1. SPECIFICATION OF CALCULATION....................................................................1 2. PRINCIPLE ON PT SELECTION ..............................................................................1 3 CALCULATION FORMULA.......................................................................................1 3.1 SELECTION FOR RATIO OF PT........................................................................1 3.2 SELECTION OF ACCURACY CLASS OF PT...................................................2 4. SECONDARY LOAD VERIFICATION.....................................................................3 4.1 SECONDARY LOAD OF PT ...............................................................................3 4.2 PARAMETERS OF PT .........................................................................................4
1/5 1. SPECIFICATION OF CALCULATION
This calculation shall be done according to the specifications as follows: The Guide for selection and calculation of current transformers and voltage transformers Manual for designing electrical part of electric power engineering (2)
2. PRINCIPLE ON PT SELECTION
2.1 It should meet the requirement of rated primary voltage. 2.2 It should meet the requirement of accuracy class and capacity for measuring meters, protection equipments and automation equipments
3 CALCULATION FORMULA 3.1 SELECTION FOR RATIO OF PT According to the contract, when PT is star wiring, its phase to phase voltage of secondary winding shall be 110V. Secondary voltage of PT shall be selected in accordance with Tab. 1-1.
Tab. 1-1 Selection of Secondary Voltage of PT Winding Main secondary winding Aux. secondary winding for zero sequence voltage Wiring mode of winding Phase to phase voltage phase voltage In network where neutral point is directly grounded In network where neutral point is not directly grounded Secondary voltage (V) 110 110/3 110 110/3
2/5 Tab. 1-2 Accuracy Class of Secondary Winding of PT Accuracy Error limits Apply to function condition Phase displacement Accuracy class voltage error (%) min crad Range of voltage % Range of frequenc y % Burden and power factor% 0.1 0.1 5 0.15 0.2 0.2 10 0.3 0.5 0.5 20 0.6 1.0 1.0 40 1.2 measure ment 3.0 3.0 80~120 99~101 3P 3.0 120 3.5 protectio n 6P 6.0 240 7.0 Residual voltage winding 6P 6.0 240 7.0 5~150 or(5~190 ) 96~102 25~100 and 0.8(lag)
3.2 SELECTION OF ACCURACY CLASS OF PT The accuracy class shall be selected according to the contract. Accuracy class of CT refers to permissible error under definite secondary loads. It meets the requirements in the following tables.
Tab. 1-1 Accuracy Class of PT and Electrical Measuring Devices Accuracy class of meters Accuracy class of PT 0.5 0.5 1.0 0.5 1.5 1.0 2.5 1.0
3/5 Tab. 1-2 Accuracy Class of PT and Energy Metering Accuracy class of watthour meters Accuracy class of varhour meters Accuracy class of CT 0.2S 2.0 0.2 0.5S 2.0 0.2 1.0 2.0 0.5 2.0 3.0 0.5
4. SECONDARY LOAD VERIFICATION 4.1 SECONDARY LOAD OF PT Rated secondary load of PT (We) shall be determined by its accuracy class, it shall be no more than the permissible load which is submitted by PT manufacturer.
Secondary load of PT for each phase shall be derived from the formula as follows:
W= P Q 2 2 + (1-2)
Where: W--- Secondary load of PT(VA); P--- Active power load (W); Q--- Reactive power load (var).
Active power load (P) for each phase shall be derived from the formula as follows:
P= Wmcos (1-3)
Where: Wm--- Actual secondary load of PT for each phase (VA); --- Phase angle error.
Reactive power load for each phase (Q) shall be derived from the formula as follows:
Q= Wmsin (1-4)
Where: Wm--- Actual secondary load of PT for each phase (VA); --- Phase angle error.
4/5
When the maximum actual secondary load is smaller than permissible load of PT for each phase, then PT meets the requirement of accuracy class for measuring meters and relays.
4.2 PARAMETERS OF PT According to the parameter supplied by manufacturer, burden of different devices shall be as below: Each set of protection or automation devices: <5VA/phase Each transducer : <0.5VA; Each set of tariff metering devices: <6VA/phase;
4.2.1 EXAMPLE: PT at outlet of generator
Ratio: kV 3 0.11 / 3 0.11 / 3 0.11 / 3 22
Accuracy class 0.2/3P/6P
For accuracy class 0.2, Wm (for tariff metering or measuring) 12VA, select W=30VA
For accuracy class 3P, Wm: 10(for measuring)+15(for protection) +5(for automation equipment s) 30VA, select W=75VA
For accuracy class 6P(Residual voltage winding), Wm: 2(for measuring)+10(for protection) 12VA, select W=30VA
According to the version supplied by PT manufacturer, rated secondary load of PT shall be capacity: 30/75/30VA(corresponding to 0.2/3P/6P)
Therefore, -It meets the requirement of secondary load of PT.
4.2.2 PARAMETERS OF THE OTHERS PT
PT at HV side of main transformer, station transformer and startup transformer Ratio: /0.11kV 3 0.11 / 3 0.11 / 3 0.11 / 3 400
Accuracy class 0.2/3P/3P/6P
5/5 Capacity: 30/75/75/30VA
PT at HV side of startup transformer Ratio: /0.11kV 3 0.11 / 3 0.11 / 3 0.11 / 3 220
Accuracy class 0.2/3P/3P/6P Capacity: 30/75/75/30VA