You are on page 1of 2

MTS_CDMA_FR_600023_PE_CR_Rev 1.

3

CTO / National Network Operations
PE / CR Request
No.
<PE-circle name-Eqpt
name-xxxxx>
Date 2-May-14 Circle Kolkata
Initiated By SANDEEP GUPTA Mobile No 8697826932 Department Technical
Type of
Network Element
Severity
Proposed Date of
PE / CR
3-May-14
Proposed Start
Time
0:00 Proposed End Time 6:00
Outage
Duration (if any)
15 MIN
MOP and Testing
Plan available
NO
Informed OEM TAC
Support
NO
If outside
Maintenance
Window (Provide
explanation here)
MTS Representative
name and Mobile No.
Vendor
Representative name
and Mobile No.
Date of Completion Actual Start Time Actual End Time
Activity Executed By
(Name & Number)
Results Verification
If activity failed
(Reason of failure)
PE for SPARE PARTS TESTING(HCPM,CMPT) at DUM DUM SUBASH NAGAR
(WB_NTP_kolk_080)
Reason for Issue of PE / CR
Existing Configuration Details NA
Planned Configuration Details
ISSUED BY NATIONAL NETWORK OPERATIONS
If others (Provide explanation here:) PE for SPARE PARTS TESTING at DUM DUM SUBASH NAGAR (WB_NTP_kolk_080)
NETWORK CONFIGURATION CR / PE TEMPLATE
BTS Minor (Non Traffic Affecting)
Type of PE
(Short Description)
OTHERS
Deepak Sinha-9674729115
Sandeep Gupta-8697826932
Maintenance window time
(00:00 Hrs to 06:00 Hrs)
NO
Details of sites/ nodes on which activity
to be conducted
DUM DUM SUBASH NAGAR (WB_NTP_kolk_080)
Prasenjit Paul-9143110400
MTS - Proprietary and Confidential
This document should not be reproduced or shared in part or in entirety with anyone without written permission from issuing authority in MTS
1 OF 2
MTS_CDMA_FR_600023_PE_CR_Rev 1.3

CTO / National Network Operations
PE / CR Request
No.
<PE-circle name-Eqpt
name-xxxxx>
Date 2-May-14 Circle Kolkata
Initiated By SANDEEP GUPTA Mobile No 8697826932 Department Technical
Information for PE/ CR
shared with other
functional Area
Name, Designation &
Deptt. of Other
Functional Area
Representative
First Level Approval
Second Level
Approval
Guidelines:
Planned Event / Change Request number should be identified with PE / CR followed by circle name, equipment name and consecutive number of 5
digits.
e.g. PE-Kerala-MSC-00001
Circle team will take approval from Head - NNO for any critical planned activity on Core Elements (MSC, MGW, HLR, BSC,LI, PDSN etc) like upgrades,
updates etc.
Request will be sent on "Outage.networkoperations@mtsindia.in" for approval from Head National Network Operations.
Details of completion should be filled by NoC / CoC person.
Subject format :<Circle: PE/CR no.>/<NE detail>/<PE description >/<date (DD-MMM-YYYY)> /<Time:--:-- to --:-- >/outage: Y/N
e.g. Rajasthan: 000492/MSC/Software Upgrade/ 31-SE-2010/00:00 to 06:00/outage: Y
Records of PE / CR with complete details should be maintained (Separate record for each equipment)
Information regarding "Planned Event / Change Request" (Schedule, Location, Outage & any other relevant information) needs to be sent to other
functional (CSD, Sales, IT , Marketing, other) area, if required.
Approval
1) Activities with no outage or small outages or Non Service Affecting( Impacting up to 5 nos.of BTS) - Circle O&M head, CSD, Marketing and Sales to
approve
2) Major (Potential Traffic Affecting)outages (More than 5 BTS) - Circle O&M head, Circle CTO, CSD, Marketing and Sales to approve
3) BSC rehoming, BSC upgrade, Loop configuration change etc- Circle CTO, Head- NNO, CSD, Marketing and Sales to Approve
4) MSC, HLR Upgrade any critical (Traffic Affecting ) activity where complete MSC network getting effected etc - Circle CTO, Head- NNO, CSD,
Marketing and Sales to Approve
Remarks (if any)
CSD Marketing Sales IT Others
MTS - Proprietary and Confidential
This document should not be reproduced or shared in part or in entirety with anyone without written permission from issuing authority in MTS
2 OF 2