You are on page 1of 566

Sutitleubtitl

G01 25
th
Nov 2010 Issued for FEED Design RR SV / PS RCP
E01 14
th
Oct 2010 Issued for Client Review RR SV / PS RCP
D01 7
th
Oct 2010 Issued for Internal Review RR SV / PS RCP
REV DATE DESCRIPTION ORIG CHK APPR
CHV
DOCUMENT
CONTROL NO.
Project Area Discipline Type Originator Package Sequence-Sht Revision
VNM IPGN PPL RPT EDG 0000 00008-00 G01
EDG
DOCUMENT
CONTROL NO.
Project and Phase Task Code Sequence Revision Internal Use Only
3348370 21100 10008 PPLG01

Vietnam Block B Gas Project
CPP Risers Design & Tie-in Spools Stress
Analysis Report

PRELIMINARY
NOT FOR PERMIT,
CONSTRUCTION OR
FINAL RELEASE
Ronald Pasadyn, P.E.
TX. LICENSE NO. 48327
EDG, INC. F-2480
Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 2
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed


CHANGE LOG
REV SECTION PAGE CHANGE DESCRIPTION
E01 - - None-First Issuance
G01 - - Companys comments incorporated





Document Holds
REV SECTION PAGE CHANGE DESCRIPTION
G01 3.5 10 Internal Corrosion Allowance for 20 pipelines












Attachments

Item No.

Description Document No.

1.
2.


3.


4.


5.












Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 3
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

Table of Contents
1.0 DEFINITION ................................................................................................... 4
2.0 EXECUTIVE SUMMARY ............................................................................... 6
3.0 DESIGN AND ENVIRONMENTAL DATA ..................................................... 8
4.0 ANALYSIS METHODOLOGY ..................................................................... 15
5.0 ANALYSIS RESULTS ................................................................................. 22
6.0 CONCLUSIONS AND RECOMMENDATIONS ........................................... 25
7.0 REFERENCES ............................................................................................. 26
8.0 APPENDIX ................................................................................................... 27

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 4
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

1.0 DEFINITION
AE Asphalt Enamel

API American Petroleum Institute

ASME American Society of Mechanical Engineers

CA Corrosion Allowance

CD Chart Datum

CES Chevron Engineering Standard

CPP Central Processing Platform

CWC Concrete Weight Coating

DNV Det Norske Veritas

EL Elevation

FBE Fusion Bonded Epoxy

FEED Front End Engineering Design

FSO Floating Storage and Offloading Vessel

HD High Density

ID Internal Diameter

KP Kilometer Post

Km Kilometer

LAT Lowest Astronomical Tide

MG Marine Growth

MSL Mean Sea Level

MPa Mega Pascal

OD Outer Diameter

PL Pipeline

PP Polypropylene

PLEM Pipeline End Manifold

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 5
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

RP Return Period

RP Recommended Practice

VBGP Vietnam Block B Gas Project

WD Water Depth

WI Water Injection

WT Wall Thickness







































Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 6
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

2.0 EXECUTIVE SUMMARY
This report has been prepared for Chevron Vietnam Exploration Ltd (Company) as part
of FEED design. Riser Tie-in spool stress analyses has been performed for the
following risers and associated tie-in spools at CPP platform.

20 Riser and associated tie-in spool at CPP corresponding to 20 pipeline from
KLC-F to CPP

20 Riser and associated tie-in spool at CPP corresponding to 20 pipeline
from CVC-B to CPP

8.625 Riser and associated tie-in spool at CPP corresponding to 8.625
condensate pipeline from CPP to FSO PLEM

This report also covers the pressure containment and VIV checks for the following
risers pre-installed on CPP platform for future tie-ins.

1 x 20-inch Production Riser at CPP (To KLC-F)
1 x 20-inch Production Riser at CPP (To CVC-B)
1 x 10.75-inch Water Injection Riser at CPP
1 x 20-inch South Production Riser at CPP

The objective of this stress analysis report is to confirm the structural integrity of the
proposed riser and its tie-in spool configuration at CPP platform in accordance with
ASME B31.8/B31.4 [Ref.2 & 3]. The battery limit of the riser for this analysis is the
hanger clamp at EL +4.500. The riser portion above the hanger clamp at EL +4.500
is outside the scope of this report.

Riser span vortex induced vibration (VIV) analysis has been performed in
accordance with DNV-RP-F105 [Ref.4] to determine the allowable riser span lengths
which will prevent vortex induced in-line and cross-flow vibrations. Based on the
computed allowable span lengths, riser clamp locations have been verified for
acceptability ensuring no VIV. In-house spreadsheet is used to compute riser
allowable VIV span lengths. The calculations take into account the environmental
loadings as applicable at various elevations of the riser. The VIV span analysis is
performed for operating condition based on 100-year return period current and 1-year
return period significant wave parameters. The VIV span analysis methodology is
presented in Section 4.0.

The static stress analysis of the riser-spool system has been performed using FEA
software AUTOPIPE, Version 09.00.00. The analysis model comprises of riser, tie-in
spool and 50m long pipeline section. Simple pipe beam and bend elements have
been used. Hanger clamp and other riser clamps are simulated by defining
appropriate restraint types. AUTOPIPE Soil module is used to model the seabed, and
Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 7
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

for the interaction between the pipe and seabed soil. Pipeline expansion determined
from Pipeline Expansion Analysis Report [Ref.6] has been applied at the pipeline end
of the model. The environmental loading has been generated using AUTOPIPEs
wave module, employing Stokes 5
th
Order wave theory. The stress analysis has been
performed for four storm directions viz. towards platform East (U1), platform South
(U2), platform West (U3) and platform North (U4). The analysis incorporates platform
deflections for environmental load conditions based on structural in-place strength
analysis results.

The riser and tie-in spool stress analysis has been performed for the following load
conditions using design pressure and maximum operating temperature.

Functional
Functional +Environmental

The operational riser stress analysis with slug loads is also carried out as an
equivalent static analysis based on slug loads with DLF of 2.0 being applied as
concentrated loads at each of the spool and riser bends. The stress analysis
methodology is explained in Section 4.0.

The structural integrity of the analyzed 20/8.625 riser-spool systems at CPP has
been confirmed ensuring pipe stresses to be within the ASME B31.8/B31.4, which is
applicable.

The stress analysis results and discussions are presented in Section 5.0.
Conclusions and Recommendations are outlined in Section 6.0.

Note:

The conservative maximum inlet operating temperature and associated temperature
profiles received from the results of Flow Assurance Analysis has been used in
current riser tie-in spool stress analysis presented in this report. Subsequently, based
on the GOT (Gulf of Thailand) experience, and anticipated mixing of production from
various wells, Company has provided with more realistic revised maximum operating
temperature profiles (as presented in Ref.1) for use in pipeline FEED. The Riser Tie-
in spool stress analysis report will be updated to incorporate the revised temperature
profiles during FEED follow-on phase.









Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 8
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed


3.0 DESIGN AND ENVIRONMENTAL DATA
3.1 Linepipe Material Properties

Table 3.1 below present linepipe material and mechanical properties used in riser-
spool stress analysis:

Table 3-1 Linepipe Material Properties
Parameter Units Value
Linepipe Material - API 5L X60
Steel Density kg/m
3
7850
Youngs Modulus MPa 2.07x10
5
Poissons Ratio - 0.3
Coefficient of Expansion /C 11.7x10
-6

Specified Minimum Yield Strength (SMYS) MPa 414

3.2 Linepipe Parameters

The linepipe parameters used in the analysis are as follows (Ref .5):

Table 3-2 Linepipe Parameters
Pipeline/Riser Description Material
Actual
OD(mm)
Nominal
WT(mm)
20 Pipeline
(KLC-F/CVC-B to
CPP)

Riser/Spool

CS, API 5L X-60 508
17.5
Bend 19.1
[1]

Pipeline 14.3
8.625 Pipeline
(CPP to FSO PLEM)
Riser/Spool
CS, API 5L X-60 219.1
12.7
Bend 14.3
[1]

Pipeline 12.7
10.75 WI Riser
(for future Tie-in)
Riser
CS, API 5L X-60 273.1
20.6
Bend 22.2
20 future Risers
(future Tie-ins)
Riser
CS, API 5L X-60 508
17.5
Bend 19.1

Note:
[1] Pipe thinning of 10% has been used for all 5D bends.


Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 9
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed


3.3 Pressure and Temperature Data

Design pressure and maximum operating temperature data used in the stress
analysis is presented below.

Table 3-3 Design Pressure and Maximum Operating Temperature
Pipeline Parameter Unit Value
1, 2
20 Pipeline
(KLC-F to CPP)
Maximum
Operating
Temperature
C (F)
110 (230)
(at KLC-F)
34 (93.2)
(at CPP)
Design Pressure MPa (psig) 9.14 (1325)
20 Pipeline
(CVC-B to CPP)
Maximum
Operating
Temperature
C (F)
71.1 (160)
(at CVC-B)
37 (98.6)
(at CPP)
Design Pressure MPa (psig) 9.14 (1325)
8.625 Pipeline
(CPP to FSO
PLEM)
Maximum
Operating
Temperature
C (F) 65.6 (150)
Design Pressure MPa (psig) 3.10 (450)
20 Risers at
CPP (future)
Design Pressure MPa (psig) 9.14 (1325)
10.75 WI Riser
Maximum Design
Pressure
MPa (psig) 25.55 (3705)

Notes :

1. Design pressure and maximum operating temperature are used in riser tie-in spool
stress analysis.

2. The conservative maximum inlet operating temperature and associated temperature
profiles received from the results of Flow Assurance Analysis has been used in current
riser tie-in spool stress analysis presented in this report. Subsequently, based on the
GOT (Gulf of Thailand) experience, and anticipated mixing of production from various
wells, Company has provided with more realistic revised maximum operating
temperature profiles (as presented in Ref.1) for use in pipeline FEED. The Riser Tie-in
spool stress analysis report will be updated to incorporate the revised temperature
profiles during FEED follow-on phase.


3.4 Pipe External Coatings

The pipe external coating details used in the stress analysis of 20 and 8.625 riser-
spool system are as given in table below.

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 10
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

Table 3-4 Pipe External Coating Details
Parameter Coating Type Unit Value
Riser Corrosion Coating Thickness (Within Splash
Zone)
Neoprene mm 12
Riser Corrosion Coating Density (Within Splash Zone) Neoprene kg/m
3
1440
Riser Corrosion Coating Thickness (below splash
zone)
SP2888 mm (mil) 0.6 (18-23)
Riser Corrosion Coating Density (below splash zone) SP2888 kg/m
3
1540
Spool/Pipeline Corrosion
coating Thickness
For 20 pipelines AE
mm
4.5
For 8.625 pipeline FBE 0.41
Spool/Pipeline Corrosion
coating Density
For 20 pipelines AE
kg/m
3

1300
For 8.625 pipeline FBE 1440
Concrete Coating Thickness
For 20 pipelines
Concrete mm
48
For 8.625 pipeline -
Concrete Coating Density
For 20 pipelines
Concrete kg/m
3

2400
For 8.625 pipeline -
Note:
1. Splash Zone coating for CPP riser is from EL (+) 3.050m to EL (-) 3.050m [Ref. 1]

3.5 Internal Corrosion Allowance

Corrosion allowance has been used for Riser/Spool/Bend/pipeline sections of the
analysis model for operating condition. Corrosion allowances considered for Riser Tie-
in spool stress analysis are presented in Table 3.5.1 below.

Table 3.5.1 : Internal Corrosion Allowance (Ref.1)
Description Corrosion Allowance (mm)

20 Pipeline /Riser
6 [HOLD]
[1]
8.625 Pipeline/Riser
6
10.75 WI Riser
6
Note :

1. Internal Corrosion allowance for 20 pipelines/riser is subject to finalisation of corrosion Assessment
Study by ETC (Energy Technology Company).











Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 11
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

3.6 Product Density

Product Density considered for Riser Tie-in spool stress analysis is presented in Table
3.6.1 below.

Table 3.6.1 : Product Density
Pipeline/Riser
Maximum Product Density
(kg/m
3
)
20 Pipeline/Risers
120
8.625 Condensate Pipeline
720
10.75 WI Riser
(For future tie-n)
1025

3.7 Environmental Data

This section presents the design environmental data used in the Riser Tie-in Spool
stress analysis [Ref. 1].

3.7.1 Seawater Properties
The seawater properties [Ref. 1] used for the pipeline system are presented in Table
3.7.1.1 below.

Table 3.7.1.1 : Seawater Properties
Seawater Density
kg/m
3
(lb/ft
3
)
1025 (64)
Seawater Kinematics Viscosity
m
2
/s
1.03x10
-6

Ambient Temperature,
0
C 22.2

3.7.2 Water Depths
The water depth with respect to CD (LAT) at CPP platform is 76.5m.

3.7.3 Wave and Current Parameters
Wave and current parameters used for the Riser Tie-in spool stress analysis are
summarized in Tables 3.7.3.1 & 3.7.3.2 below (Ref. 1).










Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 12
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

Table 3.7.3.1 : Wave and Current Parameters
Description Unit
1 year
Return
Period
10 year
Return
Period
100 year Return Period
Peak Wave
with
Associated
Current
Extreme
Current with
Associated
Wave
Wave Direction - OMNI Directional
Sig. Wave Height
m
(ft)
3.1
(10.17)
4.6
(15.09)
6.4
(21.00)
5.3
(17.39)
Spectral Peak
Period
s 7.9 9.1 9.7 9.1
Maximum Wave
Height
m
(ft)
5.8
(19.03)
8.2
(26.90)
11.6
(38.06)
9.6
(31.50)
Period of Maximum
Wave
s 7.1 8.2 8.7 8.2
Current Direction - OMNI Directional
Current Velocity at
water depth

0 m
m/s
(ft/s)
0.8
(2.62)
1.0
(3.28)
0.97
(3.18)
1.07
(3.51)
8 m
m/s
(ft/s)
- -
0.81
(2.66)
0.90
(2.95)
25 m
m/s
(ft/s)
- -
0.67
(2.20)
0.78
(2.56)
52 m
m/s
(ft/s)
- -
0.53
(1.74)
0.59
(1.94)
Seafloor
m/s
(ft/s)
0.3
(0.98)
0.3
(0.98)
0.15
(0.49)
0.15
(0.49)
Surge
m
(ft)
0.2
(0.66)
0.2
(0.66)
0.2
(0.66)

The current profile below 1 m height above the seabed will be evaluated using
the 1/7
th
power law profile formulation.

Table 3.7.3.2 : Omni-Directional 100-Year Bottom Current
Current
Location
Velocity
(m/s)
0 m (Surface) 0.30
At seafloor 0.89




Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 13
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

3.7.4 Hydrodynamic Coefficient
The hydrodynamic coefficients adopted for the Riser-Tie-in spool stress analyses are
presented in Table 3.7.4.1 [Ref. 1].

Table 3.7.4.1 : Hydrodynamic Coefficients
Hydrodynamic Coefficient Pipeline/Spool Riser
Drag Coefficient, C
D
1.2 1.2
Lift Coefficient, C
L
0.9 0
Inertia Coefficient, C
M
3.29 2.0

3.7.5 Marine Growth Data
The marine growth profile has been extracted from Pipeline and Riser Design Basis [Ref.
1] and is presented in Table 3.7.6.1.

Table 3.7.6.1 : Marine Growth Profiles
Elevation (CD)
(m)
Thickness
(mm)
Density
(kg/m
3
)
(+) 0.7 64 1325
[2]

(-) 20 118 1325
(-) 50 45 1325
Mudline 45 1325

Notes:
1. The marine growth values between levels shall be derived by linear interpolation.
2. The density of marine growth in air will be taken as 1325 kg/m
3
(82.7 pcf)

3.8 Soil Data

The soil type encountered along all the VBGP offshore pipeline routes is
predominately very soft Clay [Ref. 1]. The soil properties used in the stress analysis
are presented below.

Table 3.8.1 : Soil Data
Parameter Unit Value
Bulk Density kN/m
3
13.75
Shear Strength kPa 2.0
Longitudinal Friction
Coefficient
- 0.5
Lateral Friction Coefficient - 1.0


Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 14
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

3.9 Flanges

Flange ratings considered for the riser tie-in spool stress analysis are as shown in
below Table.

Table 3.9.1 : Flanges
Pipeline Flange Rating
20 Pipelines/Risers/Spools 600 #
8.625 Condensate Pipeline/Riser/Spool 300 #
10.75 WI Riser 1500 #
20 Risers at CPP (Future Tie-ins) 600 #


































Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 15
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

4.0 ANALYSIS METHODOLOGY
4.1 General

The structural integrity of the riser and associated tie-in spool at CPP shall satisfy the
design requirements of ASME B31.8/B31.4 whichever is applicable [Ref. 2 & 3]. As
part of verifying structural integrity of the riser-spool system, the following have been
performed:

Riser Span VIV Analysis
Stress analysis of riser and tie-in spool system
Flange Equivalent Pressure Check
Pressure containment checks for future risers

Sections below describe the methodology adopted for riser VIV span analysis and
the stress analysis for riser-spool system.

4.2 Riser Span VIV Analysis

The riser span VIV analysis establishes the maximum spacing between the riser clamps
based on the limiting dynamic spanning criteria i.e. susceptibility to vortex induced
vibration, either in-line or cross-flow. The riser VIV span analysis has been performed for
operating condition. The allowable span calculations have been performed for 1 year
wave and 100 year current condition.

Each of the riser spans has been verified taking into consideration the VIV due to fluid
flow. Vortex shedding generating a riser dynamic response is dependent on:

Environment (wave and current)
Self weight

The potential for the fluid flow passing the riser inducing in-line or cross-flow excitation
due to the shedding of vortices has been evaluated following the guidelines set by DNV
RP-F105 [Ref. 4]. Based on the riser span VIV analysis results, the riser clamp spacings
are verified to ensure that neither in-line nor cross flow vibration occurs for combined
current and wave loading.

The VIV span assessment is based on the following criteria:

Screening Fatigue Criteria in-line VIV
Screening Fatigue Criteria Cross-flow VIV

The screening fatigue criteria have been calibrated against full fatigue analysis to provide
a fatigue life in excess of 50 years [Ref.2].
Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 16
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

The riser span VIV analysis has been performed using Contractors validated in-
house spreadsheet. The wave kinematics, which is input to the span calculations,
have been computed using J P Kennys PipeCalc program. The riser VIV span
calculations are included in Appendix A.

4.3 Riser Stress Analysis

Stress analysis using AUTOPIPE software has been performed to evaluate riser and
tie-in spool structural integrity at CPP.

4.3.1 Software Description

AUTOPIPE software Version 09.00.00 has been used. AUTOPIPE is industry-
accepted commercially available FEA software used to perform piping stress analysis
and design. The software has capability to analyze risers and tie-in spools complying
offshore design code requirements.

AUTOPIPE uses simple beam and bend elements and the defined loading conditions
to analyze complex piping systems subjected to static and dynamic loading. The
analysis model may be subjected to operating, buoyancy and wave loading
depending on the load case and any load combination can be analysed by defining
appropriate load components. The software also has the capability to model soil pipe
interaction which enables to simulate pipeline on seabed. Structural interaction with
piping elements is represented by defining appropriate restraints.

AUTOPIPE performs pipe stress analysis using the defined input parameters such
as,
- pipe parameters like OD, WT, corrosion allowance, material density, SMYS
etc.,
- operational parameters like temperature, pressure, product density etc.,
- uniform load due to wave and current action (hydrodynamic loading)
- external displacements like pipeline expansion, platform deflection or
support height etc.
- boundary conditions and system restraints like anchor, guide, +y supports
or spring supports etc.
- slug loading in the form of point load on bends

With the above input, for any selected load combination, AUTOPIPE produces
results in the form of displacements, global and local element forces, restraint forces
and stresses for each element of the analysed piping system.




Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 17
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

4.3.2 Analysis Model

The geometry and configuration of the riser and its tie-in spool modelled for the
analysis is based on CPP riser and tie-in spool arrangement and approach drawings
developed as part of FEED [Ref. 7 & 8], which are included in Appendix D.

The riser-spool stress analysis model consists of riser, associated tie-in spool and
50m long pipeline section resting on seabed. The riser slope, bend angles and
pipeline approach angle are correctly represented in the 3-dimensional analysis
model.

The riser, tie-in spool and pipeline sections are modelled as a system of finite
elements using beam and bend elements. 10% bend wall thinning has been
considered in the analysis. The piping support system comprising anchors, +Y
supports and guide restraints are incorporated as applicable. AUTOPIPE Soil module
is used to model the seabed, for the interaction between the pipe and seabed soil.
Design pressure, temperature and other operating parameters are defined as input
data. The pipeline expansion is applied as displacement at the end of the modelled
pipeline section. Platform deflections are incorporated as displacements at riser
clamp/support locations.

Nodes are specified at riser clamp or other support locations and at locations where
there is change in material properties, coating properties, marine growth etc. so as to
set up a more realistic model.

Model Restraints

Hanger clamp at riser top is anchored. Riser clamps are modelled as guide supports
which, prevent pipe lateral movement but allows vertical upward and downward
movement. The riser is free to rotate about its axis.

AUTOPIPE Soil module is used to model the seabed. The following parameters are
input in the AUTOPIPE Soil module.

Soil resistance to downward pipe movement in vertical direction =Pipe Submerged
weight

Soil resistance to axial pipe movement =Axial friction factor x Pipe Submerged weight

Soil resistance to lateral pipe movement =Lateral friction factor x Pipe Submerged
weight

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 18
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

AUTOPIPE creates soil springs at every 1m spacing. The soil stiffness (K) per one
meter is determined as follows:


d
W
= K
s


Where: W
s
= Pipe submerged weight (kg/m)
d = Pipe settlement (m)

4.3.3 Key Input

Design pressure, temperature and other operating parameters are defined as input
data. Maximum content density has been used in the analysis for operating condition.
The rest of the key input is presented below.

Equivalent Density

Since there is no provision in AUTOPIPE to input individual coating thicknesses and
densities, an equivalent insulation thickness and density has been input.

Hydrodynamic Loading

Hydrodynamic loading has been applied using AUTOPIPEs wave module.
AUTOPIPE computes hydrodynamic loading using Morisons equations. Stokes 5
th

Order wave theory has been used to calculate the flow velocities and the
accelerations.

The UDL has been calculated using Morisons equations as given below:

F
Lat
=1/2 * * C
d
* D * U *I U I +/4 * * C
M
* D
2
* A

F
L
=1/2 * * C
L
* D * U *I U I

Where, F
Lat
= Lateral force
F
L
= Lift Force
= Fluid density
C
D
= Drag coefficient
C
L
= Lift Coefficient
D = Pipe diameter
U = Particle velocity
C
M
= Inertia coefficient
A = Particle acceleration

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 19
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

The values of hydrodynamic coefficients as presented in Section 3.7.4 have been
used.

100-year maximum wave and coincident current values have been used for operating
conditions.

Pipeline Expansion

The pipeline end expansion has been input at the pipeline section end of the
AUTOPIPE analysis model. The pipeline end expansion values for operating
conditions are based on Pipeline Expansion Analysis Report [Ref.6]. Full expansion
is applied at end of the pipeline model and the expansion values are presented in
Table 4.1 below.

Table 4-1 Pipeline End Expansion Input

Pipeline Pipeline End
Pipeline Expansion
(mm)
20 Pipeline KLC-F to CPP CPP 436
20 Pipeline CVC-B to CPP CPP 524
8.625 Pipeline CPP to FSO PLEM CPP 377

Note :
The above pipeline expansion values are based on the conservative maximum inlet operating
temperature and associated temperature profiles received from the results of Flow Assurance
Analysis. As mentioned in Section 3.3, the Riser Tie-in spool stress analysis report will be
updated to incorporate the pipeline expansions based on the revised temperature profiles
during FEED follow-on phase.

Platform Displacements

The platform displacements are input as imposed displacements at riser clamp
elevations. Appropriate platform displacements are considered in the riser tie-in spool
stress analysis.

Slug Load

Slug loads are considered in the riser tie-in spool stress analysis as per slug data
tabulated in Pipeline and Riser Design Basis.

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 20
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

The slug load has been applied at each bend location as concentrated load using
DLF of 2.0. Load cases comprising slug load being applied at each bend location
have been analysed.

Force due to Slug Load = DLF v
2
A [2(1 cos )]
1/2


Where:
DLF =Dynamic Load Factor =2
=slug density
v =slug velocity
A =internal area of pipe
=inclusion angle at elbow

4.3.4 Design Load Combination

The AUTOPIPE analysis has been performed for the load combination indicted in
table below.
Table 4-2 Design Load Combination
Load
Combination
Description
Design Load Description
Operational Loads
Environmental
Loads
D
e
a
d

L
o
a
d

L
i
v
e

L
o
a
d

D
e
s
i
g
n

P
r
e
s
s
u
r
e

D
e
s
i
g
n

T
e
m
p
.

P
i
p
e
l
i
n
e

E
x
p
a
n
s
i
o
n

S
l
u
g

L
o
a
d

100 Year
Max.
Wave+
Current
100 Year
Platform
Displace
ments
Functional +100 Year
Return Period
Environmental Load
X X X X X X X
Functional +100 Year
Return Period
Environmental Load +
Slug Load
X X X X X X X X
X: indicates applicability

Basic Load Cases and Load Combinations

The stress analysis has been performed considering the basic load cases and
combinations presented in Table 4-3 below.













Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 21
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

Table 4-3 Basic Load Cases and Combinations (Operating Condition)
Basic Load Case Description
GR
Weight of pipe, product and other components, and Vertical
displacements at crossing supports
T1
Maximum operating temperature (Including Pipeline
Expansion)
P1 Design pressure
U1
100-year return maximum wave & current load towards
Platform East (+X direction)
U2
100-year return maximum wave & current load towards
Platform South (+Z direction)
U3
100-year return maximum wave & current load towards
Platform West (-X direction)
U4
100-year return maximum wave & current load towards
Platform North (-Z direction)
Load Combination Type
GR+T1+P1 Operating Functional
GR+T1+P1+U1 Operating Functional +Environmental
GR+T1+P1+U2 Operating Functional +Environmental
GR+T1+P1+U3 Operating Functional +Environmental
GR+T1+P1+U4 Operating Functional +Environmental


4.3.5 Structural Integrity Verification

Stress Check

The Von Mises equivalent stress computed by AUTOPIPE has been verified against
the allowable value based on ASME B31.8/B31.4 whichever is applicable [Ref. 2 & 3]
specified Usage Factor, which is shown below.

Table 4-4 Equivalent Stresses Usage Factors
Design Code
Hoop Stress
Longitudinal Stress Combined Stress
Riser Pipeline
ASME B31.8
(20 Risers/Pipelines)
0.50 0.72 0.80 0.90
ASME B31.4
(8.625 Condensate
Riser/Pipeline & 10.75
WI Riser)
0.60 0.72 0.80 0.90

4.4 Pressure Containment Checks

Pressure containment checks are carried out for the pre-installed risers at CPP
platform and calculations are included in Appendix-D.


Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 22
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

5.0 ANALYSIS RESULTS
5.1 Riser Span VIV Analysis Results

Summary of riser VIV span analysis results are presented in table below. The VIV
span spreadsheet validation and the span calculations are presented in Appendix A.
J PK PipeCal Wave module programme is used to determine wave kinematics.

Table 5-1 20 Risers Clamp Spacing Assessment at CPP

S.No
Riser Span Allowable Riser Span
Governing
Span (m)
Actual Riser
Span Length
(m)
Remarks
Al lowable
Inline VIV
Span Length
(m)
Allowable
Crossflow
VIV Span
Length (m)
1 EL (+) 4.500 to EL (-) 12.000 19.205 28.789 19.205 16.500 OK
2 EL (-) 12.000 to EL (-) 32.500 22.560 35.037 22.560 20.500 OK
3 EL (-) 32.500 to EL (-) 52.500 28.202 42.439 28.202 20.000 OK
4 EL (-) 52.500 to EL (-) 74.822 34.392 50.205 34.392 25.922 OK
5
Riser Span on J acket
horizontal framing near
seabed
26.596 40.011 26.596 22.000 OK

Table 5-2 8.625 Riser Clamp Spacing Assessment at CPP

S.No
Riser Span Allowable Riser Span
Governing
Span (m)
Actual Riser
Span Length
(m)
Remarks
Al lowable
Inline VIV
Span Length
(m)
Allowable
Crossflow
VIV Span
Length (m)
1 EL (+) 4.500 to EL (-) 3.000 7.571 10.286 7.751 7.500 OK
2 EL (-) 3.000 to EL (-) 12.000 9.033 13.318 9.033 9.000 OK
3 EL (-) 12.000 to EL (-) 21.500 9.721 15.408 9.721 9.500 OK
4 EL (-) 21.500 to EL (-) 32.500 11.034 17.328 11.034 11.000 OK
5 EL (-) 32.500 to EL (-) 42.500 12.078 18.736 12.078 10.000 OK
6 EL (-) 42.500 to EL (-) 54.000 13.174 20.135 13.174 11.500 OK
7 EL (-) 54.000 to EL (-) 68.000 14.684 22.346 14.684 14.000 OK
8 EL (-) 68.000 to EL (-) 74.822 13.276 46.319 13.276 6.822 OK
9
Riser Span on J acket
horizontal framing near
seabed
11.792 51.825 11.792 11.500 OK


Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 23
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed


Table 5-3 10.75 WI Riser Clamp Spacing Assessment at CPP

S.No
Riser Span Allowable Riser Span
Governing
Span (m)
Actual Riser
Span Length
(m)
Remarks
Al lowable
Inline VIV
Span Length
(m)
Allowable
Crossflow
VIV Span
Length (m)
1 EL (+) 4.500 to EL (-) 4.000 9.788 13.260 9.788 8.500 OK
2 EL (-) 4.000 to EL (-) 13.500 11.508 17.427 11.508 9.500 OK
3 EL (-) 13.500 to EL (-) 23.000 12.871 20.250 12.871 9.500 OK
4 EL (-) 23.000 to EL (-) 32.500 14.439 22.535 14.439 9.500 OK
5 EL (-) 32.500 to EL (-) 42.500 15.937 24.646 15.937 10.000 OK
6 EL (-) 42.500 to EL (-) 52.500 17.324 26.655 17.324 10.000
OK

7 EL (-) 52.500 to EL (-) 65.000 19.125 30.359 19.125 12.500 OK
8 EL (-) 65.000 to EL (-) 74.822 17.436 44.821 17.436 9.822 OK
9
Riser Span on J acket
horizontal framing near
seabed
15.459 50.823 15.459 14.000
OK



5.2 Riser Tie-in Spool Stress Analysis Results

The stress analysis results of the riser-spool system are tabulated in the following
tables. AUTOPIPE computer input and output are included in Appendix B.

Table 5-4 20 Riser & Tie-in Spool at CPP (KLC-F to CPP Pipeline)

S.No Design Condition
Hoop Stress (MPa)
Longitudinal Stress
(MPa)
Combined Stress
(Mpa)
Remarks
Maximum
Stress
Allowable
Stress
Maximum
Stress
Al lowable
Stress
Maximum
Stress
Allowable
Stress
1 Operation Functional 201.9 207.0 247.3 331.2 246.1 372.6 OK
2
Operation Functional +
Environmental
201.9 207.0 251.8 331.2 246.7 372.6 OK





Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 24
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed


Table 5-5 20 Riser & Tie-in Spool at CPP (CVC-B to CPP Pipeline)

S.No Design Condition
Hoop Stress (MPa)
Longitudinal Stress
(MPa)
Combined Stress
(Mpa)
Remarks
Maximum
Stress
Allowable
Stress
Maximum
Stress
Al lowable
Stress
Maximum
Stress
Allowable
Stress
1 Operation Functional 201.9 207.0 259.0 331.2 248.9 372.6 OK
2
Operation Functional +
Environmental
201.9 207.0 264.0 331.2 252.9 372.6 OK


Table 5-6 8.625 Riser & Tie-in Spool at CPP (CPP to FSO PLEM Pipeline)

S.No Design Condition
Hoop Stress (MPa)
Longitudinal Stress
(MPa)
Combined Stress
(Mpa)
Remarks
Maximum
Stress
Allowable
Stress
Maximum
Stress
Al lowable
Stress
Maximum
Stress
Allowable
Stress
1 Operation Functional 50.7 248.4 246.2 331.2 238.1 372.6 OK
2
Operation Functional +
Environmental
50.7 248.4 252.2 331.2 244.0 372.6 OK


5.3 Flange Equivalent Pressure Checks

Flange equivalent pressure checks have been carried out for all the flanges for the
bending moment and axial force extracted from riser tie-in spool stress analysis. It is
found that the proposed flange ratings (600#for 20 pipeline/riser/spool and 300#for
8.625 pipeline/riser/spool) are suitable for the risers and spools at CPP. Flange
equivalent pressure check calculations are presented in Appendix-C.





















Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 25
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

6.0 CONCLUSIONS AND RECOMMENDATIONS
6.1 Conclusions

The following conclusions have been drawn based on the stress analyses performed
using design pressure and operating temperature in this report for the 20/8.625 risers
and associated tie-in spools at CPP platform.

The proposed riser clamps for 20 & 8.625 risers ensure no in-line or cross-
flow vortex induced vibrations and meeting DNV RP F105 requirements.
Hence the proposed number of riser clamps and their elevations are
acceptable.
The maximum stresses (Hoop, Longitudinal and Combined) induced in the
riser are all within allowable stress limit as stipulated by ASME B31.8/B31.4
whichever is applicable.
The proposed spool layout and riser configuration at CPP (Ref. 7 &8) for both
20 risers and 8.625 riser meet pipe stress requirement. Therefore, it is
concluded that the riser-spool system is structurally adequate to serve the
intended purpose during its design life.
The proposed riser clamps for 20 and 10.75 future risers ensure no in-line or
cross-flow vortex induced vibrations and meeting DNV RP F105
requirements. Hence the proposed number of riser clamps and their
elevations are acceptable.
Proposed wall thicknesses for 20 and 10.75 future risers meet the pressure
containment criteria as per ASME B31.8/B31.4 whichever is applicable.

6.2 Recommendations

Based on the Riser Tie-in spool stress analyses presented in this report, the following
are recommended.

The proposed spool configurations for 20 and 8.625 risers shall be further
verified during detailed engineering based on the changes in pipeline
approaches, other design/operating data, CPP platform displacements and
installability.

Flange integrity design checks (600 #for 20 pipelines and 300#for 8.625
pipeline) shall be performed by flange manufacturer during detailed
engineering based on actual bending moment and axial forces.

The CPP risers hanger and guide clamps shall be designed to safely cater
the clamp loads established during detailed engineering.

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 26
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

7.0 REFERENCES
1. VNM-IPGN-PPL-PHL-EDG-0000-00001, Pipeline and Riser Design Basis

2. ASME B31.8, Gas Transmission and Distribution Piping Systems, 2007

3. ASME B31.4, Pipeline Transportation Systems for Liquid Hydrocarbons and
Other Liquids, 2009

4. DNV-RP-F105, Free Spanning Pipelines, 2006

5. VNM-IPGN-PPL-RPT-EDG-0000-00003, Pipeline and Riser Wall Thickness
and Material Grade Selection Report

6. VNM-IPGN-PPL-RPT-EDG-0000-00007, Pipeline Expansion Analysis Report

7. VNM-IPGN-PPL-GAR-EDG-0000-00071 (Two Sheets), CPP Risers
Arrangement Plan and Elevation

8. VNM-IPGN-PPL-LAY-EDG-0000-00014, Pipeline Approaches at CPP
platform.





























Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 27
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

8.0 APPENDIX
Appendix - A Riser VIV Span Calculations
Appendix - B AutoPipe Input/Output
Appendix - C Flange Equivalent Pressure Checks
Appendix D Pressure Containment Checks






















Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 28
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed












Appendix - A. Riser VIV Span Calculations














Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 29
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed













Appendix A1 VIV calculations for 20 Risers at CPP











Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 30
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 31
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed










Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 32
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed












Appendix A2 VIV calculations for 8.625 Riser at CPP










Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 33
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 34
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed











Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 35
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed












Appendix A3 VIV calculations for 10.75 Risers at CPP













Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 36
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 37
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed













Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 38
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed











Appendix - B. AutoPipe Input/Output














Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 39
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed












Appendix B1 20 Riser & Tie-in spool (Pipeline from KLC-F)
Autopipe Input / Output











Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 40
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 41
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 42
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 43
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 44
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 45
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 46
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 47
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 48
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 49
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 50
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 51
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 52
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 53
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 54
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 55
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 56
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 57
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 58
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 59
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 60
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 61
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 62
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 63
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 64
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 65
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 66
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 67
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 68
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 69
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 70
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 71
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 72
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 73
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 74
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 75
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 76
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 77
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 78
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 79
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 80
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 81
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 82
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 83
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 84
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 85
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 86
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 87
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 88
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 89
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 90
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 91
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 92
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 93
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 94
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 95
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 96
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 97
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 98
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 99
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 100
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 101
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 102
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 103
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 104
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 105
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 106
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 107
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 108
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 109
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 110
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 111
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 112
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 113
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 114
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 115
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 116
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 117
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 118
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 119
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 120
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 121
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 122
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 123
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 124
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 125
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 126
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 127
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 128
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 129
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 130
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 131
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 132
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 133
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 134
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 135
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 136
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 137
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 138
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 139
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 140
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 141
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 142
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 143
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 144
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 145
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 146
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 147
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 148
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 149
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 150
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 151
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 152
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 153
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 154
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 155
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 156
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 157
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 158
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 159
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 160
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 161
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 162
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 163
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 164
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 165
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 166
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 167
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 168
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 169
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 170
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 171
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 172
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 173
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 174
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 175
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 176
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 177
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 178
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 179
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 180
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 181
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 182
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 183
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 184
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 185
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 186
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 187
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 188
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 189
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 190
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 191
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 192
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 193
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 194
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 195
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 196
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 197
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 198
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 199
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 200
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 201
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 202
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 203
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 204
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 205
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 206
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 207
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 208
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 209
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 210
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 211
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 212
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 213
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 214
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 215
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 216
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 217
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 218
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 219
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 220
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 221
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 222
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 223
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed












Appendix B2 20 Riser & Tie-in spool
(Pipeline from CVC-B)
Autopipe Input / Output










Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 224
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 225
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 226
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 227
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 228
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 229
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 230
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 231
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 232
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 233
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 234
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 235
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 236
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 237
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 238
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 239
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 240
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 241
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 242
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 243
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 244
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 245
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 246
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 247
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 248
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 249
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 250
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 251
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 252
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 253
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 254
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 255
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 256
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 257
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 258
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 259
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 260
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 261
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 262
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 263
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 264
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 265
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 266
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 267
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 268
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 269
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 270
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 271
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 272
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 273
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 274
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 275
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 276
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 277
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 278
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 279
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 280
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 281
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 282
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 283
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 284
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 285
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 286
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 287
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 288
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 289
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 290
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 291
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 292
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 293
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 294
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 295
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 296
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 297
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 298
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 299
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 300
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 301
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 302
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 303
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 304
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 305
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 306
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 307
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 308
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 309
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 310
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 311
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 312
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 313
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 314
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 315
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 316
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 317
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 318
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 319
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 320
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 321
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 322
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 323
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 324
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 325
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 326
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 327
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 328
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 329
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 330
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 331
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 332
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 333
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 334
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 335
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 336
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 337
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 338
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 339
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 340
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 341
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 342
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 343
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 344
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 345
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 346
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 347
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 348
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 349
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 350
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 351
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 352
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 353
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 354
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 355
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 356
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 357
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 358
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 359
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 360
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 361
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 362
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 363
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 364
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 365
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 366
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 367
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 368
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 369
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 370
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 371
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 372
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 373
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 374
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 375
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 376
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 377
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 378
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 379
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 380
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 381
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 382
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 383
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 384
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 385
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 386
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 387
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 388
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 389
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 390
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 391
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 392
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 393
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 394
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 395
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 396
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 397
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 398
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 399
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 400
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 401
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 402
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 403
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 404
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 405
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 406
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 407
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 408
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 409
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 410
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 411
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 412
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed











Appendix B3 8.625 Riser & Tie-in spool
(Pipeline to FSO PLEM)
Autopipe Input / Output











Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 413
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed

1) Click Options and change setting to Enable this
content.
2) View >Macros >View Macros >insert_tif
3) Select the first TIFF file, eg Appendix A - Exp
Calcs_Page_01.tiff .
4) After running the macro, Copy and Paste the results into
your own file.

Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 414
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 415
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 416
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 417
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 418
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 419
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 420
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 421
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 422
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 423
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 424
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 425
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 426
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 427
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 428
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 429
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 430
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 431
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 432
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 433
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 434
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 435
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 436
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 437
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 438
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 439
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 440
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 441
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 442
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 443
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 444
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 445
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 446
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 447
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 448
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 449
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 450
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 451
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 452
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 453
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 454
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 455
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 456
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 457
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 458
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 459
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 460
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 461
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 462
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 463
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 464
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 465
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 466
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 467
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 468
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 469
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 470
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 471
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 472
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 473
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 474
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 475
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 476
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 477
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 478
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 479
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 480
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 481
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 482
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 483
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 484
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 485
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 486
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 487
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 488
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 489
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 490
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 491
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 492
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 493
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 494
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 495
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 496
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 497
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 498
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 499
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 500
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 501
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 502
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 503
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 504
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 505
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 506
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 507
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 508
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 509
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 510
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 511
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 512
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 513
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 514
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 515
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 516
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 517
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 518
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 519
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 520
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 521
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 522
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 523
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 524
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 525
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 526
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 527
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 528
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 529
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 530
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 531
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 532
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 533
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 534
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 535
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 536
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 537
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 538
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 539
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 540
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 541
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 542
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 543
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 544
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 545
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 546
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 547
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 548
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 549
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 550
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 551
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 552
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 553
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 554
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 555
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 556
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 557
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 558
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 559
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 560
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 561
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed














Appendix - C. Flange Equivalent Pressure Checks













Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 562
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



















Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 563
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed




















Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 564
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed



















Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 565
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed












Appendix - D Pressure Containment Checks














Vietnam Block B Gas Project

VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report


VNM-IPGN-PPL-RPT-EDG-0000-00008-00 CPP Risers Design and Tie-in Spool Stress Analysis Report Page 566
Last printed 12/24/2010 1:09:00 PM Uncontrolled when printed