SPE 166209

Intelligent Completions And Un-Cemented Liners Combine To Provide A


Fully Completed Solution With Zonal Isolation In Norway
A.W. Kent, D.W. Burkhead, R.C. Burton, K. Furui, S.C. Actis, K. Bjornen, J.J. Constantine, W.W. Gilbert, R.M.
Hodge, L.B. Ledlow, M. Nozaki, A. Vasshus, and T. Zhang, ConocoPhillips
Copyright 2013, Society of Petroleum Engineers
This paper was prepared for presentation at the SPE Annual Technical Conference and Exhibition held in New Orleans, Louisiana, USA, 30 September2 October 2013.
This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been
reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its
officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to
reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright.

Abstract
This paper describes the design, testing, installation, and performance of the first fully-completed well using an intelligent
inner completion inside an un-cemented liner with openhole packers for zonal isolation. The well design concept evolved
from technical challenges associated with completing long cased and cemented laterals in the mature Ekofisk waterflood. The
term fully-completed implies full reservoir access along the pay length for production and high rate matrix acid stimulation
using limited entry for fluid diversion within well segments.
The paper covers the development and qualification of custom openhole 7 in. liner components that can handle high
differential pressures and extreme temperature fluctuations, the marriage of this complex liner with a five zone intelligent
completion system, and results from a year of system integration testing. The paper also discusses the strategic placement of
both mechanical openhole and inner string packers based on caliper and drilling logs; challenges met and overcome during
installation; and a remarkable collection of down-hole gauge data that confirms the performance of each component before,
during, and after the stimulation.
The Ekofisk field waterflood began in 1987 and continues to date, exceeding expectations for improved oil recovery while
mitigating reservoir compaction. As the waterflood matures, new wells are more often found partially water-swept. Limited
infrastructure for lifting and handling the high water production has led to increased emphasis on isolating these water-swept
intervals. Cased, cemented and perforated completions have traditionally been used for this service. It has become
increasingly difficult to execute a successful cement job in longer horizontals with 4,000 ft to 8,000 ft laterals where rotation
of the liner is impossible and high effective circulating densities (ECDs) limit rates during cementing. Wide variations in
reservoir pore pressures, often in excess of 2,000 psi difference along the lateral, are typical of the Ekofisk chalk and
exacerbate the difficulties of cementing. As a result, a new method for zonal isolation has been developed to ensure the
success of future infill drilling campaigns.
The design and careful planning that went into the fully-completed openhole un-cemented liner strategy resulted in a
successful field trial and has proven this solution to be an effective alternative to cemented reservoir liners in long horizontals
where zonal isolation is critical. Use of the intelligent well system (IWS) allowed offline acid stimulation without rig, coiledtubing, or wireline intervention. What would have traditionally been a significant water producer, with three water-swept
zones totaling nearly 2,000 ft across a 4,000 ft reservoir section, has turned out to be one of the best oil producers in the field
with nearly zero water cut. Production results show high productivity with highly negative acidized completion skins.
With large investments in intelligent completions to provide zone-specific inflow control and water shut-off, isolation outside
the liner becomes much more important. Over recent years, the Ekofisk wells have illustrated the difficulty of achieving
effective cement along lengthy reservoir targets. The openhole fully-completed solution combining an accessorized uncemented liner with an inner intelligent completion string will allow operators to push the limits in terms of lateral length
while
maintaining
full
control
over
producing
and
non-producing
zones.

SPE 166

Introduction
The Ekofisk field is located in the central part of the North Sea off the south western coast of Norway. The sea depth in the
area is 230 to 250 ft. The Ekofisk field produces from the naturally fractured Ekofisk and Tor chalk formations of Early
Paleocene and Late Cretaceous age. The reservoir chalk has high porosity, but low permeability with an oil column of
approximately 1,000 ft at depths ranging from 9,000 to 11,000 ft below sea level. Ekofisk was originally developed by
pressure depletion and was expected to have a relatively low recovery factor of approximately 17%. Since then, limited gas
injection and comprehensive water injection have contributed to a substantial increase in oil recovery. Large scale water
injection started in 1987, and experience has shown that water displacement of the oil has been more effective than expected,
with current projections indicating a recovery factor of approximately 50%. In addition to water injection, compaction of the
soft, high porosity chalk provides an additional recovery mechanism. This reservoir compaction has resulted in subsidence of
the seabed, which is now more than 30 ft in the central part of the field. As a consequence of water injection, the rate of
subsidence has slowed significantly; however, current projections indicate that subsidence will continue at a few inches per
year for the remaining life of the field. Hermansen (2008) provides a more detailed account of how the waterflood has
impacted the Ekofisk field development.
Completion practices at Ekofisk have evolved over time. Initial vertical wells were cased, perforated and acid fractured. As
horizontal wells were introduced to the field, the long horizontal sections were also cased and cemented. The heavy-walled
production liners were then perforated in 10 foot clusters, typically at one shot per foot, every 200 to 500 ft along the length
of the lateral. The wells were then stimulated with acid by bullheading alternating stages of pad and acid with ball sealers for
diversion. These cluster perforation designs typically showed high initial productivity followed by sharp production declines
(Snow and Hough 1988). Production logging results indicated that many of the perforation clusters were not effectively
stimulated, with some clusters, typically at the heel of the well, receiving far more acid than required and others receiving
little or no acid. This ineffective treatment diversion was often made worse by performing remedial acid treatments by
bullheading additional acid into the wells, generally into the previously stimulated intervals without reaching the un-treated
perforation clusters. The large volumes of acid placed into a limited number of perforation clusters weakened the rock and,
coupled with reservoir compaction and associated chalk movement, led to liner buckling. Liner buckling then led to the loss
of zonal access and in extreme cases, pipe failure and loss of the well. Restricted access to the reservoir liner impeded well
intervention and remedial opportunities. Figure 1, below, illustrates the correlation between high acid volume and casing
failures.

Figure 1Sample of 28 wells. Each bar represents a well.


As shown in the figure, wells with acid injection volumes greater than 100 bbl/station have a much higher liner deformation
and failure rate than wells stimulated with lower acid volumes per station. The high failure wells are all cluster perforated
wells where large volumes of acid were injected into the small perforation clusters.
To improve acid stimulation and reduce casing deformation and well failures, a new class of wells was introduced to the
field. These new, fully-completed wells were perforated along the entire horizontal section and used limited entry
techniques to distribute acid more evenly over the reservoir intervals. Perforations were generally spaced at one hole every
ten feet of reservoir net pay along the horizontal section with stimulation volumes in the order of 20 bbls of 28% HCl acid
per perforation. These new completion techniques proved successful in providing high productivity completions with low
well failure rates. Post-stimulation skin values have been found to be in the -4 to -4.5 range (Furui et al. 2012, Parts I and II),

SPE 166

while liner deformation and well failures have decreased as shown in Figure 1, above. In this figure, the wells stimulated with
less than 100 bbl/station are the fully-completed wells.
The new fully-completed designs were first implemented in horizontal wells with cemented liners, but as confidence in the
designs increased, conceptual planning moved to openhole designs with un-cemented liners. An early field trial of the fullycompleted well design in an openhole, un-cemented liner completion proved favorable with no liner deformation seen after
three years of production. To further improve the fully-completed well designs, it was desired to combine the benefits of a
surface-operated, Intelligent Well System (IWS) for down-hole flow control with limited entry diversion to provide uniform
acid distribution along pay intervals in an un-cemented liner. While primarily designed to assist in the initial acid
stimulation, these benefits would help achieve more effective diversion during remedial acid and scale inhibitor treatments
later in the life of the well. This led to the Ekofisk 2/4-B-19C (hereafter referred to as B-19C) well design.
The objectives of the new B-19C openhole un-cemented liner completion are to
1. Enhance well productivity and recovery
2. Provide water shut off capabilities and selective zone access for scale/acid treatments
3. Allow stimulation and remedial scale treatments without rig, coiled tubing, or wireline intervention
4. Provide adequate liner stability to improve well access and prolong well life
Functional Requirements for the Un-Cemented Liner and Intelligent Completion
As the B-19C un-cemented horizontal completion team worked on the design, a number of functional requirements were
established to improve well performance, reservoir management, and reservoir liner integrity. These functional requirements
include:
Un-cemented reservoir liner with openhole packers, allowing for effective hydraulic isolation of water-swept intervals
while allowing high pressure/high rate acid stimulation and oil production from target oil zones.
Full completion of entire length of productive zones, utilizing high-rate matrix acid stimulation, in lieu of acid fracturing,
to improve post-acid completion skin, improve well productivity, and minimize liner deformation for extended well life.
Ability of reservoir drilling fluid system to allow for effective acid cleanup of mud and filter cake without causing
compatibility issues.
Surface controlled access to productive zones in the horizontal lateral to allow
o Unlimited down-hole valve manipulations (open/close) without wireline or coiled-tubing intervention
o Flow control into and out of each zone during stimulation, production, and scale inhibitor squeezes
o Uniform acid stimulation of entire length of each zone
o Uniform scale inhibitor treatments and remedial acid treatments along entire length of each zone
o Well test flexibility
o Measurement of zonal pressure/temperature data
Ability to run the pre-drilled reservoir liner as a solid, pressure-sealed liner to allow
o Elimination of an inner string, as normally required with a conventional pre-drilled liner
o Ability to circulate and maintain well control while running the IWS completion string
o Pressure activation of all liner components, including openhole packers at one time
o Elimination of tubing conveyed or wireline perforating operations
Allow for successive acid stimulation of each zone after moving the rig off location, without the need for wireline or
coiled-tubing intervention.
Ability of completion equipment to resist pipe movement and stress failure as a result of thermal and hydraulic loads
induced during stimulation, water injection, or production operations.
Ability to handle stimulation differential pressures between zones of up to 5,000 psi.
Ability to handle temperature change of 200oF during stimulation.
Design Features of the Un-Cemented Liner Completion
The drilling of the 9 in. horizontal lateral in the Ekofisk and Tor chalk reservoirs would be performed using an 11 ppg oilbased (oil-based indicates inverted phase) emulsion containing 60 lbs/bbl calcium carbonate. This system is unique in that
it lays down an oil-wet calcium carbonate filter cake, but can be converted to a water-wet filter cake once acid is applied and
the pH is lowered (Lim et al. 2011). The water-wet filter cake, consisting almost entirely of calcium carbonate, can be
dissolved with HCl acid allowing for effective stimulation of the entire completion length.
After drilling the reservoir section, a dedicated trip with a stiff roller reamer assembly would be made. This roller/reamer
assembly was designed to imitate the stiffness and geometry of the reservoir liner and liner components as closely as
possible. The purpose of this assembly was to smooth out any doglegs and remove any problematic ledges in the openhole
section. This reamer run would also provide a field estimate of drag for calibrating torque and drag models before running the
reservoir liner.

SPE 166

Once the wellbore was conditioned, a 7 in. 51.2 lb/ft Q125, metal-to-metal seal, 6.125 in. drift, openhole liner system
would be run to total depth (TD) in the 9 in. horizontal lateral on drill pipe.

Figure 2A conceptual drawing of the un-cemented liner showing the relative positions of liner components.
A number of components would be run as part of the liner design to meet the functional requirements of the completion
system (Fig. 2, above). All components were designed with a drift diameter equal to or larger than the 6.125 in. drift
diameter of the 7 in. liner. An expanded view of the 7 in. liner is provided in Fig. 2 to show the relative position of these
liner components. A description of each 7 in. openhole liner component is provided below to explain its purpose.
Liner Hanger Packer the liner hanger packer was designed to hold large axial loads in both directions and to provide
hydraulic isolation above and below the liner hanger during the life of the well. The liner hanger packer would be activated
hydraulically using a ball drop sub as soon as the liner was landed on bottom.
Toe Isolation Valves two valves would be run in series at the toe of the liner. Both valves would be run in the open
position while running in hole to allow for pipe fill. A battery powered, electronic type valve would be run on bottom as the
primary valve and set to automatically close on a timer an estimated 12 hours after reaching TD. Pressure activation would
allow for the valve to be re-opened if premature closure occurred. A ball drop type valve would be run above the electronic
valve as a contingency, in case the electronic valve did not close as planned. The main function of both toe valves was to
provide permanent hydraulic isolation in both directions once closed. During actual well operations, the primary valve
worked as intended and the backup valve was not activated.
Metal Expandable Openhole Packers these specially designed openhole packers (Hazel et al. 2013) would be positioned
in the liner string to provide hydraulic isolation between strategically defined zones, intervals, in the horizontal section.
Design requirements called for the packers to provide hydraulic isolation at up to 5,000 psi zone-to-zone differential pressure
in openhole sizes up to 10 in. Porosity and resistivity responses generated by Logging-While-Drilling (LWD) tools during
the drilling process would be used to differentiate pay zones from zones that had been swept by the waterflood. The entire
well team was involved in determining which zones required isolation, based on the location of faults, caliper data, porosities,
water saturations, and pressure data. Two openhole packers were placed at the ends of each zone to enhance isolation
performance during stimulation. The openhole packers would be set hydraulically by pressuring the entire length of the liner
to a pressure differential of 10,000 psi.
The openhole packers were designed to provide hydraulic isolation between all zones during the acid stimulation and
production phases. The key challenge facing this design was the stimulation design case of injecting 75F acid at 60 bbl/min.
Because of the tremendous forces exerted by the large thermal and hydraulic loads during acid stimulation, special
consideration was given to allowing for liner contraction and stabilization of the openhole packers. Without such provisions,
tensile forces within the 7 in. liner string would exceed 600,000 lbs. Such high tensile forces could cause the openhole
packers to slip along the formation, resulting in possible acid leakage around the packers and loss of ability to seal in the
open hole.

SPE 166

Rock Anchors rock anchors were designed to minimize liner and packer movement during stimulation and production.
Each rock anchor would consist of two sets of three independent slip segments that were designed to tolerate variations in
openhole diameter and shape. A single rock anchor was positioned adjacent to or between each set of openhole packers in
near-gauge hole, so as to provide additional anchoring support of up to 200,000 lbs for the packers. The anchors would be
positioned to minimize the risk of acid exposure during stimulation, since acid would likely weaken the rock in which the
anchors were set. The rock anchors were designed to be hydraulically activated at 3,000 psi.
Expansion Joints - one expansion joint would be run near the middle of each zone to relieve tensile loads that were expected
to develop during stimulation, whether from the 7 in. liner or from the inner completion. The expansion joints were
designed to release at 5,500 psi differential pressure during the openhole packer setting process. Expansion was not possible
during the setting process, since the rock anchors were fully set and both ends of the liner were additionally confined by the
liner hanger and the end of the well. The expansion joints were designed to expand up to a maximum of 36 in. due to cooldown during stimulation. Actual movement of the expansion joints in the B19 completion was expected to be less than 18 in.
in all cases, based on the chosen length of each zone.
Acid Soluble Plugs (ASP) these plugs (Fig. 3, below), served to
allow for running of a pressure-tight liner, thus enabling the pressure activation of all liner components
eliminate the need to perforate the liner, providing reservoir access by dissolving the plugs with acid
prevent fluid loss while running the intelligent inner completion string. Each of the plugs ports was drilled with a
0.20 in. entrance hole to create a limited entry effect during stimulation. The diagrams below illustrate the geometry
of the liner ports and acid soluble plugs

Figure 3Cross-section of acid soluble plug installed in 7 in. 51.2 lb/ft liner.
Acid Circulating Valves (ACV) ACVs would be included at one end of each productive zone to allow for acid to be
circulated into the wellbore after running and setting the intelligent completion system. The purpose of the acid circulation
process is to effectively place acid along the target interval and dissolve the acid soluble plugs described above. With the
plugs dissolved, the stimulation process could proceed.
The ACVs were run in the closed position, allowing for a pressure-tight liner while running in hole and the subsequent
openhole packer setting process. Dual ACV shifting tools were run as part of a subsequent liner cleanout trip. Below the
shifting tools, a specially designed valve position logging tool with memory gauges was run to verify that the ACVs had been
successfully shifted to the open position. A closed ACV would have prevented acid from being spotted to dissolve the acid
soluble plugs, thus preventing access to the zone of interest. Rupture disks, installed in the ACV flowports, prevented fluid
losses until the intelligent completion string was safely in place. Figure 4 shows a diagram of the ACV, an ACV shifting
tool, and the memory logging tool.

SPE 166

Figure 4Drawing of two ACVs. On the left, an ACV shifting tool is shown engaged in the ACV shifting profile. On
the right, a shifted ACV is shown with a logging tool. The logging tool senses the exposed antenna thereby confirming
the ACV position.
IWS Tubing String The B-19C upper completion configuration was dictated by two requirements: reservoir production
zonal control and stimulation zonal control. The ability to selectively shut off water swept sections was considered critical
for well performance and reserves recovery, and has proven to be invaluable. This entailed use of a dedicated IWS string with
multiple control valves and packers to be run inside the 7 in. production liner. Stimulation rates of 60 bbl/min far exceed
production rates, demanding maximum through-bore diameter. Within the 7 in. 51.2 lb/ft un-cemented liners 6.125 in.
drift, 3 in. flow-control components and 4 in., 12.6 lb/ft tubing were the largest components possible, while still
accommodating control line flatpack running on the outside of the IWS string. Above the liner top, the 10 in. production
casing allowed upsizing to 5 in., 17 lb/ft and 20 lb/ft tubing. The Annular Safety Valve (ASV) and Subsurface Safety
Valve (SSSV) were similarly 5 in. Sizing of upper completion components was less influenced by production criteria than
by stimulation requirements.
Flow Control Architecture The existing 18 in. 10,000 psi wellhead limited the penetration count at the tubing hanger to
eight lines. A five zone IWS system, plus down-hole pressure and temperature (DHPT) gauges, a tubing retrievable
subsurface safety valve (TRSSSV) and an annular safety valve (ASV), required too many lines for the tubing hanger when
utilizing a direct hydraulic control architecture. As such, a multiplexed control architecture was employed, synchronizing two
interval control valves (ICV) on a single line with Single Line Switch (toggled) functionality. As a result, the five production
zones could be controlled by four hydraulic lines in total, lowering tubing hanger penetration count from nine to eight. Figure
5, below, illustrates the flow control architecture for the well with the eight lines at the tubing hanger (far right).

Tubing Hanger
Zone A
HCM-A

Production
Packer

Zone A
Packer
Zone D

Zone E

Zone C
Zone B

ASV

Figure 5IWS inner completion control architecture. The tubing encapsulated conductor (TEC) is an electrical cable
that transmits down-hole gauge data. All other lines shown in the figure are hydraulic control lines.
Feed-Through Production Packer A 10 in. x 5 in. feed-through production packer was installed above the uncemented liner. This ISO14310V0 rated packer is designed for acid stimulation, production and gas-lift service; each
component accommodated control lines for down-hole IWS functionality. The 5 in. production tubing string was crossed

SPE 166

over to 4 in. directly below the production packer. Five out of seven line feed-throughs were required to accommodate the
four hydraulic control lines and one electronic gauge line (Fig. 5).
Zonal Isolation Packers 7 in. x 3 in. feed-through zonal isolation packers were set in blank sections between the
openhole packers separating reservoir net pay intervals. Up to six feed-throughs were utilized, depending on the zone control
architecture in each packers location (Fig. 5).
Dual DHPT Gauge Subs down-hole pressure and temperature measurement was considered essential for stimulation and
production control. Quartz oscillator transducer pressure gauges were installed in each zone, which enabled reservoir
characterization and stimulation diagnostics to be performed after acid injection. In addition, the gauges provide early
identification of water breakthrough, allowing valve positions to be configured for optimal producing conditions.
Control Line/Flatpack Protection of control lines was a critical design requirement. Encapsulation of control lines,
eliminating bare line exposure to the annulus, was the goal. Protection of lines in areas of high velocity was of particular
concern. Cross coupling clamps were installed on every joint and specialty clamps were employed in locations such as
SSSV, ASV and the Tubing Hanger. Incoloy-825 control line was specified throughout the system. All control line
terminations utilized state-of-the-art metal-to-metal fittings with isolated tension anchoring to protect control system integrity
in the event of external pressure or induced tension during installation.
Interval Control Valves (ICV) Variable position sliding sleeve valves were installed in each zone. Full tungsten carbide
trim was utilized for tolerance of extreme stimulation velocities. These ICVs operate by indexing sleeve actuation, providing
14 valve positions from fully open to fully closed. Synchronization of sleeves between two ICVs provides multiple control
combinations: both zones closed, both zones full open, one zone open and one closed, etc. Figure 6, below, illustrates the
wellbore configuration.
Contingencies Intelligent Well ICVs offer a mechanical alternative in the event remote control is not available. Profiles are
present in all trim to mechanically shift a valve, typically with a wireline stroker. Gas lift valves and the annular safety valve
were installed in the upper tubing string as a contingency for flow assurance.

Figure 6A conceptual drawing of the un-cemented liner with IWS inner completion string showing the relative
positions of completion components.
Equipment Testing and Modeling
Extensive tubular stress modeling was performed on the IWS tubing string for the entire well, but extra effort involving an
expert consulting company was placed on the tubing section between the production packer and the toe of the well. This area
involved the most complexity and the highest risk, because a new tubular design involving new components, multiple zones,
and new loading conditions was being simultaneously implemented. The well team identified at an early stage that high
tensile loads would develop in this section of the well due to thermal cooling during high rate stimulation with cold treating
fluids. Ballooning forces, caused by high bottomhole treating pressure conditions combined with partially depleted zones,
would further increase these already severe tensile loads.

SPE 166

A robust modeling tool that accounted for thermal effects was used to model the combination of these treating conditions. As
suspected, modeling results validated the severity of the combined loads and was very useful in defining the maximum downhole treating pressure criteria that could be tracked in real time to avoid tubular failures.
To initiate the acid stimulation treatment, the acid must breach the aluminum plugs and traverse the liner by openhole
annulus to reach the chalk reservoir. Although the chalk is highly acid soluble, there were concerns that the oil based mud
(OBM) occupying the annulus and the OBM filter cake on the borehole wall could impede acid/chalk contact stimulation
treatment. To minimize the potential of the OBM impeding the access of the acid to the chalk reservoir, an acid-reversible
OBM (Lim et al. 2011) was used to drill the reservoir section. This oil-external mud system was designed to be reversed to a
water-external state on contact with acid to allow ready access of the acid treatment stage to the filter cake and chalk
reservoir. Laboratory testing of the reversible OBM was conducted to optimize the formulation with regard to drilling
performance (rheology, fluid loss control, thermal stability, etc.) and acid reversibility. The results shown below (Fig. 7) led
to the selection of mud formulation 2 for this well.

Figure 7Effect of a 15% hydrochloric acid (HCl) solution on filter cake samples and an acid soluble plug. These
tests were conducted at the expected reservoir temperature of 275F.
Among the innovative design features of the fully completed, un-cemented liner were the Acid Soluble Plugs (ASP). These
plugs must provide a reliable pressure seal until the liner and IWS equipment were installed and the acid stimulation was
ready to be executed. At that time, the ASP must be dissolved to provide access to the reservoir. A range of plug designs
were reviewed and tested. Aluminum was selected as the best material for this application, as it is readily soluble at
atmospheric pressure and reacts vigorously with 15% HCl. Initial testing of the ASP prototypes at 150-250F and 300 psi
pressure indicated the plugs could be rapidly removed with 15% HCl. However, testing at higher pressure revealed that the
reaction rate was pressure dependent and the time to breach the plug with acid could be excessive for thick-wall ASP designs.
To accurately predict the time required to remove the ASP with acid, an extensive testing program was initiated to measure
acid break-through times at down-hole pressure and temperature. Numerous ASP designs were tested with various acid
formulations until a design was identified that provided the required pressure integrity and a companion acid formulation was
developed to give an acceptable break-through time of approximately 17 minutes at the formation temperature of 275F (Fig.
7, above).
The rock anchors, expansion joints, ACVs, and openhole packers were new designs with no field runs. As such, they required
rigorous qualification programs to ensure they survived the trip in hole and remained functional before, during, and after the
high-rate matrix acid stimulation. The following are examples of tests performed as part of the qualification programs:
ACV flow testing to ensure sufficient flow area for spotting of acid for aluminum plug dissolution and to calibrate
discharge coefficient required for post-stimulation analysis (Fig. 8, below).
Compressive and tensile load tests of rock anchors set inside cemented test fixture to replicate expected unconfined
compressive strength (UCS) of chalk borehole (Fig. 9a, below).
Expansion joint function testing in mud with high solids content and 5/100ft dogleg severity at the expected reservoir
temperature of 275F.
Comprehensive pressure and temperature cycle testing of openhole packers to simulate pressure setting, stimulation,
production, and depletion scenarios in hole sizes up to 10 in. diameter.

SPE 166

Figure 8Pressure drop vs. rate during ACV flow testing. The actual measurements matched calculations for a
discharge coefficient (C-factor) of 0.66.
In addition to the qualification programs mentioned above, multiple contingencies were prepared in case the toe valves did
not function as intended or a leak developed before all liner components could be set. To ensure compatibility with this
unique liner design, the following system integration tests were performed:
Pump through test of toe valve ball through ACV internal recess (Fig. 9b, below). The tests indicated that a pump rate of
5 bbl/min was required to move the 1.7 SG ball out of the recess, and 3 bbl/min for the 1.3 SG ball.
Drifting of liner components with retrievable hook-wall packer.
Drifting of liner components with cup type straddle packer assembly (Fig. 9c, below), including rotation-operated drag
block ball valve (Fig. 9d, below).

Figure 9Images of the (a) rock anchor cemented pull test fixture, (b) toe valve ball/ACV pump through test, (c) cup
type straddle packer elements, and (d) rotation-operated drag block ball valve.

Qualification of Intelligent Well Valves


To achieve successful acid stimulations in Ekofisk, high treating rates in the order of 60 bbl/min are employed to force the
acid deep into the chalk formation. A benefit of intelligent well technology is that it allows surface controlled isolation or
access to a specific interval allowing selective stimulation of the reservoir. Unfortunately, no test data was available to
determine the reliability of the Intelligent Well Completion System (Intelligent Well System, or IWS) during the high rate
acid treatment and during subsequent production operations. To determine the performance of the Intelligent Well System
under well treating conditions, a Computational Fluid Dynamics (CFD) model was created to predict the velocity and
pressure losses across the specific geometry of the IWS valve. After a number of model runs, it was determined that the
maximum allowable pressure drop of 300 psi at 60 bbl/min could not be avoided without a substantial redesign of the
hydraulic valve. As a result, additional CFD work was conducted and a final compromise of 500 psi maximum differential
pressure across the valve at 60 bbl/min was accepted. After completing the CFD modeling work, a full scale flow test of the

10

SPE 166

control valve and associated equipment was scheduled.


Requirements for the flow test included:
Determine if the system would remain functional after exposure to a flow rate of 60 bbl/min.
o Would pressure losses be excessive at design rates, limiting acid stimulation effectiveness?
o Would components be damaged by vibration under high velocity flow conditions?
o Would components be damaged by erosion during high rate flow?
Validate the CFD model by measuring pressure drop across different areas the system.
o Determine pressure drop across the hydraulic valve for water flow and for water with friction reducer.
o Determine pressure drop across clamps and control lines in the liner for water flow and for water with friction
reducer.

Figure 10Diagram of the flow loop designed to test and measure friction pressure losses across various IWS
components inside the liner during high rate matrix acid stimulation. Flow path 1 represents friction pressure losses
through intervals upstream of the zone being treated. Flow path 2 represents annular friction pressure losses in the
zone being treated.
To run these tests, a flow loop was designed to allow flow straight through the valve ID with the valve closed, or through the
open valve into the annulus (Fig. 10). The flow loop included a hydraulic valve with an internal diameter of 2.75 in. and
5.940 in.2 of flow area through the valve ports in the open position. A 3 in. gauge mandrel with dual pressure and
temperature sensors was included upstream of the hydraulic valve to measure the differential pressure across the valve ports.
Other pressure points included measurements of the pressure loss across a cross-coupling clamp and the annular pressure loss
between the tubing and casing. To validate friction pressure loss and flow rate measurements, two full tubing joints and
pressure gauges were installed downstream of the test fixture. By comparing this measured pressure loss to published
empirical data, the flow rate could be confirmed and the impact of adding friction reducer was established for various rates.
Testing was completed with full functionality of the dual sensor gauges and hydraulic valve. However, with the test fixture
disassembled, it was observed that the control line by-pass protector plate had broken in two. Vibration had caused the small
retaining cap screws to back out of their tapped holes, thereby allowing the protector plate to enter the flow stream and
separate. A simple redesign of the plate retention method proved successful at preventing vibration related damage. The
image in Fig. 11a, below, shows the broken protector plate after the initial post-test inspection. To the right is the new design
(Fig. 11b), which survived a full hour of annular flow at 60 bbl/min.

Figure 11Photos of two control line protector plates installed at the IWS valve flowports. (a) The damaged

SPE 166

11

protector plate from the first IWS flow loop test. (b) The retaining mechanism was redesigned and successfully
prevented damage to the protector plate in a subsequent flow test.
Operational Highlights
The complex nature of the naturally fractured chalk in the Ekofisk field makes it challenging to predict the pattern of the
waterflood, leaving the details of the final completion to be decided only after the well has been drilled. A sophisticated
logging plan was implemented to better characterize the wellbore and improve hole conditioning efforts. Among the LWD
tools was a Deep Directional Electro-Magnetic (DDEM) tool (Constable et al. 2012) which helped with trajectory planning
while drilling. Approximately halfway into the Tor formation, the DDEM readings indicated that the well was being drilled
into the lower, wet layers of the target Upper Tor formation, near the border of deeper Tor layers. After passing through a
fault, higher resistivity values were seen above the well and the decision was made to increase hole angle from 90 to 94,
steering up and into oil filled formation. The presence of sub-seismic faults and layers with high water saturations also plays
an important role in the decision on where to blank off sections with openhole packers and solid liner joints versus where to
expose the liner to the reservoir using acid soluble plugs. Figure 12, below, shows the point at which the decision was made
to build to 94 in an effort to remain in the oil saturated Tor interval.

Figure 12DDEM image superimposed over the associated reservoir model image. Distinct changes in the DDEM
image correlate well with fault lines captured in the model. The narrow black line is the well path, which was adjusted
while drilling to access the oil saturated Upper Tor interval.
Formation pressure points in the shallower Ekofisk formation, at the heel of the horizontal well, revealed lower than expected
reservoir pressures. Anticipating higher pressure in the deeper Tor formation, LCM and wellbore strengthening techniques
were utilized to manage mud losses to the low pressured heel interval. Drilling concluded 500 ft shallower than planned due
to increasing formation pressure and water saturations. Maximum pressure differential across the reservoir had increased to
1,600 psi, which would make cementing the liner very challenging. LWD logs indicated five pay zones of 1,400 ft in total
and four water saturated intervals making zonal isolation absolutely critical for long term production. In terms of the basis of
design, the B-19C well was an ideal candidate to field trial the un-cemented liner technology for its capability to provide
zonal isolation. A five zone completion was selected with two openhole packers between each adjacent interval for zonal
isolation in open hole.
Pipe conveyed, multi-arm mechanical caliper logs revealed that most of the 9 in. open hole was well gauged with hole
diameter ranging from 9.7- to 10-in., well within the openhole packer specifications. Results from LWD caliper readings
were in very close alignment with mechanical logs. A stiff reamer assembly was then run to bottom to remove any localized
doglegs or ledges that might prevent the 9.2 in. maximum OD liner equipment from reaching TD. The images below show
caliper log comparisons of three washout (in red) sections and the under gauge (in blue) toe section. These logs were
carefully evaluated to determine the optimal openhole packer setting depths.

12

SPE 166

Figure 13Caliper log comparisons for three washout (red) sections and the under-gauge (blue) toe section.
The 7 in. un-cemented liner make-up and running operation went well until the last 800 ft from TD, where sticking
occurred and the string was worked in order to reach TD. Actual hook loads were plotted against torque and drag modeling
results while the liner was being run (Fig. 14, below).

Figure 14Measured hook load values (orange) compared to simulated values. The actual hook load diverged from
simulation results at approximately 14,000 ft MD, the same depth at which the build to 94o was made.
After the 7 in. liner was run to TD and liner hanger was successfully set, a retrievable, hook-wall service packer was run
and set immediately below the liner hanger for pressure setting all openhole equipment. A leak developed at 8,200 psi while
attempting to pressurize the liner and prevented us from reaching the designed 10,000 psi setting pressure for the openhole
packers. The service packer was then re-set at different depths and the liner leak was located near an openhole packer at the
top of Zone B. An injection test with mud indicated the size of the leak matched the flow area of the openhole packer setting
ports. Before retrieving the service packer, it was used to pressure set all liner components below the leak with 10,000 psi. A
cup type, straddle-packer assembly was then run as per the contingency plan and proved successful in setting all 17
remaining pressure activated liner components located above the leak. Subsequent testing and investigation of the openhole
packer design has led to improvements that further minimize the risk of failure.

SPE 166

13

A five zone Intelligent Well System (IWS) inner string was then successfully installed with full functionality of hydraulically
controlled valves, mechanical isolation packers, and pressure and temperature gauges for each interval. Due to the known
liner leak at the top of Zone B, it was decided to spot 15% HCl through the valve at the bottom of the IWS string across
zones A and B to dissolve the aluminum plugs before setting the isolation packers. This was in lieu of relying on bursting the
ACV rupture disks to establish the required flow path after setting the isolation packers.
The isolation packers were set and, as expected, the pressure in each zone diverged from equilibrium to approach their
respective interval reservoir pressures (Fig. 15, below). This implied that every stage contained some aluminum plugs already
dissolved by the 15% HCl acid. It also confirmed the status of positive zonal isolation in the open hole. The pressure and
temperature data from each zone proved to be invaluable from all planned events and even some unplanned events.

Eko B19C Isolation Packers Set - 5 Zones Annulus Pressure


Ann A

Ann B

Ann C

Ann D

Ann E

4200
4100
4000

Pressure (psi)

3900
3800
3700
3600
3500
3400
3300
3200

Time

Figure 15Measured annulus pressure vs. time from five IWS zone gauges during the isolation packer setting
process. Pressure diverge at the moment the isolation packer elements make contact with the 7 in. liner ID.

Acid Stimulation Results


After moving the rig off location, lines were laid to the well and a dedicated stimulation vessel moved into position for the
acid treatment.
As noted in the previous sections the Ekofisk B-19C well encountered a number of oil and water intervals. After reviewing
the LWD logs, the completion liner was set up to stimulate five oil zones and to isolate wet zones with openhole packers.
This completion design is summarized in the figure below.

Figure 16Well trajectory and log-derived oil and water saturation predictions.

14

SPE 166

Each completion interval (A, B, C, D and E) was equipped with an IWS assembly consisting of a surface controlled valve
providing flow access to the formation and pressure and temperature gauges ported to tubing and annulus (Fig. 17a).

Figure 17Sequence diagram showing (a) the relative position of zone flow control and isolation equipment, (b) the
initial acid circulation path through the burst ACV rupture disks, and (c) high rate matrix acid stimulation through
the dissolved plug holes and ACV ports.
Each zone was selectively stimulated starting from Zone E (heel zone) to Zone A (toe zone) using the IWS flow control
valves.
For each treatment, the IWS valve in the treatment zone is opened. Tubing pressure is then increased to break the rupture
discs in the ACVs allowing fluid displacement to the target interval. The initial fresh water filling the tubing is followed by a
15% HCl/Mutual Solvent mixture pumped at low rate (Fig. 17b).
Acid pumping continues until the entire 7 in. liner x IWS string annulus has been displaced to acid. This places the 15%
HCl/Mutual Solvent acid system in direct contact with the Acid Soluble Plugs (ASP) which seal the holes in the 7 in. liner
and isolate the formation. The acid soluble plugs are then soaked for a few hours depending on down-hole temperature while
leak-off is monitored to determine the rate of plug dissolution. The HCl/Mutual Solvent acid system is then displaced with
freshwater and an injectivity test pumped at maximum rate consistent with well pressure limits. At the end of the injectivity
period, a hard shut-down is conducted to determine the instantaneous shut-in pressure (ISIP) and allow calculation of the
number and equivalent flow area for the dissolved acid soluble plugs (ASPs). If sufficient flow area has been exposed by the
acid then the main acid treatment can proceed as planned (Fig. 17c). If the flow area is deemed insufficient to pump the main
acid treatment then another HCl/Mutual Solvent treatment is pumped and another soak and injectivity step is conducted.
Table 1 summaries ASAP dissolution results after soaking with the 15% HCl/Mutual Solvent system and after pumping the
main acid treatment with 28% HCl. The average open perforation area was estimated to be 44% of the design area after the
15% HCl/Mutual Solvent soak process. This was slightly lower than our target open area of 67% prior to commencing the

SPE 166

15

main acid treatment. However, after the main acid treatment, the average plug open area rose to approximately 69% of the
design area. Assuming all of the acid soluble plugs have been at least partially dissolved, the average hole diameter is
estimated to be 0.13 in. after the 15% HCl/Mutual Solvent soak process, and 0.17 in. after the main 28% HCl acid treatment
compared to the 0.20 in. design diameter. Note that all these calculations are based on a discharge coefficient (C-factor) of
0.80.
TABLE 1B-19C ACID SOLUBLE PLUG OPENING RESULTS
ACV

Acid Soluble Plugs

Total

After Soaking

After Main Acid Treatment

Stage

Zone

(holes)

_____(num)_____

holes

(% of holes open)

___ (% of holes open)___

Zone E

21

25

38 %

85 %

Zone D

11

67 %

70 %

Zone C

35

39

38 %

67 %

Zone B

63

67

39 %

66 %

Zone A

56

60

38 %

58 %

After dissolving the acid soluble plugs, the flow path for the 28% HCl used in the main acid treatment is through the acid
soluble plug holes (Fig. 17c). The acid exits the 7 in. liner x IWS string annulus through the 0.20 in. acid soluble plug holes
and the four ACV holes at the bottom section of each treatment interval. As in a conventional cased hole limited entry
treatment, frictional pressure losses due to high velocity flow through the small plug holes limit the amount of fluid exiting
through any one point in the liner, thereby distributing flow more evenly along the openhole treatment interval. At design
acid rates of 0.7 to 1.3 BPM/perforation, average fluid velocities discharging through the 0.20 in. holes in the liner and into
the openhole range from 300 to 550 ft/sec and provide perforation pressure losses in the 1,000 psi to 3,000 psi range. These
high perforation pressure losses are far greater than the frictional pressure loss due to flow along the 7 in. liner x 4-1/2 in.
IWS string annulus and are also greater than formation breakdown and treating pressure differences along the openhole
completion interval.
The main acid treatments consisted of pumping 75 gallons of 28% HCl acid per foot of completion interval at high rate
followed by approximately 150 gallons of fresh water overflush per foot of interval. At design pump rates, down-hole
pressures at the reservoir face typically start out at or above formation parting pressure and very quickly drop below fracture
pressure as acid enters the chalk formation. This pressure behavior indicates that the bulk of the acid stimulation treatment is
pumped under matrix injection conditions conducive to wormholing of the near-wellbore chalk reservoir. A pressure plot of
a typical zone treatment is provided in Figure 18, below.
Ekofisk 2/4-B-19C Zone B Treatment
180

9,000
Annular Pressure

Acid Injection @ Reservoir Face

160

7,000

140
Fracture Closure Pressure

Pressure, psi

6,000

120

Acid at ICV

5,000

100

4,000

80

Reservoir-Face Pressure
Rate

Acid at ACV

3,000

60

Friction Reducer
Concentration

2,000

40

1,000

20
Wellhead Density

0
480

490

500

510

520

530

Time Elapsed, min

Figure 18High rate matrix acid stimulation data vs. time for Zone B.

540

550

560

Slurry rate, bpm


Wellhead density, ppg
Friction Reducer Concentration, gal/Mgal

8,000

16

SPE 166

As shown, bottom hole pressure at the reservoir face is above formation parting pressure as the acid is pumped down to the
reservoir. Once the 28% HCl acid reaches the chalk face/reservoir face, pressure rapidly drops below fracture pressure and
into the matrix injection realm. As the acid wormholes through the chalk formation, reservoir face pressure continues to
decline as pump rate increases. This injectivity improvement can be used to calculate skin evolution during the course of the
treatment in a manner similar to that introduced by Pacaloni and Tambini (1993) and later extended by Hill and Zhu (1996).
An analysis showing the evolution of effective wellbore radius versus injection time is provided in Figure 19, below.

Ekofisk B-19C Zone B Skin Evolution


10,000
rwa = rw = 0.4 f t and Skin = 0

9,000

rwa = 1.7, skin = -1.5


rwa = 5, skin = -2.5

8,000

rwa = 10, skin = -3.2


rwa = 20, skin = -3.9

DP, psi

7,000

rwa = 33, skin = -4.4

6,000

First Acid at Perf s

5,000

Overf lush

Acid Treatment Data

4,000
3,000
2,000
1,000
0
0.01

0.1

10

Injection Time, hrs

Figure 19Pressure change vs. time. The light green data points were measured while acid was being injected at the
reservoir face, resulting in matrix wormhole growth and an increase in the effective wellbore radius (rwa). The dark
blue data points were measured during the post-acid overflush, during which time wormhole length remained at a
constant 33 ft.
As shown, the effective wellbore radius grows from around 5 ft, corresponding to a skin of -2.5, at the time acid first reaches
the reservoir face to roughly 33 ft, corresponding to a skin of -4.4, at the end of the treatment. The large increase in effective
wellbore radius after fracture closure is considered strong evidence that the bulk of the stimulation benefit comes from acid
wormholes dissolved through the formation (Furui et al. 2012, Parts I and II). This type of analysis is performed for each
zone in the well to determine stimulation effectiveness and to provide skin values for initial rate forecasts and later
production evaluation.
A summary of zone permeability and acid stimulation results for the Ekofisk B-19C openhole completion are provided in the
table below:
TABLE 2B-19C ACID STIMULATION RESULTS

Completion

Interval

Average Zone

Maximum

Effective

Post Stim

Zone

Zone Length

K*L Value

Permeability

Pump Rate

Well Radius

Skin Value

Zone E

199 ft

103 md-ft

0.52 md

32 bbl/min

30 ft rwa

-4.34 Skin

Zone D

117 ft

234 md-ft

2.00 md

10 bbl/min

35 ft rwa

-4.49 Skin

Zone C

281 ft

762 md-ft

2.71 md

37 bbl/min

30 ft rwa

-4.34 Skin

Zone B

444 ft

848 md-ft

1.91 md

54 bbl/min

33 ft rwa

-4.42 Skin

Zone A

404 ft

764 md-ft

1.89 md

46 bbl/min

56 ft rwa

-4.95 Skin

Stage

As shown, all zones were successfully stimulated. Post-stimulation skins range from -4.34 to -4.95, corresponding to
effective wellbore radius values (rwa values) ranging from 30 to 56 ft. These openhole stimulation results are similar to
those seen in cased and perforated, fully completed wells in the field (Furui et al. 2012, Parts I and II).

SPE 166

17

Production Results
After conclusion of acid treating operations, the B-19C well was turned over to field production operations. The well was
flowed back at increasing rates with all zones open and after approximately 3-months stabilization time, a well test was
conducted. The objectives of this test program were to check the mechanical function of the sleeves, determine any zone-tozone communication and acquire data on the rates and types of fluids flowing from the various completed intervals.
TABLE 3B-19C WELL TEST RESULTS
Zone Status (O=Open, X=Closed)

Oil Rate

GOR

Water Cut

FWHP

FWHT

(STBOPD)

(scf/stb)

__(%)__

_(psia)_

_(oF)_

3580

1417

4.0

995

197

3564

1417

2.4

995

197

3395

1248

2.9

950

187

3409

1243

1.6

947

191

3439

1304

0.6

971

192

3347

687

1.0

941

180

3539

1406

0.0

1020

187

3119

1267

0.2

931

187

The test showed that all down-hole gauges were functioning as designed, allowing both annular and tubing pressure and
temperature from each zone to be recorded. The test program confirmed communication between the three bottommost Tor
zones: Zones A, B and C. It also indicated that one zone, Zone D, contributed more water than the others. After obtaining this
information, the water-bearing zone, Zone D, was shut-in to reduce the wells water cut and lighten fluid column. With this
adjustment, the well now requires less gas lift gas during start-up after shut-ins. Subsequent testing has also shown that oil
production has not been significantly affected as shown in the figure below. An added benefit of shutting off the water
producing zone, Zone D, was that the wells sulfate scaling potential was significantly reduced. This in turn means less
intervention for scale squeeze and potentially a prolonged lifespan of the well.

Figure 20(a) Production data vs. time, annotated to show choke increases and valve operation. (b) Sulfate content
increased with water cut (WCT) approximately 175 days since start of production. Barium sulfate scaling potential
was reduced by closing the IWS valve in zone D.
The low water cut measured in the B-19C wells early flow tests also indicated that the openhole packers had withstood the
high rate acid treatment and were effectively isolating the water zones from the acid stimulated oil zones. Review of acid
treatment data had shown some pressure/temperature communication late in the Zone C and Zone B acid treatments.
Analysis of the magnitude and duration of these leaks indicated they were small leaks; however, even a small leak while
pumping acid could provide a flow path for high pressure water during production operations. Fortunately, the wells
production data has shown that the high pressure water zones along the horizontal section are effectively isolated.

18

SPE 166

Figure 21Actual producing conditions for five zones plotted over the well path and log-derived oil and water
saturation predictions.
As shown in the figure above, the differential pressures between the water zones and producing pressures in the oil zones
range from 1000 psi to 2000 psi. At these high pressure differentials, significant water production would be expected if the
openhole packers were not providing an effective seal. As a result, the small acid treatment communication seen between
zones C and B and between Zones B and A are thought to be the result of matrix communication brought on by high rate
acidizing at both ends of the inter-zone blank sections.
Overall production results from the well have been encouraging. Despite lower than expected reservoir pressures and
reservoir net pay length, the B-19C well is producing at rates above expectations. The use of an intelligent well completion
system is this well allowed the very low pressure Zone E and the marginal Zone D intervals to be completed with the better
intervals seen at the toe of the well. This would not have been possible with a conventional completion.

Conclusions
An Openhole Un-Cemented Completion with a five-zone Intelligent Well System was successfully installed in the Ekofisk B19C well.
Acid stimulation results show that each of the five reservoir net pay intervals was effectively stimulated through the IWS
system without the rig on location.
Oil production from the well exceeds expectations despite lower than expected reservoir pressures and reservoir net pay
lengths.
Pressure communication was observed during high rate acid stimulation of the bottom three intervals. Future work will be
conducted to help characterize the nature of this pressure communication and optimize zonal isolation in future wells.
Production results show that the openhole packers placed along the horizontal section to isolate oil zones from adjacent high
pressure water zones are providing effective zonal isolation at production differential pressures in the 1,000 psi to 2,000 psi
range.
The Acid Soluble Plugs used to provide reservoir access along the un-cemented liner worked well.

Acknowledgements
The authors wish to thank the ConocoPhillips management and PL018 license partners ConocoPhillips Skandinavia AS,
Total E&P Norge AS, ENI Norge AS, Statoil Petroleum AS and Petoro AS for their permission to publish this paper. Special
recognition is made to the entire B-19C team, both onshore and offshore, whose dedication and hard work resulted in a
successful well design and completion operation. The numerous service companies who worked together seamlessly in both
the design and completion phases are also recognized for their roles in the collaboration that was necessary for success.

SPE 166

Nomenclature
ACV=Acid Circulating Valve
Al=Aluminum
AROBM=Acid Reversible Oil Based Mud
ASP=Acid Soluble Plugs
ASV= Annular Safety Valve
BBL=Barrel
BBL/MIN=Barrels Per Minute
C=Discharge Coefficient
CFD=Computational Fluid Dynamics
DDEM=Deep Directional Electro-Magnetic
DP=Pressure Drop
ECD=Equivalent Circulating Density
F=Fahrenheit
FT=Feet of length
HCl=Hydrochloric Acid
ICV=Interval Control Valve
ID=Internal Diameter
ISIP=Instantaneous Shut-In Pressure
ISO=International Standards Organization
IWS=Intelligent Well System
LB=Pound
LCM=Loss Control Material
LWD=Logging While Drilling
MD=Measured Depth
MWD=Measurement While Drilling
OBM=Oil Based Mud
OD=Outer Diameter
OH=Open Hole
PPG=Pounds Per Gallon fluid density
PSI=Pounds Per Square Inch Pressure
rwa=Effective Wellbore Radius
SG=Specific Gravity=Fluid Density/Density of Fresh Water
STBOPD=Stock Tank Barrels Oil Per Day
TD=Total Depth
TRSSSV= Tubing Retrievable Subsurface Safety Valve
TVD=True Vertical Depth
UCS=Unconfined Compressive Strength
V0=ISO Packer Test Qualification

19

20

SPE 166

References
Constable, M.V., Antonsen, F., Olsen, P.A. et al. 2012. Improving Well Placement and Reservoir Characterization with Deep
Directional Resistivity Measurements. Paper SPE 159621 presented at the SPE Annual Technical Conference and
Exhibition, San Antonio, Texas, 810 October. http://dx.doi.org/10.2118/159621-MS.
Furui, K., Burton, R.C., Burkhead, D.W. et al. 2012. A Comprehensive Model of High-Rate Matrix-Acid Stimulation for
Long Horizontal Wells in Carbonate Reservoirs: Part I-Scaling Up Core-Level Acid Wormholing to Field Treatments.
SPE J. 17 (1): 271-279. SPE-134265-PA. http://dx.doi.org/10.2118/134265-PA.
Furui, K., Burton, R.C., Burkhead, D.W. et al. 2012. A Comprehensive Model of High-Rate Matrix-Acid Stimulation for
Long Horizontal Wells in Carbonate Reservoirs: Part II-Wellbore/Reservoir Coupled-Flow Modeling and Field
Application. SPE J. 17 (1): 280-291. SPE-155497-PA. http://dx.doi.org/10.2118/155497-PA.
Hazel, P., Bardsen, J., Vasques, R., Pearcy, R., Hannah, N., and Singh, H., 2013. Open Hole Packers Provide Zonal Isolation
for a High Pressure Acid Stimulation within a Chalk Reservoir. Paper SPE 166391 presented at the SPE Annual
Technical Conference and Exhibition, New Orleans, Louisiana, 30 September2 October.
Hermansen, H. 2008. The Ekofisk Field: Achieving Three Times the Original Value. Presented at the 19th World Petroleum
Congress, 29 June3 July, Madrid, Spain. Paper 19-3966, World Petroleum Congress.
Hill, A.D. and Zhu, D. 1996. Real-Time Monitoring of Matrix Acidizing Including the Effects of Diverting Agents. SPE Prod
& Fac 11 (2): 95-101. SPE-28548-PA. http://dx.doi.org/10.2118/28548-PA.
Lim, L., Luyster, M., Patel, A. and Ravitz, R. 2011. New Approach for Completion Applications With Higher Internal Phase
Inverts Utilizing Innovative Surfactants. Paper SPE 144131 presented at the SPE European Formation Damage
Conference, Noorwijk, The Netherlands, 710 June. http://dx.doi.org/10.2118/144131-MS.
Paccaloni, G. and Tambini, M. 1993. Advances in Matrix Stimulation Technology. JPT 45 (3): 256-263. SPE-20623-PA.
http://dx.doi.org/10.2118/20623-PA.
Snow, S.E. and Hough, E.V. 1988. Field and Laboratory Experience in Stimulating Ekofisk Area North Sea Chalk
Reservoirs. Paper SPE 18225 presented at the 63rd SPE Annual Technical Conference and Exhibition, Houston, Texas,
25 October. http://dx.doi.org/10.2118/18225-MS.