Technology Management Division

Network Operation Dept. (Nile maintenance Team)


Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT












BSS Sites DDF & Data Base Standardization Project
Version no (0)





By: - Reda Omar
Date: - 14 November 2005
















Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


Preface:

The main aim from that project is finding a standard rules for
framing and connections of all PCMs & transmission systems in our
BSS network. And unify the connection and framing in all our sites
and BSCs.
The 2
nd
target is creating a unified standard transmission and
cabling, Frames data base in order to facilitate our work, increase
performance & quality of our maintenance jobs in order to decrease
down time and efficient use of our man power resources.






























Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT




Chapter 1: Standardization

I. Standardization of cabling and DDF framing.
This Part describes the standard way to be used in framing
different kind of cables in our Network sites.

1. 16 Pair cable framing over Alcatel DDF:

Pair 1
TX
Pair 2
TX
Pair 3
TX
Pair 4
TX
Pair 5
TX
Pair 6
TX
Pair 7
TX
Pair 8
TX Free free


Free free

Pair 9
RX
Pair
10 RX
Pair
11 RX
Pair
12 RX
Pair
13 RX
Pair
14 RX
Pair
15 RX
Pair
16 RX Free free
Free free


2. 10 Pair Cables framing over Alcatel DDF:

Pair 1
TX
Pair 2
TX
Pair 3
TX
Pair 4
TX
Pair 5
TX
Pair 6
TX
Pair 7
TX
Pair 8
TX
Pair 9
TX
Pair 10
TX




Pair 1
RX
Pair 2
RX
Pair 3
RX
Pair 4
RX
Pair 5
RX
Pair 6
RX
Pair 7
RX
Pair 8
RX
Pair 9
RX
Pair 10
RX



3. 16 Pair cable Framing over Alcatel Wire Rap DDF:


Pair 9 Port 1 RX Pair 1 Port 1 TX
Pair 10 Port 2 RX Pair 2 Port 2 TX
Pair 11 Port 3 RX Pair 3 Port 3 TX
Pair 12 Port 4 RX Pair 4 Port 4 TX
Pair 13 Port 5 RX Pair 5 Port 5 TX
Pair 14 Port 6 RX Pair 6 Port 6 TX
Pair 15 Port 7 RX Pair 7 Port 7 TX
Pair 16 Port 8 RX Pair 8 Port 8 TX

16 Pair Cable to Wire
Rap Block.
Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT



4. 16 _ Pair Cable Framing over Siemens Fiber DDF:
16 Pair Cable No. 1
Pair 1 Pair 1 Free Pair 9 Pair 9 Free Pair 2 Pair 2 Free Pair
10
Pair
10
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 3 Pair 3 Free Pair
11
Pair
11
Free Pair 4 Pair 4 Free Pair
12
Pair
12
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 5 Pair 5 Free Pair
13
Pair
13
Free Pair 6 Pair 6 Free Pair
14
Pair
14
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 7 Pair 7 Free Pair
15
Pair
15
Free Pair 8 Pair 8 Free Pair
16
Pair
16
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
16 Pair Cable No. 2

Pair 1 Pair 1 Free Pair 9 Pair 9 Free Pair 2 Pair 2 Free Pair
10
Pair
10
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 3 Pair 3 Free Pair
11
Pair
11
Free Pair 4 Pair 4 Free Pair
12
Pair
12
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 5 Pair 5 Free Pair
13
Pair
13
Free Pair 6 Pair 6 Free Pair
14
Pair
14
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 7 Pair 7 Free Pair
15
Pair
15
Free Pair 8 Pair 8 Free Pair
16
Pair
16
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
16 Pair Cable No. 3

Pair 1 Pair 1 Free Pair 9 Pair 9 Free Pair 2 Pair 2 Free Pair
10
Pair
10
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 3 Pair 3 Free Pair
11
Pair
11
Free Pair 4 Pair 4 Free Pair
12
Pair
12
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 5 Pair 5 Free Pair
13
Pair
13
Free Pair 6 Pair 6 Free Pair
14
Pair
14
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Pair 7 Pair 7 Free Pair
15
Pair
15
Free Pair 8 Pair 8 Free Pair
16
Pair
16
Free
Red TX Blue
TX
Free Red
RX
Blue
RX
Free Red
TX
Blue
TX
Free Red
RX
Blue
RX
Free
Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT



5. BSC Alcatel G2 External Alarm DDF:

Ext.
1
Ext.
2 Ext. 3 Ext. 4
Ext.
5 Ext. 6 Ext. 7 Ext. 8
Ext.
9 Ext. 10
Rect. PWR DOOR LOOP FIRE LOOP LOOP LOOP H.T
A/C
Control



Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


6. Standard Alcatel BSC G2 DDF:

TX part DDF:
HW1 TX HW2 TX HW3 TX HW4 TX HW5 TX HW6 TX Free Free free free
free Free free free


TP1 TX TP2 TX TP3 TX TP4 TX TP5 TX TP6 TX TP7 TX TP8 TX free free
free free

TP9 TX TP10 TX TP11 TX TP12 TX TP13 TX TP14 TX TP15 TX TP16 TX free free
free free

TP17 TX TP18 TX TP19 TX TP20 TX TP21 TX TP22 TX TP23 TX TP24 TX free free
free free

HW7 TX HW8 TX HW9 TX
HW10
TX
HW11
TX
HW12
TX free Free free free
free Free free free

TP25 TX TP26 TX TP27 TX TP28 TX TP29 TX TP30 TX TP31 TX TP32 TX free free
free free

TP33 TX TP34 TX TP35 TX TP36 TX TP37 TX TP38 TX TP39 TX TP40 TX free free
free free

TP41 TX TP42 TX TP43 TX TP44 TX TP45 TX TP46 TX TP47 TX TP48 TX free free
free free

TP49 TX TP50 TX TP51 TX TP52 TX free free free Free free free
free free free Free free free


Free Position





Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


Rx Part DDF:

HW 1
RX HW2 RX HW3 RX HW4 RX HW5 RX HW6 RX free Free free free
free Free free free

TP1 RX TP2 RX TP3 RX TP4 RX TP5 RX TP6 RX TP7 RX TP8 RX free free
free free

TP9 RX
TP10
RX
TP11
RX
TP12
RX
TP13
RX
TP14
RX
TP15
RX
TP16
RX free free
free free

TP17
RX
TP18
RX
TP19
RX
TP20
RX
TP21
RX
TP22
RX
TP23
RX
TP24
RX free free
free free

HW7 RX HW8 RX HW9 RX
HW10
RX
HW11
RX
HW12
RX free Free free free
free Free free free

TP25
RX
TP26
RX
TP27
RX
TP28
RX
TP29
RX
TP30
RX
TP31
RX
TP32
RX free free
free free

TP33
RX
TP34
RX
TP35
RX
TP36
RX
TP37
RX
TP38
RX
TP39
RX
TP40
RX free free
free free

TP41
RX
TP42
RX
TP43
RX
TP44
RX
TP45
RX
TP46
RX
TP47
RX
TP48
RX free free
free free

TP49
RX
TP50
RX
TP51
RX
TP52
RX free free free Free free free
free free free Free free free









Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


Chapter 2: Labeling
The labeling phase is a very important work phase as it will
maintain good knowledge and secures our data base from
misunderstanding and safe it against lost by aging. So, labels must be
put with extra care and we have maintained it over the time by
checking it during PM and replace the faulty or bad labels.

1. DDF Labeling:
DDF must be labeled with a plastic water resistance label and it
must have the following data:
1. Cable no. & Direction or MW Link direction name.
2. Ports of MW, Fiber or cables (for Example ports from 1:8 or
ports from 9:16, Ports from 17 to 24 or 21 for SDH
ETC.).
3. Each DDF block should have at list 2 labels. One from up
side and other from down side or lift / right side.
-----------------------------------------------------------------------------
2. PCM cable Labeling:
PCM cables should be labeled with a Plastic ring label as a 3 Ring
on each side in the following position:
One Ring label on the end of cable.
2
nd
Ring label fixed after 1 meter from the end of cable.
3
rd
Ring label fixed after 2 meters from the end of cable.

That means that each cable should have 6 plastic Ring labels
which should have the following Data:

1. Cable Capacity:
1P: for Cable 1 pair PCM cable.
2P: For 2 pair PCM cables.
10P: For 10 Pair PCM cables.
16P: For 16 Pair PCM cables.

2. Direction of Cable:
F: For fiber Room.
B1: For 2
nd
Shelter of BSC 1 (old BSC Shelter).
B2: For 3
rd
Shelter of BSC 2.
N1: For 1
st
Nodal Shelter.
MW: For Cable goes to MW link.

Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


4. Number of Cable:
It must be labeled according to number of cables goes
to the same direction. For example (16P_ F_ 1) means 16
Pair cable to fiber room, cable no. 1.

I . 16 pair cable of MW Links Case:
For 16 Pair Cable which coming from a MW link it must has the
following data:
1. MW Link Name as (MW_ Destination/ Remote site _ PCM
1:8/ 9:16).
2. PDH/ SDH: to differentiate between SDH and PDH MW links
in the same sites or in the same direction. (It must be put,
even if it is for future use especially at Cairo area).
------------------------------------------------------------------
3. Rectifier Fuses Labeling:

The label over the rectifier fuse must contain the following data:
Fuse Feeding Equipment.
For Example: BTS1, BTS 2, MW _ Remote Site _ 1 / MW_
Remote site _ X (for MW IDU extension) ...

Fuse Rating by Ampere: for Example 10 A / 20 A / 63 A ..

3. DC power cable Labeling:
DC power cables must be labeled with a 3 Ring Plastic
labels from each side as follows:
One Ring label on the end of cable.
2
nd
Ring label fixed after 50 cm from the end of cable.
3
rd
Ring label fixed after 1 meter from the end of cable.
And it must contain the same data as DC fuse label.










Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


2
nd
Part: BSS Site standard Documentation


Each site should have a Site file contains the following data and
document.
1. Updated Shelter lay out.
Shelter lay out created with dimension during site PM and has a
clear representation for all equipment in the site with its location and
draw with Any CAD program or even Excel sheet. This Site lay out
must be reviewed and updated after each Site PM / every 4 Months.



2. Updated Main DDF lay out:
Drawing for DDF blocks using MS_ Excel or other related SW
which must unified / available for all our teams and
subcontractors.

3. Site Data base sheets:
It is a Data base sheet creating by using MS _ Excel and contain
the following data fields:
1) Transmission Data base sheet
Transmission Data base sheet creating by using MS _ Excel
and contain the following data fields:
1. Transmission Link named by remote target site.
2. RX/ TX frequency.
3. TX Power & Nominal RX power in dBm.
4. Link E1 capacity.
5. Link transmission Securitization (I.e. 1+1, 1+1 HSB, 1+0,
1+1 MUX protection, Etc.).
6. Each Port with Served site (i.e. Port 1: Site Ramsis, Port 2:
BSC Casino Highway 1).
7. Link SNMP supervision IP address.
8. Link Identity code.
9. Link installation parameters.
10. Any other related parameters according to MW or link
supplier technical manual.


Note:
Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT


16 / 10 pair will be treated as a transmission link between two
locations as the following example:
I. 16 Pair cable no 1 to fiber room will be named as (cable 1 to
fiber long room and its ports will be port 1 to port 8 . & so on).
ii. 16 pair cable between Minya 1 & M inya 2 shelters in Minya
Exchange will be named as ( Cable 1: Minta 1 _ Minya 2 and its ports
will be port 1 to port 8 )

2) Power system data base sheet.

Power system Data base sheet creating by using MS _ Excel and
contain the following data fields:

1. Power meter / temporary power connection availability /
type (I.e. single or 3 phase with its KWH capacity / location
of power meter/ power cable diameter in mm/ Last
intervention PM reading).
2. Generator Data if applicable.
3. Battery data. (Type, cell voltage, AH capacity, quantity, last
PM battery test status by Volt/ time).
4. Rectifier Data (Type, Part no. , Model, S/ N & Rectifier Module
type/ part no. / SN / NO. No of modules / Module ampere
capacity).

3) Cooling & fire & Security system data base sheet.

Cooling system Data base sheet creating by using MS _ Excel and
contain the following data fields:
1. A/ C units data (Type / Model / SN / capacity / last intervention
status %, Compressor capacity/ model / SN, A/ C fan unit
Model no. / SN & A/ C control & alarm system Type / Model
/ SN / status).
2. Fire system Data (Fire Panel Type/ model/ SN, Fire sensors
Type/ model/ SN, Fire extinguisher Type/ model/ SN,
Temperature sensor Type / Model / SN / status).
3. Door sensor & other intervention security systems
Type/ model/ SN.
4. Earth Bar data (Location / other related data / status).


Technology Management Division
Network Operation Dept. (Nile maintenance Team)
Report
Title
Maintenance Process _ Standardization.
Author: Reda Omar Date Page

Title: BSS Sr. Team Leader. 14 October 05 12/12



Network Operation Department
NGLI BSS maintenance team
MobiNil
World Trade Centre,
1191 Cornish El Nil, Boulaq
CAIRO - EGYPT



4) Antenna & RF feeders data base
Antenna Data base sheet creating by using MS _ Excel and
contain the following data fields:
1. GSM/ DCS Antennas (Type / Model / band / max TX power /
gain / location / labeling / status from last PM).
2. MW antennas (Type / Model / band / Polarization/ labeling /
gain / location / status from last PM).
3. RF cables (Type / diameters / connectors / status from last
PM).

5) Equipment data base:

Data base sheet creating by using MS _ Excel and contain the
following data for all installed equipment inside / outside site shelter.
Equipment name &supplier (if available) / Model / part no. /
SN / status.
Note:
For BTS equipment just safe copies from BTS terminal
inventory file during site PM.