act. All rights reserved. While all efforts are made
to ensure that the information published is correct,
PROJECT REPORTER holds no responsibility for any
unlikely errors that might have occurred.
Printed and Published by Tarun Pal on behalf of ASAPP
Media Pvt Ltd, printed at M.B. Graphics, A-38, Shri Ram
Industrial Estate, G.D. Ambekar Marg, opp. Wadala
Udyog Bhawan, Mumbai - 400 031 and Published from
A-303, Navbharat Estates, Zakaria Bunder Road, Sewri
(West), Mumbai-400 015.
Editor : Pratap Vijay Padode.
The information on products and projects on offer is
being provided for the reference of readers. However,
readers are cautioned to make inquiries and take their
decisions on purchase or investment after consulting
experts on the subject. PROJECT REPORTER holds no
responsibility for any decision taken by readers on the
basis of information provided herein. Subject to Mumbai
J urisdiction only.
Airport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (80)
Terminal at Chandigarh Airport. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Automobile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (81)
Banking & Finance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1)
9,000 White Label ATMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Chemicals & Fertilizers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (64)
Cold Chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2)
Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3, 47 to 50)
Major residential project in Bangalore . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Effluent Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4)
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (51)
Healthcare. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5, 82)
Super speciality hospitals at Navi Mumbai . . . . . . . . . . . . . . . . . . . . . . . 82
Housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (6 to 10)
1072 dwelling units under RAY scheme. . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Industrial Products. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (52, 62)
Bharat Gears commence production at Lonand . . . . . . . . . . . . . . . . . . . 65
Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Oil & Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (53)
Paradip-Haldia-Durgapur LPG Pipeline Project . . . . . . . . . . . . . . . . . . . . 53
Ports & Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (12 to 14)
Ro-Pax vessels cum terminal operator at Dahej . . . . . . . . . . . . . . . . . . . 12
Two multipurpose berths at Dighi. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (15 to 20, 54 to 59, 67 to 73)
4000 MW super thermal power project . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Sewage treatment plant at Raiyadhar . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Transmission Lines in Madhya Pradesh . . . . . . . . . . . . . . . . . . . . . . . . . 55
Solapur-Aurangabad transmission line project . . . . . . . . . . . . . . . . . . . . 56
Refurbish High Voltage Direct Current at Bhadrawati . . . . . . . . . . . . . . . 58
120 MW Vyasi Hydro Electric Project . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Railways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (21, 60)
Real Estate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(22, 23, 61, 83, 84)
Luxurious residential project Gurgaon Hills . . . . . . . . . . . . . . . . . . . . . . . 61
Refinery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (74)
Renewable Energy . . . . . . . . . . . . . . . . . . . . . . . . (24 to 26, 75 to 78, 85)
50 MW wind energy project at Duliajan . . . . . . . . . . . . . . . . . . . . . . . . . . 24
10 MW Solar PV Power Station at Unchahar . . . . . . . . . . . . . . . . . . . . . 78
Roads/Highways/Bridges . . . . . . . . . . . . (27 to 36, 62, 63, 79, 86 to 89)
Four laning of Kazhakkootam to Mukkola junction . . . . . . . . . . . . . . . . . 29
Flyovers on the Kalewadi phata-Dehu Alandi road . . . . . . . . . . . . . . . . . 31
Four laning of Sultanpur-Varanasi section. . . . . . . . . . . . . . . . . . . . . . . . 34
Strengthening of J odhpur-Barmer Section. . . . . . . . . . . . . . . . . . . . . . . . 62
Chennai Outer Ring Road Phase I Project . . . . . . . . . . . . . . . . . . . . . . . 79
Four laning of Solapur to Yedeshi section . . . . . . . . . . . . . . . . . . . . . . . . 87
Santacruz-Chembur Link Road (SCLR) project . . . . . . . . . . . . . . . . . . . . 88
Sewerage Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (37)
Theme Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (38)
Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (39 to 42)
Bus terminal cum commercial complex at Bhopal . . . . . . . . . . . . . . . . . . 39
Metro Line 3 project in Mumbai . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Elevated section of east west corridor. . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Warehousing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (43, 44)
Water Sector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (45, 46)
Project Reporter 4 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Conceptual/Planning Stage
1 Srei
Infrastruc-
ture
Finance Ltd
The company got RBI's approval to
set-up, own and operate 9,000 White
Label ATMs (WLAs). Initially a pilot roll
out of 200 WLAs in Tier 3, Tier 4 and
Tier 5 towns will be done in the next six
to eight months before scaling up.
Multiple NA Siddhartha Somani-Associate VP
(Liability & Treasury Management),
86C, Topsia Road (South), Kolkata
- 700046. T: 033-66023920, 033-
61607734, F: 22857542, siddhartha.
somani@srei.com
Banking &
Finance
2 Directorate
of Horticul-
ture and
Farm
Forestry
Plans to develop cold chain in Madhya
Pradesh on PPP mode.
Madhya
Pradesh
NA R K Namdev - Deputy Director,
Department of Horticulture, Plot
No.-92 Zone-II,M.P Nagar, Bhopal,
Madhya Pradesh. T : 0755-2576960,
2578491, M: 930262699
Cold Chain
3 National
Highways
Authority of
India
Plans construction of culvert at
Km.537.755 on left hand side of NH-16
of Kolkata Chennai corridor from
Ichapuram to Srikakulam.
Srikakulam
Andhra
Pradesh
0.21 Project Director, NHAI, PIU(GQ),
Visakhapatnam, Andhra Pradesh. T:
0891-2707600, 2714119, www.nhai.
org.
Construc-
tion
4 Northern
Coalfelds
Ltd
Plans to set up integrated effuent
treatment plant (ETP) for block b
opencast project (4.375 MTPA), NCL,
Singrauli (MP) on turnkey basis.
Singrauli
Madhya
Pradesh
NA Singeshwar Singh, General Manager,
PO-Singrauli Distt- Sidhi--486889,
Madhya Pradesh. T: 07805-266670,
F: 266640, M: 9425176630
Effuent
Treatment
5 Sri
J ayadeva
Institute of
Cardiovas-
cular Scien
ces and
Research
Plans construction of new 350 bedded
hospital and allied facilities for Sri
J ayadeva institute of cardiovascular
sciences and research complex at
KRS road, Mysore.
Mysore
Karnataka
NA Premlatha Rao, Public Relation
Offcer, Jayanagar 9th Block,
Bannerghatta Road, Bangalore -
560069, Karnataka. T: 080-22977267,
F: 26534477, projayadevacardiol-
ogy@gmail.com
Healthcare
6 Karnataka
Slum
Clearance
Board
(KSCB)
Plans construction of 1072 dwelling
units (G+3) including infrastructure at
fve locations of Hubli-Dharwad city
under Rajiv Awas Yojana (RAY)
scheme by adopting Fast Track
Technology. The completion is targeted
in 15 months.
Hubli
Karnataka
59.38 Ranga Murti, Superintending
Engineer, No. 55, Abhaya Complex,
3rd Floor, Risaldar Street, Seshad-
ripuram, Bangalore, Karnataka. T:
080-23460085, F:23563506, M:
8884492335, kscb_blr@rediffmail.
com
Housing
7 Karnataka
State Police
Housing
Corporation
Ltd
Plans to undertake construction of 110
nos police quarters in Shimoga district
under police gruha 2020 scheme.
Tenders are currently invited for this
project.
Shimoga
District
Karnataka
NA R Prakash, Executive Engineer,
Davangere Division, 8th main,P J
Extn, Brahma kumari Road, Davan-
gere - 577002. T: 08192-253065, M:
9448328900, eedvg@ksphc.org
Housing
8 Karnataka
Slum
Develop-
ment Board
Construction of 444 (G+3) dwelling
units at Laggere Sy. No.9/1 (in-situ) in
Bangalore under Rajiv Awas Yojana
scheme by adopting fast Track
Technology. Completion period: 15
months.
Bangalore
Karnataka
53.39 Srinivas Babu, Asst Executive
Engineer, Abhaya Complex, 3rd Floor,
No.55, Risaldar Street, Seshadripu-
ram, Bangalore-560020, Karnataka. T:
080-23460085, 23564651, M:
9341225250
Housing
9 Govern-
ment Of
Karnataka
Bids are called for architectural and
engineering services for the proposed
composite housing scheme at
Gaddankeri, Bagalkot taluk & district
(52 acre 37 guntas).
Bagalkot
Karnataka
NA T Bijay Gowda - Chief Engineer, III
Floor Cauvery Bhavan, Bangalore-9,
Karnataka. T: 080-22100077, F:
22215125
Housing
10 Balapur
Municipal
Council
Plans construction of 759 housing units
at Sr. No. 65, 66 areas Balapur.
Completion period: 15 months.
Balapur
Maharashtra
NA Prabhakar Labade, Executive
Engineer, Balapur Municipal Council,
Akola Dist, M: 9423721503
Housing
11 Indian Oil
Corporation
Ltd
Plans to undertake development of
tourist infrastructure facilities including
site management at world/national
heritage sites for IOF projects.
Consultancy bids are invited currently.
NA NA Sidhartha Mukherjee, General
Manager (Corp Comm), 3079/3, J B
Tito Marg, Sadiq Nagar, New Delhi
- 110049. T: 011-26260000, 26260140
Infrastruc-
ture
12 Gujarat
Maritime
Board
Bids are invited for the selection of
integrated Ro-Pax vessels cum
terminal operator at Gogha-Dahej for
the Ro-Ro ferry service across the Gulf
of Cambay.
Dahej
Gujarat
NA Ram Patel, Executive Engineer, Block
O-20, New Civil Hospital Annex,
Meghaninagar Ahmedabad, Gujarat.
T: 079-23238346, 2376270,
9925053090
Ports &
Shipping
Project Reporter 5 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Conceptual/Planning Stage
13 Vivus
Global
Australia
Pty Ltd
Plans to set up a shipbuilding facility
along the Konkan coast in Maharash-
tra. The investment is planned in the
shipyard that will built by its unit
Rajapur Shipyards Pvt Ltd in Ratnagiri
district.
Maharashtra 15000.00 R Balasubramaniam, Downtown,
Auckland 1143, New Zealand. M: +64
223090013, cmde.bala@vivusglobal.
com
Ports &
Shipping
14 V. O. Chidam
baranar
Port Trust
Plans construction of rubble bund for
dumping dredged materials at north
side of North break water at VOC Port,
Tuticorin. The completion is targeted
in 5 months.Bids are currently invited.
Tuticorin
Tamil
Nadu
6.47 K Ramachandra Rao, Chief Engineer,
V.O. Chidambaranar Port Trust,
Tuticorin, Tamil Nadu - 628004. T:
0461-2352290, F: 2352301, M:
9848190797, ce@vocport.gov.in
Ports &
Shipping
15 NTPC Ltd Plans to set up imported coal based
4000 MW super thermal power project
at Pudimadaka. The project is not
moving ahead as the APIIC has yet to
allocate 1,500 acre.
Visakhapa-
tnam
Andhra
Pradesh
NA K.V. Rama Rao, Executive Director-
Commercial, NTPC Bhawan, SCOPE
Complex, Institutional Area, Lodhi
Road, New Delhi-110003, T: 011-
24360100, mkvrrao@ntpc.co.in
Power
16 Andhra
Pradesh
Power
Generation
Corp Ltd
Setting up of 1x700 MW gas based
combined cycle power plant on EPC
basis at Nedunoor village in Karimna-
gar dist., A.P. Completion period: 36
months.
Karimna-
gar District
Andhra
Pradesh
NA C Radha Krishna - Director (Projects),
Vidyutsoudha, Khairatabad, Hy-
derabad-500082, T: 040-23499000,
39839000, dirprojects@apgenco.gov.
in
Power
17 Rajkot
Municipal
Corporation
(RMC)
Plans to setup sewage treatment plant
at Raiyadhar and Bedigam. The
Rajyadhar STP will have 56 MLD
capacity while the Bedigam STP will
have 76 MLD capacity.
Rajkot
Gujarat
86.00 M H Ghoniya, Deputy Executive
Engineer, Dhebarbhai Road, Rajkot,
Gujarat T: 0281-2239973, 2224133, F:
2224258, M: 9624055885, mc_rmc@
rmc.gov.in
Power
18 Maharash-
tra State
Electricity
Transmis-
sion Co. Ltd
MSETCL plans 400/220kV sub-station
at Alkud and 2 nos 400 kV line bays at
400 kV J ejuri sub-station on turnkey
basis. Bids are currently invited.
J ejuri
Maharashtra
NA R D Chavan, Chief Engineer (C & M),
Prakashganga, Plot no .C-19,
E-Block, BKC, Bandra, Mumbai -
400051. T:022-26595000,
F:26591254, M: 9769006280
Power
19 Coal India
Ltd (CIL)
Plans to set up 1.6 GW pit-head power
plant by 2015-16 in joint venture by
2015-16 near one of its coal mines
where the rail connectivity is poor and
evacuation of coal is not happening.
NA NA C B Sood, Executive Director,10
Netaji Subhas Road, Kolkata -
700001, West Bengal, T: 033-
22435542, F:22435316, edsnr@
coalindia.in
Power
20 Rajasthan
Rajya
Vidhyut
Utpadan
Nigam Ltd
EPC bids are called for 160 MW gas
based combined cycle power project
Stage - IV of RRVUNL at Ramgarh
district J aisalmer.
J aisalmer
Rajasthan
NA Z A Attari, Chief Engineer, Ramgarh,
Dist. J aisalmer, Rajasthan. T:
02991-270411
Power
21 Rail Land
Develop-
ment
Authority
Plans to engage a consultant to
conduct feasibility study and bid
process management for commercial
development of railway land at
Mahalaxmi Wadala, Mumbai.
Mumbai
Maharashtra
NA Virendra Kumar, General Manager,
Projects, Next to Safdarjung Railway
Station, Moti Bagh I, New Delhi -
110021, T: 011-24104789
Railways
22 Kolte-Patil
Developers
Ltd
Plans to develop residential housing
project at Pune on 30 acre land parcel
at Kondhwa.
Pune
Maharashtra
NA Ram Amate - DGM, 201, City Point,
Dhole Patil Road, Pune. T: 020-
66226622, 66226500, F: 66226626,
ram.amate@koltepatil.com
Real Estate
23 SSPDL Ltd SSPDL Green Acres LLP has entered
into partnership with Godrej Properties
Ltd to develop a residential project in
Padur, OMR, Chennai on proft sharing
model.
Chennai
Tamil
Nadu
NA A Shailendra Babu, Company
Secretary cum Compliance Offcer,
SSPDL, 8-2-595 / 3/6, Eden Gardens,
Road No 10 Banjara Hills ,Hyderabad
-500034 Andhra Pradesh, Tel:
040-66637560,65507567
Real Estate
24 Oil India Ltd Plans to set up 50 MW wind energy
project at Duliajan in the state of
Assam. EPC bids are currently invited.
Duliajan
Assam
NA Shantanu Saikia- BDM, Plot No. 19,
Near Film City, Sector 16A, Noida
- 201301. T: 0120 - 2488325,
2488333 to 2488347, F: 2488310,
oilindia@oilindia.in
Renewable
Energy
Project Reporter 6 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Conceptual/Planning Stage
25 Gujarat
State
Electricity
Corp Ltd
Plans to set up 2x10 MW solar
photovoltaic grid-connected power
plant at Gujarat solar park, Village
Charanka, taluka Santalpur.
Patan
District
Gujarat
NA M L Patel, Chief Engineer (P&P),
Vidyut Bhavan, Race Course,
Vadodara - 390007, T: 0265-6612154,
6612131, cepnp.gsecl@gebmail.com
Renewable
Energy
26 Ministry of
New &
Renewable
Energy
Plans to invite consultants for providing
services on grid connected SPV
rooftop power plants to MNRE.
Nationwide NA G Prasad, Director, Lodhi Road, CGO
Complex, Block 14, MNRE Offce
New Delhi-110504, T: 011-24361151,
prasad@nic.in
Renewable
Energy
27 National
Highways
Authority of
India
Plans construction of fyover at
Derabassi from km 29.830 to km
30.970 of NH-22 (Ambala-Chandigarh
section) on EPC basis. Bids were
recently invited.
Ambala
Chandi-
garh (U.T.)
146.00 M.K J ain, General Manager, G-5 & 6,
Sector-10, Dwarka, New Delhi -
110075 Delhi. T: 011-25074100-1449,
F: 250741100, 200, mkjain@nhai.org
Roads/
Highways/
Bridges
28 IL&FS
Transporta-
tion
The company has emerged as lowest
bidder for Road Infrastructure Com-
pany Kerala Ltd project comprising
rehabilitation of state highways and
MDR - package III (A), Total 96.72 km
and package III (B) Total 97.54 km
under DBFMT on annuity basis. The
concession period is of 15 years.
Kerala 289.60 Tarun Udwala, Sr Manager-
CC,6-3-1186 / 1&2, Plot #12, IL&FS
Engineering House, Begumpet,
Hyderabad - 500016. T: 040-
40409333, 40409540, F: 40409444,
tarun_udwala@ilfsengg. com (K
Ramchand, Managing Director)
Roads/
Highways/
Bridges
29 National
Highways
Authority of
India
Plans four laning of Kazhakkootam to
Mukkola junction of NH-47 along the
Trivandrum bypass from km 0.000 to
km 26.500 on bot (toll) basis in Kerala.
Kazhak-
kootam
Kerala
577.95 M.K J ain, General Manager, G-5 & 6,
Sector-10, Dwarka, New Delhi -
110075 Delhi. T: 011-25074100-1449,
F: 250741100, 200, mkjain@nhai.org
Roads/
Highways/
Bridges
30 Brihan-
mumbai
Municipal
Corporation
(BMC)
The Maharashtra Govt ambitious
coastal road project comprises
35.6-km long coastal road connecting
Nariman Point to Kandivali. BMC is the
nodal agency to implement this project.
The civic body has appointed a
consultant to undertake feasibility
study and prepare design that will
constrain scope of work that requires
NOC from the MoEF. Once all the
approval is in place, the project is
expected to complete in fve years.
Mumbai
Maharashtra
8000.00 D Dixit,Chief Engineer-Roads, 3rd
foor, NX Bldg, Mahanagarpalika
Marg, Opp, CST Station, ,Fort,
Mumbai, Maharashtra-4000001. T:
022-24919252,
22620451,F:22620451, M:
09820068081
Roads/
Highways/
Bridges
31 Pimpri
Chinchwad
Municipal
Corporation
(PCMC)
PCMC decides to construct two
parallel fyovers at KSB Junction. The
fyovers on the Kalewadi phata-Dehu
Alandi road will each be 810 metre
long and 8 metre wide. The two
parallel grade separators on Telco
Road will be 510 metre long and 9.5
metre wide. The 45 metre BRT route of
Kalewadi Phata-Dehu Alandi Road
crosses Telco road. The work is
expected to complete by September
2016.
Pimpri,
Chinchwad
Maharashtra
109.26 Shrikant Saune,Executive Engineer,
Mumbai-Pune Road, Pimpri, Pune,
Maharashtra-411018. T: 020-
27425511-14, F: 27425600, M:
09922501723, s.saune@pcmcindia.
gov.in,
Roads/
Highways/
Bridges
32 National
Highway
Authority of
India
(NHAI)
Plans to undertake repair work on the
40-km stretch from Mansar to Kha-
wasa on NH-7.
Nagpur
Maharashtra
NA NY Wadetwar, Project Director, PIU,
Amravati, Matruchhaya, Plot No.33,
Raguvir Co-op Housing Society,
Badnera Road, Sai Nagar, Amravati,
Gujarat-444607 T:0721-2510035,F:
2510035, M: 09764003380
Roads/
Highways/
Bridges
33 Rajasthan
Public
Works
Department
Plans to undertake construction of road
under PMGSY (World bank assisted
projects RRP-II (Tranch-II Phase-X) in
Jaipur district, (Tranch-V Phase-XII) in
Dausa and Udaipur District. The
completion will take 240 days. Bids are
currently invited.
J aipur
Rajasthan
NA AK Singhvi, Chief Engineer, J acob
Road, J aipur 302006, Rajasthan. T:
0141-5110544, F: 0141- 5110554. M:
9829128389, sebot@rediffmail.com
Roads/
Highways/
Bridges
Project Reporter 7 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Conceptual/Planning Stage
34 National
Highways
Authority of
India
Plans four laning of Sultanpur-Varanasi
section of NH-56 from km 134.700
(design chainage 134.700) to km
271.300 (design chainage 280.925)
under NHDP Phase IV through public
private partnership (ppp) on DBFOT
Toll basis.
Varanasi
Uttar
Pradesh
1564.73 M.K J ain, General Manager, G-5 & 6,
Sector-10, Dwarka, New Delhi -
110075 Delhi. T: 011-25074100-1449,
F: 250741100, 200, mkjain@nhai.org
Roads/
Highways/
Bridges
35 National
Highways
Authority of
India
Plans four laning of Ghaghar bridge to
Varanasi section from Km 121.800 to
Km 299.350 of nh-233 in the state of
Uttar Pradesh under NHDP Phase-IV
to be executed as bot (toll) project on
DBFOT pattern.
Varanasi
Uttar
Pradesh
1895.95 M.K J ain, General Manager, G-5 & 6,
Sector-10, Dwarka, New Delhi -
110075 Delhi. T: 011-25074100-1449,
F: 250741100, 200, mkjain@nhai.org
Roads/
Highways/
Bridges
36 National
Highways
Authority of
India
Plans construction of temporary toll
plaza - Guabari at Km 243.00 of
nh-31c in the state of West Bengal.
Guabari
West
Bengal
NA Chief General Manager, White House,
Block-A, 2nd Floor, 119 Park Street,
Kolkata - 700016 West Bengal. T:
033-22268133, F: 22268135
Roads/
Highways/
Bridges
37 Ahmedabad
Municipal
Corporation
Plans to set up 55 MLD output capacity
tertiary treatment plant including
upgradation of 60 MLD stream of
existing 180 MLD STP to produce
Industrial Grade Water for Ahmedabad
textile processors association at New
Pirana, Ahmedabad. Completion
period: 18 months.
Ahmedabad
Gujarat
NA Dr. Guruprasad Mohapatra, IAS,
Commissioner, Municipal Commis-
sioner P.W.A. Offce, Municipal
Corporation, Sardar Patel Bhavan,
Danapith, Ahmedabad - 380001,
Gujarat, T: 079-25391811 to
25391830, F: 25350926, gpmohapa-
tra@egovamc.com
Sewerage
Treatment
38 Uttar
Pradesh
State Indust
rial Develop
ment Corp
Plans development of theme park at
Agra under a public private partner-
ship/ joint venture mode. Bids are
currently invited.
Agra Uttar
Pradesh
NA V K Nanda, Chief Manager, UPSIDC
Complex, A-1/4 Lakhanpur, Kan-
pur-208024. T: 0512-2582851,
2582852, 2582853, F: 2580797, M:
09935441764
Theme
Park
39 Bhopal
Municipal
Corporation
Plans development of bus terminal
cum commercial complex at Putligha-
rin, Bhopal in the state of Madhya
Pradesh.
Bhopal
Madhya
Pradesh
NA Sunil Shrivastav, Chief Engineer
(Project), Sadar Manzil, Nagar Nigam,
Bhopal. T: 0755-2542070, 2701671,
2701410, M: 9424499880
Transport
40 Mumbai
Metro Rail
Corporation
(MMRCL)
Plans to implement underground metro
corridor named 'Metro Line 3' covering
32.5 km having 26 stations under-
ground and one at ground level. The
corridor will start from Colaba in south
Mumbai till SEEPZ in the north. J ICA is
funding 57 per cent while Govt of India
and MMRDA will bear the rest.
Fourteen international and domestic
companies have registered their
interest in the pre-qualifcation round.
Tenders will be issued by J uly 2014.
Mumbai
Maharashtra
23136.00 PRK Murthi - Chief Transportation and
Communication, Bandra Kurla
Complex, Bandra (East), Mum-
bai-400051, T: 022-26594000, F:
26594182, prkmurthi1960@yahoo.
com (Sanjay Sethi, MD)
Transport
41 Lucknow
Metro Rail
Corporation
Ltd (LMRC)
Plans to execute metro-rail project in
Lucknow city. The foundation stone
was laid in March 2014. The project is
expected to complete in three years.
The frst phase of the project com-
prises North South (N-S) metro
corridor from Amausi Airport to
Charbagh covering approximately 23
km. The stretch from airport to
Alambagh will be taken up on priority
as part of frst phase. LMRC has
currently invited request of proposal to
appoint a commercial consultant -
cum-property development advisor for
Lucknow metro rail project-Part 1 A
(North-South Corridor).
Lucknow
Uttar
Pradesh
18000.00 Rajeev Agarwal, MD, 1st Floor,
J antpath Market, Hazrat Ganj,
Lucknow, 226001, M: 9918771111
Transport
Project Reporter 8 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Conceptual/Planning Stage
42 Kolkata
Metro Rail
Corporation
Ltd
Plans construction of 365.646 m
viaduct from (Ch 8958.405m to
9324.051 m) on either side along the
elevated section of east west corridor
of Kolkata Metro. Bids are invited.
Kolkata
West
Bengal
NA Biswanath Dewanjee, Dy Chief
Engineer (Civil), HRBC Complex,
KMRCL Bhawan, 2nd & 3rd Floor,
Munsi Premchand Sarani, Kolkata, T:
033-22134342, M: 9051399329
Transport
43 Central
Warehous-
ing
Corporation
Plans to set up 10000 MTC godowns
at Munger and Khagariya in the state
of Bihar. Bids are currently invited to
carry out sub-soil investigation.
Another 1800 MTC Godown along with
internal roads and electrical installation
at CW, Nokha.
Munger
Bihar
NA B B Pattnaik, MD, 4/1 Siri Institutional
Area, Hauz Khas, New Delhi-110 016.
T: 011-26566107, F: 26967256,
warehouse@nic.in, mdcwc@nic.in
Warehous-
ing
44 Madhya
Pradesh
Warehous-
ing and
Logistics
Corporation
Consultant bids are called for world
class centre for perishable cargo to be
set up at Devi Ahilya Bai international
airport, Indore.
Indore
Madhya
Pradesh
NA J K Dubey, Chief Engineer, Offce
Complex, Block A, Gautam Nagar,
Bhopal-462023, Madhya Pradesh,
0755-2600524, 2600509, 510, F:
2600384, M: 9425382942, ho@
mpwarehousing.com
Warehous-
ing
45 Krishna
Bhagya
J ala Nigam
Ltd
(KBJ NL)
KBJ NL plans to undertake remodelling
of the Narayanapura Left Bank Canal
(NLBC) and the network extension,
renovation and modernisation (ERM)
programme of the Upper Krishna
Project (UKP). The project will be taken
up under the Accelerated Irrigation
Beneft Programme (AIBP) and the
National Water Mission.
Narayan-
pura
Karnataka
3752.00 Pramod Reddy Patil, Chief Engineer,
PWD Offce Annexe Building, III Floor,
K.R.Circle, Bangalore ,Karnata-
ka-560001. T: 080-22277393, 488, F:
22219470, kbjnl123@yahoo.co.in,
Water
Sector
46 Bengaluru
Mahana-
gara Palike
Plans remodelling of storm water
drains, food mitigation & sewage
diversion to improve environment
condition near waterbodies in Yela-
hanka zone under project - II (Gedala-
halli Kere watershed region)
Bangalore
Karnataka
NA V Yashwant - Special Commissioner
Projects, South, 9th cross 9th main
2nd block, J aynagar Bangalore 560
011, Karnataka. T: 080-22975708,
22975551, specialcommission-
erbbmp@gmail.com
Water
Sector
Contract Award (Sno. 47 to 63)
47 Larsen &
Toubro
(L&T)
Bagged construction of a major
residential project in Bangalore. The
scope of work involves construction of
24 towers and 271 villas. The towers
will comprise two basements and a
ground foor with levels varying from 18
to 29 foors. The project is scheduled
to be completed in 42 months.
Bengaluru
Karnataka
1981.00 S N Subrahmanyan,Whole- time
Director & Sr. EVP, (Infrastructure &
Construction), Mount Poonamallee
Road, Manapakkam, P B no 979,
Chennai - 600089, Tamil Nadu.
T:044-2528000, F:22493888, sns@
lntecc.com
Construction
48 Era Infra
Engineering
Ltd
Bagged construction contract from
Department of Atomic Energy for the
construction of phase II hostel complex
consisting of 376 bachelors and 144
married accomodation for trainees of
Bhabha Atomic Research Centre
(BARC) / Homi Bhabha National
Institute at Anushaktinagar in Mumbai.
Mumbai
Maharashtra
48.98 Anirudh Kumar, General Manager
(Contracts), 370-371/2, Sahi Hospital
Road, J ungpura, Bhoga, New Delhi
- 110014, T: 011-40637000, F:
24378784
Construction
49 Vascon
Engineers
Ltd
Bagged an order from Sheth Creators
Pvt Ltd for the construction of residen-
tial building at Mumbai.
Mumbai
Maharashtra
115.00 M Krishnamurthi,Company Secretary,
Phoenix, Bund Garden Road, Camp,
Pune - 411001 Maharashtra. T:
020-30562100, 200, 400, 500, F:
26131071, mk_muthi@vascon.com
Construction
50 Vascon
Engineers
Ltd
Bagged housing contract from Uttar
Pradesh Housing and Development
Board for the construction of multisto-
ried fats in Lucknow.
Lucknow
Uttar
Pradesh
130.00 M Krishnamurthi,Company Secretary,
Phoenix, Bund Garden Road, Camp,
Pune - 411001 Maharashtra. T:
020-30562100, 200, 400, 500, F:
26131071, mk_muthi@vascon.com,
http://vascon.com (R Vasudevan,
Managing Director)
Construction
Project Reporter 9 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Contract Award
51 Kilburn
Engineering
Ltd
The company has got letter of intent
(LOI) from a large fertilizer company
for supply of equipment for a new DAP/
NPK fertilizer project.
NA 31.00 D P Sarvadhikari,V.P. (Works), Plot
No. 6, MIDC - Saravali, Kalyan
Bhiwandi Road,Taluka, Bhiwandi
District, Thane, Maharashtra. T:
02522-22241800, F:22280166
Equipment
52 Kilburn
Engineering
Ltd
Bagged NPCIL's orders for nuclear
reactor building cooling systems in
Gujarat and Rajasthan.
Gujarat 18.00 D P Sarvadhikari, V.P. (Works), Plot
No. 6, MIDC - Saravali, Kalyan
Bhiwandi Road,Taluka, Bhiwandi
District, Thane, T: 02522-22241800
Industrial
Products
53 J aihind
Projects Ltd
Bagged Paradip-Haldia-Durgapur LPG
Pipeline Project from Indian Oil
Corporation Ltd. The project envisages
laying of mainline for Paradip-Haldia-
Durgapur LPG Pipeline Project
(PHDPL)-Group A.
Paradip,
Haldia
Gujarat
114.83 Vinod Kumar Bhogayata, GM, 3rd
Floor, Venus Atlantis, Corporate Park,
Nr Prahladnagar, AUDA Garden,
Satellite, Gujarat-380015. T: 079-
40501300, F:40501310/11, vinodku-
mar@jpl.co.in,,
Oil & Gas
54 Transform-
ers and
Rectifers
(India) Ltd
Bagged an order for supply of 66KV
class transformers aggregating to 1290
MVA from Gujarat Energy Transmis-
sion Corporation Ltd (GETCO).
Gujarat 66.00 Darshan Shah GM Marketing, Survey
No: 345-350, Sarkhej Bavla Highway,
Vill: Changodar, Tal: Sanand,
Ahmedabad-382410, Gujarat. T:
02717-661661, M: 9687659521
Power
55 BS Ltd Bagged several orders from power
utilities. These orders are for turnkey/
EPC contractors for 220 KV & 132 KV
transmission lines & associated
substations in Madhya Pradesh. The
projects funded by Asian Development
Bank are for strengthening the grid and
enhancing transmission capacity,
bringing much-needed electricity to the
region to meet growing domestic and
industrial demand.
Madhya
Pradesh
722.00 Sarin Paul, Corporate Communica-
tion, 504, Trendset Towers, Road
No.2, Banjara Hills, Hy-
derabad-500034 Andhra Pradesh. Tel:
040-44558888, Fax: 040-66667268,
M: 09949960508, sarinpaul@
bsgroup.in, www.bslimited.in (Rajesh
Agarwal, Chairman & Managing
Director)
Power
56 Kalpataru
Power
Transmis-
sion Ltd
Bagged order for supply & erection of
765KV D/C Solapur-Aurangabad
transmission line of 140km worth from
PGCIL
Solapur
Maharashtra
350.00 Rahul Shah, Company Secretary,
101, Kalpataru Synergy, Opp. Grand
Hyatt, Santacruz (E), Mumbai -
400055, T: 022-30645000
Power
57 ABB Ltd ABB bags GIS substation contract
worth US$18 million to construct a 400
kV gas-insulated switchgear (GIS)
substation at Kolhapur. The completion
is targeted in 2016.
Kolhapur
Maharashtra
NA Sanaj Natarajan, Manager-CC, No.49
Race Course Road, Bangalore,
Karnataka-560001, T:080-22949195,
22949150, F:22949148,
M:09972800477
Power
58 Alstom T&D
India
Bagged a contract from PGCIL to
supply and refurbish HVDC converter
transformers at Bhadrawati.
Bhadra-
wati Uttar
Pradesh
182.00 Aparna Srivastava, DGM-Corp
Comm, IHDP Bldg, Sector-127, Noida
-201301, Uttar Pradesh T: 0120-
4732535, 4731141, M: 9560646622,
aparna.srivastava@alstom.com,
Power
59 Bharat
Heavy
Electricals
Ltd
Bagged a contract for setting up a 120
MW Vyasi Hydro Electric Project (HEP)
from UJ VNL in Uttarakhand. The order
is for setting up of Hydro Generating
sets and associated Electro-Mechani-
cal works for this project.
Uttarakhand 125.00 Inder Pal Singh, CS & Compliance Of-
fcer, BHEL House, Siri Fort, New
Delhi-110049. T: 011-66337000,
26001046, F: 011-66337533, inder@
bhel.in, www.bhel.com ( B P Rao,
CMD)
Power
60 GMR
Infrastruc-
ture Ltd
GMR led consortium bagged rail line
doubling contract from RVNL between
J hansi and Bhimsen stations. The work
included construction of roadbed,
major & minor bridges, track linking,
outdoor S&T works, OHE, TSS &
general electrical works from J hansi to
Erich Road. The work is likely to start
shortly and complete in 42 months.
J hansi
Uttar
Pradesh
267.00 Sowmya Shenoy, Corp Comm, GMR
Group, IBC Knowledge Park,,Phase
2, D Block, 9th Floor, 4/1, Ban-
nerghatta Road, Bangalore - 560029,
T:080-40432000, 40432507, F:
40432180, M: 9663699991, sowmya.
shenoy@gmrgroup.in,
Railways
Project Reporter 10 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
61 IL & FS
Engineering
and
Construc-
tion
Company
Ltd
Bagged a letter of intent (LoI) from Ireo
Pvt Ltd for construction of its luxurious
residential project Gurgaon Hills
located at Sec-02, Gurgaon, Haryana.
The project comprises six towers (20 to
26 Storey) with total built-Up area of
around 1.77 million sq feet including
basement, EWS, Club House, and so
on. The completion is targeted in 39
months.
Gurgaon
Haryana
175.80 G Venkateswar Reddy, Company
Secretary, D.No. 8-2-120/113/3 4th
Floor, Sanaili Info Park, Road No. 2,
Banjara Hills, Hyderabad - 500033
Andhra Pradesh. T: 040-40409333, F:
040-40409444, cs@ilfsengg.com,
cs@maytas.in, www.ilfsengg.
com(Murli Dhar Khattar, Managing
Director)
Real Estate
62 Sadbhav
Engineering
Ltd
Bagged order from NHAI for the
widening & strengthening of J odhpur-
Barmer Section of NH-112 (J odhpur to
Pachpadra Pkg-I) with two lane with
paved shoulder/four lane from km
140.00 to km 225.615 (Length 85.615 )
under NHDP-IV in Rajasthan on EPC
Mode. The construction period is 910
days. The maintenance period is 4
years from the date of the provisional
certifcate.
J odhpur
Rajasthan
212.40 Vijay J Kalyani, CS & Compliance
Offcer, Sadbhav House, Ellisbridge ,
Ahmedabad - 380006, T: 079-
26463384, F: 26400210, vijay.
kalyani@sadbhaveng.com, www.
sadbhaveng.com (Vishnubhai M
Patel, MD)
Roads/
Highways/
Bridges
63 Sadbhav
Engineering
Ltd
Bagged EPC contract for highways
project from NHAI for widening and
strengthening of J odhpur- Barmer
Section of NH-112. The project is being
implemented under NHDP, Phase IV.
The maintenance period for the project
is for four years.
J odhpur
Rajasthan
212.00 Parul Shah,Sr. Business Development
Offcer, Sadbhav House, Opp Law
Garden Police Chowki, Ellisbridge,
Ahmedabad, Gujarat-380006.
T:079-26463384, F: 26400210, parul.
shah@sadbhaveng.com,
Roads/
Highways/
Bridges
Project Update / Commissioned Project Stage (Sno. 64 to 79)
64 SRF Ltd The company has recently commis-
sioned the following units: 1) Captive-
Power-Plant (15 MW) 2) HFC-
134a/125 plant (12500 TPA). 3)
AHF-Plant (20000 TPA) 4) Specialty
Chemical Plant (800 TPA) and 5)
Specialty chemicals Plant for agro-
chemical industry (500 TPA).
NA NA Anoop K J oshi, VP & CS, Block - C,
Sector - 45, Gurgaon - 122003, T:
0124-4354400, F: 4354500, sanjiv.
sharma@srf.com, www.srf.com
(Ashish Bharat Ram, Managing
Director)
Chemicals
& Fertiliz-
ers
65 Bharat
Gears Ltd
The company has commenced
production at Lonand plant in Satara.
Satara
Maharashtra
NA S G Gandri, Plant Head, Lonand,
Taluka ,Khandala, Satara District -
415521, Maharashtra, T: 02169-
226285, 225285, info@bglindia.com
Industrial
Products
66 Dighi Port
Pvt Ltd
Dighi Port has commissioned two
multipurpose berths having a single
linear quay length of 650 m. The port
already has two multipurpose berths
on the South Bank, three more
multipurpose berths having a total
quay length of 1100 m are under
construction on the North Bank and will
be commissioned by the last quarter of
2014.
Raigad
District
Maharashtra
NA Oman Khosla, BDM, New Excelsior
Building, 6th Floor, A.K. Nayak Marg,
Fort, Mumbai- 400001. T: 022-
22074824/25, F: 2072124 (Vijay
Kalantri, CMD)
Ports &
Shipping
67 J indal
Power Ltd
The company has commissioned the
second unit of 600 MW out of the
4x600 MW expansion project at
Tamnar in Raigarh district. The frst unit
of 600 MW was commissioned on
March 14, 2014. The third unit of 600
MW is complete and ready for
synchronization.
Raigarh
District
Chhattis-
garh
NA J indal Centre, 12, Bhikaiji Cama
Place, New Delhi 110066 Delhi. T:
011-2618 8340-50, F: 011-26161271,
www.jindalpower.com (R. S. Sharma,
Managing Director)
Power
Contract Award
Project Reporter 11 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
E
page 15
68 Reliance
Power Ltd
The company has recently commis-
sioned third unit with 660 MW unit of
the 3,960 MW (6x660 MW) Sasan
Ultra Mega Power Plant (UMPP) being
developed by SPV-Sasan Power Ltd.
Balance three units of this project are
in advanced stages of construction.
The commissioning is targeted over
the next couple of months.
Sasan
Madhya
Pradesh
19400.00 Nagraj Rao,Corp Comm, Dhirubhai
Ambani Knowledge City (DAKC),
Thane-Belapur Road, Koparkhairne,
Navi Mumbai - 400710, T: 022-
30386600, F:30386999, M:
9323342576, www.reliancepower.
co.in (J P Chalasani, Chief Executive
Offcer)
Power
69 NTPC Ltd The company has declared commer-
cial operations of the Unit #2 of 500
MW of Mouda Super Thermal Power
Station, Stage-I. With this the total
commercial capacity of Mouda STPS
has become 1000 MW and the total
commercial capacity of NTPC has
become 41814 MW.
Nagpur
District
Maharashtra
NA B P Singh, Director (Projects), NTPC
Bhawan, Scope Complex, 7, Institu-
tional Area, Lodi Road, New Delhi -
110003, T: 011-24360100, 011-
24361018, info@ntpc.co.in, isd@ntpc.
co.in, bpsingh@ntpc.co.in (Arup Roy
Choudhary, CMD)
Power
70 NTPC Ltd The company has declared commer-
cial operation of Unit #12 of 500 MW
of Vindhyachal Super Thermal Power
Station.
Singrauli
District
Maharashtra
NA B P Singh, Director (Projects), NTPC
Bhawan, Scope Complex, 7, Institu-
tional Area, Lodi Road, New Delhi -
110003, T: 011-24360100, 24361018,
bpsingh@ntpc.co.in (Arup Roy
Choudhary, CMD)
Power
71 Adani
Power Ltd
The company has commissioned the
fourth unit of 660 MW at its power plant
at Tiroda in Maharashtra.
Tiroda
Maharashtra
NA Roy Paul, DGM,Sambhav Building,
J udges Bungalow Road, Bodakdev,
Ahmedabad. T: 079- 25556628, F:
25557177, roy.paul@adani.in
Power
72 Reliance
Power Ltd
The Butibori power plant comprising
2x300 MW capacity developed by
Vidarbha Industries Power Ltd, a
subsidiary company is now fully
operational.
Butibori
Maharashtra
2076.00 Nagraj Rao, Corp Comm, Dhirubhai
Ambani Knowledge City (DAKC),
Thane-Belapur Road, Koparkhairne,
Navi Mumbai - 400710, T: 022-
30386600, F:30386999, M:
9323342576, www.reliancepower.
co.in (J P Chalasani, Chief Executive
Offcer)
Power
73 NTPC Ltd The company has declared commer-
cial operation of Unit #6 of 500 MW of
Rihand Super Thermal Power Station.
Soneb-
hadra
District
Uttar
Pradesh
NA B P Singh, Director (Projects), NTPC
Bhawan, Scope Complex, 7, Institu-
tional Area, Lodi Road, New Delhi -
110003, T: 011-24360100, 24361018,
bpsingh@ntpc.co.in (Arup Roy
Choudhary, CMD)
Power
74 Mangalore
Refnery
and
Petrochemi-
cals Ltd
The company has commissioned the
delayed coker unit (DCU) of 3.0
MMTPA, which is part of the refnery
up-gradation cum expansion project.
Mangalore
Karnataka
NA Dinesh Mishra, Company Secretary
& Compliance Offcer, Kuthethur P O
Via Katipalla, Moodapadav ,Manga-
lore-575030, T: 0824-2270400, F:
0824-2270382, 2270013, mrplmlr@
mrplindia.com, www.mrpl.co.in. (P P
Upadhya, Managing Director)
Refnery
75 NTPC Ltd The company has recently com-
menced commercial operations of 5
MW Solar PV Power Station at
Faridabad.
Faridabad
Haryana
NA S C Pandey, Director (Projects),
NTPC Bhawan, Scope Complex, 7,
Institutional Area, Lodi Road, New
Delhi - 110003, T: 011-24360100,
24361018, scpanday02@ntpc.co.in
(Arup Roy Choudhary, CMD)
Renewable
Energy
76 NTPC Ltd The company has recently com-
menced commercial operations of 30
MW Solar PV Power Station at
Rajgarh.
Rajgarh
Madhya
Pradesh
NA S C Pandey, Director (Projects),
NTPC Bhawan, Scope Complex, 7,
Institutional Area, Lodi Road, New
Delhi - 110003, T: 011-24360100,
24361018, scpanday02@ntpc.co.in
(Arup Roy Choudhary, CMD)
Renewable
Energy
Project Update / Commissioned Project
Project Reporter 12 April 15, 2014
Realty Zone
Could you tell us about your
company, achievements and core
competencies?
S Raheja Realty, the name that
speaks trust and tradition, has been a
prominent player in the Indian real estate
market for more than 5 decades now. Our
business policies have ensured purity
not only in the quality of our construction
but also in the nature of our practices.
Associations with leading international
and domestic consultants enable the
group to continually innovate, and create
architectural landmarks.
The company primarily has four
verticals; redevelopment, corporate,
luxury mid-level housing and second
homes. The strategies for each of
these segments are different. Keeping
pace with the changing concepts of
luxury, our second-home projects like
the Cascades have been designed
with keeping privacy and relaxation in
mind.
While real estate is S Rahejas
key business vertical, the groups
portfolio also includes a diversifed
range of services in the construction and
architecture industries. These verticals
act as the backbone and work in sync
with all other departments ensuring
strong project execution.
Could you provide us insight about
the emerging trends in the Indian real
estate sector?
Indian real estate market is going
through a very interesting phase with
the general economic development.
With buyers getting more of international
exposure, the nature of the demands are
changing as the consumers want quality
projects that have all the amenities at par
with the rest of the world. This is true not
only for the metros but also tier-II cities.
The concept of luxury is also evolving
with far greater emphasis on personal
space and comfort.
One of the emerging trends in
the Indian realty segment is mixed-
use developments. There has been
a considerable rise in mixed-use
projects which encompass residential,
commercial and even other facilities
like healthcare. Their main beneft is
reduced distances between housing,
workplaces, retail businesses, and other
destinations.
I see a huge growth in the smaller
cities with each youth wanting to have
his own home at a very early phase of
his career. With many big companies
coming into the real estate market, only
good quality housing will survive as
the investors are far more conscious
and know exactly what they want.
Sustainable architecture and green
buildings are also a trend expected to
become pre-dominant with concerns
about the environment growing. In
terms of innovation, I foresee a lot of
improvement in terms of technology and
demand for smart-homes. The process
of construction is also undergoing
changes with pre-fabricated materials
and alternatives to raw materials like
cement being used by developers to
speed up the process. Thus, real estate
sector in India will only grow into a larger
and better market in the coming years.

How is the real estate space shaping
up in the Mumbai Metropolitan
Region?
With space being a major concern
in a metro like Mumbai, there are
two major trends that are shaping up
in the real estate segment. One is
redevelopment projects and another is
expansion towards the outskirts. The
MMR region has now started expanding
and the farther suburbs are witnessing
a metamorphosis. Most developers
are opting for luxury projects in the
redevelopment space. Also, the central
suburbs are coming up in a big way with
new retail and real estate projects.
Which are your signature projects in
the luxury segment? Do you plan to
launch new projects in the near term?
One of S.Raheja Realty signature
luxury projects, Cascades is an
exclusive 15-villa-project with a total
campus area of 2 acres. The size
of each villa is 3500-5000 sq ft. The
amenities that these villas offer includes
Ram Raheja, Director, S. Raheja Realty shares his views with Sandeep Sharma about his company, achievements,
core competencies, emerging realty trends in MMR, signature projects, affordable housing, sustainable design and
architecture, re-development opportunities, increase in building material prices, pilot housing start up index (HSUI),
real estate as an asset class, government initiatives and solution to Indias growing housing defcit. Edited excerpts...
In the current scenario, bringing in foreign funds will benefit the
sector immensely. The original FDI guidelines issued attracted
large amounts of foreign funds to the Indian real estate sector;
however, subsequent amendments to the FDI policy relating to
real estate have created unwanted apprehensions and confusion
in the minds of global investors thereby affecting FDI inflows
adversely. It is therefore, essential for the policy makers to look
into this matter.
Project Reporter 13 April 15, 2014
Realty Zone
landscaped gardens, clubhouse, Table
Tennis Room, Snooker Room, Cricket
Pitch with Nets, Childrens Play area with
a Tree House, Recreation for the mind
and body, Yoga Centre, Outdoor Spa,
Library, Card Room, Terrace spaces
provide a transition between the hard
materials of the architecture and softer
ones of the garden. Amongst others, the
villa features includes private thirty feet
waterfall, swimming pool with sunken
seats, refection ponds and provision for
an outdoor hot tub that enhances both
your experience & the environment in
the villa.
Ideal for a romantic rendezvous or
a fun evening with your friends& family,
these villas are also equipped with
other facilities like home automation,
two car parks, Laundry Room, Room
and bathroom for servants, automated
security systems, WIFI and cable,
Modular Kitchen, International fxtures
and fttings.
Being one of the very few projects
in the city with a 360 degree view of
the park, Natraj is a premium luxury
address located at the green and serene
suburb of Khar in Mumbai. Natraj is
spread across 25, 000sq. ft & houses
12 apartments (one on each foor) and
a penthouse.
Gurukripa, located at the bustling
area of Kalina, Santacruz which has
an easy accessibility to the highway &
Sea Link is spread over 30,000 sq ft.
The affuent residency comprises of
two& three bedroom apartments with
beautifully landscaped terrace garden
for each. Each of the fat is designed
keeping in mind the requirement of the
new age working class buyers offering
the best amenities in terms of foorings,
bathroom fttings, club house facilities
amongst others.
S. Raheja is also a pioneer in the
affordable luxury segment. SDS Raheja
Residency in Varanasi and
Raheja Prime in Palghar are
two instances of such projects.
Being the tallest approved
buildings in the city and
the only one with two-level
basement parking facilities,
SDS residency is a premium
luxury address located at the
green and serene Panchkoshi
area of Varanasi. Planned with
utmost care and crafted with
discerning neutral palettes, the
residency is spread over an
area of lakh square feet(approximately)
with 2 BHK and 3 BHK blocks ranging
from 1010 sq ft to 1600 sq ft. the
apartments are designed keeping in mind
the requirement of the new age working
class buyers offering the best amenities
in terms of vitrifed foorings, high-end
bathroom fttings, semi modular kitchens
with granite tops& stainless steel sinks
amongst others.
Set to change the defnition of luxury
housing, Raheja Prime, located at
Palghar is the frst residential facility in the
vicinity to have an elevator. The project
has revamped Palghar and changed the
dynamics of the location. The USP of
the project is the fact that it offers latest
technology and has state-of-the-art
amenities at an affordable price. Raheja
primes 1 bhk and 2 bhk apartments are
complete with fne vitrifed tiles (RAK),
granite platform stainless, dado
tiles, superior quality sanitary
fxtures, chrome plated fttings,
and antiskid fooring.
How would you defne
affordable housing keeping
in mind the Tier-I, II and III
cities customer? What kind of
projects are you doing in the
affordable segment?
Be it Tier-I, II, or II, todays
consumer is well-aware and demands
the best quality at an affordable price.
Higher disposable incomes, increased
aspirational values for a better standard
of living and also the infrastructural
development and general economic
growth have given a boost to affordable
and mid-level real estate. Considering
the pyramid of society, the demand in
mid-income housing is bound to be high
but in outskirts and tier-II cities, there is
a lack in the supply of quality projects.
S Raheja is primarily into luxury housing
but having identifed the potential of Mid-
cap housing in the country, we ventured
into this segment with projects on the
outskirts of Mumbai and tier-II cities.
We aim at bridging this gap by providing
luxury housing at affordable prices and
the success of our projects in Palghar
and Varanasi are testimonies to that.
Could you comment on the need for
sustainable design and architecture?
Sustainable architecture or
ecological design is to ensure that
our actions and decisions today do
not inhibit the opportunities of the
coming generations. Sustainable
architecture or green design is a
philosophy of designing buildings
to comply with the principles of
social, economic and ecological
sustainability.
We at S Raheja seek to minimize
the negative environmental impact of
buildings by using materials, energy
and space in a way that is least
damaging for the environment. Creating
sustainable buildings starts with proper
site selection as the location, orientation,
and landscaping of a building affect
local ecosystems, transportation and
optimize energy use .Fresh water is an
increasingly scarce resource and as
a developer, we try to optimize its use
or recycle water for on-site use, when
feasible. We make sure that the
Project Reporter 14 April 15, 2014
Realty Zone
materials used in our constructions
minimize environmental impacts such
as global warming, resource depletion,
and human toxicity. The indoor
environmental quality (IEQ) of a building
has a signifcant impact on occupant
health, comfort, and productivity and as
an architect, I design keeping in mind
optimal operations and maintenance
of the building. As a real estate frm,
we implement all possible methods
to simplify and reduce maintenance
requirements, reduce usage of water,
energy and toxic chemicals to ensure
sustainability of all our projects.
How big is the re-development
space in Mumbai? Are you active
in the re-development segment?
As I mentioned earlier, due to
the space crunch and rapidly rising
development and population in
Mumbai, redevelopment is the only
way forward for the housing segment.
Also, it is the best solution to convert
Mumbais old, ill maintained buildings
and uplift the citys skyline. Our
projects like Gurukripa (Kalina) and
Natraj (Khar) are redevelopment
projects.
How far increase in building material,
equipment and labour cost has
contributed to rise in construction
cost considering period of last 2-3
years? What is the way forward to
control these prices?
Since building material, equipment
and labour form the base of any
construction, the rise in prices has
defnitely led to a rise in construction.
One way of improving effciency and
reducing costs is using new construction
techniques. Pre-fabricated materials,
brickless technology, partition wall
systems are a few examples of such
techniques. India is gaining prominence
in the global map as a place for investment
and we can expect a lot of foreign
real estate companies entering
the market. These companies will
introduce pre-fabricated products
and new age technologies which
will not be as labour intensive and
make construction a lot faster.
Post election reforms by the new
government should boost the
infrastructure industry and their
policies are hopefully going to
tackle the issues of infation, cash
fow, transparency in the approvals
and acquisition processes, to uplift the
sector.
The Pilot Housing Start Up Index
(HSUI) released by Ministry of Housing
and Urban Poverty Alleviation and
RBI recently has indicated decline in
housing for Kolkata, Bengaluru and
Chennai. Whats your take on this
index?
Its the frst time that this index has
been released and I think its a good
initiative. I will help in analyzing the
scenario and deciding future course
of action. The decline is housing in
Kolkata, Bengaluru and Chennai calls for
government attention and intervention.
Schemes like Rajiv Awas Yojana, which
focuses on construction of houses for the
urban poor and Rajiv Rinn Yojana, which
offers loans for construction of houses to
the urban poor need to be implemented
in these cities.
The stock market is throwing mixed
signals and investors are looking
forward for safe investment. In the
current scenario, do you think real
estate as an asset class can be an
attractive proposition?
Real estate is a tangible asset
and will always be a good bet to
invest in. However, in the absence of
instruments like REITS, it is advisable to
invest for long-term in realty to get best
returns.
What kind of Government initiatives
can go a long way in boosting the
real estate sector growth?
In the current scenario, bringing
in foreign funds will beneft the
sector immensely. The original FDI
guidelines issued attracted large
amounts of foreign funds to the
Indian real estate sector; however,
subsequent amendments to the FDI
policy relating to real estate have
created unwanted apprehensions
and confusion in the minds of global
investors thereby affecting FDI infows
adversely. It is therefore, essential for
the policy makers to look into this matter.
Further, lack of consistency in
rules relating to development of SEZs,
increased monitoring of the sector by
regulatory agencies, tightening of rules
for lending to the real estate sector and
increase of key rates by the RBI several
times during the last one year, have
arrested the growth of the sector. There
is a need to streamline government
policies and introduce reforms to boost
the real estate sector.
What is the solution to Indias growing
housing defcit?
Apart from streamlining current
policies like FDI in real estate, the
Government must provide incentives to
the public and private sectors to take up
R&D activities for new building materials
and technologies so that the industry can
deliver low cost, affordable, sustainable
and environment-friendly housing and
building structures. Also, developers
must try to bridge the gap between supply
and demand. They need to research and
identify the need in the area they are
developing; low-income, affordable, or
luxury, and build accordingly.
Project Reporter 15 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Project Update / Commissioned Project
77 NTPC Ltd The company has recently commis-
sioned 10 MW Solar PV power plant at
Talcher.
Angul
District
Odisha
NA S C Pandey, Director (Projects),
NTPC Bhawan, Scope Complex, 7,
Institutional Area, Lodi Road, New
Delhi - 110003, T: 011-24360100,
24361018, scpanday02@ntpc.co.in
(Arup Roy Choudhary, CMD)
Renewable
Energy
78 NTPC Ltd The company has recently com-
menced commercial operations of 10
MW Solar PV Power Station at
Unchahar in Raebareli district.
Raebareli
District
Uttar
Pradesh
NA S C Pandey, Director (Projects),
NTPC Bhawan, Scope Complex, 7,
Institutional Area, Lodi Road, New
Delhi - 110003, T: 011-24360100,
24361018, scpanday02@ntpc.co.in
(Arup Roy Choudhary, CMD)
Renewable
Energy
79 GMR
Infrastruc-
ture Ltd
The company has recently completed
29.65 km Chennai Outer Ring Road
Phase I Project. The project was
executed on DBFOT basis. The ORR
connects Vandulur on NH-45 to
Nemilllicheri on NH-205 via Nazaratpet
on NH-4. The concession period of the
project is 20 years including 30 months
of construction.
Chennai
Tamil
Nadu
1100.00 Sowmya Shenoy, Manager-Corporate
Communications, GMR Group, IBC
Knowledge Park, Phase 2, "D" Block,
9th Floor, 4/1, Bannerghatta Road,
Bangalore - 560 029, Karnataka. T:
080-40432000, info@gmrgroup.in,
www.gmrgroup.in (BVN Rao,
Business Chairman)
Roads/
Highways/
Bridges
Project Under Implementation Stage (Sno. 80 to 90)
80 Airports
Authority of
India (AAI)
AAI is constructing 60,591 sq mtr
terminal at Chandigarh Airport located
at J hurjeri village of Mohali district. L&T
is undertaking the construction work.
The terminal will have the capacity to
accommodate 1600 passengers at a
time with eight parking bays for
aircrafts. The construction work is
progressing well and the completion of
the apron and taxiways work is likely
by year-end.
Mohali
Chandi-
garh (U.T.)
452.00 Harish Mathur, J oint GM-Engineering,
Chandigarh Airport, Chandigarh (U.T.)
T: 0172-2659886, F:2659887,
apdchd@aai.aero
Airport
81 Mahindra
Trucks and
Buses Ltd
Plans to invest Rs 300 crore on
development of a completely new
platform for intermediate commercial
vehicle (ICV) in the 8-12 tonne range.
Another Rs. 200 crore will be used for
strengthening current product line-up
of trucks and buses including the
refurbishing of existing LCVs.
NA 500.00 Mahindra & Mahindra, Truck & Bus
Division Marketing Department,2nd
Floor Mahindra & Mahindra Ltd.
Towers Worli, Mumbai -400018
Maharashtra, T: 020-27473600, www.
mahindratrucksandbuses.com
Automobile
82 CIDCO Bids are called for the development,
operation and management of
greenfeld general and super speciality
hospitals and multispecialty at Navi
Mumbai, Maharashtra
Navi
Mumbai
Maharashtra
NA Dr. B S Bawaskar- Chief Help Offcer,
CIDCO Bhavan, CBD-Belapur, Navi
Mumbai-400614. T: 022-67918100, F:
67918166, M: 9833232233 (Sanjay
Bhatia, VCMD)
Healthcare
83 Godrej
Properties
Ltd (GPL)
GPL enters into a partnership to
develop a residential project in
Mundhwa, Keshavnagar, Pune. The
project spread over 43 acre, will offer
approximately 2,60,000 sq meter (2.8
million sq ft) of saleable area and will
be developed as a premium residential
development comprising 1,2,3, and 4
BHK apartments.In this joint venture
project.
Pune
Maharashtra
NA Shodhan A Kembhavi, Company
Secretary & Compliance Offcer,
Godrej Bhavan, 4th Floor, 4-A, Home
Street, Fort ,Mumbai-400001
Maharashtra. T: 022-66510200, F:
022-22072044, secretarial@
godrejproperties.com, www.
godrejproperties.com (K T J ithendran,
Executive Director)
Real Estate
Project Reporter 16 April 15, 2014
*Figures are approximate ( `. Crore)
Sno Organisation Project Title / Details Location Budget* Contacts Sector
Project Under Implementation
84 PBEL PBEL City Chennai is an integrated
township project coming up at OMR.
The construction of all the 4 towers
Argent, Daytona, Aroa, and Matira
launched in the frst phase are in full
swing and as per schedule.
Chennai
Tamil
Nadu
NA T Tulasiram Theeda, Marketing
Manager, #1/212, Thaiyur (OMR),
Kelambakkam, Tamil Nadu - 603103.
T :044 - 39151500, 39151515, M:
09282444003, tulasiram.t@pbel.in
(Surya Reddy, MD)
Real Estate
85 Ujaas
Energy Ltd
Ujaas Energy is setting up 'Ujaas Park'
at Rajgarh in Madhya Pradesh. This
project promises to provide complete
plug & play solution for putting up a
solar power plant at an affordable cost.
The investor would get services like
land identifcation, registration, EPC,
O&M, power sale, identifying third
party buyer, REC trading, etc.
Rajgarh
Madhya
Pradesh
NA Monika Choukse, Company Secre-
tary, Survey No 211/1, Sanwer
Road,Opp Sec-C & Metalman Indl
Area ,Rajgarh - 452015, Madhya
Pradesh, T: 0731-4715330, F:
2721693, cs@ujaas.com (Shyam S
Mundra, Chairman & Managing
Director)
Renewable
Energy
86 IRB
Infrastruc-
ture
Developers
Ltd
IRB Westcoast Tollway Pvt Ltd - whol-
ly-owned subsidiary of the company is
executing NHAI project comprising four
laning of Goa/Karnataka Border to
Kundapur section of NH-17 from Km
93.700 to Km 283.300 in Karnataka
under NHDP phase IV on DBFOT
basis. The work on this project has
started.
Karnataka 2639.00 Vinod Menon, Sr VP (Business
Development), IRB Complex,
Chandivli Farm, Chandivli Village,
Andheri (East), Mumbai - 400072, T:
022-67335900, 66404220, F:
66751024, vinod.menon@irb.co.in,
(Virendra D Mhaiskar, Managing
Director)
Roads/
Highways/
Bridges
87 IRB
Infrastruc-
ture
Developers
Ltd
Solapur Yedeshi Tollway Pvt Ltd -
wholly-owned subsidiary of the
company is executing NHAI project
comprising four laning of Solapur to
Yedeshi section of NH-211 from km
0.000 to km 100.000 (Design Length
98.717 km) in Maharashtra under
NHDP Phase IV on DBFOT (Toll)
basis. The work on this project
Maharashtra 1500.00 Vinod Menon, Sr VP (Business
Development), IRB Complex,
Chandivli Farm, Chandivli Village,
Andheri (East), Mumbai - 400072, T:
022-67335900, 66404220, F:
66751024, vinod.menon@irb.co.in,
(Virendra D Mhaiskar, Managing
Director)
Roads/
Highways/
Bridges
88 Mumbai
Metropoli-
tan Region
Develop-
ment
Authority
(MMRDA)
The Santacruz-Chembur Link Road
(SCLR) project is under implementa-
tion. The fyover connects east-west
corridor. The project is likely to
complete by mid-April, 2014.
Mumbai
Maharashtra
428.00 Sanjay Karadi, Media Advisor,
Bandra-Kurla Complex, East, Mumbai
-400051, T:022-26590001, F:
26591264, M: 8108190077
Roads/
Highways/
Bridges
89 Tamil Nadu
Highways
Department
The department hopes to complete the
construction of the Radha Nagar
subway in Chromepet, Chennai.The
box portion of the subway is 30-metre
long, 2.5 metre wide and 5 metre high.
The subways is likely to complete in
three months.
Chennai
Tamil
Nadu
NA S Ramesh,Asst Divisional Engineer,
PWD Complex, Kamarajar Salai,
Chepauk, Chennai,Tamil Nadu-
600005. T:044-24320657, 28558999,
M: 09444266697
Roads/
Highways/
Bridges
90 Mumbai
Metro One
Pvt Ltd
The Mumbai metro project is all set to
be launched in April. The Versova-
Andheri-Ghatkopar (VAG) corridor
has recently received the penultimate
clearance from the Research, Design
and Standards Organisation (RDSO).
The Mumbai Metro One Private Ltd
(MMOPL) is likely to approach the
commissioner of metro rail safety
(CMRS) for fnal approval. In case
this is cleared, the commuters in
Mumbai can expect a joyous ride in
the metro thus easing out congestion
on roads.
Mumbai
Maharashtra
3893.00 Amit Biswas, Manager-Public
Relation, Mumbai Metro One Depot,
D N Nagar, J .P. Road, 4 Bungalows
Andheri (West), Mumbai 400053. T:
022- 33789895, 30766632,
30091410, F: 33789820, amit.
biswas@relianceada.com
Transport
Real t y Proj ect s
Project Reporter 17 April 15, 2014
91 | Agrim Vista
This project is under construction at Guwahati. It
comprises of 8 towers of G+8 foors of 1-3 BHK
total 230 apartments and commercial complex
with all modern amenities
Location: Guwahati, Assam
Completion: August 2015
Agrim Infrasproject Pvt Ltd
Contacts: Rubal Sharma, Sales Executive, 2nd
Floor, Aditya Plaza, G.S. Road, Christian Basti,
Guwahati - 781005. T: 0361-2341356, 2349872,
enquiry@agriminfra.com
92 | Magnolia Skyview
This project is under construction at Rajarhat.
It comprises of 7 towers of G+4 foors of 2-3
BHK total 300 apartments with amenities like
swimming pool, landscaped garden, gym,
spa etc
Location: Guwahati, Assam
Completion: June 2016
Magnolia Infrastructure Developments Ltd
Contacts: 93,Dr.Suresh Chandra Banerjee
Road, Kolkata-700010. T: 033-64581844,
M: 974871156
93 | Alice Legacy
This project is under construction at Thrissur. It
comprises a tower of 3 BHK with amenities like
gym, parking etc
Location: Thrissur, Kerala
Completion: December 2016
Cheloor Property Development Projects Ltd
Contacts: Jiju, Marketing, Cheloor Residency,
Sankarankulangara Jn, Punkunnam, Thrissur
680 002, Kerala.T : 0487 - 2388168, 2388180,
F: 2388179
94 | Beverly Park
This project is under construction at Kadavanthra.
It comprises of a tower of G+10 foors of 3-4 BHK
with amenities like swimming pool, club house etc
Location: Cochin, Kerala
Completion: December 2015
SFS Homes
Contacts: Abhilash, Marketing Executive,
Karikkamuri Cross Road, Cochin - 682011,
Kerala. T: 0484-4118888, 2377885,
M: 9947355555
95 | Center Cove
This project is under construction at
Kadavanthra. It comprises of a tower of G+10
foors of 2-4 BHK with amenities like swimming
pool, club house etc
Location: Cochin, Kerala
Completion: December 2016
SFS Homes
Contacts: Abhilash, Marketing
Executive, Karikkamuri Cross Road,
Cochin - 682011, Kerala.
T: 0484-4118888, 2377885,
M: 9947355555
96 | Ranch
This project is under construction over 12.5
acres of land at Tripunithura. It comprises of
72 bungalows of 3-4 BHK with amenities like
barbeque, swimming pool, health spa, games
room, table tennis etc
Location: Kochi, Kerala
Completion: December 2015
Skyline Builders
Contacts: Skyline House, Rajaji Road,
Kochi-682035, T: 0484-2363695,
F: 2374176, M: 09744045700,
marketing@skylinebuilders.com
97 | Mahavir Kalpavruksha
This project is under construction at Thane
(West). It comprises of 7 towers of G+14 and
G+17 foors of 2-3 BHK with amenities like club
house, swimming pool, jacuzzi, steam & sauna,
banquet hall, landscaped garden etc
Location: Mumbai, Maharashtra
Completion: December 2015
Damji Shamji Shah Group
Contacts: Rahul, Sales Executive, Meghdoot,
Vallabh Baug Lane, Damji Shamji Shah Chowk,
Ghatkopar (East), Mumbai - 400 077.
T: 022-21027711, 21027722, F: 21027755,
info@dssgroup.in
98 | Good Morning
Plans to construct at Panvel. It comprises of
3 towers of G+40 foors of 2-3 BHK with all
modern amenities.
Location: Mumbai, Maharashtra
Completion: December 2015
Mega Fortune Developers
Contacts: Dipen Thakkar, 23, Anmol Plaza,
Near Hiranandani, Sector - 8 Kharghar, Navi
Mumbai - 410 210. T: 9029580173
99 | Valencia Homes
This project is under construction at Sector 1 in
Noida. It comprises of 12 towers of G+19, G+15
and G+21 foor of 2-3 BHK with amenities like
swimming pool, gym, club house etc
Location: Noida, Uttar Pradesh
Completion: December 2015
Civitech Developers Pvt Ltd
Contacts: Kuldip Singh, Sr Sales Executive,
H-71, Sec-63, Noida, Uttar Pradesh-201301,
T: 07838505052, info@civitech.in
100 | Atri Green Valley
This project is under construction at Rajpur. It
comprises 8 blocks of G+4 foors having 2/3
BHK total 192 apartments with amenities like
swimming pool, club house, gym etc.
Location: Kolkata, West Bengal
Completion: December 2015
Atri Group
Contacts: 131,Park Street, Kolkata-700017,
West Bengal, T: 033-32216589, 22641208,
atri.group@yahoo.com
101 | Ivory Tower
This project is coming up
near Kudghat Metro Station.
It comprises a tower of
G+11 foors having 2/3 BHK
total 41 apartments with
amenities like gym, childrens
play area, community hall
etc.
Location: Kolkata, West
Bengal
Completion: November
2015
N K Realtors
Contacts: 17/1 Chandi
Ghosh Road, Beside Netaji
(Kundghat) Metro Station.
T: 033-40401010, 66201010
102 | Bou Thaurani Haat
This project is under
construction at Rajarhat.
It comprises of 2 blocks
of G+4 foors of 1-3 BHK
with amenities like gym,
courtyard, banquet hall,
creche etc.
Location: Kolkata, West
Bengal
Completion: December
2015
Team Tauras
Contacts: Debarutti, Sales
Executive, Room D 302, 3rd
Floor, D Block, City Centre,
Saltlake, Kolkata - 700064.
T: 033-40048013, F: 4004
8012, info@teamtaurus.co.in
103 | Panchsheel Hynish
This project is under
construction at Sector 75.
It comprises of 12 towers
of G+12 and G+23 foors
of 2-3 BHK total 1100
apartments with amenities
like amphitheatre, banquet,
etc.
Location: Kolkata, West
Bengal
Completion: December
2016
Panchsheel Buildtech Pvt
Ltd
Contacts: Mukul Mishra,
Sales, H- 169, Sector 63,
Noida - 201301, Plot No. 8,
Sector-1, Greater Noida.
T: 0120- 4777700, 4777777,
F: 4777798
Project Reporter 18 April 15, 2014
Consultancy Bids
104 | Naval Air Station
Ministry of Defence has invited expression of
interest for design consultancy for creation of
naval air station on the west coast in phase IIA of
project seabird
Submission Date: 30/06/2014
Contact Details: Director General, Project
seabird, West Block V, RK Puram, New Delhi
110605, Delhi.
105 | Widening of Existing Carriageway
Government of West Bengal has invited bids for
consultancy services for appointment of authority
engineer for the work widening and strengthen-
ing of the existing carriageway.
Submission Date: 03/06/2014
Contact Details: Superintending Engineer,
Khadya Bhavan, 3rd Floor, Block-A, 11A, Mirza
Galib Street, Kolkata-700087, West Bengal.
T: 033-22520346/47, F: 22520346
106 | Housing Scheme at Badami
Karnataka Housing Board has invited bids for
architectural and engineering services for the
proposed composite housing scheme at Badami,
Badami taluk & Bagalkot district (30 acres 01
guntas).
Submission Date: 19/05/2014
Contact Details: Asst Director Town Planning,
3rd foor, Cauvery Bhavan, Bagalkot District,
Karnataka. T: 080-22273511
107 | High Level Major Bridge at Hatania
National Highway Division has invited consul-
tants for supervision of construction of high level
major bridge on river Hatania Doania at Km.
113.297 of NH 117 in South 24 Parganas.
Submission Date: 28/04/2014
Contact Details: Superintending Engineer,
National Highway Division, Khadya Bhavan, 3rd
Floor, 11A, Mirza Ghalib Street, Kolkata-700087,
West Bengal. T: 033-22520346,47, F:22520346
108 | Infrastructure Work at Anik
Chembur Yard
Mazagon Dock Ltd has invited bids for consul-
tancy services for project planning design and
supervision during construction of civil structural
works and associated infrastructure at Anik
Chembur yard.
Submission Date: 14/05/2014
Contact Details: Offce of the Additional General
Manager, Capital Works Department, 1st Floor,
Project Offce Building, Alcock Yard, Dock Yard
Road, Mumbai 400010, Maharashtra
109 | Sewerage Network at Allahabad
UP J al Nigam has invited bids for survey, review
the design, redesign where necessary & build
new sewerage network of about 242 km, 3
sewage pumping stations incl all appurtenant
structures, & O & M of sewerage network &
pumping stations for 10 years in sewerage
district-A of Allahabad.
Submission Date: 13/05/2014
Contact Details: General Manager, Ganga
Pollution Control Unit, U. P. Jal Nigam, Mahewa
Patti Purab, Naini, Allahabad, Uttar Pradesh
211007. T: 0532-2684691, 2684179,
gmganga.allahabad@gmail.com
110 | Hassan Arakalagud Road Project
Karnataka Road Development Corporation Ltd
has invited bids for design, build, fnance,
operation and maintenance of Road No 3:
Hassan - Arakalagud- Ramanathpura Gangur -
Piriyapatna on DBFOMT annuity basis
Submission Date: 23/04/2014
Contact Details: Chief Engineer, 1st Floor, #
16 / J, Thimmaiah Road Cross, Miller Tank Bed
Area, Vasanthanagar, Bangalore 560052.
T: 080-49071400
111 | Residential Infrastructure Facilitaties
Nuclear Power Corporation of India Ltd has
invited consultancy service for architectural
planning and design of type iii spl category
housing block along augmenting residential
infrastructure facilities in RR site colonies.
Submission Date: 03/05/2014
Contact Details: Station Director, Rawatbhata
Rajasthan Site, Post Offce: Anushakti,Via
Kota-: 323303, Rajasthan. T: 0147-5242001,
F: 5282030
112 | Cable Stay Bridge at Kamla Park
Bhopal Municipal Corporation has invited bids for
supervision and quality control consultancy for
construction of cable stay bridge at Kamla Park
on design and build basis.
Submission Date: 01/05/2014
Tender Value (`): 25,56,00,000
Contact Details: Sadar Manzil, Bhopal,
Madhya Pradesh. T: 0755-2701222
113 | Commercial Development
of Railway Land
Rail Land Development Authority has invited bids
for engagement of consultant for feasibility study
and bid process management for commercial
development of railway land at Mahalaxmi,
Wadala in Mumbai
Submission Date: 21/04/2014
Contact Details: Director General Manager/
Project, Near Safdarjung Railway Station,
Moti Bagh-I, New Delhi-110021, Delhi.
T: 011-24102063, F: 24104793
114 | Solar Power Project at Chennai Port
Chennai Port Trust has invited bids for appoint-
ment of consultant for 100 KW solar power plants
in Chennai Port Trust.
Submission Date: 07/05/2014
Contact Details: Chief Mechanical Engineer,
Mech Eng Department, Chennai 600001, Tamil
Nadu. T: 044-25362070/2539, F: 044 25360955,
cme@chennaiport.gov.in
INFRASTRUCTURE
115 | Ship Recycling Unit
MSTC Ltd has invited bids
for appointment of
consultant for preparation of
feasibility study report &
detailed project report for
setting up of an integrated
ship recycling unit
Submission Date:
30/05/2014
Tender Value (`):
2,477,200,000
Contact Details: 225-C,
A.J.C Bose Road,
Kolkata-700020, West
Bengal. T: 033-22900964,
22877557, F: 22878547
116 | Multi Modal Logistic
Hub at Vizag
Balmer Lawrie and
Company Ltd has invited
bids for survey and soil
investigation work for
proposed multi modal
logistic hub at
Visakhapatnam in Andhra
Pradesh
Submission Date:
30/04/2014
Contact Details: General
Manager, Materials
Management Division, Coal
Bhavan Annexe, 10, Netaji
Subhas Road,
Kolkata-700001, West
Bengal. T: 033-22225435,
F:22225353
117 | Rajiv Gandhi
National Aviation
University
Ministry of Civil Aviation has
invited consultant for the
work relating to setting up of
Rajiv Gandhi National
Aviation University under
Ministry of Civil Aviation
Submission Date:
28/04/2014
Contact Details: Under
Secretary, Rajiv Gandhi
Bhawan, New Delhi-110003,
Delhi. T: 011-24610359
Project Reporter 19 April 15, 2014
B2B Opportunities
AVIATION
118 | Upgradation of Hanger
Hindustan Aeronautics Ltd has invited bids
for extension of annexe and upgradation of
Kiran MK I/IA hangar at overhaul division,
HAL [BC]. including civil, electrical & fre
alarm works
Submission Date: 10/05/2014
Contacts: Deputy General Manager, Ground
Floor, Facilities Management Division, Next
to HAL Sports Club, Old Airport Road,
Vimanapura Post, HAL (BC), Bangalore
560017,
T: 080-22322285, 22322288
CONSTRUCTION
119 | Computer Repair Centre
Military Engineer Services has invited bids
for provision of computer repair centre (Crc)
for Ccc at Hqtc Bangalore.
Submission Date: 15/05/2014
Contacts: Sebeena Augustine, Garrison
Engineer (AF) Hebbal, Bangalore -06.
T: 080-23416401, F: 23416401
120 | Godowns at CK Road
Central Warehousing Corporation has invited
bids for construction of 14500 mtc godowns
along with internal roads, drains and
electrical installations at central warehouse,
CK.Road
Submission Date: 07/05/2014
Tender Value (`): 3,69,36,648
Contacts: Construction Cell, CMC Building,
6th Floor,Phase-i, 15 N,Nellie Sengupta
Sarani, Kolkata, West Bengal.
T: 033-22520426, F: 22520425
121 | Main Institute Building at Faridabad
Central Public Works Department has invited
bids for construction of main institute building
vertical extension under modernization and
upgradation of training facilities at Npti V.O at
Sector 33 Faridabad including providing
electrical installation and fans.
Submission Date: 05/05/2014
Tender Value (`): 2,68,08,479
Contacts: Executive Engineer, Faridabad
Central Division-I, Faridabad, Haryana,
T: 0129-23370919
COAL HANDLING
122 | Maintenance of Coal Handling
Uttar Pradesh Rajya Vidyut Utpadan Nigam
Ltd has invited annual break down &
preventive maintenance of auxiliaries of coal
handling plant of atps, Obra thermal power
station.
Submission Date: 28/04/2014
Contacts: Executive Engineer, Central Work
Contract Division-IV, BTPS, Obra-
Sonebhadra, Uttar Pradesh. T: 05445-
262282
123 | Renovation of Coal Handling Plant
Rajasthan Rajya Vidyut Utpadan Nigam Ltd
has invited consultancy services for
monitoring of renovation works of coal
handling plant stage I & II of KSTPS, Kota
Submission Date: 24/04/2014
Contacts:Suprintending Engineer, RRVUNL,
J aipur Rajasthan. T: 0141-2740692
124 | Coal Handling Plant at TNPL
Tamil Nadu Newsprint and Papers Ltd for
providing civilworks for construction of water
treatment plant and coal handling plant at
Tnpl Unit II project, Mondipatti Village
Submission Date: 25/04/2014
Contacts:Kagithapuram639136, Karur
District, Tamil Nadu. T: 04324-277027,
F: 277001 (10 lines) Extn: 2402/2295
HOUSING
125 | 3 BHK Housing Project at
Valagerhalli
Bangalore Development Authority has invited
bids for construction of 3 bhk housing project
at Valagerhalli phase-v in sy. no. 101/2b and
71/2 under Gnanabharathi layout 1st block,
Kengeri, Hubli, Bangalore south taluk,
Bangalore on lump sum turnkey basis.
Submission Date: 23/04/2014
Contacts: Navinchand G, Bangalore,
Karnataka. T: 09845620349
HEALTHCARE
126 | Maintenance and Management of
Meso Hospitals
Jharkhand State Tribal Cooperative
Development Corporation Ltd has invited
bids for selection of suitable private sector
operators for operation, maintenance and
management of Meso hospitals in jharkhand.
Submission Date: 31/05/2014
Contacts: Secretary, Balihar Road, Morabadi,
Ranchi-834008, J harkhand. T:0651-2552398,
F: 2551686
127 | Development of Diagnostic Centres
Government of Haryana, Health Department
has invited bids for development, operation
and maintenance of radiology imaging
diagnostic centres in selected district
hospitals and government medical college of
MINING
128 | Extraction of Coal
Bharat Coking Coal Ltd
has invited bids for
drafting Pookee Balihar
and extraction of coal by
mass production
technology package with a
guaranteed minimum of 9
million tons of mining on
turnkey basis.
Submission Date:
28/04/2014
Contacts: Koyla Bhawan,
Koyla Nagar, Dhanbad
826 005,
T: 0326-2230206
129 | Crushing and
Screening Plant
Odisha Mining Corporation
Ltd has invited bids for
carrying out geo technical
investigations as per the
scope of work of the
tender schedule at its
Gandhamardan-B Mining
lease area for setting up a
9.12 MTPA crushing &
screening Plant.
Submission Date:
30/04/2014
Contacts: AGM, Post Box
No.34, Bhubaneswar,
Odisha
130 | Turnkey Mining
Contract
Gujarat Mineral
Development Corporation
Ltd has invited bids for
turnkey mining contract
involving overburden/ inter
burden removal,
excavation and/or loading
of lignite from mines face
and ancillary activities at
lignite project, Umarsar.
Submission Date:
21/04/2014
Contacts: General
Manager, Khanij Bhavan
132 Ft. Ring road,
Ahmedabad 380 052
Gujarat. T: 079-27912746,
F: 27912195
Project Reporter 20 April 15, 2014
B2B Opportunities
RENEWABLE
141 | Wind Power Project
NHPC has invited bids for
engineering, procurement
and construction (EPC)
contract for 50 (+5%) MW
capacity wind power
project at suitable site at
one location in any of the
states of Tamilnadu,
Andhra Pradesh,
Maharashtra, Madhya
Pradesh or Gujarat with its
comprehensive operation
and maintenance.
Submission Date:
20/05/2014
Contacts: Narender, Chief
Engineer Room No.209,
Faridabad -121003
T: 0129-2270974,
narender@nhpc.nic.in
142 | Solar Water
Heating System
Tripura Renewable Energy
Development Agency has
invited bids for supply,
installation &
commissioning of 3000
LPD solar water heating
system at Tripura Bhawan,
New Delhi
Submission Date:
15/05/2014
Contacts: Vigyan
Bhawan, Gorkhabasti,
Agartala,Tripura.
T: 0381-2326139
143 | Solar Power Supply
System
Karnataka State Natural
Disaster Monitoring Centre
has invited bids for supply,
installation, commissioning
and fve years
maintenance of solar
power supply system for
the psms network of
Karnataka
Submission Date:
29/04/2014
Contacts: S J agadeesh,
Bangalore, Karnataka.
T: 080-67355000
Haryana on public private partnership basis.
Submission Date: 15/05/2014
Contacts: Director, Sector-6 Panchkula,
Haryana. T: 0172-2584549, 2584189
POWER
131 | Power Supply for NFC
Nuclear Fuel Complex has invited bids for
construction of power supply for NFC, Kota
at Rawatbhata, Chithorgarh Dist at Rajasthan
Submission Date: 04/06/2014
Contacts: Senior Superintending
Engineer(CED,PD&EP), Hyderabad, Andhra
Pradesh. T: 040-27184083, F: 27122532
132 | Upgradation of Main Substation
Chittaranjan Locomotives Works has
upgradation of main substation for reliable
power supply by providing additional VCBs
Submission Date: 21/05/2014
Contacts: Deputy Chief Electrical Engineer
(Maintenance), Central Power House, P.O-
Chittaranjan, Dist.- Bardhaman-713331,
West Bengal. T: 0341-2525542, F: 2525560
133 | Supply of Power Transformer
West Bengal State Electricity Transmission
Co Ltd has invited bids for supply of 10 MVA,
33/11 KV.3ph power transformer complete
with all fttings and accessories as detailed in
our technical specifcation
Submission Date: 06/05/2014
Contacts:Procurement Department,
Wbsetecl, Vidyut Bhavan, Kolakata-700091,
West Bengal . T: 033-23197395
PORTS
134 | Main Terminal for Barge
Indian Oil Corporation Ltd has invited bids for
surveyor contract at Kandla main terminal for
barge bunker and tanker - at Kandla port,
Bedi port, Sikka port and Vadinar port.
Submission Date: 07/05/2014
Contacts: Gujarat state offce operations
department (4th foor), Shikhar complex,
Mithakhali six road, Navrangpura,
Ahmedabad -380009, Gujarat
135 | Concrete Platform at JNPT
J awarharlal Nehru Port Trust has invited bids
for construction of concrete platform at empty
container stacking yard & auto-garage along
with replacement of rolling shutters at
workshop, auto garage and main stores at
JN Port. Completion in 6 months.
Submission Date: 05/05/2014
Contacts: Chief Manager, (JNPT) Mumbai,
Maharashtra. T: 022-27244081
136 | Electrical Load Centre
at Kamarajar Port
Kamarajar Port Ltd has invited bids for
providing technical consultancy to identify the
electrical load centre at Kamarajar Port.
Submission Date: 02/05/2014
Contacts: Deputy General Manager, Vallur
(Post), Chennai- 600120, Tamil Nadu.
T: 044-27950029.
137 | Hiring of Harbour Mobile Crane
Visakhapatnam Port Trust has invited bids for
hiring of 2 nos of 100 metric tonnes capacity
harbour mobile cranes of model 2009 and
later including operation and maintenance
staff for 24 hours for a period of 5 (fve) years
initially for a period of 3 years and then
extendable by upto another 2 years as per
VPTs requirement for the use of Stevedores /
Port Users at West Quay berths and other
VPT berths.
Submission Date: 30/05/2014
Contacts: Traffc Manager, Traffc
Department, 1st Floor, Ambedkar Bhavan,
Visakhaptnam-530035, Andhra Pradesh.
T: 022-2873713, 2563247
138 | Merger of Cargo Berth
Paradip Port Trust has invited bids for merger
of cargo berth substation I & II, Paradip Port
Trust.
Submission Date: 22/04/2014
Tender value (`): 2,43,72,221
Contacts: Belalasen Naik, Port Electrical
division, Paradip Port Trust, PO Paradip, dist.
J agatsinghpur, Odisha. T: 0672-2222075,
F: 222075
RAILWAYS
139 | Aunrihar- Manduadih
doubling project
North Eastern Railway has invited bids for
linking of bg track, carting of p. way material,
spreading of ballast & other miscellaneous
track works between Rajwari (incl.) to
Sarnath (incl.) in Aunrihar-Varanasi section of
Varanasi division of railway in connection
with Aunrihar- Manduadih doubling project.
Submission Date: 21/05/2014
Contacts: Secy to cao/con,
Offce of Chief administrative offcer,
Gorakhpur, Uttar Pradesh
140 | Terminal Block at Kolkata
Eastern Railway has invited bids for terminal
block for railway signalling, Pbt suitbale
compound 25Mm [6 Way] to Drg. No.
Sa-23756 [Alt-3]
Submission Date: 22/05/2014
Project Reporter 21 April 15, 2014
B2B Opportunities
TRANSPORT
153 | Elevated Section
of East West Corridor
Kolkata Metro Rail
Corporation Ltd has
invited bids for design,
construction of 365.646m
viaduct from (Ch
8958.405m to
9324.051m) connecting
via-duct constructed on
either side along the
elevated section of east
west corridor of Kolkata
Metro.
Submission Date:
15/05/2014
Contacts: Managing
Director, KMRCL
Bhaban, 2nd & 3rd
Floor, Munshi
Premchand Sarani,
Kolkata-700021,
West Bengal.
T: 033-22134345
154 | Gandhinagar-
Ahmedabad Metro
Rail Project
Metro Link Express For
Gandhinagar and
Ahmedabad Co Ltd has
invited bids for
appointment of general
engineering consultant
for Gandhinagar-
Ahmedabad metro rail
project for phase- 1 of
the metro rail project.
Submission Date:
28/05/2014
Contacts: 5th Floor
Nirman bhavan, Opp.
Gate No -4,
Sachivalaya, Sector -10,
A Gandhinagar -382010,
Gujarat.
T: 079-26800000,
F: 23248573, info@
gujaratmetrorail.com
Contacts: Fairley Place, Kolkata, West
Bengal. T: 033-22227400
144 | Solar Photovoltaic Grid Plant
Gujarat State Electricity Corporation Ltd has
invited bids for engineering, procurement ,
construction, operation and maintenance of
2x10 MW solar photovoltaic grid connected
power plant at Gujarat Solar Park in
Charanka village in Patan
Submission Date: 29/04/2014
Contacts: CE P and P, Vidyut Bhavan, Race
Course, Vadodara-390007, Gujarat.
T: 0265-6612131, F: 0265-2341588,
cepnpgsecl@gebmailcom
ROADS/HIGHWAYS/BRIDGES
145 | Nelamangala Chikkaballapura
Road
Government of Karnataka has invited bids
for development of road Nelamangala
Chikkaballapura from km 0.00 to km 64.05 of
SH 74 in the state of Karnataka under
PPP-DBFOT-VGF(Toll) basis
Submission Date: 05/05/2014
Contacts: Chief Engineer, Bangalore
560052, Karnataka. T: 080-22382360, 2238
0141, F: 22382360
146 | Improvements to NH 4
Govt of Karnataka, Public Works Department
has invited bids for improvements to NH-4 to
Pandrahally road via Hullur,
Bettadanagenahally road from km 29.00 to
33.60 in Chitradurga Taluk (Chitradurga
constituency).
Submission Date: 25/4/2014
Contacts: C.Thimmappa, Executive
Engineer, M.S.Building, 3rd Floor, Vikasa
Soudha, Dr.Ambedkar Road, Bangalore -
560001, Karnataka. T: 08194-222446
147 | Maintenance of State Highways
Govt of Gujarat, Roads and Buildings
Department has invited bids for upgrading
and maintenance of state highways under
design, build, fnance, operate, maintain and
transfer on annuity basis.
Submission Date: 15/05/2014
Contacts:Superintending Engineer, PIU,
Ground Floor, Nirman Bhavan, Gandhinagar,
Gujarat. T: 079-23252986
148 | Improvement to Surdi Sadola
Majalgaon
Govt of Maharashtra, Public Works
Department has invited bids for Improvement
to Surdi Sadola Majalgaon Road Km. 5/00 to
10/00 MDR-30 (Actual Km. 5/600 to 9/200)
Tq. Majalgaon Dist. Beed
Submission Date: 30/04/2014
Tenders Value (Rs): 60,86,550
Contacts: Superintending Engineer, Public
Works Circle, Osmanabad. T: 02472-
222882-84, F: 224129
SPORTS INFRASTRUCTURE
149 | Sports Facilities in Rawatbhata
Stadium
Nuclear Power Corporation of India Ltd has
invited bids for construction developing of
playground and various sport facilities in
Rawatbhata stadium
Submission Date: 07/05/2014
Tender Value (Rs): 2,03,80,284
Contacts: Station Director, Rawatbhata
Rajasthan Site, Post Offce: Anushakti, Via
Kota-323303, Rajasthan. T: 0147-5242001,
F: 5282030
150 | Repairs to Gallery at Kridangan
Ordnance Factory Board has invited bids for
special repairs to gallery of sports ground at
propex Kridangan at o.f. Bhandara
Submission Date: 07/05/2014
Tender Value (Rs): 42,27,758
Contacts: Ordnance Factory, J awaharnagar,
Bhandara, Mumbai, Maharashtra.
T: 0718-4275018, F: 4275242
SOLID WASTE
151 | Municipal Solid Waste in Mumbai
Brihanmumbai Mahanagarpalikal has invited
bids for request for qualifcation (RFQ) for
development of municipal solid waste (MSW
processing & disposal facilities at Greater
Mumbai
Submission Date: 29/05/2014
Contacts: Deputy Chief Manager, Solid
Waste Mangement-Projects, Bai Padmabai
Thakkar Marg, Kotwadi, Mahim Shivaji Park,
Mumbai Maharashtra.
152 | Solid Waste to Energy at Kochi
Kochi Municipal Corporation has invited bids
for design, build, fnance, operate and
transfer (DBFOT) of municipal solid waste to
energy project for Kochi city and adjoining
areas using thermal technologies in
gastication or pyrolisis or its advanced
variants through PP mode.
Submission Date: 21/04/2014
Contacts: AB Selam Road, J ew Town,
Mattancherry, Kochi-682002, Kerela.
T: 0484-2369007,
kochicorpsecretary@gmail.com
Power St at i st i cs
Project Reporter 22 April 15, 2014
Requirement Energy met
Surplus(+)/
Deficit(-)
Requirement Energy met
Surplus(+)/
Deficit(-)
%
Shortage
Requirement
Peak
Demand
Surplus(+)/
Deficit(-)
%
Shortage
Chandigarh 4 4 0 98 98 0 0.0 214 214 0 0.0
Delhi 61 61 0 1695 1694 -1 -0.1 3670 3670 0 0.0
Haryana 101 101 0 2828 2824 -5 -0.2 5919 5919 0 0.0
H.P. 24 24 0 666 666 0 0.0 1384 1384 0 0.0
J&K 49 39 -10 1374 1099 -304 -20.0 1374 1099 -275 -20.0
Punjab 91 90 -1 2553 2533 -22 -0.8 5552 5552 0 0.0
Rajasthan 190 189 -1 5307 5281 -29 -0.5
10047 10038
-9 -0.1
U.P. 251 220 -31 7033 6157 -970 -12.5 12821 10526 -2295 -17.9
Uttarakhand 33 33 -1 937 920 -20 -1.9 1826 1826 0 0.0
NFF/Railway 2 2 0 59 59 0 0.0 94 94 0 0.0
TOTAL 795 759 -36 22250 21254 -1103 -4.5 40675 38330 -2345 -5.8
Gujarat 240 240 0 6711 6709 -2 0.0 11560 11532 -28 -0.2
Madhya Pradesh 158 158 0 4415 4415 0 0.0 9385 9346 -39 -0.4
Chhattisgarh 67 66 0 1870 1860 -10 -0.5 3246 3210 -36 -1.1
Maharashtra 379 369 -10 10607 10341 -266 -2.5 19622 18510 -1112 -5.7
Goa 8 8 0 222 222 0 0.0 434 434 0 0.0
D&D 6 6 0 162 162 0 0.0 268 268 0 0.0
DNH 14 14 0 404 403 -1 -0.2 644 644 0 0.0
ESIL 8 8 0 222 219 -3 -1.4 487 487 0 0.0
TOTAL 879 869 -10 24613 24333 -280 -1.1 43106 42253 -853 -2.0
AP-TRANSCO 287 266 -21 8034 7446 -588 -7.3 13367 12671 -696 -5.2
KPTCL 201 189 -12 5625 5282 -343 -6.1 9873 9223 -650 -6.6
KSEB 62 61 0 1731 1718 -13 -0.8 3541 3467 -74 -2.1
TNEB 266 254 -12 7446 7116 -330 -4.4 12581 12037 -544 -4.3
PONDICHERRY 6 6 0 163 164 1 0.6 322 322 0 0.0
TOTAL 821 776 -45 22999 21727 -1272 -5.5 36893 35466 -1427 -3.9
Bihar 41 42 0 1155 1164 9 0.8 2370 2135 -235 -9.9
JSEB 25 21 -4 700 580 -120 -17.1 1220 1013 -207 -17.0
DVC 56 57 1 1555 1595 40 2.6 2755 2659 -96 -3.5
Odisha 78 66 -12 2190 1851 -339 -15.5 3700 3568 -132 -3.6
West Bengal 118 115 -3 3295 3218 -77 -2.3 7008 6713 -295 -4.2
TOTAL 318 300 -17 8895 8408 -487 -5.5 16668 16090 -578 -3.5
Arunachal Pradesh 2 1 0 44 42 -2 -5.1 119 116 -3 -2.7
Assam 20 18 -1 547 507 -40 -7.4 1095 1085 -10 -0.9
Manipur 2 2 0 46 44 -3 -6.0 129 128 -1 -0.9
MeSEB 5 5 -1 147 131 -16 -11.0 297 296 -1 -0.3
Mizoram 1 1 0 37 36 -1 -3.6 79 77 -2 -2.6
Nagaland 2 2 0 45 43 -2 -4.0 104 104 0 -0.3
Tripura 3 3 0 81 80 -2 -2.0 207 206 -1 -0.5
TOTAL 34 31 -2 948 881 -66 -7.0 2031 2012 -19 -0.9
2847 2734 -111 79704 76550 -3208 -4.0 139373 126189 -13184 -9.5
ACTUAL POWER SUPPLY POSITION - FEBRUARY 2014
REGION STATE
Requirement/Availability in MU/DAY Requirement/Availability in MU Peak Demand/Peak Met in MW
NR
WR
ALL INDIA
SR
ER
NER
Page 16 of 31
Source: Central Electricity Authority
Project Reporter - Electronic Editon
Tenure Cover Price Discount You pay Assured Gift
1 Year (24 Issues) 3,500 550 2,950 Waist Pouch
2 Years (48 Issues) 7,000 2,000 5,000 Sling Bag
3 Years (72 Issues) 10,500 3,500 7,000 Waist Pouch + Sling Bag
PROJECT REPORTER
B2B Multisector, newsletter providing more than 100+ projects which are arranged
stage wise & presented in a tabular format along with the contact details,
comes in electronic edition.
Indias trusted magazines on Project opportunities
SUBSCRIBE NOW!
To Subscribe
Call: 022 - 2419 3000 / Email: Subscriber@ASAPPmedia.com
Subscribe Online: www.ASAPPmedia.com/subscribe
ASAPP MEDIA PVT. LTD.
A - 303, Navbharat Estate, Zakaria Bunder Road, Sewri (West), Mumbai 400 015.
Tel: + 91 22 2419 3000 | Email: Subscriber@ASAPPmedia.com
1 year :
Multi Utility. Waist Pouch
2 years:
Multi Utility Sling Bag
15
5
Projects
CMYK
Indian Edition: Annual Subscription Rates: Print Edition: `1950/-,
Frequency: Fortnightly (1st & 15th of every month)
Indias Project Database
Vol. 9 No. 14 l J anuary 15, 2014
PORT
OPPORTUNITIES
Regd. No. MCW/192/2012-2014. Posted at Mumbai Patrika Channel Sortng Ofce. Mumbai - 400 001. 1st fortnightly on 1st & 2nd every month &
2nd fortnightly on 15th & 16th of Every month. RNI No. MAHENG/2005/19320. ISSN 2277-6532 Date of Publicaton: 1st & 15th of Every Month. 24

You might also like