You are on page 1of 37

www.mch.

cl
2013
/14
C
A
T
A
S
T
R
O

D
E

P
R
O
Y
E
C
T
O
S

M
I
N
E
R
O
S
M
I
N
I
N
G

P
R
O
J
E
C
T
S

S
U
R
V
E
Y
Fotografa Portada / Cover Picture:
Gentileza de / Courtesy of Dassault Systmes GEOVIA
La perforacin de exploracin o sondaje tiene como nalidad analizar
y determinar tipos, calidades y cantidades de mineral para la eventual
explotacin del yacimiento. / Exploration drilling or drill hole has the goal to analyze and
determine types, qualities and quantities of ore for the eventual exploitation of the reservoir.

Presidente / President:
Ricardo Corts
Director / Director:
Roly Sols

Gerente General / General Manager:
Cristin Sols
Gerente Conferencias y Estudios / Conference and Research Manager:
Nelson Torres
Jefe rea de Estudios / Chief Research Area:
Christian Sanhueza

Analistas de Estudios / Research Analysts:
Fabiola Fuentes, Jorge Gonzlez, Michelle Blay y Gian Scappaticcio

Traduccin / Translation:
Joanna Garcia (Captulo 1 / Chapter 1)
Base de Datos / Database:
Editec S.A.
Diseo y Produccin / Design and Production:
Ediarte S.A.
Impreso en / Printed in:
Morgan Impresores S.A.
Producido por el rea de Estudios del Grupo Editorial Editec
/ Published by the Research Department of Editec - Publishing Group
Direccin / Address : Antonio Bellet 444. Piso 6, Providencia
Santiago de Chile. Fono (56-2) 27574200, Fax (56-2) 27574201,
Email: Estudios@editec.cl - www.mch.cl
Registro Propiedad Intelectual N 233.835
Editec S.A. Prohibida su reproduccin total o parcial, y por cualquier tipo de
medios o sistemas, sin el consentimiento por previo escrito de sus creadores.
/ It is prohibited its total or partial reproduction, by any means, without the written and previous
approval of is authors.
CATA S T R O D E
MI NE R OS
PROYECTOS
MINING PROJECTS SURVEY
2013
/14
2
CATASTRO DE PROYECTOS MINEROS 2013/14
Mining Projects Survey 2013/14
P
r

l
o
g
o

F
o
r
e
w
o
r
d
Estimado lector:
La minera constituye una de las principales actividades eco-
nmicas en muchos pases de Sudamrica; sin embargo, su de-
pendencia de las condiciones del mercado a nivel internacional
y del sector fnanciero, hace de este rubro un negocio riesgoso.
Es por estas fuctuaciones propias del negocio minero que
durante el presente ao 2013, se ha registrado una postergacin
considerable en la cartera de nuevos proyectos mineros. Para ci-
tar un caso, en Chile el 40% de la carpeta de inversiones en mine-
ra est en revisin o ha postergado su puesta en marcha, corres-
pondiendo esto a una reduccin desde los US$ 110 mil millones,
proyectados para los prximos diez aos, a US$ 43,6 mil millones.
Por lo anterior, se hace necesario conocer cmo se mueve
la industria minera, los actores ms relevantes y, obviamente, los
futuros desarrollos mineros en carpeta. De esta manera es posi-
ble prever las tendencias y futuras necesidades, lo que se puede
traducir en futuras ganancias.
En este contexto, presentamos una nueva edicin del Catas-
tro de Proyectos Mineros, el que desde su primera publicacin en
1992 se ha convertido en una de las herramientas ms importan-
tes de anlisis y consultas para el sector minero sudamericano.
Con mucho agrado ponemos a su disposicin la versin
actualizada 2013-2014 que Ud. tiene en sus manos.
Este documento es el resultado del esfuerzo diario por bus-
car y proveer informacin confable y oportuna desde hace 35
aos a travs de nuestra revista Minera Chilena, Compendio de
Dear Reader:
Mining represents one of the most important
economic activities in many countries of South
America. However, its dependence on global
market conditions and the nancial sector makes
this business risky.
Is because of these uctuations own mining
business during the current 2013, there has been a
considerable decline in the portfolio of new mining
projects, to quote one instance, in Chile, 40% of the
investment portfolio in mining is under review or
has postponed its implementation, this corresponds
to a reduction from the $ 110 billion, projected for
the next ten years, to U.S. $ 43,6 billion.
Therefore, it is important to know how it
moves the mining industry, the most relevant ac-
tors and obviously, the future miners developments
in folder. Thus it is possible to predict future trends
and needs that can be translated into prot.
Within this context, we provide a new edi-
tion of our Mining Projects Survey which from its
beginning in 1992 has become one of the most im-
portant tools for the South American mining sector.
We are pleased to present you the updated volume
2013-2014 which you are holding in your hands.
The present document is the result of our
daily effort searching for and providing reliable and
3
PRLOGO
Foreword
timely information since 35 years, by means of
Minera Chilena magazine, the Chilean Mining
Compendium, and a daily online news service,
among other products.
Regarding to the structure of the book, it
shows to the reader an introduction to the eco-
nomic situation in general and the mining sector
in particular, each of the countries included.
Meanwhile, the subsequent sections show the
investments by country, project type and stage
of development.
In order to facilitate the access to further
information sources, we also include a register
of engineering and construction firms dedi-
cated to the development of mining projects.
The directory of junior mining companies in
chapter 7 gives an overview over the key play-
ers in exploration.
An appendix and alphabetic index at the
end of the book allow for a quick search of
investments by project names, locations or
other items.
We kindly invite you to get familiar with
our Mining Projects Survey 2013 - 2014 with
detailed information, a clear structure and a
modern layout.
The Editors
la Minera Chilena, y servicios de noticias diarias online, entre
otros productos.
En cuanto a la estructura del libro, se muestra una introduc-
cin al lector con la situacin econmica en general, y al rubro
minero en particular, de cada uno de los pases incluidos. En
tanto, las secciones subsiguientes se presentan las inversiones
segn pas, tipo de proyecto y etapas de desarrollo.
Con el objetivo de facilitar el acceso a otras fuentes de informa-
cin, se ha incluido adems un directorio de empresas de ingeniera
y construccin que se dedican al desarrollo de proyectos mineros y
un directorio de empresas mineras junior que permite formarse una
idea de los actores ms importantes en la exploracin.
La informacin de los proyectos mineros est ordenada
segn la importancia minera y por montos de inversin. Cabe
mencionar que la actualizacin de sta informacin tom fecha
al mes de Agosto de 2013.
Le invitamos a conocer el Catastro de Proyectos Mineros
2013-2014
Los editores
EN CHILE EL 40% DE LA CARPETA DE
INVERSIONES EN MINERA EST EN REVISIN
O HA POSTERGADO SU PUESTA EN MARCHA
4
CATASTRO DE PROYECTOS MINEROS 2013/14
Mining Projects Survey 2013/14

n
d
i
c
e

d
e

c
o
n
t
e
n
i
d
o
s

I
n
d
e
x
1 Captulo / Chapter 1 .......................... 9
Latinoamrica y la minera
/ Latin America and mining
Inversin minera y exploracin en la regin .... 13
/ mining and exploration investment in the region
La regin andina / The andean region ........... 18
El escudo continental de sudamrica ............ 19
/ The South American continental shield
Chile / Chile ................................................... 20
Per / Peru .................................................... 32
Brasil / Brazil ................................................. 37
Argentina / Argentina ..................................... 43
Mxico / Mexico ............................................ 50
Ecuador / Ecuador ........................................ 52
Colombia / Colombia .................................... 53
Tablas / Tables
Tabla 1 / Table 1 ..................................................... 12
Mayores productores sudamericanos de metales
/ Main South American metal producers
Tabla 2 / Table 2 ..................................................... 17
Presupuestos en exploracin (US$ millones)
/ Exploration budgets (US$ million)
Tabla 3 / Table 3 ..................................................... 22
Produccin minera Participacin de Chile en Amrica
Latina y el mundo / Mining production Ranking of
Chile in Latin America and the world
Tabla 4 / Table 4 ..................................................... 23
Produccin minera de metales en Chile
/ Metal mining production in Chile.
Tabla 5 / Table 5 ..................................................... 24
Distribucin sectorial de la inversin extranjera
materializada en Chile 2012 (miles US$)
/ Sectorial distribution of foreign investment
materialized in Chile 2012 (thousand US$)
Tabla 6 / Table 6 ..................................................... 33
Produccin minera de metales en Per
/ Metal mine production in Peru.
Tabla 7 / Table 7 ..................................................... 34
Indicadores econmicos de Per.
/ Economic indicators in Peru.
Tabla 8 / Table 8 ..................................................... 41
Produccin minera en Brasil.
/ Mining production in Brazil.
Tabla 9 / Table 9 ..................................................... 47
Produccin minera en Argentina.
/ Mining production in Argentina.
2 Captulo / Chapter 2 ..................... 55
Proyectos en Chile / Projects in Chile
Principales proyectos / Major projects
Los Pelambres Ampliacin ............................ 56
Pascua Lama ................................................ 58
Codelco Andina 244 ..................................... 65
Collahuasi Expansin .................................... 69
Cerro Casale ................................................. 72
Quebrada Blanca .......................................... 76
Codelco Radomiro Tomic .............................. 79
El Abra Mill Projet .......................................... 82
Caspiche ....................................................... 84
Codelco Chuquicamata Subterrnea ............. 88
Relincho ........................................................ 92
Escondida OGP1 .......................................... 95
Codelco El Teniente Nuevo Nivel ................... 99
Caracoles .................................................... 103
Codelco Ministro Hales ............................... 105
Caserones ................................................... 110
El Morro ...................................................... 115
Telgrafo ..................................................... 118
Sierra Gorda ................................................ 120
Antucoya ..................................................... 122
Otros Proyectos / Other Projects
Lomas Bayas III ........................................... 125
Santo Domingo ........................................... 125
Pampa Hermosa ......................................... 126
Lobo Marte ................................................. 126
Cerro Negro Norte ....................................... 127
5
NDICE DE CONTENIDOS
Index
Volcn ......................................................... 127
Escondida Olap ........................................... 128
Pampa Blanca ............................................. 128
Inca de Oro ................................................. 129
El Espino ..................................................... 129
Ampliacin Produccin kcl .......................... 130
Diego de Almagro ....................................... 130
Nueva Esperanza ........................................ 131
Jernimo ..................................................... 131
SQM Planta Nitratos (Npt4) ......................... 132
Cerro Blanco ............................................... 132
Bellavista ..................................................... 133
3 Captulo / Chapter 3 ................... 135
Proyectos en Per / Projects in Per
Principales Proyectos / Major projects
Las Bambas ................................................ 136
Conga ......................................................... 139
Cerro Verde ................................................. 142
Toromocho .................................................. 145
Quellaveco .................................................. 149
Pampa de Pongo ........................................ 152
Haquira ....................................................... 154
El Galeno .................................................... 157
Opaban ....................................................... 160
Caariaco Norte .......................................... 163
Otros Proyectos / Other Projects
Los Chancas ............................................... 166
Constancia .................................................. 166
Zafranal ....................................................... 167
Los Calatos ................................................. 167
Ro Blanco .................................................. 168
Marcona ..................................................... 168
Chucapaca ................................................. 169
La Granja .................................................... 169
Ta Mara ..................................................... 170
Corani ......................................................... 170
Magistral ..................................................... 171
Marcobre / Mina Justa ................................ 171
Pukaqaqa ................................................... 172
Michiquillay .................................................. 172
Toquepala .................................................. 173
Accha ......................................................... 173
Bayovar ...................................................... 174
Quechua ..................................................... 174
Hilarin ........................................................ 175
Lagunas Norte ............................................ 175
Inmaculada ................................................. 176
Rondon ...................................................... 176
Colquijirca ................................................... 177
Cuajone ..................................................... 177
Ollachea ...................................................... 178
Shahuindo ................................................... 178
Crespo ........................................................ 179
Invicta ......................................................... 179
Alpamarca - Ro Pallanga ............................ 180

4 Captulo / Chapter 4 ................... 181


Proyectos en Brasil / Projects in Brazil
Principales proyectos / Major projects
Carajs ....................................................... 182
Minas Rio .................................................... 185
Apolo ......................................................... 188
Vale do Rio Pardo ....................................... 190
Serra Azul .................................................. 192
Cristalino ..................................................... 194
Jacar ......................................................... 196
Pedra de Ferro ............................................ 199
Salobo II ...................................................... 202
Araguaia ...................................................... 205
Otros Proyectos / Other Projects
Boa Esperana ........................................... 208
Alemo ........................................................ 208
Paragominas III............................................ 209
118 copper ................................................. 209
Serrote de Laje (Ex-Arapiraca) ..................... 210
Tocantinzinho .............................................. 210
Gurupi ......................................................... 211
6
CATASTRO DE PROYECTOS MINEROS 2013/14
Mining Projects Survey 2013/14
Chapada Suruca ...................................... 211
Maracas ...................................................... 212
Mara Rosa .................................................. 212
Pilar ......................................................... 213
Borborema ................................................. 213
Jambreiro .................................................... 214
C1 Santa Luz .............................................. 214
Ernesto / pau a pique .................................. 215
Turmalina .................................................... 215
Cachoeira ................................................... 216
Lavras do Sul .............................................. 216
5 Captulo / Chapter 5 ................... 217
Proyectos en Argentina / Projects in
Argentina
Principales proyectos / Major projects
El Pachn .................................................... 218
Los Azules .................................................. 221
Altar ......................................................... 224
Agua Rica ................................................... 226
Cerro Negro ................................................ 230
Cerro Moro .................................................. 234
Lindero ........................................................ 236
Ro Grande .................................................. 240
Navidad ...................................................... 243
Gualcamayo ................................................ 247
Otros Proyectos / Other Projects
Calcatreu .................................................... 249
Don Nicols ................................................ 249
Taca Taca .................................................... 250
Diablillos ...................................................... 250
San Jorge ................................................... 251
Cap-Oeste .................................................. 251
Cerro Vanguardia ........................................ 252
El Quevar .................................................... 252
Joaqun ....................................................... 253
La Manchuria .............................................. 253
Las Calandrias ............................................ 254
Loma de Leiva ............................................ 254
Vicua ......................................................... 255
6 Captulo / Chapter 6 ................... 257
Otros Proyectos en Latinoamrica
/ Other Projects in Latin America
Principales proyectos / Major projects
Cobre Panam ............................................ 258
Metates ....................................................... 261
Valentines .................................................... 263
Fnix ......................................................... 266
Mirador ....................................................... 268
Otros Proyectos / Other Projects
Mayaniquel .................................................. 270
Buenavista .................................................. 270
Cerrejn ...................................................... 271
El Boleo ...................................................... 271
La Verde ...................................................... 272
7 Captulo / Chapter 7 ................... 273
7.1 Directorio de empresas de ingeniera y
construccin / Directory of Engineering and
Construction
8 Captulo / Chapter 8 ................... 303
8.1 Directorio de empresas junior / Junior
company directory
7
ABREVIACIONES
Nomenclature
Distancia, Superfcie y Volumen
/ Distance, suface and volume
mm Milmetro / Millimeter
m Metro / Meter
km Kilmetro / Kilometer
m
2
Metro cuadrado / Square meter
m Metro cbico / Cubic meter
msnm Metros sobre nivel del mar
masl Meters above sea level
Peso y Medida / Weight and Measure
g Gramo / Gramm
kg Kilogramo / Kilogramm
t Tonelada (mtrica) / Tonne (metric)
kt Kilotonelada / Kilotonne
Mt Millones de toneladas (mtricas)
/ Million tonnes (metric)
oz Onza / Ounce
koz Miles de onzas / Thousand ounces
Moz Millones de onzas / million ounces
lb Libra / Pound
Mlb Millones de libras / Million pounds
Minerales ms comunes / Common minerals
Ca Calcio / Calcium
Cu Cobre / Copper
CuEq Cobre equivalente / Copper equivalent
Cu conc Cobre en concentrado / Copper in concentrate
Cu cat Ctodos de Cobre / Copper cathodes
Au Oro / Gold
AuEq Oro equivalente / Gold equivalent
Ag Plata / Silver
Mo Molibdeno / Molybdenum
Ni Nquel / Nickel
Fe Hierro / Iron
Zn Zinc / Zinc
Pb Plomo / Lead
I
2
Yodo / Iodine
SO
4
Sulfatos / Sulfates
KNO
3
Nitrato de Potasio / Potassium nitrate
TiO
2
Rutilio / Rutile
Fsp Feldespato / Feldspar
conc en concentrado / in concentrate
cat en ctodos / in cathodes
Concentracin y Tasa de Produccin
/ Concentration and Production Rate
ppm Partes por milln / Parts per million
gpt Gramos por tonelada / Grammes per tonne
tph Toneladas mtricas por hora
/ Metric tonnes per hour
tpd Toneladas mtricas por da
/ Metric tonnes per day
tpm Toneladas mtricas por mes
/ Metric tonnes per month
tpa Toneladas mtricas por ao
/ Metric tonnes per year
oz/a Onzas por ao / Ounces per year
Moz/a Millones de onzas por ao
/ Million ounces per year
Procesos e Insumos / Processes and consumables
g/L Gramos por litro / Grams per liter
kg/L Kilogramos por litro / Kilogrammes por liter
l/s Litros por segundo / Liters per second
l/m Litros por mes / Liters per month
kV Kilovoltios
kVA Kilovoltio-amperios
MWh Megawatt-horas / Megawatt-hours
Procesos de Produccin / Production Processes
Flot Flotacin / Flotation
Lix Lixiviacin / Leaching
SX Extraccin por solventes / Solvent extraction
EW Electro-obtencin / Electro-winning
Moneda y Precios / Currency and Prices
US$ Dlares Estados Unidos / US dollars
MUS$ Millones de dlares / Million dollars
US$/lb Dlares por libra / Dollars per pound
Tipo de Sociedades y Cargos
/ Type of Company and Positions
Ca. Compaa / Company
Ltda. Responsabilidad Limitada / Limited
S.A. Sociedad Annima / Incorporated
SCM Sociedad Contractual Minera / Contract Mining Company
VP Vicepresidente / Vice president
s/a sin antecedentes / not available
Abreviaciones
/ Nomenclature
CATA S T R O D E
MI NE R OS
PROYECTOS
MINING PROJECTS SURVEY
www.mch.cl
2013
/14
C A P T U L O 1
LATINOAMRICA
Y LA MINERA
LATI N AMERI CA
AND MI NI NG
Figura 1.1 Todos los pases de Latinoamrica explotan recurso minerales, sin embargo solo algunos se pueden llamar pases de trascendencia minera, y otros pases emergentes. Latinoamrica posee grandes
reservas metlicas, cobre (40%), oro (16,8%), plata (40,9%), hierro (13%) y manganeso (17,5%) entre otros. Fuertes recursos que pueden ser explotados, y estos se traducen en nuevos proyectos.
En el siguiente catastro se muestran los principales proyectos mineros en Latinoamrica.
Figure 1.1: All Latin American countries exploit mineral resources; however, only some countries can be called of mining importance, and others emerging countries. Latin America has large metal reserves such as
copper (40%), gold (16.8%), silver (40.9%), iron (13%), and manganese (17.5%), among others. Strong resources that can be exploited and the results are new projects.
Below is the record of the main mining projects in Latin America.
BOLIVIA
PARAGUAY
La Paz
Sucre
Brasilia
Caracas
Bogot
Monterrey
OCANO
ATLNTICO
MAR
CARIBE
OCANO
PACFICO
Santiago
Lima
Quito
Asuncin
AMRICA DEL SUR
AMRICA CENTRAL
AMRICA DEL NORTE
PER
ECUADOR
CHILE
URUGUAY
ARGENTINA
Montevideo Buenos Aires
BRASIL
VENEZUELA
GUYANA
COLOMBIA SURINAME
Paramaribo
Georgetown
GUATEMALA
MEXICO
Flores
12
CATASTRO DE PROYECTOS MINEROS 2013/14
Mining Projects Survey 2013/14
apoy en la creciente y constante demanda de minerales por economas
emergentes, como es el caso de China e India, escenarios en los que
se observaron precios histricos de minerales, mantenindose hasta
mediados de 2012, momento en que se evidenci un desplome en
la demanda de minerales, repercutiendo en la baja de los precios. Sin
embargo y a pesar de este panorama, las inversiones en Latinoamrica
no se vieron afectadas, lo que se tradujo en que el continente capt el
25,4% del total global, seguido por frica con un 16,6%
El presente 2013 se ha mostrado como una continuacin y agu-
dizacin del panorama. A la baja en la demanda de commodities se
suman nuevas restricciones a la puesta en marcha de nuevos proyec-
tos mineros, siendo las principales razones el aumento de los costos
de extraccin, nuevas y ms extrictas normativas medioambientales,
localizacin de estos proyectos cerca de comunidades, entre otros.
A pesar de lo anterior, Latinoamrica mantiene el estatus de
slido productor de minerales y commodities en general, lo que
mantiene el inters de los grandes jugadores globales de la minera
en apostar en la regin.
the industrial activity. The recovery of the industry (2009)
was based on the steadily increasing demand for minerals
from emerging economies such as China and India, moment
where historical prices of minerals was observed, staying
until mid-2012, when evidenced a slump in demand for
minerals, which infuence the price declines. However, and
despite this scenario, investments in Latin America were not
affected, which meant that the continent captured 25.4% of
the global total, followed by Africa with 16.6%
This 2013, is shown as a continuation and intensifca-
tion of the outlook. Added to the low demand for commodities,
there are new restrictions on the implementation of new min-
ing projects, the main reasons for the increase in extraction
costs, new and strictest environmental regulations, and the
location of these projects near communities, among others.
Despite this, Latin America remains as a solid minerals
and commodities producer in general, keeping the interest of
large global players bet on mining in the region.
TABLA 1.1 / TABLE 1.1
MAYORES PRODUCTORES SUDAMERICANOS DE METALES
MAIN SOUTH AMERICAN METAL PRODUCERS
METAL PAS PRODUCCIN 2012 RANKING RANKING SUDAMRICA
/ COUNTRY / COUNTRY / PRODUCTION MUNDO / WORLD / SOUTH AMERICA
Aluminio / Alumina (ton) Brasil / Brazil 1.338.000 8 1
Cobre / Copper (ton) Chile 5.484.710 1 1
Per / Peru 1.298.564 3 2
Estao / Tin (ton) Per / Peru 26.105 3 1
Bolivia 20.000 4 2
Brasil / Brazil 7.339 5 3
Hierro / Iron Ore (Mt) Brasil / Brazil 375 3 1
Litio / Lithium (ton) Chile 13.000 1 1
Argentina 2.700 4 2
Brasil / Brazil 490 7 3
Manganeso / Manganese (ton) Brasil / Brazil 1.100 5 1
Molibdeno / Molybdenum (ton) Chile 34.793 3 1
Per / Peru 16.790 4 2
Nquel / Nickel Brasil / Brazil 43.100 9 1
Niobio / Niobium (ton) Brasil / Brazil 63.000 1 1
Oro / Gold (ton) Per / Peru 147 6 1
Plata / Silver (ton) Per / Peru 3.171 3 1
Chile 1.195 8 3
Plomo / Lead (ton) Per / Peru 248.659 4 1
Tantalita / Tantalum (ton) Brasil / Brazil 180 2 1
Zinc / Zinc (ton) Per / Peru 1.280.975 3 1
Fuente / Source: USGS Mineral Commodity Service, COCHILCO y EDITEC.
www.mch.cl
2013
/14
C A P T U L O 2
CHILE
CHI LE
56
CATASTRO DE PROYECTOS MINEROS 2013/14 CHILE
Mining Projects Survey 2013/14

L
o
s

P
e
l
a
m
b
r
e
s
A
m
p
l
i
a
c
i

n
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t
En la cordillera de los Andes, cercano al pueblo de Salamanca (Regin
de Coquimbo).
In the Andes mountains, near the town of Salamanca (Coquimbo Region).
Mapa de Ubicacin / Map of Location

Razn social / Company : Minera Los Pelambres
Domicilio / Address : Av. Apoquindo 4001, Piso 18
Ciudad / City : Santiago
Pas / Country : Chile
Telfono / Telephone : (56-2) 27987000
Fax : (56-2) 27984181
Internet : www.pelambres.cl
E-mail : cvillela@pelambres.cl

EJECUTIVOS A CARGO / Executive Staff
Gerente General : Alberto Cerda Merey
/ General Manager
Gerente
de Operaciones : Jaime Guzmn
/ Operations Manager
Gerente de Proyecto de
Expansin : Juan Carlos Alarcn F.
/ Expansion Project Manager

Propiedad / Ownership : Antofagasta Minerals 60%
Nippon LP Resources B.V. 25%
MM LP Holding B.V. 15%
Minerales / Minerals : Cu, Mo, Au
Recursos / Resources : 1.488,1 Mt @ 0,62% Cu;
0,025% Mo; 0,03 gpt Au
Reservas / Reserves : 1.650,1 Mt @ 0,61% Cu;
0,020% Mo; 0,03 gpt Au
Los Pelambres
Chile - Principales Proyectos
Ampliacin Los Pelambres
/ Expansion Los Pelambres
Etapa actual : Postergado
/ Actual stage : Standby
Objetivo : Elevar produccin desde las 400.000 tpa a 750.000 tpa.
/ Objective : Increase production from 400,000 tpy to 750,000 tpy.
Inversin (millones de US$) : 10.000
/ Investment (million US$)
Produccin anual : 400.000 tpa Cu
/ Annual production
Puesta en marcha : s/a
/ Start-up
Ley de Corte
/ Cut-off grade : 0,35% Cu
57
CAPTULO 2 PRINCIPALES PROYECTOS
Major projects

Chile - Principales Proyectos
MINERA LOS PELAMBRES cuenta con un depsito cuprfero
ubicado en la cordillera de los Andes cercano al lmite con Argentina
en la comuna de Salamanca (Regin de Coquimbo).
La compaa pertenece en un 60% a Antofagasta Minerals (Grupo
Luksic) y en un 40% a un grupo japons integrado por Nippon LP Resou-
rces B.V. (25%) y MM LP Holding B.V. (15%). El proyecto Los Pelambres
se construy en 23 meses, entre diciembre de 1997 y noviembre de
1999, y desde sus inicios se han realizado trabajos de optimizacin en
sus instalaciones, que han permitido aumentar de manera sustentable
su capacidad de tratamiento desde las 85.000 tpd iniciales a las cerca
de 175.000 tpd obtenidas como promedio anual de tratamiento diario
actualmente. En 2002 se iniciaron los trabajos de optimizacin de las
instalaciones para obtener una capacidad de tratamiento de 114.000
a 120.000 toneladas de mineral por da.
En 2004 se obtuvo la aprobacin del Estudio de Impacto Ambiental
del Proyecto Integral de Desarrollo, para explotar un total de 2.100
millones de toneladas de mineral, ampliando la vida til de 30 a casi 50
aos, y para aumentar la capacidad de tratamiento hasta 175.000 tpd.
A inicios de 2007 se complet el Proyecto de Repotenciamiento
Fase 1 a 130.000 tpd y a fnes de 2008 un nuevo depsito de relaves
en el sector de El Mauro inici sus operaciones. Como parte de su
Proyecto Integral de Desarrollo, la compaa realiz una ampliacin de
su capacidad que permite procesar 175.000 toneladas de tratamiento
diario como promedio anual, cuya construccin requiri una inversin
de aproximadamente US$ 1.000 millones (realizada principalmente
en 2009) y cuya puesta en marcha se complet el primer semestre de
2010. Esta ampliacin le permite producir 90.000 toneladas adicionales
de cobre fno en los prximos quince aos, a partir de 2010.
El actual proyecto de ampliacin busca nuevamente un aumento
de produccin, de 400.000 toneladas por ao a casi el doble este no
estara operando antes de 2019. Se espera que los estudios de facti-
bilidad se encuentren listos para 2014, comenzando la construccin
el mismo ao.
El ambicioso proyecto de expansin actualmente se encuentra
postergado debido al aumento de los costos.
MINERA LOS PELAMBRES has a copper deposit
located in the Andes near the border with Argentina in
the town of Salamanca (Coquimbo Region).
The company owned 60% by Antofagasta Miner-
als (Luksic Group) and 40% to a Japanese group Nippon
LP Resources composed BV (25%) and MM LP Holding
B.V. (15%). The project Pelambres was built in 23
months between December 1997 and November 1999,
and since its inception has been made optimization
work on their premises, which have increased sustain-
ably its treatment capacity from 85,000 tpd to initial the
approximately 175,000 tpd obtained as annual average
daily treatment today. In 2002 work began on site opti-
mization for a treatment capacity of 114,000 120,000
tons of ore per day.
In 2004 the project obtained the approval of the
Environmental Impact Assessment Comprehensive
Development Project, to operate a total of 2,100 million
tonnes of ore, extending the life of 30 to almost 50 years,
and to increase treatment capacity to 175,000 tpd .
In early 2007 was completed Phase Repowering
Project 1-130,000 late 2008 tpd and a new tailings dam
in the area of El Mauro began operations. As part of its
Comprehensive Development Project, the company
undertook an expansion of its capacity to process
175,000 tons of annual average daily treatment, whose
construction required an investment of approximately
$ 1,000 million, mainly conducted in 2009 - and whose
start-up was completed the rst half of 2010. This
extension allows you to produce 90,000 additional tons
of ne copper in the next fteen years, from 2010.
The current expansion project seeks to increase
production again, 400,000 tons per year to nearly
double; this would not be operational before 2019. It
is expected that feasibility studies are ready for 2014,
beginning construction the same year.
The ambitious expansion project is currently
delayed due to rising costs.
Descripcin del Proyecto
Project description
EL PROYECTO COMPLETO SUMAR UN MONTO DE
INVERSIN QUE ASCIENDE A US$10.000 MILLONES.
58
CATASTRO DE PROYECTOS MINEROS 2013/14 CHILE
Mining Projects Survey 2013/14
50 km al sureste de Vallenar, Comuna Alto del Carmen, Regin de Ata-
cama, Chile; 300 km al noroeste de la ciudad de San Juan, Provincia de
San Juan, Argentina; -4.600 5.000 msnm.
50 km southeast of Vallenar, Region of Atacama, Chile; and 300 km
northwest of the city of San Juan, San Juan Province, Argentina; 4,200-
52000 masl.
Mapa de Ubicacin / Map of Location
Etapa actual : Construccin
/ Actual stage : Construction

Razn Social Chile : Compaa Minera Nevada
/ Company Chile S.A. (Barrick Gold)
Razn Social / Company : Barrick Gold
Domicilio / Address : Av. Ricardo Lyon 222, Piso
8, Providencia
Ciudad / City : Santiago
Pas / Country : Chile
Telfono / Telephone : (56-2) 2340 2022
Fax : ((56-2) 2340 2062
Internet : www.barrick.com
E-Mail : info@barrick.com

EJECUTIVOS A CARGO / Executive Staff
Gerente de Construccin : Brayan Bradley
/ Construction Manager

Propiedad / Ownership : Barrick Gold 100%
Objetivo : Explotacin a rajo abierto
de un yacimiento de oro,
plata y un porcentaje
contenido menor de cobre
y posterior tratamiento del
mineral mediante fotacin
y lixiviacin.
/ Objective : Open cut exploitation of a gold
and silver deposit, with lower
copper content and later ore
treatment through otation and
lixiviation.
Minerales / Minerals : Au, Ag, Cu.
Reservas Probadas : 18,3 Moz Au, 689 Moz Ag,
y Probables 565 Mlb Cu
/ Proven & Probable Reserves
Inversin (US$ millones) : 8.500
/ Investment (US$ million)
Pascua Lama
Produccin anual : 800.000 - 850.000 oz Au,
/ Annual production 35 Moz Ag.
Puesta en marcha : Indefnido
/ Start-up
Vida til (aos) : 25
/ Life time (years)
Camino / Road
P
a
s
c
u
a

L
a
m
a
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t
www.mch.cl
2013
/14
C A P T U L O 3
PER
PERU
136
CATASTRO DE PROYECTOS MINEROS 2013/14 PER
Mining Projects Survey 2013/14
L
a
s

B
a
m
b
a
s
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t

72 km de la ciudad de Cuzco, Departamento de Apurmac
72 km from the city of Cusco, Apurimac Department
Mapa de Ubicacin / Map of Location
Etapa actual : Construccin
/ Actual Stage : Construction

Razn Social / Company : Xstrata Per S.A.
Domicilio / Address : Calle Monte Rosa 271 Of.
7B Centro Empresarial,
Chacarilla del Estanque,
Santiago de Surco
Ciudad / City : Lima
Pas / Country : Per
Telfono / Telephone : (51-1) 372 2233
Fax : (51-1) 372 8272
(51-1) 217 1111
Internet : www.lasbambas.com
www.glencorexstrata.com

EJECUTIVOS A CARGO / Executive Staff
VP Ejecutivo Divisin : Luis Rivera
Operaciones Per
E-mail : lrivera@xstratacopper.com.pe

Propiedad / Ownership (%) : Glencore Xstrata plc
Objetivo : Explotacin a rajo abierto
de yacimiento de cobre
con contenidos de molib-
deno y oro; adems de la
construccin de planta de
tratamiento de minerales.
/ Objective : Open-pit mining of a copper
deposit with contents of molyb-
denum and gold; furthermore,
construction of a mineral
treatment plant.
Minerales / Minerals : Cu, Mo, Au
Recursos Medidos : 1.210 Mt @ 0,66% Cu; 173
e Indicados ppm Mo; 0,05 gpt Au;3,3
/ Measured and Indicated gpt Ag
Resources
La Bambas
Recursos Inferidos : 500 Mt @ 0,50% Cu; 145
/ Inferred Resources ppm Mo; 0,03 gpt Au; 2,4
gpt Ag
Ley de Corte : 0,20% Cu
/ Cut-off grade
Inversin : 5.200
(Millones de US$
/ Investment (Million US$)
Produccin anual : 315.000 tpa Cu
/ Annual Production
Puesta en Marcha : Q1 2015
/ Start-up
Vida til (aos) : 20
/ Life time (years)
Camino / Road
Per - Principales Proyectos
137
CAPTULO 3 PRINCIPALES PROYECTOS
Major projects
Descripcin del Proyecto
Project description
EN AGOSTO DE 2004 Xstrata se adjudic el derecho de explorar y
desarrollar el proyecto Las Bambas, despus de un proceso de licitacin
internacional competitivo realizado por ProInversin, agencia que tiene
por objetivo, fomentar la inversin en Per.
El proyecto se encuentra a una altura entre 3.700 a 4.650 metros
sobre el nivel del mar, en las provincias de Cotabambas y Grau, regin
de Apurmac, 75 kilmetros al suroeste de la ciudad de Cuzco.
El proyecto minero Las Bambas cubre 35.000 hectreas e incluye
las concesiones mineras de Ferrobamba, Chalcobamba y Sulfobamba.
Los yacimientos de cobre son del tipo skarn con una minerali-
zacin probable tipo prfdo con sulfuros y xidos de cobre y hierro.
Adems, presenta una mineralizacin aurfera con potencial para
ser explorada.
IN AUGUST 2004, Xstrata was awarded the right to
explore and develop Las Bambas project after an interna-
tional bidding process called by ProInversin, an agency
whose purpose is to promote investment in Peru.
The project is located at 3,700 to 4,650 meters
above sea level, in the Districts of Cotabambas and Grau,
Apurimac Region, 75 Km south-west from Cuzco.
Las Bambas mining project covers 35,000 hectares
and includes Ferrobamba, Chalcobamba, and Sulfobamba
mining leases.
Deposits are of the skarn type, with a probable
mineralization of the porphyry type, with copper and iron
sulphide and oxides. In addition, it presents gold mineral-
ization with exploration potential.
Las Bambas current mineral resources are estimated
in 1.21 billion tons copper mineralization with 0.66% copper
grade, using a copper grade cut-off of 0.2%. The deposit in-
cludes signicant contents of gold, silver, and molybdenum
sub-products. Mineral resources estimates were updated
in 2011 based on the results from 28,000 meter drilling
during 2010. The economic pits had been updated using
the measured, indicated and inferred, and the long-term
price of metals, as well as new cost assumptions. All other
modifying factors are the same as in the feasibility study.
In August 2010, after the approval of the feasibil-
ity and environmental impact studies in June 2010, the
company started executing Las Bambas copper project, of
great mining importance, low operation cost, with a long
estimated useful life.
The development of the project represents an invest-
ment of 5.200 billion, is currently under construction.
Las Bambas will be a rst-level copper mine, with an
initial production of 400,000 annual tons copper contained
in concentrates and important gold, silver, and molybde-
num sub-products. The company expects the rst rock is
processed at the end of 2014 with ramp - up for 2015. The
mine lifetime is estimated at 20 years with a signicant
future growth potential.
EL DESARROLLO DEL PROYECTO REPRESENTAR
UNA INVERSIN DE 5.200 MILLONES DE DLARES.

Los recursos minerales actuales de Las Bambas se estiman en
1.210 millones de toneladas de mineralizacin de cobre con una ley
de 0,66% Cu, usando una ley de corte de 0,2%, e incluye importantes
contenidos de subproductos de oro, plata y molibdeno. Las estimacio-
nes de los recursos minerales fueron actualizadas en mayo de 2011 e
incorporan los resultados de 28.000 metros de perforacin realizados
durante 2010. Los pits econmicos fueron actualizados en base a los
recursos medidos, indicados e inferidos y el precio a largo plazo de los
metales, como tambin nuevos supuestos de costos. Todos los otros
factores modifcantes son los mismos que en el estudio de factibilidad.
En agosto de 2010, y tras la aprobacin de los estudio de factibi-
lidad e impacto ambiental en junio de 2010, la Compaa dio el vamos
al desarrollo del proyecto cuprfero Las Bambas, el cual posee una gran
envergadura minera, bajo costo de operacin y se estima una larga vida
de operacin en la faena.
El desarrollo del proyecto representar una inversin de 5.200 millo-
nes de dlares, encontrndose actualmente en etapa de construccin.
Las Bambas ser una mina de cobre de primer nivel con una
produccin inicial de 400.000 toneladas anuales de cobre contenido
en concentrados, incluyendo importantes subproductos de oro, plata y
molibdeno. La compaa espera que la primera roca se procese a fnes
Per - Principales Proyectos
138
CATASTRO DE PROYECTOS MINEROS 2013/14 PER
Mining Projects Survey 2013/14
de 2014 con ramp - up durante 2015. La vida til de la mina se estima
en 20 aos con un potencial de expansin futuro importante.
Ubicados a una distancia de 150 kilmetros, los proyectos Las
Bambas y Antapaccay se benefciarn de importantes sinergias. Los
concentrados de Las Bambas se bombearn a travs de un minero-
ducto de 215 kilmetros a una planta de molibdeno y de fltrado cerca
de Tintaya-Antapaccay, para luego ser transportados por la misma va
frrea al Puerto de Matarani.
Estos proyectos tambin compartirn la red vial existente en Tintaya,
una va de conexin a lo largo del corredor del mineroducto, un centro
de logstica establecido en Arequipa y las ampliadas instalaciones del
Puerto de Matarani.
El mineral se extraer a una tasa de 51,1 millones de toneladas
por ao, proveniente de tres minas de rajo abierto (inicialmente del rajo
Ferrobamba, y despus de los rajos Chalcobamba y Sulfobamba), y se pro-
cesarn 140.000 toneladas al da en la planta concentradora de sulfuros.
Para la aprobacin de la fusin de Glencore y Xstrata por parte
del Gobierno de China, el Ministerio de Comercio de China exigi a la
nueva compaa la venta del proyecto Las Bambas para as limitar su
capacidad de intervencin en el mercado de metales. Chinalco, empresa
de capitales chinos, estara interesadas en adquirir el proyecto.
El desarrollo de Las Bambas generar un promedio de aproximada-
mente 3.600 puestos de trabajo directos durante la construccin y 1.350
puestos de trabajo permanentes una vez que entre en operacin.
Located at 150 Km distance, Las Bambas and
Antapaccay project will benet from important synergies.
Las Bambas concentrates will be pumped through a 215
Km long ore slurry pipeline to molybdenum and ltering
plant near Tintaya Antapaccay, and then transported by rail
to the port of Matarani.
These projects will also share the road network
existing in Tintaya, a connection line along the ore slurry
pipeline, a logistics center in Arequipa, and the expanded
port facilities in Matarani.
Mineral will be extracted at an annual rate of 51.1
million tons, and will come from three open pit mines (ini-
tially from Ferrobamba pit, and later from the Chalcobamba
and Sulfobamba pits). The sulphide concentrator plant will
process 140,000 tons a day.
For the approval of the merger between Glencore and
Xstrata by the Government of China, the Ministry of Com-
merce of China demanded that the new company selling
the project Bambas thereby limiting its ability to intervene
in the metal market. Chinalco Chinese owned company,
would become interested in acquiring the project.
The development of Las Bambas will generate an
average of approximately 3,600 direct jobs during con-
struction and 1,350 permanent jobs once in operation.
Obras Principales / Main tasks
F
i
c
h
a

T

c
n
i
c
a
T
e
c
h
n
i
c
a
l

s
h
e
e
t
Presa de relaves
Ocinas administrativas
Carreteras
Campamentos mineros
Servicios elctricos
Sistemas de comunicacin (telefona celular)
Servicios sanitarios (alcantarillado)
Tailings dams
Administrative ofces
Highways,
Permanent mining camps
Electricity services
Communication systems (cellular telephony)
Sanitation (sewers).
MANO DE OBRA
/ WORK FORCE
ETAPA / STAGE N TRABAJADORES / WORKERS
Construccin / Construction 3.600
Operacin / Operation 1.350
139
CAPTULO 3 PRINCIPALES PROYECTOS
Major projects
C
o
n
g
a
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t

75 km al noreste de Cajamarca, Provincia de Celendin, Departamento de
Cajamarca.
75 km. Norteast of Cajamarca, Celendin province, Cajamarca De-
partment.
Mapa de Ubicacin / Map of Location
Etapa actual : Estudio. Factibilidad
/ Actual Stage : Study. Feasibility
Razn Social / Company : Minera Yanacocha
Domicilio / Address : Av. Camino Real 348,
Torre del Pilar, piso 10,
San Isidro
Ciudad / City : Lima
Pas / Country : Per
Telfono / Telephone : (51-1) 215-2600
Fax : (51-1) 215-2610
Internet : www.newmont.com
www.yanacocha.com.pe
E-mail : omar.jabara@newmont.com
EJECUTIVOS A CARGO / Executive Staff
VP Newmont para
Sudamrica : Todd White
/ VP Newmont South America
VP, Gerente : Javier Velarde
General Per
/ VP, General Manager Peru
Propiedad / Ownership (%) : Newmont Mining
Corporation 51.35%
Buenaventura 43.65%
Corporacin Financiera
Internacional 5%
Objetivo : Explotacin de yacimiento de
cobre y oro y construccin
de planta concentradora.
/ Objective : Mining of copper and gold
deposit and construction of
concentrating plant.
Minerales / Minerals : Cu, Au.
Reservas Probadas : 535,93 Mt @ 0,73 gpt Au;
y Probables 2,2 gpt Ag; 0,28% Cu
/ Proven and Probable Reserves
Recursos Medidos : 157,94 Mt @ 0,40 gpt Au;
e Indicados 1,6 gpt Ag; 0,19% Cu
/ Measured and Indicated Resources
Conga
Recursos Inferidos : 230,57 Mt @ 0,39 gpt Au;
/ Inferred Resources 1,1 gpt Ag; 0,19% Cu
Inversin
(millones de US$) : 4.800
/ Investment (Million US$)
Produccin anual : 54.000 tpa Cu; 680.000 oz Au
/ Annual Production
Puesta en marcha : Suspendido
/ Start-up
Vida til (aos) : 19
/ Life time (years)
Camino / Road
www.mch.cl
2013
/14
C A P T U L O 4
BRASIL
BRASI L
182
CATASTRO DE PROYECTOS MINEROS 2013/14 BRASIL
Mining Projects Survey 2013/14
C
a
r
a
j

s

S
e
r
r
a

S
u
l

(
S
1
1
D
)
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t
Brasil - Principales Proyectos
780 km al suroeste de Sao Luis, en el sur de Carajs, Estado de Par
780 km southwest of Sao Luis, in southern Carajs, State of Par
Mapa de Ubicacin / Map of Location
Etapa actual : Factibilidad
/ Actual Stage : Feasibility

Razn Social / Company : Companhia Vale do
Rio Doce
Domicilio / Address : Avenida Graca Aranha,
No. 26
Ciudad / City : Rio de Janeiro
Pas / Country : Brasil
Telfono / Telephone : (55-91) 3327 4705
Internet : www.vale.com
Telfono / Telephone : (55-91) 3214 5432
E-mail : info@vale.com

EJECUTIVOS A CARGO / Executive Staff
Gerente de Proyectos : Gilberto Acevedo
/ Project Manager
Comunicaciones : Lvia Amaral
/ Communication

Propiedad / Ownership : Vale 100%
Objetivo : Expansin de la mina de
hierro, la construccin de
una planta de proceso y
una ferrova de 104 km de
largo.
/ Objective : Contruction of an iron mine,
construction of a processing
plant and a 104-km long
railroad.
Minerales / Minerals : Fe
Reservas probadas : 4.240 Mt @ 66,7% Fe
y probables
/ Proven and probable reserves
Carajs
130 Mtpa
Camino / Road
Inversin : 19.297
(millones de US$)
/ Investment (million US$)
Produccin anual : 90 Mtpa Fe
/ Annual production
Puesta en marcha : 2016
/ Start-up
Vida til : 50
/ Life of Mine
183
CAPTULO 4 PRINCIPALES PROYECTOS
Major projects
Brasil - Principales Proyectos
Descripcin del Proyecto
Project description
CARAJS SERRA SUL es considerado el proyecto tipo greenfeld
ms grande en la historia de Vale y el proyecto de hierro ms grande
del mundo.
Ubicado en el sur de Carajs, Estado de Par, se proyecta la
construccin de una operacin con una capacidad de 90 Mtpa de Fe.
Ello implicara el desarrollo de la mina y la construccin de una planta de
proceso que tendr tres mdulos con una capacidad unitaria de 30 Mtpa
de Fe, correspondiente a una parte del proyecto denominado S11D.
Una de las grandes innovaciones que pretende implementar Vale
en esta operacin es el proceso de extraccin del material, el que se
realizar mediante un sistema de correas (sistema truck-less) desde la
mina a la planta, reduciendo considerablemente la emisin de CO2 de
los camiones.
La otra parte del proyecto S11D CNL aumentara la infraestruc-
tura logstica necesaria para la operacin. Entre las obras se destaca la
construccin de una ferrova de 104 km de largo, la construccin de un
nuevo muelle en el terminal embarcadero de Ponta Madeira en el Estado
de Maranho, y la instalacin de nuevas placas giratorias de ferrova y
equipos de carga para barcos.
Para su implementacin la empresa subi su millonaria inversin a
US$ 11.297 millones desde los anteriores US$ 10.094 millones.
En el ao 2011 la compaa destino US$ 1.162 millones, al encon-
trarse en la fase ms intensa de gastos de capital. Del total destinado
para este ao US$ 1.017 sern invertidos en el proyecto Serra Sul S11D
y US$ 155 en el proyecto Serra Sul CNL S11D.
Las operaciones comienzan con la extraccin del mineral, para
posteriormente ser transportado a las chancadoras; el mineral ya chan-
cado alimenta las cintas transportadoras, las que a su vez alimentan la
planta de procesamiento. En todo el trayecto, 37 kilmetros de cintas
transportadoras distribuidas alrededor del rea, constituidas por una lnea
principal tronco de 9.5 km. Mediante el uso de cintas transportadoras
se lograrn reducciones signifcativas en el consumo de aceite diesel,
las emisiones de partculas y la generacin de los residuos tales como
neumticos, fltros y lubricantes. Adems, utilizando cintas transportadoras
se evita hacer grandes intervenciones al bosque.
CARAJS SERRA SUL is considered to be the larg-
est greeneld project in the history of its owner Vale and
the longest iron ore project in the world.
Located on the southern range of Carajs, in the
state of Par, the initiative comprises the construction
of an operation with a capacity of 90 million Mtpy of Fe.
This implies the mine development and construction of a
process plant with three modules with a 30 Mtpy unit ca-
pacity, corresponding to a part of the project called S11D.
One of the large innovations VALE plans to implement
in this operation is the material extraction process, which will
be through a belt system (truckless system) from the mine to
the plant, considerably reducing trucks CO2 emissions.
The other part of the project, S11D CNL, would
increase the logistics infrastructure necessary for opera-
tions. Construction of a 104 Km long railway, a new jetty
in Ponta Madeira terminal, State of Maranho, and the
installation of new railway rotating plates and vessel
loading equipment outstand among the works.
For its implementation, the company increased its
investment from $10.094 billion to $11.297 billion.
For 2011, the company has assigned $1.162 billion,
as this is the most intense capital expenditure stage.
From the total assigned for this year, $1.017 billion will
be invested in the Serra Sul S11D project and $155 in the
Serra Sul CNL S11D project.
Operations begin with the extraction of mineral
and then are transported to the crusher, ore crusher and
conveyor feeds, who in turn feed the processing plant.
Throughout the journey, 37 miles of conveyors distributed
around the area, consisting of a main trunk line 9.5 km
By using conveyor belts, were achieved signicant reduc-
tions in diesel oil consumption, emissions and particulate
generation of waste such as tires, lters and lubricants.
In addition, using conveyor belts to avoid making major
interventions forest.
Furthermore, the water consumption is reduced by
93% compared with conventional process. This saving
INVERSIN 19.297 (MILLONES DE US$)
185
CAPTULO 4 PRINCIPALES PROYECTOS
Major projects

En el Estado de Minas Gerais.
In Minas Gerais State
Mapa de Ubicacin / Map of Location
MINAS GERAIS
Belo
Horizonte
Baha
Gois
Sao Paulo
Tocantins
OCANO
ATLNTICO
Etapa actual : Construccin
/ Actual stage : Construction
Razn Social / Company : Anglo American Brasil
Ltda. (Anglo Ferrous Brazil)
Domicilio / Address : Av. Paulista 2300, 10 andar
Ciudad / City : So Paulo
Pas / Country : Brasil
Telfono / Telephone : (55-11) 2125-7555
Fax : (55 11) 2125-7500
Internet : www.angloamerican.com.br
Propiedad / Ownership : Anglo American 100%
Objetivo : Explotacin de mineral
ferroso a rajo abierto y
la construccin de una
planta de proceso para
producir pellet feed de alto
grado.
/ Objective : Iron ore exploitation in an open
pit and construction of a bene-
ciation plant producing high
grade pellet feed.
Minerales / Minerals : Fe
Recursos medidos : 244,2 Mt @ 41,7% Fe
(1)
e indicados / Measured 1.370,5 Mt @ 37.6% Fe
(2)
and indicated resources
Reserva : 5.800 Mton
/ Reserves
Ley de corte / Cut-off grade : 25% Fe
Inversin
(millones de US$) : 8.800
/ Investment (million US$)
Produccin anual : 26,5 Mtpa Fe pellet feed
/ Annual production
Minas Ro
Puesta en marcha : 2014-Q4
/ Start-up
Vida til (aos) : 20+
/ Life time (years)
(1)
Depsito Serra do Sapo / Serra do Sapo deposit
(2)
Depsito Itapanhoacanga / Itapanhoacanga deposit
Camino / Road
M
i
n
a
s

R
i
o
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t
www.mch.cl
2013
/14
C A P T U L O 6
LATINOAMRICA
LATI N AMERI CA
258
CATASTRO DE PROYECTOS MINEROS 2013/14 LATINOAMRICA
Mining Projects Survey 2013/14

PANAM
C
o
b
r
e

P
a
n
a
m

P
r
o
y
e
c
t
o
P
r
o
j
e
c
t
Situado en el Distrito de Donoso, Provincia de Coln, Repblica de Pana-
m a solo 120 kilmetros al oeste de la Ciudad de Panam.
Located in the District of Donoso, Province of Colon, Republic of Panama
just 120 miles west of Panama City.
Mapa de Ubicacin / Map of Location
Razn social / Company : Minera Panam S.A.
Domicilio / Address : Torre de las Amricas,
torre a, piso 20 punta
pacfca
Ciudad / City : Panam
Pas / Country : Panam
Telfono / Telephone : +507 294-5700
Fax : +507 294- 5701
Internet : www.minerapanama.com
E-mail : contacto@minerapanama.com

EJECUTIVOS A CARGO / Executive Staff
Director ejecutivo : Steven D. Botts.
y presidente
/ CEO and President

Propiedad / Ownership : First Quantum Minerals
85%
Minerales / Minerals : Cu, Au, Mo
Reservas / Reserves : 11.793 ton Cu 7,3 Moz
Ley de Corte : 0.15% Cu
/ Cut-off grade
Inversin : 6.200
(Millones de US$)
/ Investment (Million US$)
Produccin annual : 260.850 tpa Cu
/ Annual production 94.600 ozpa Au
2.525 tpa Mo
Puesta en marcha : 2017
/ Start-up
Vida til (aos) : 40
/ Life time (years)
Cobre Panam
Latinoamrica - Principales Proyectos Panam
259
CAPTULO 6 PRINCIPALES PROYECTOS
Major projects

EL PROYECTO COBRE PANAM es el ms grande de dicho
pas e incluso de Centroamrica, y uno de los ms grandes del mundo.
Durante el mes marzo de 2013 la mayor parte de las acciones (85%)
de propiedad de Inmet fueron compradas por First Quantum, corres-
pondiendo esta oferta a US$ 5.100 millones, con lo que First Quantum
proyecta llegar a tasas productivas cercanas a 1,3 millones de toneladas
de cobre para el ao 2018.
El tipo de mineralizacin de este yacimiento se clasifca como un
prfdo cobre con oro y molibdeno. Este cuerpo mineralizado se ubica
en el centro de Panam, y fue descubierto en el ao 1698. Su ubicacin
es a 120 km hacia el oeste de la ciudad de Panam y 20 km de la costa
caribea, en el distrito de Donoso, provincia de Coln, Panam.
El proyecto total posee una extensin aproximada de 5.900 hectreas.
El proyecto muestra interesantes reservas; a fnes del ao 2012
estas aumentaron cerca de un 27% para las de cobre, 11,8 millones de
toneladas, y un 41% para las de oro, 7,3 millones de onzas. Estos nuevos
descubrimientos permitieron extender la vida del yacimiento en 40 aos.
El proyecto contempla una capacidad de procesamiento de 206.850
toneladas de cobre fno, 99.600 oz de oro, 1.441.500 oz de plata y 2.525
toneladas de molibdeno por ao.
Actualmente se llevan a cabo las obras de construccin del proyec-
to, obras que son el prestriping, accesos, campamentos, y un puerto
provisorio. Estas obras permitirn la puesta en marcha del proyecto en
el ao 2017.
THE COBRE PANAMA PROJECT is the biggest in
the country and even in Central America, and one of the
biggest of the world.
During March 2013, the majority of the shares
(85%) owned by Inmet were bought by First Quantum,
corresponding this offer to U.S. $ 5,100 million, which
First Quantum plans to reach production rates close to 1,
3 million tons of copper for the year 2018.
The type of mineralization of this deposit is clas-
sied as a porphyry copper gold and molybdenum. This
ore body is located in the center of Panama, and was
discovered in 1698. Its location is at 120 km to the west
of Panama City and 20 km to the Caribbean coast, in the
district of Donoso, province of Colon, Panama.
The total project has an approximate area of 5,900
hectares.
The project shows interesting reserves at the end of
2012 these increased about 27% for copper, 11.8 million
tons, and 41% for gold, 7.3 million ounces. These discov-
eries allowed extending the life of the eld in 40 years.
The project includes a processing capacity of
206,850 tonnes of copper, 99,600 ounces of gold,
1,441,500 ounces of silver and 2,525 tonnes of molybde-
num per year.
Currently perform the construction of the project,
these works are the pre-striping, access, camps and tem-
porary port. These works will allow the implementation of
the project in 2017.
11.794 TONELADAS DE COBRE Y 7,3 MILLONES DE
ONZAS DE ORO.
Descripcin del Proyecto
Project description
260
CATASTRO DE PROYECTOS MINEROS 2013/14 LATINOAMRICA
Mining Projects Survey 2013/14
Etapa / Stage 2010 2011 2012 2013 2017
Construccin
/ Construction

Puesta en marcha
/ Start-up

E
t
a
p
a
s

d
e
l

p
r
o
y
e
c
t
o
P
r
o
j
e
c
t

s
t
a
g
e
s
Obras Principales / Main tasks
F
i
c
h
a

T

c
n
i
c
a
T
e
c
h
n
i
c
a
l

s
h
e
e
t
Puerto de alto calado
Planta termoelctrica
Planta de procesos
Construccin de 3 rajos para la explotacin
Instalaciones auxiliares
Instalaciones de manejo de relaves
Lneas de transmisin elctrica
Accesos a la mina y puerto
Ductos de concentrado
Deep-water port
Thermal power plant
Process Plant
Construction of 3 open pits operations
Auxiliary facilities
Tailings management facilities
Power transmission lines
Access to the mine and port
Concentrate Pipelines
MANO DE OBRA
/ WORK FORCE
ETAPA / STAGE N TRABAJADORES / WORKERS
Construccin / Construction 10.000
Operacin / Operation 2.000
261
CAPTULO 6 PRINCIPALES PROYECTOS
Major projects

Monterrey
AMRICA DEL NORTE
MEXICO
El proyecto est ubicado al noroeste del Estado de Durango.
Mapa de Ubicacin / Map of Location
Razn social / Company : Chesapeake Gold Corp.
Domicilio / Address : Cerro Blanco #410
Ciudad / City : Durango
Pas / Country : Mxico
Telfono / Telephone : 52-618-130-2326
Fax : 52-618-130-2328
Internet : www.chesapeakegold.com
E-mail : chesapeake@shaw.ca

EJECUTIVOS A CARGO / Executive Staff
Presidente y Director : P. Randy Reifel
/ President & Director
Vice Presidente : Gary A. Parkison
de Desarrollo
/ Vice President Development
Vice Presidente : Mark Malfair
de Exploracin
/ Vice President Exploration
Gerente de Exploracin : Alberto Galicia
/ Exploration Manager

Propiedad / Ownership : Chesapeake Gold Corp
100%
Objetivo : Explotar los recursos mi-
nerales, produciendo ms
del doble de la otra mina,
Los Filos, de Chesapeake
Gold.
/ Objective : Explotar los recursos minerales,
produciendo mas del doble de la
otra mina.
Minerales / Minerals :
Recursos : 18.5 Moz Au, 526 Moz
/ Resources Ag, 1,9 Kt Zn
Inversin : 4.358
(Millones de US$)
/ Investment (Million US$)
Metates
Produccin anual : 845.000 oz Au, 2 Moz Ag
/ Annual production
Puesta en marcha : 2018
/ Start-up
Vida til (aos) : 25
/ Life time (years)
M
e
t
a
t
e
s
P
r
o
y
e
c
t
o
P
r
o
j
e
c
t
Mxico
www.mch.cl
2013
/14
C A P T U L O 7
DIRECTORIO
DE EMPRESAS
DE INGENIERA Y
CONSTRUCCIN
DI RECT ORY
OF ENGI NEERI NG
AND CONSTRUCTI ON
COMPANI ES
274
CATASTRO DE PROYECTOS MINEROS 2013/14
Mining Projects Survey 2013/14
ACD Consultores Ambientales
Ausenco Vector
Ecotecnica
Geoconsult Buenos Aires S.A
Geoconsult S.A.
Golder Associates Argentina
Ingeniera di Bacco
Intergeo Argentina
Knight Pisold Argentina Consultores
Lihue Ingeniera
LM-ING
Penta Sur
Serman & Asoc.
SGS Argentina
Skanska
Techint Argentina
Tecnet
Argentina
ACD CONSULTORES AMBIENTALES
Direccin / Address : Balcarce 954, Santa Fe
Ciudad / City : Rosario
Telfono / Telephone : (54-341) 440 4399
Fax : (54-341) 440 4399
Internet : www.acdambiental.com.ar
E-Mail : mandrews@acdambiental.
com.ar
Personal Ejecutivo / Executives
Director : Matthew Andrews
Servicios / Services
Estudios de lnea de base ambiental
/ Environmental base line studies
Estudios de impacto ambiental
/ Environmental impact studies
Estudios de impacto socioeconmico
/ Socio-economic impact studies
Planes de gestin ambiental
/ Environmental management plans
Planes de cierre / Closure plans
Planifcacin ambiental / Environmental planning
Programas de rehabilitacin y revegetacin
/ Programs for rehabilitation and re-vegetation
AUSENCO VECTOR
Direccin / Address : Besares 941 - Chacras de
Coria
Ciudad / City : Mendoza
Telfono / Telephone : (54-261) 4965957 / 8
Internet : www.ausenco.com
E-Mail : info.argentina@
ausencovector.com
Personal Ejecutivo / Executives
Gerente General : Silverio Prota.
/ General Manager
E-Mail : silverio.prota@
ausencovector.com
Servicios / Services
Ingeniera de Costos / Cost Engineering
Ingeniera de Detalles / Detail Engineering
Ingeniera de Estanques, Piping y Dosifcacin
/ Tanks and Piping Engineering
Ingeniera de Instalaciones On Shore
/ Conceptual & Details Eng of on Shore Installations & Facility
Ingeniera de Instrumentacin
/ Instrumentation Engineering
Ingeniera de Plataformas Off Shore
/ Conceptual and Details Engineering of Off Shore Platforms
Ingeniera de Procesos / Process Engineering
Ingeniera de Procesos Metalrgicos
/ Metallurgic Process Engineering
Ingeniera de Proyectos en Transporte Continuo
/ Permanent Transportation Projects
Ingeniera de Sistemas de Terminales Martimos
/ Conceptual & Details Eng. Of Marine Terminal Systems
ECOTCNICA
Direccin / Address : Paraguay 792 piso 5
Ciudad / City : Buenos Aires
Telfono / Telephone : (54-11) 4312- 6904
Fax : (54-11) 4312- 6904
Internet : www.ecotecnica.com.ar
E-Mail : info@ecotecnica.com.ar
Servicios / Services
Anlisis de riesgos ambientales
/ Environmental risk analysis
Auditoras ambientales / Environmental auditing
Cursos de induccin / Induction courses
Estudios de impacto ambiental
/ Environmental impact studies
Estudios de lnea de base / Base line studies
Planes de cierre / Mine closure plans
Planes de emergencia y contingencia
/ Emergency and contingency plans
Planes de gestin ambiental
/ Environmental management plans
Programas de monitoreo / Monitoring programs
GEOCONSULT BUENOS AIRES S.A
Direccin / Address : Av. del Libertador 6550, Piso
7, Ofcina C
Ciudad / City : Buenos Aires
Telfono / Telephone : (54-11) 4326 3434
Internet : www.eocunsult.at
E-Mail : offce@geoconsultba.com.ar
Personal Ejecutivo / Executives
Presidente / President : Martn Bfer
Gerente General / CEO : Exequiel Zielonka
Servicios / Services
Consultora / Consultancy
Ingeniera Basica / Basic Engineering
Ingeniera de Detalle / Detail Engineering
Ingeniera de Proyectos / Project Engineering
Tuneles y Obras Subterraneas
/ Tunnels and Underground Works
GEOCONSULT S.A.
Direccin / Address : General Csar Daz 1651/ 57
Ciudad / City : Buenos Aires
Telfono / Telephone : (54-11) 4103-1820
Fax : (54-11) 4103-1820
Internet : www.geoconsult.com.ar
E-Mail : Info@geoconsult.com.ar
Servicios / Services
Balance hidrogeolgico / Hydrogeological balance
Caracterizacin geolgica preliminar
/ Preliminary geological characterization
Cartografa / Cartography
Climatologa / Climatology
Determinacin del nivel de base ambiental
/ Determination of environmental base level
Inventario de industrias / Industry inventory
Previsin de impacto ambiental
/ Environmental impact precaution
Tcnicas especfcas de remediacin
/ Specic repair techniques

275
CAPTULO 7 DIRECTORIO DE EMPRESAS DE INGENIERA Y CONSTRUCCIN
Directory of Engineering and Construction Companies
GOLDER ASSOCIATES ARGENTINA
Direccin / Address : Caseros 34 Norte
Ciudad / City : San Juan
Telfonos/ Telephones : (54-264) 4229050
: (54-264) 426-5944
: (54-264) 426-1377
Fax : (54-264) 426-5844
Internet : www.golder.com
E-Mail : ilopez@golder.com
jmunoz@golder
Servicios / Services
Control medioambiental / Environmental control
Control y monitoreo de Pendientes y Laderas
/ Control and monitoring of hanging walls
Monitoreo medioambiental / Environmental monitoring
Cierre de minas / Mine closure
Geotcnia y Medio Ambiente
Canchas de lixiviacin / Leaching pads
Evaluacin de impacto ambiental
/ Environmental impact assessment
Ingeniera geotcnica / Geotechnical engineering
Mecnica de rocas / Rock mechanics
Medio ambiente / Environment
Tratamientos / Processing
Tronadura / Blasting
Servicios geotcnicos / Geotechnical services
INGENERIA DI BACCO
Direccin / Address : Ruta 9 Km. 1298
Ciudad/ City : San Miguel, Tucumn
Telfono / Telephone : (54-381) 437-2206
Fax : (54-381) 437-2194
Internet : www.dibacco.com.ar
E-Mail : dbmail@dibacco.com.ar
Servicios / Services
Anlisis de constructibilidad / Constructability Estimation
Consultora / Consultancy
Gestin y Ejecucin de Proyectos
/ Project Managment and Development
Ingeniera Bsica / Basic Engineering
Ingeniera de detalles / Detail Engineering
Mantenimiento y Reparacin / Maintenance and Repair
Montajes Industriales / Industrial Assembly
Presupuestacin / Budgeting
Planeamiento integral / Integral Planning
Plantas llave en mano / Turnkey Plants
Proyectos de ingeniera / Engineering Projects
Fabricacin de partes y equipos completos
/ Fabrication of Parts and Complete Equipment
INTERGEO ARGENTINA
Direccin / Address : Av. Triunvirato 2976
Ciudad / City : Buenos Aires
Telfonos / Telephone : (54-11) 455-37266
: (54 -911) 443-86088
Fax : (54-11) 4553-72696
Internet : www.intergeo.com
E-Mail : cairo@intergeo.com
Personal Ejecutivo / Executives
Director : Carlos D. Le Coche
E-Mail : cairo@intergeo.com
Servicios / Services
Anlisis de Riesgos / Risk assessment
Auditorias / Auditing
Ingeniera y Consultora Ambiental
/ Environmental engineering and consultancy
Implementacin de sistemas de gestin
/ Implementation of management systems
Proyectos de remediacin de suelos y aguas sub-
terrneas y superfciales
/ Remediation of soils, underground and surface water
KNIGHT PISOLD
ARGENTINA CONSULTORES
Direccin / Address : 25 de Mayo 234 Oeste
Ciudad / City : San Juan
Telfono / Telephone : (54-262) 421-0014
Fax : (54-262) 421-0014
Internet : www.knightpiesold.com
E-Mail : sanjuan@knightpiesold.com
Personal Ejecutivo / Executives
Gerente Regional : Hernn Andrade
Servicios / Services
Caracterizacin de desechos / Waste analysis
Cierre de mina / Mine closure
Diseo de reas de pilas de lixiviacin
/ Leaching pad design
Manejo de desechos mineros / Mining waste handling
Manejo de relaves / Tailings handling
Manejo de las aguas / Water handling
Mecnica de rocas / Rock mechanics
Medio Ambiente / Environment
LIHUE INGENIERA
Direccin / Address : Diagonal 78 N 1348.
Villa Zagala.
Ciudad / City : Buenos Aires
Telfono / Telephone : (54-11) 471-33137
Fax : (54-11) 472-40093
Internet : www.lihue.com.ar
Servicios / Services
Anlisis de riesgo / Risk assessment
Asesoramiento normativo / Normative assessment
Auditora / Auditing
Control de erosin / Erosion control
Estudios de impacto ambiental
/ Environmental impact studies
Estudios de factibilidad y tratabilidad de residuos
/ Feasibility and residuals treatment studies
Gestin de residuos slidos urbanos
/ Management of urban solid residues
Monitoreo y tratamiento de efuentes
/ Efuent monitoring and treatment
Remediacin de suelos y aguas contaminadas
/ Remediation of soils and contaminated water
Sistemas de gestin / Management systems
LM-ING
Direccin / Address : Av. 44 esq. 2053, piso 1
Ciudad / City : La Plata
Telfono / Telephone : (54-221) 479-5196
Fax : (54-221) 470-8307
Internet : www.lming.com.ar
E-Mail : lm_ing@netverk.com.ar
Servicios / Services
Diseo de caeras de procesos / Process piping design
Diseo de instalaciones industriales
/ Design of industrial installations
Ingeniera Bsica / Basic engineering
Ingeniera Detalle / Detailed engineering
Inspeccin de Equipos y Caeras
/ Equipment and piping inspection
PENTA SUR
Direccin / Address : Maip 780
Ciudad / City : Tucumn
Telfono / Telephone : (54-381) 422-6151
Fax : (54-381) 497-5757
Internet : www.penta.net/
E-Mail : nlares@penta.net
Servicios / Services
Almacenamiento y terminales
/ Bulk storage and terminals
Anlisis de medio ambiente / Environmental analysis
Anlisis de reservas / Reserve analysis
Diseo de ingeniera / Design engineering
Estudio de plazos / Time studies
Estudios de factibilidad / Feasibility studies
Manejo de material / Material Handling
Minera y excavacin de minerales
/ Mining/Quarrying of raw materials
www.mch.cl
2013
/14
C A P T U L O 8
DIRECTORIO
DE EMPRESAS
JUNIOR
DI RECT ORY
OF J UNI OR
COMPANI ES
304
CATASTRO DE PROYECTOS MINEROS 2013/14
Mining Projects Survey 2013/14
Este captulo incluye una seleccin de empresas junior que se encuen-
tran desarrollando actividades de exploracin en Argentina, Brasil, Chile
y Per. Este tipo de compaas mineras se dedica bsicamente a la
exploracin de yacimientos. En general, no cuentan con operaciones
mineras en produccin sino solamente con propiedades en prospec-
cin o exploracin.
This chapter includes a selection of junior mining companies that are
active in South America, particularly in Argentina, Brazil, Chile and Peru.
This type of mining companies are mainly dedicated to exploration of ore
deposits. In general, they do not have mining sites under operation, but only
properties under prospection or exploration.
ACERO-MARTIN RESOURCES
AGUILA AMERICAN RESOURCES
ALDERSHOT RESOURCES
ALEXANDER MINING
ALTURAS MINERALS
AMARILLO GOLD
AMAZON MINING
AMERA RESOURCES
AMERIX PRECIOUS METALS
ANACONDA MINING
ANDEAN AMERICAN MINING
ANDEAN RESOURCES
ANDINA MINERALS
ANTARES MINERALS
APOQUINDO MINERALS
ARGENTEX MINING
ATNA RESOURCES
AUEX VENTURES
AURA MINERALS
AUSTRAL GOLD
BEAR CREEK MINING
BRAZAURO RESOURCES
BRAZILIAN DIAMONDS
BRETT RESOURCES
BROOKMOUNT EXPLORATION
CANADIAN SHIELD RESOURCES
CANDENTE
CAPELLA RESOURCES
CARDERO RESOURCES
CATALINA RESOURCES
CELESTE COPPER
CHARIOT RESOURCES
COASTAL GOLD
COLOSSUS MINERALS
CONDOR RESOURCES
CONSTITUTION MINING
CORO MINING
COUGAR METALS
CRUSADER RESOURCES
CUERVO RESOURCES
Empresas Junior
DOREX MINERALS
ECOMETALS
ESPERANZA SILVER CORPORATION
EXETER RESOURCE
EXPLORATOR RESOURCES
FAR WEST MINING
FORTUNE VALLEY RESOURCES
FRANC-OR RESOURCES
GALILEO MINERALS
GEOLOGIX EXPLORATIONS
GINGURO EXPLORATION
GITENNES EXPLORATION
GLOBAL COPPER
GLOBAL GOLD
GLOBAL HUNTER
GOLDEN ARROW RESOURCES
GOLDEN PEAKS RESOURCES
GOLDEYE EXPLORATIONS
GOLDMARK MINERALS
GRENVILLE GOLD
HERENCIA RESOURCES
HIDEFIELDS GOLD
HORIZONTE MINERALS
INCA PACIFIC RESOURCES
INTERNATIONAL MINERALS
INTERNATIONAL NICKEL VENTURES
INTERNATIONAL PBX
INTREPID MINERALS
IRON CREEK CAPITAL
KARMIN EXPLORATION
LA MANCHA RESOURCES
LARA EXPLORATION
LOS ANDES COPPER
LUMINA COPPER
LUNDIN MINING
MAGELLAN MINERALS
MANDALAY RESOURCES
MANSFIELD MINERALS
MEDINAH MINERALS
MINERA ANDES
MINERA IRL
MINERA PEREGRINE
MIRASOL RESOURCES
MUNDO MINERALS
NETWORK EXPLORATION
NEW DIMENSION RESOURCES
NEWGOLD
NGEX RESOURCES
PANAMERICAN SILVER
PANORO MINERALS
PLEXMAR RESOURCES
POLAR STAR MINING
RADIUS GOLD
RED LAKE EXPLORATION
REY RESOURCES
RO CRISTAL ZINC
ROCKWELL DIAMONDS
SAMEX MINING
SAVANT EXPLORATIONS
SILVER STANDARD RESOURCES
SOLEX RESOURCES
SOLITARIO EXPLORATION & ROYALTY
SOLOMON RESOURCES LIMITED
SOUTH AMERICAN GOLD AND COPPER COMPANY
SOUTH AMERICAN SILVER
SOUTHERN HEMISPHERE MINING
SOUTHWESTERN RESOURCES
SOUTHWESTERN GOLD
ST. ELIAS MINES
STRAIT GOLD
STRIKE RESOURCES
TALON METALS
VALENCIA VENTURES
VENA RESOURCES
WHITE MOUNTAIN TITANIUM
ZINCORE METALS
305
CAPTULO 8 DIRECTORIO DE EMPRESAS JUNIOR
Directory of Juniors Companies
ACERO-MARTIN RESOURCES
Direccin / Address : 1601, 700 West Pender
Street Vancouver, BC,
Canada, V6C 1G8
Telfono / Telephone : (1-877) 646 0067
Fax : (1-604) 646 0640
Internet : www.aceromartinexp.com
E-Mail : info@acero-martin.com
Prospectos en Chile / Prospects in Chile
La Mamita
Minas Lucho
Pinaya Gold
AGUILA AMERICAN RESOURCES
Direccin / Address : 1130-789 W.Pender Street
: Vancouver, BC,
: Canada, V6C 1H 2
Telfono / Telephone : (1-604) 669 9330
Fax : (1-604) 683 1585
Internet : www.aguilaamerican.ca
E-Mail : andean.american@gmail.com
Proyecto en Per / Project in Peru:
Angostura
ALDERSHOT RESOURCES
Direccin / Address : 885 West Georgia St, Ste
1500
: Vancouver, B.C.
: Canada, V6C 2B3
Telfono / Telephone : (1-604) 682 6718
Fax : (1-604) 682 6722
Internet : www.aldershotresources.com
E-Mail : info@aldershotresources.com
Prospectos en Chile / Prospects in Chile
Hornitos (option)
ALEXANDER MINING
Direccin / Address : 1st Floor, 35 Piccadilly,
: London, W1J 0DW
: UK
Telfono / Telephone : (44-20) 7292 1300
Fax : (44-20) 7292 1313
Internet : www.alexandermining.com
E-Mail : info@alexandermining.com
Prospectos y Proyectos en Chile / Prospects
and Projects in Chile:
Argentina
Len
Per
Malinetes
ALTURAS MINERALS
Direccin / Address : 330 Bay Street, Suite 820
: Toronto, ON
: Canada
Telfono / Telephone : (1-416) 366 5555
Fax : (1-416) 703 6515
Internet : www.alturasminerals.com
Per:
Direccin / Address : Manuel de Falla 297, Piso 5,
San Borja
: Lima, Per
Telfono / Telephone : (51-1) 475 1700
Fax : (51-1) 225 1233
Prospectos y Proyectos en Per / Prospects
and Projects in Peru:
Baos del Indio
Callejones
Ccaccapaqui
Chavina
Huajoto
Huilacollo
La Divina
Pampa Colorada
Pausa
San Antonio
Sombrero
Utupara / Chapi Chapi
AMARILLO GOLD
Direccin / Address : Suite 1818-701 West
Georgia Street P.O. BOX
10144, centro del Pacfco
: Vancouver, British Columbia
: Canada V7Y 1 6
Telfono / Telephone : (1-604) 689-1799
Fax : (1-604) 689-8199
Internet : www.amarillogold.com
E-Mail : info@amarillogold.com
Brasil
Razn Social
/ Business Name : Amarillo Mineraao do Brasil
Ltda.
Direccin / Address : Praa Carlos Chagas 49 -
Salas 504 506
: Bairro Santo Agostinho,
Belo Horizonte, MG
: Brasil CEP 30170-020
Telfono / Telephone : (55-31) 3261 5974
Proyectos en Brasil / Projects in Brazil:
Lavros do Sul
Mara Rosa
Ourolandia
Santo Antonio
AMAZON MINING
United Kingdom
Direccin / Address : Salatin House
: 19 Cedar Road
: Surrey SM2 5DA
: United Kingdom
Telfono / Telephone : (44-20) 8816 7641
Fax : (44-20) 866-8829
Internet : www.amazonplc.com
E-Mail : investor@amazonplc.com
Canad
Direccin / Address : 47 Colborne Street, Suite 307
: Toronto, ON
: Canada M5E 1P8
Telfono / Telephone : (1-416) 866 2966
Fax : (1-416) 866 8829
Brasil
Direccin / Address : 430 Av. Antonio Abrahao
Caram, sala 301
: Bairro Sao Jose
: Belo Horizonte MG
Telfono / Telephone : (55-31) 3245 0205
Proyecto en Brasil / Project in Brazil:
Madeira
Mimoso
Tucano vanadio
AMERA RESOURCES
Direccin / Address : Suite 709, 837 West Has-
tings Street
: Vancouver, BC
: Canada V6C 3N6
Telfono / Telephone : (1-604) 687 1828
Fax : (1-604) 687 1858
Internet : www.ameraresources.com
E-Mail : info@ameraresources.com
Edicin Anual
Bilinge (espaol-ingls)
Incluye CD
Edicin Bienal
Bilinge (espaol-ingls)
Incluye CD
Bilinge (espaol-ingls)
Edicin Anual
Incluye CD
Ms que un directorio, una
completa gua de la Minera
Chilena.
Herramienta de consulta
nica en su tipo, compila in-
formacin tcnica de equipos
para la minera.
Completa informacin
de las principales faenas
productivas de la minera
en Chile.
Herramienta de consulta y
anlisis de los principales
aspectos del mercado ener-
gtico nacional.
ESTUDIOS & COMPENDIOS
Toda la informacin que su empresa necesita para
acceder a nuevas oportunidades de negocios en
las industrias minera y energtica
LA EDITORIAL TCNICA Y DE NEGOCIOS LDER DE CHILE
Necesita ms informacin?
Contctenos en estudios@editec.cl
El rea de Estudios & Compendios de Grupo Editorial
Editec es reconocida por el desarrollo de productos
con alto grado de especializacin y experiencia en los
mercados minero y energtico. Lo invitamos a conocer
ms sobre nuestros libros.
Aviso ESTUDIOS.indd 3 04-10-13 15:19

You might also like