Professional Documents
Culture Documents
2014
NOTICE
This is for the information to ECE/EEE students those who have completed VAP training that they are required to prepare the project reports as per the format given below and submit their reports to undersigned latest by 22nd April 2014. All the reports should be hard bound. They are required to prepare two hard copies of the report; one copy is to be submitted to the department & second to be retained by the student. Soft copy of the report in PDF format is also to be submitted.
3. 4. 5. 6. 7. 8. 1 2 3 4. 5. 9. 10. 11.
2.
3. 4. 5.
6.
7. 8.
9.
10.
11.
12. 13.
PROJECT REPORT
(Times New Roman, 24 pt. Bold)
Hmr logo
SUBMITTED TO:
Department of Electronics & Communication Engineering (16 size) HMR INSTITUTE OF TECHNOLOGY & MANAGEMENT Hamidpur, Delhi.110036
I hereby declare that the Project Report entitled ("Title of the project") is an authentic record of my own work of VAP Training during the ------- semester for the award of degree of B.Tech. (Electronics & Communication Engineering), HMR Institute of Technology & Management., Hamidpur Delhi, under the guidance of (Name of Project Guide). (12 size)
Certified that the above statement made by the student is correct to the best of our knowledge and belief.