Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
BSS Sites DDF & Data Base Standardization Project Version no (0)
By: - Reda Omar Date: - 14 November 2005
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
Preface:
The main aim from that project is finding a standard rules for framing and connections of all PCMs & transmission systems in our BSS network. And unify the connection and framing in all our sites and BSCs. The 2 nd target is creating a unified standard transmission and cabling, Frames data base in order to facilitate our work, increase performance & quality of our maintenance jobs in order to decrease down time and efficient use of our man power resources.
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
Chapter 1: Standardization
I. Standardization of cabling and DDF framing. This Part describes the standard way to be used in framing different kind of cables in our Network sites.
3. 16 Pair cable Framing over Alcatel Wire Rap DDF:
Pair 9 Port 1 RX Pair 1 Port 1 TX Pair 10 Port 2 RX Pair 2 Port 2 TX Pair 11 Port 3 RX Pair 3 Port 3 TX Pair 12 Port 4 RX Pair 4 Port 4 TX Pair 13 Port 5 RX Pair 5 Port 5 TX Pair 14 Port 6 RX Pair 6 Port 6 TX Pair 15 Port 7 RX Pair 7 Port 7 TX Pair 16 Port 8 RX Pair 8 Port 8 TX
16 Pair Cable to Wire Rap Block. Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
4. 16 _ Pair Cable Framing over Siemens Fiber DDF: 16 Pair Cable No. 1 Pair 1 Pair 1 Free Pair 9 Pair 9 Free Pair 2 Pair 2 Free Pair 10 Pair 10 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 3 Pair 3 Free Pair 11 Pair 11 Free Pair 4 Pair 4 Free Pair 12 Pair 12 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 5 Pair 5 Free Pair 13 Pair 13 Free Pair 6 Pair 6 Free Pair 14 Pair 14 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 7 Pair 7 Free Pair 15 Pair 15 Free Pair 8 Pair 8 Free Pair 16 Pair 16 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free 16 Pair Cable No. 2
Pair 1 Pair 1 Free Pair 9 Pair 9 Free Pair 2 Pair 2 Free Pair 10 Pair 10 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 3 Pair 3 Free Pair 11 Pair 11 Free Pair 4 Pair 4 Free Pair 12 Pair 12 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 5 Pair 5 Free Pair 13 Pair 13 Free Pair 6 Pair 6 Free Pair 14 Pair 14 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 7 Pair 7 Free Pair 15 Pair 15 Free Pair 8 Pair 8 Free Pair 16 Pair 16 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free 16 Pair Cable No. 3
Pair 1 Pair 1 Free Pair 9 Pair 9 Free Pair 2 Pair 2 Free Pair 10 Pair 10 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 3 Pair 3 Free Pair 11 Pair 11 Free Pair 4 Pair 4 Free Pair 12 Pair 12 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 5 Pair 5 Free Pair 13 Pair 13 Free Pair 6 Pair 6 Free Pair 14 Pair 14 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Pair 7 Pair 7 Free Pair 15 Pair 15 Free Pair 8 Pair 8 Free Pair 16 Pair 16 Free Red TX Blue TX Free Red RX Blue RX Free Red TX Blue TX Free Red RX Blue RX Free Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
Chapter 2: Labeling The labeling phase is a very important work phase as it will maintain good knowledge and secures our data base from misunderstanding and safe it against lost by aging. So, labels must be put with extra care and we have maintained it over the time by checking it during PM and replace the faulty or bad labels.
1. DDF Labeling: DDF must be labeled with a plastic water resistance label and it must have the following data: 1. Cable no. & Direction or MW Link direction name. 2. Ports of MW, Fiber or cables (for Example ports from 1:8 or ports from 9:16, Ports from 17 to 24 or 21 for SDH ETC.). 3. Each DDF block should have at list 2 labels. One from up side and other from down side or lift / right side. ----------------------------------------------------------------------------- 2. PCM cable Labeling: PCM cables should be labeled with a Plastic ring label as a 3 Ring on each side in the following position: One Ring label on the end of cable. 2 nd Ring label fixed after 1 meter from the end of cable. 3 rd Ring label fixed after 2 meters from the end of cable.
That means that each cable should have 6 plastic Ring labels which should have the following Data:
1. Cable Capacity: 1P: for Cable 1 pair PCM cable. 2P: For 2 pair PCM cables. 10P: For 10 Pair PCM cables. 16P: For 16 Pair PCM cables.
2. Direction of Cable: F: For fiber Room. B1: For 2 nd Shelter of BSC 1 (old BSC Shelter). B2: For 3 rd Shelter of BSC 2. N1: For 1 st Nodal Shelter. MW: For Cable goes to MW link.
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
4. Number of Cable: It must be labeled according to number of cables goes to the same direction. For example (16P_ F_ 1) means 16 Pair cable to fiber room, cable no. 1.
I . 16 pair cable of MW Links Case: For 16 Pair Cable which coming from a MW link it must has the following data: 1. MW Link Name as (MW_ Destination/ Remote site _ PCM 1:8/ 9:16). 2. PDH/ SDH: to differentiate between SDH and PDH MW links in the same sites or in the same direction. (It must be put, even if it is for future use especially at Cairo area). ------------------------------------------------------------------ 3. Rectifier Fuses Labeling:
The label over the rectifier fuse must contain the following data: Fuse Feeding Equipment. For Example: BTS1, BTS 2, MW _ Remote Site _ 1 / MW_ Remote site _ X (for MW IDU extension) ...
Fuse Rating by Ampere: for Example 10 A / 20 A / 63 A ..
3. DC power cable Labeling: DC power cables must be labeled with a 3 Ring Plastic labels from each side as follows: One Ring label on the end of cable. 2 nd Ring label fixed after 50 cm from the end of cable. 3 rd Ring label fixed after 1 meter from the end of cable. And it must contain the same data as DC fuse label.
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
2 nd Part: BSS Site standard Documentation
Each site should have a Site file contains the following data and document. 1. Updated Shelter lay out. Shelter lay out created with dimension during site PM and has a clear representation for all equipment in the site with its location and draw with Any CAD program or even Excel sheet. This Site lay out must be reviewed and updated after each Site PM / every 4 Months.
2. Updated Main DDF lay out: Drawing for DDF blocks using MS_ Excel or other related SW which must unified / available for all our teams and subcontractors.
3. Site Data base sheets: It is a Data base sheet creating by using MS _ Excel and contain the following data fields: 1) Transmission Data base sheet Transmission Data base sheet creating by using MS _ Excel and contain the following data fields: 1. Transmission Link named by remote target site. 2. RX/ TX frequency. 3. TX Power & Nominal RX power in dBm. 4. Link E1 capacity. 5. Link transmission Securitization (I.e. 1+1, 1+1 HSB, 1+0, 1+1 MUX protection, Etc.). 6. Each Port with Served site (i.e. Port 1: Site Ramsis, Port 2: BSC Casino Highway 1). 7. Link SNMP supervision IP address. 8. Link Identity code. 9. Link installation parameters. 10. Any other related parameters according to MW or link supplier technical manual.
Note: Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
16 / 10 pair will be treated as a transmission link between two locations as the following example: I. 16 Pair cable no 1 to fiber room will be named as (cable 1 to fiber long room and its ports will be port 1 to port 8 . & so on). ii. 16 pair cable between Minya 1 & M inya 2 shelters in Minya Exchange will be named as ( Cable 1: Minta 1 _ Minya 2 and its ports will be port 1 to port 8 )
2) Power system data base sheet.
Power system Data base sheet creating by using MS _ Excel and contain the following data fields:
1. Power meter / temporary power connection availability / type (I.e. single or 3 phase with its KWH capacity / location of power meter/ power cable diameter in mm/ Last intervention PM reading). 2. Generator Data if applicable. 3. Battery data. (Type, cell voltage, AH capacity, quantity, last PM battery test status by Volt/ time). 4. Rectifier Data (Type, Part no. , Model, S/ N & Rectifier Module type/ part no. / SN / NO. No of modules / Module ampere capacity).
3) Cooling & fire & Security system data base sheet.
Cooling system Data base sheet creating by using MS _ Excel and contain the following data fields: 1. A/ C units data (Type / Model / SN / capacity / last intervention status %, Compressor capacity/ model / SN, A/ C fan unit Model no. / SN & A/ C control & alarm system Type / Model / SN / status). 2. Fire system Data (Fire Panel Type/ model/ SN, Fire sensors Type/ model/ SN, Fire extinguisher Type/ model/ SN, Temperature sensor Type / Model / SN / status). 3. Door sensor & other intervention security systems Type/ model/ SN. 4. Earth Bar data (Location / other related data / status).
Technology Management Division Network Operation Dept. (Nile maintenance Team) Report Title Maintenance Process _ Standardization. Author: Reda Omar Date Page
Title: BSS Sr. Team Leader. 14 October 05 12/12
Network Operation Department NGLI BSS maintenance team MobiNil World Trade Centre, 1191 Cornish El Nil, Boulaq CAIRO - EGYPT
4) Antenna & RF feeders data base Antenna Data base sheet creating by using MS _ Excel and contain the following data fields: 1. GSM/ DCS Antennas (Type / Model / band / max TX power / gain / location / labeling / status from last PM). 2. MW antennas (Type / Model / band / Polarization/ labeling / gain / location / status from last PM). 3. RF cables (Type / diameters / connectors / status from last PM).
5) Equipment data base:
Data base sheet creating by using MS _ Excel and contain the following data for all installed equipment inside / outside site shelter. Equipment name &supplier (if available) / Model / part no. / SN / status. Note: For BTS equipment just safe copies from BTS terminal inventory file during site PM.