Professional Documents
Culture Documents
4.5 MW (3x)
3.96 MW (6x)
6 MW (3x)
15.1 MW (8x)
30 MW (20x)
12 MW (6x)
34 MW (17x)
8 MW (4x)
62 MW (31x)
23 MW (10x)
46 MW (23x)
28 MW (14x)
5.4 MW (6x)
4.8 MW (8x)
4 MW (2x)
/
43.7 MW (19x)
4.6 MW (2x)
11.5 MW (5x)
1.75 MW (1x)
/
14.7 MW (7x)
34 MW (16x)
16.1 MW (7x)
42 MW (21x)
/
75.9 MW (33x)
/
96.6 MW (42x)
2.64 MW (4x)
State-owned
Private
4
copyright
2014 ITRI
Target for Wind Energy
Ref. Bureau of Energy, Ministry of Economic Affairs, TAIWAN
Thousand Wind Turbines Project
Short-termTarget: 4 demonstration offshore wind turbines by 2015.
Mid-termTarget: Offshore 320 MW, total 1,520 MW by 2020.
Long-termTarget: Offshore 3,000 MW, total 4,200 MW by 2030.
0
200
400
600
800
1,000
1,200
0
600
1,200
1,800
2,400
3,000
3,600
4,200
C
a
p
a
c
i
t
y
(
M
W
)
Year 2013 2015 2020 2025 2030
MW WTs MW MW MW MW WTs
Onshore 614 311 814 1,200 1,200 1,200 450
Offshore 0 0 15 320 1,520 3,000 600
Total 614 311 829 1,520 2,720 4,200 1,050
I
n
s
t
a
l
l
e
d
C
a
p
a
c
i
t
y
(
M
W
)
T
u
r
b
i
n
e
s
1,200
1,000
800
600
400
200
0
4,200
3,600
3,000
2,400
1,800
1,200
600
0
1,050
311
Installed Capacity
Turbines
5
copyright
2014 ITRI
Promoting Offshore
Feed-in Tariff (FIT)
Onshore: NT$2.6338 / kWh during 2014
Offshore: NT$5.6076 / kWh during 2014
Offshore Demonstration Incentive Program (DIP)
Officially announced on 3
rd
July, 2012
4 Demonstration Turbines by 2015, 3 Demonstration Wind Farms by 2020
Government provides subsidy for both equipment & developing processes
Zonal Development
Industrial Zone for offshore wind farms (e.g. Round 3 of UK)
Commercial scale for cost down
Year 2015 2020 2030
Onshore 814 1,200 1,200
Offshore 15 320 3,000
Total 829 1,520 4,200
6
copyright
2014 ITRI
Offshore Demonstration Incentive Program
3 Demonstration Wind Farms
Winners (Fuhai, Formosa & TPC) officially announced on 9
th
January 2013
Subsidize 50 % cost of the Demonstration Turbines (FIT advances/interest-free loan)
Subsidize NT$250m for preparatory (wind mast, EIA, etc.) expense
Year 0
(2012)
Year 1
(2013)
Year 2
(2014)
Year 3
(2015)
Year 4
(2016)
Year 5
(2017)
Year 6
(2018)
Year 7
(2019)
Year 8
(2020)
Year 9
(2021)
Year 10
(2022)
Proposal
deadline
(Oct. 2012)
Demonstration
Turbines
commissioned
(Dec. 2015)
Demonstration
Wind Farms
commissioned
(Dec. 2020)
Plan
initiation
(Jul. 2012)
Proposal
review
complete
(Jan. 2013)
Establishment
Permit
(Dec. 2014)
Construction
Permit
(Dec. 2018)
Formosa
Fuhai
TPC
5 m depth
12 nm
territory
7
copyright
2014 ITRI
Specifications & Requirement of DIP
Met Mast
Water depth: 10 m or more
Height: 70 m or more
Demonstration Turbines
MW
MW
Annual Investment
2013-2015: 7.3b/yr
2016-2020: 14.1b/yr
2021-2030: 42.6b/yr
Offshore (MW)
Onshore (MW)
Accumulated Investment
2030 2025 2020 2015 2013
NT$546.6b NT$311.3b NT$120.5b NT$50.1b NT$35.6b
N
T
$
i
n
b
i
l
l
i
o
n
Offshore Wind Farm Investment: NT$159m/MW
Offshore 3,000 MW by 2030 NT$480 billion investment
10
copyright
2014 ITRI
Investment by Service Provider
Source: DECC
Manufacture
Fleet investment
NT$15-22.5b
(100-150m/ship)
R&D investment
NT$12b
(80m/GW)
Turbines (component/system/subsystem)
Electric System (cable/substation)
Foundation/Sub-structure
Marine Construction & Installation
O&M for Wind Turbines
Fleet Supply
Construction
Source: DECC
Foundation
12.4%
Turbine
25%
O&M
37.4%
15.8%
Construction
Misc 0.5%
Planning 2.5%
Electric System 6.4%
11
copyright
2014 ITRI
Design against Environment
Turbine design resistant to typhoons
Foundation design resistant to earthquakes
Environmental Impact Assessment
Migrating birds & ocean mammals
Local fishery, navigation and harbor development
Project Management
Risk assessment and mitigation
Vessel coordination and construction scheduling
Risk Identifications
Pictures from: Vergnet, YCPS, Centrica
12
copyright
2014 ITRI
Successful Experiences of Wind Farm Development in Europe
Strategy: demonstration vs commercial
EIA solutions: navigation, fishery, environmental activists
Onshore Infrastructure: design of onshore base for offshore wind farm industry
Finance & Insurance: project finance and risk management
Taiwan Offshore Demonstration Wind Farm Project
Developer: general consulting, project management and financial advice
Equipment: typhoon-proof design technology
Service: marine construction and O&M
Offshore Test Wind Farm
Offshore test site for new turbine technology (e.g. Hunterston or EOWDC)
International Interactions of Offshore Wind
13
copyright
2014 ITRI
All rights reserved. No part of this confidential report may be reproduced
in any form or by any means without written permission from ITRI.
Thousand Wind Turbines Promotion Office
http://www.twtpo.org.tw