PLTU BUNTOK 2x7 MW


CONTRACTOR DOCUMENT REVIEW
DATE
COMM NO.
APPROVED
APPROVED AS NOTE
NOT APPROVED
INFORMATION

CIVIL
MECH
ELECT
I&C
SUPPORT
CONTRACTOR
RECORD
WORKING DOCUMENT

DATE
COMM NO.

A
REV

IFR
STATUS

ISSUED FOR REVIEW


ISSUE DESCRIPTION

7/6/2011
EDT
HRD
DATE PREPARED CHECKED

SGN
REVIEWED

AMI
APPROVED

PT PLN (PERSERO) PUSAT ENJINIRING KETENAGALISTRIKAN


PLN NO.

0 7 4 -

CONTRACTOR :

SUBCONTRACTOR / DESIGN INSTITUTE :

SUBCONTRACTOR DOCUMENT NO :
SIGNATURE
EPC APPD
APPROVED
REVEIWED
CHECKED
PREPARED

DATE

TITLE :

CALCULATION OF BOILER PILE CAP


DOCUMENT NO :

T3125-CA/C/

STAGE :
DETAIL
DESIGN
REV.

PLTU BUNTOK 2x7 MW KALIMANTAN TENGAH

DOCUMENT

ISSUED DATE

CALCULATION OF BOILER PILE CAP


JOB NO

CONTRACT NO

T3125

24. PJ/121/PIKITRINGKAL/2010

7-Jun-11
PAGE

REVISION

1 OF 4

TABLE OF CONTENTS
1 GENERAL DESCRIPTION
1.1 Scope
1.2 Codes, Standards & Refferences
1.3 Quality of Material
1.4 Unit Weight of Material
2 LOADING DESIGN
2.1 Load Type
2.2 Load Calculation
2.2.1 Dead Load
2.2.2 Live Load
2.2.4 Wind Load
2.2.5 Seismic Load
2.3 Load Combination
3 STRUCTURAL ANALYSIS AND DESIGN
3.1 Structural Data
3.2 Input Data
3.3 Result Analysis
3.3.1 Stress Check
3.3.2 Deflection Check
3.3.3 Support Reaction
3.4 Base Plate and Anchor Bolt Design
3.4.1 Base Plate Design
3.4.2 Anchor Bolt Design
3.5 Foundation Design
3.5.1 Footing Foundation Calculation
3.5.2 Reinforcement Calculation
3.5.3 Column Pedestal Calculation
3.6 Steel Connection
3.6.1 Beam to Column
3.6.2 Beam to Beam
4 Appendix
1 StaadPro Text Editor
2 StaadPro Input Data
3 Table for Utilization Ratio

Page 2

PLTU BUNTOK 2x7 MW KALIMANTAN TENGAH

DOCUMENT

ISSUED DATE

CALCULATION OF BOILER PILE CAP


JOB NO

CONTRACT NO

7-Jun-11
PAGE

REVISION

Page 3

PLTU BUNTOK 2x7 MW KALIMANTAN TENGAH

DOCUMENT

ISSUED DATE

CALCULATION OF BOILER PILE CAP


JOB NO

CONTRACT NO

7-Jun-11
PAGE

REVISION

Page 4

PLTU BUNTOK 2x7 MW KALIMANTAN TENGAH

DOCUMENT

ISSUED DATE

CALCULATION OF BOILER PILE CAP


JOB NO

CONTRACT NO

7-Jun-11
PAGE

REVISION

Page 5

PLTU BUNTOK 2x7 MW KALIMANTAN TENGAH

DOCUMENT

ISSUED DATE

CALCULATION OF BOILER PILE CAP


JOB NO

CONTRACT NO

7-Jun-11
PAGE

REVISION

Page 6

PLTU BUNTOK 2x7 MW KALIMANTAN TENGAH

DOCUMENT

ISSUED DATE

CALCULATION OF BOILER PILE CAP


JOB NO

CONTRACT NO

7-Jun-11
PAGE

REVISION

Page 7

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

1 Purpose
Estimate Pile Number of Boiler Foundation and Check Pile Cap Bearing Capacity
2 Reference
Reaction Force from Boiler Calculation by Grand Kartech ( vendor of Boiler )
and Soil Investigation Report by. PT. Kalimantan Soil Engineering.
2.a BOILER # 1 #
Form Result SPT Data at location # BOILER 1 # with Bore Hole No. DH -4, hard soil at the 13 m depth
before cutting of soil 3 m for end bearing pile.
The Bearing Capacity Single Pile for 400 mm = 186.19 ton ( allowable ), use = 100 ton
2.b BOILER # 2 #
Form Result SPT Data at location # BOILER 2 # with Bore Hole No. DH -5, hard soil at the 35 m depth
before cutting of soil 4 m for end bearing pile.
The Bearing Capacity Single Pile for 400 mm = 143.58 ton ( allowable ), use = 100 ton
( For More Detail see Table Attached )
3 Quality Of material
1 Concrete
C-30
300
Kg/cm2
compressive strength at 28 days
2 Deformed reinforcing
yield strength
4000
Kg/cm2
steel bar (fy)
3 Plain reinforcing
yield strength
2400
Kg/cm2
steel bar (fy)
C-50
500
Kg/cm2
compressive strength at 28 days
4 Pile dia 400 mm
Class A
Allowable Axle Load = 117.6 ton
4 FOUNDATION TYPE 1

Width
Length
Thickness Slab
Depth

B
L
T
D
F
Concrete Cover
d'
Rebar Size
f
Efective width, d = T-d'-0.5 f
Pedestal
C
Spun Pile
dia
Pile Length
L
Design Single Pile Bearing
Capacity

=
=
=
=
=
=
=
=
=
=
=

1000
2000
800
1300
200
70
19
721
520
400
30

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
m

80

ton

2 of 24

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

4.a Control Compressive Strength


Reaction from Boiler Structure ( Grand Kartech )
Fx / kg
Fy / kg
-620
34350
BC 5B
=
-984
25589
BC 5C
=
-254
27260
BC 6B
=
-378
22568
BC 6C
=

Fz / kg
-815
-495
-744
-543

Estimate the number of Pile :


80 ton
Design Single Pile Bearing Capacity
Pa
=
30 mpa
Axial Compressive Strength
fc'
=
400
Diameter of Pile
=
mm
f
0.8
2.4
Pile Cap Selfweight
=
1.0
x
2.0
x
x
0.7
2.4
Selfweight of Pedestal
= 0.52
x
0.52 x
x
0.7
0.5
Selfweight of Soil
= 1.0
x
2.0
x
x
0.7
0.52
x 0.52 x
x 1.0
Total Load

P
N

Group Pile Bearing Capacity


Pile Number ( n )
=
Efficiency Group ( x )

=
=
=

disc. pile ( s )
disc. to the edge ( p ) =
foundation length ( L )
=
Pile bearing capacity total
SF

4.b Shear Check


Pons Shear
Vc1
=
dia pile =
r pile
=
d
=
bo =
=
=
c =
=
Vc1
=
=
=
Vc2

=
=
=
=

=
=
=

34.35
P
/
39.15

4.805
+
Pa
80
/

= 3.840
= 0.454
x 1.0
= 0.5107
4.805
39.15
ton

= 0.4894
. Select the pile number =2

2
(x 1) y ( y 1)x
1
1
tan ( D / s) / 90
yx

0.76
1.000
m
0.50
m
2.000
m
121.24 ton
= n (x *Pbearing capacity single ) =
=
P comp. Total / P
=
121.24 / 39.15
=
(OK)
3.096 >
3.0

(1+(2/bc) (1/6 fc^0.5 ) bo d


400 mm
200 mm
721 mm ( effective width )
2*phi*(r+d)
2 *phi* ( 200 + 720.5 )
5780.74 mm
l/b
1.00
(1+ ( 2 /1 ) )*(1/6 fc' ^ 0.5 )*5780.74*720.5
11406385.71 N
1140.64 ton
(1/3*fc') bo d
( 1/3* 30 )* 5780.74*720.5
4.2E+07 N
4165.02 ton

3 of 24

f = 21.80
x =
2
y =

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Vc =
Vc =
=
Status :

min ( Vc1, Vc2 )


0.75 x 1141
855.48
ton
Vu
<
80.00
ton
<

( choose minimum )

1141

"SK SNI 11.3"

Vc
855.48

OK !
ton

4.c Pile Cap Reinforcement


Pmak
39.15 ton
=
A pile cap
q max
qu
Mu

fy
fc'

=
=

=
=
=
=
=
=
=
400
30

1* 2
=
2 m2
P max / A
=
19.6 ton/m2
q max * L
39.15 ton/m
1
1
1
2
/2*qu*( /2L - /2C)
0.5*39 * ( 0.5 * 2 - 0.5 * 0.52 ) ^ 2
10.7 tm
mpa
mpa
10.7
Mu
=
800
T
=
70
d'
=
19
f
=
721
d
=

min

=
=
=

1.4 / fy
1.4 / 400
0.0035

max

0.75 * rb

0.75

: 0.9
Mu
Rn
m

r req

0.75

=
=

0.75 x
0.024

10.721

m
0.06375
0.06375

0.003597

fy

SK.SNI

tm

Mu / 0.9bd2
10720636.81 / ( 0.9 * 1000 * 720.5 ^ 2 )
fy / ( 0.85*f'c )
400
0.85 * 30

1.33 * r req =

( Slab thickness )
( concrete cover )
( rebar size )
( efective width )

600
0.85*b1*f'c
x{
fy
600
+
0.85 * 0.85 *30
x
600
400
600 +400
0.054
x
0.60
x

=
=
=
=
=

tm
mm
mm
mm
mm

{( 1-(1-(2*m*Rn)/fy)

0.5

10720637

0.023

15.686

)}

* {( 1 - (1 - ( 2 * 15.686*0.023 ) / 400 ) ^0.5)}


*{(
1
- 0.9982003 ) }0.5 =
0.0027

<
<
>
r min

4 of 24

kgmm

r min
r max

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

use r min
=
Use r req.
Rebar size, D
Rebar nos, n
Rebar pitch ( s )
As required

0.0035
=
=
=
(b-d'-d')/(n-1)
=
r req * b * d
=
=
=

As provide
r provide

0.0035
19
10
96
2522

p*n* D2/4
As provide /(b*d)

2834
0.0039

mm
nos/m'
mm
mm
mm2

O.K
O.K

Reinforcement
Use

D 19

100

4.d Shringkage Reinforcement


t

=
=

T /2
800 / 2

As req

=
=

0.0018 * b * t
720 mm

use D

13

400

A f 13 mm

mm

=
=
=
=

A x 1000
As req

Shringkage Reinforcement
Use
D 13

0.25 * p * d

2
132.67 mm
( 132.67* 1000 ) / 720
184 mm
~

200

mm

200

4.e Pedestal Reinforcement


Load Factor
P tot
Pu

=
=
=

1.3
39.15
50.901

Pu

1.3 * P tot

ton

Pu

= f 0.8 * ( 0.85 *fc'*(Ag-As) + As*fy)

As

As

c
=
0.52
c
m
2
Ag = 0.27 m
= 2704 cm2
As min

=
=

As req

As req

=
=

{Pu/(0.65*0.8)}-0.85fc'Ag
fy - 0.85fc'
-157.98

cm

1 % * Ag
27.04 cm2
Max ( AS min, AS1 )
27.04
20 D16

cm2

Use

16

5 of 24

20

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Stirups
H lateral =
=
=

Vc

1/2

/6 fc'

22.31

-20.60

smin

<
<

Av*fys

smin

<
<

Use

ton

kg
1.2792 ton

( Minimum Stirupps )
Av = 2.1/4. p f2

/3b
24.15 cm

/2 C
26.00

1279.2

, f = 0.75

mm
f 10 mm

Vu = 1.3*H =
=

bd
ton

Vu/f - Vc

Vs =
=
Try

984 kg

cm

f 10 -150

6 of 24

1.57 cm2

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

5 FOUNDATION TYPE 2

Width
Length
Thickness Slab
Depth

B
L
T
D
F
Concrete Cover
d'
Rebar Size
f
Efective width, d = T-d'-0.5 f
Pedestal
C
Spun Pile
dia
Pile Length
L
Design Single Pile Bearing
Capacity

=
=
=
=
=
=
=
=
=
=
=

1000
2000
800
1300
200
70
19
721
500
400
30

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
m

80

ton

5.a Control Compressive Strength


Reaction from Boiler Structure ( Grand Kartech )
Fx / kg
Fy / kg
-137
10780
BC 1A
=
-734
25373
BC 2A
=
-843
21674
BC 3A
=
-887
18241
BC 4A
=
-902
7112
BC 5A
=
-724
5695
BC 6A
=

Fz / kg
-254
-779
-416
-386
-411
-309

Estimate the number of Pile :


80 ton
Design Single Pile Bearing Capacity
Pa
=
30 mpa
Axial Compressive Strength
fc'
=
400 mm
Diameter of Pile
=
f
0.8
2.4
Pile Cap Selfweight
=
1.0
x
2.0
x
x
0.7
2.4
Selfweight of Pedestal
= 0.50
x
0.50 x
x
0.7
0.5
Selfweight of Soil
= 1.0
x
2.0
x
x
0.7
0.50
x 0.50 x
x 1.0
Total Load

P
N

=
=
=

25.373
P
/
30.16

7 of 24

4.785
+
Pa
80
/

= 3.840
= 0.420
x 1.0
= 0.525
4.785
30.16
ton

= 0.377
. Select the pile number =2

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Group Pile Bearing Capacity


Pile Number ( n )
=
Efficiency Group ( x )

=
=
=

disc. pile ( s )
disc. to the edge ( p ) =
foundation length ( L )
=
Pile bearing capacity total
SF

5.b Shear Check


Pons Shear
Vc1
=
dia pile =
r pile
=
d
=
bo =
=
=
c =
=
Vc1
=
=
=
Vc2
=
=
=
=
Vc =
Vc =
=
Status :

2
(x 1) y ( y 1)x
1
1
tan ( D / s) / 90
yx

0.76
1.000
m
0.50
m
2.000
m
121.24 ton
= n (x *Pbearing capacity single ) =

=
=
=

P comp. Total / P
121.24 / 30.16
4.02 >
3.0

(OK)

(1+(2/bc) (1/6 fc^0.5 ) bo d


400 mm
200 mm
721 mm ( effective width )
2*phi*(r+d)
2 *phi* ( 200 + 720.5 )
5780.74 mm
l/b
1.00
(1+ ( 2 /1 ) )*(1/6 fc' ^ 0.5 )*5780.74*720.5
11406385.71 N
1140.64 ton
(1/3*fc') bo d
( 1/3* 30 )* 5780.74*720.5
4.2E+07 N
4165.02 ton

min ( Vc1, Vc2 )


0.75 x 1141
855.48
ton
Vu
<
80.00
ton
<

( choose minimum )

1141

"SK SNI 11.3"

Vc
855.48

OK !
ton

5.c Pile Cap Reinforcement


Pmak
30.16 ton
=
A pile cap
q max
qu
Mu

fy
fc'

=
=

=
=
=
=
=
=
=
400
30

1* 2
=
2 m2
P max / A
=
15.1 ton/m2
q max * L
30.16 ton/m
1
/2*qu*(1/2L -1/2C)2
0.5*30 * ( 0.5 * 2 - 0.5 * 0.5 ) ^ 2
8.5 tm
mpa
mpa

8 of 24

f = 21.80
x =
2
y =

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Mu
T
d'
f
d

min

max

: 0.9
Mu

=
=
=
=

1.4 / fy
1.4 / 400
0.0035
0.75 * rb

0.75

r req

0.75

=
=

0.75 x
0.024

8.482

m
0.06375
0.06375

use r min
=
Use r req.
Rebar size, D
Rebar nos, n
Rebar pitch ( s )
As required

tm

0.0035
19
10
96
2522

p*n* D2/4
As provide /(b*d)

2834
0.0039

D 19

100

5.d Shringkage Reinforcement

As req

=
=
=
=

8481938

0.018

15.686

kgmm

* {( 1 - (1 - ( 2 * 15.686*0.018 ) / 400 ) ^0.5)}


*{(
1
- 0.9985761 ) }0.5 =
0.0024

<
<
>
r min

Reinforcement
Use

{( 1-(1-(2*m*Rn)/fy)0.5 )}

0.0035
=
=
=
(b-d'-d')/(n-1)
=
r req * b * d
=
=
=

fy

SK.SNI

0.003199

As provide
r provide

( Slab thickness )
( concrete cover )
( rebar size )
( efective width )

Mu / 0.9bd2
8481937.5 / ( 0.9 * 1000 * 720.5 ^ 2 )
fy / ( 0.85*f'c )
400
0.85 * 30
1

1.33 * r req =

tm
mm
mm
mm
mm

600
0.85*b1*f'c
x{
fy
600
+
0.85 * 0.85 *30
x
600
400
600 +400
0.054
x
0.60

8.5
800
70
19
721

=
=
=
=
=

Rn

=
=
=
=
=

T /2
800 / 2 = 400
0.0018 * b * t
720 mm

mm

9 of 24

mm
nos/m'
mm
mm
mm2

O.K
O.K

r min
r max

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

use D

A f 13 mm

13

=
=
=
=

A x 1000
As req

0.25 * p * d2
2
132.67 mm
( 132.67* 1000 ) / 720
184 mm
~

Shringkage Reinforcement
Use
D 13

200

mm

200

5.e Pedestal Reinforcement


Load Factor
P tot
Pu

=
=
=

1.3
30.16
39.205

Pu

1.3 * P tot

ton

Pu

= f 0.8 * ( 0.85 *fc'*(Ag-As) + As*fy)

As

As

c
0.5
c
m
2
=
0.25
m
Ag
= 2500 cm2
=

As min

=
=

As req

=
=

-150.09

cm2

1 % * Ag
25
cm2

As req

{Pu/(0.65*0.8)}-0.85fc'Ag
fy - 0.85fc'

Max ( AS min, AS1 )


25.00
20 D16

cm

Use

20

16

Stirups
H lateral =
=
=

Vc

-19.27

954.2 kg
0.9542 ton

, f = 0.75
ton

mm
f 10 mm

smin

<
<

Av*fys

smin

<
<

Use

Vu = 1.3*H =
=

/6 fc'1/2 b d
20.54 ton

Vu/f - Vc

Vs =
=
Try

734 kg

( Minimum Stirupps )
Av = 2.1/4. p f2

/3b
25.12 cm

/2 C
25.00

cm

f 10 -150

10 of 24

1.57 cm2

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

6 FOUNDATION TYPE 3

Width
Length
Thickness Slab
Depth

B
L
T
D
F
Concrete Cover
d'
Rebar Size
f
Efective width, d = T-d'-0.5 f
Pedestal
C
Spun Pile
dia
Pile Length
L
Design Single Pile Bearing
Capacity

=
=
=
=
=
=
=
=
=
=
=

2000
2000
800
1300
200
70
19
721
600
400
30

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
m

80

ton

6.a Control Compressive Strength


Reaction from Boiler Structure ( Grand Kartech )
Fx / kg
Fy / kg
-326
83480
BC 1B
=
-453
68491
BC 1C
=
-746
133011
BC 2B
=
-1038
110260
BC 2C
=
-1094
105736
BC 3B
=
-1621
87393
BC 3C
=

Fz / kg
-1051
-816
-2717
-1774
-1000
-62

Estimate the number of Pile :


80 ton
Design Single Pile Bearing Capacity
Pa
=
30 mpa
Axial Compressive Strength
fc'
=
400 mm
Diameter of Pile
=
f
0.8
2.4
Pile Cap Selfweight
=
2.0
x
2.0
x
x
0.7
2.4
Selfweight of Pedestal
= 0.60
x
0.60 x
x
0.7
0.5
Selfweight of Soil
= 2.0
x
2.0
x
x
0.7
0.60
x 0.60 x
x 1.0
Total Load

P
N

=
=
=

133.011
P
/
142.44

7 of 24

9.433
+
Pa
80
/

= 7.680
= 0.605
x 1.0
= 1.148
9.433
142.44 ton

= 1.7805
. Select the pile number =4

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Group Pile Bearing Capacity


Pile Number ( n )
=
Efficiency Group ( x )

=
=
=

disc. pile ( s )
disc. to the edge ( p ) =
foundation length ( L )
=
Pile bearing capacity total
SF

6.b Shear Check


Pons Shear
Vc1
=
dia pile =
r pile
=
d
=
bo =
=
=
c =
=
Vc1
=
=
=
Vc2
=
=
=
=
Vc =
Vc =
=
Status :

4
(x 1) y ( y 1)x
1
1
tan ( D / s) / 90
yx

0.76
1.000
m
0.50
m
2.000
m
242.48 ton
= n (x *Pbearing capacity single ) =

=
=
=

P comp. Total / P
242.48 / 142.44
1.702 <
3.0

.(Not OK)

(1+(2/bc) (1/6 fc^0.5 ) bo d


400 mm
200 mm
721 mm ( effective width )
2*phi*(r+d)
2 *phi* ( 200 + 720.5 )
5780.74 mm
l/b
1.00
(1+ ( 2 /1 ) )*(1/6 fc' ^ 0.5 )*5780.74*720.5
11406385.71 N
1140.64 ton
(1/3*fc') bo d
( 1/3* 30 )* 5780.74*720.5
4.2E+07 N
4165.02 ton

min ( Vc1, Vc2 )


0.75 x 1141
855.48
ton
Vu
<
80.00
ton
<

( choose minimum )

1141

"SK SNI 11.3"

Vc
855.48

OK !
ton

6.c Pile Cap Reinforcement


Pmak
142.44 ton
=
A pile cap
q max
qu
Mu

fy
fc'

=
=

=
=
=
=
=
=
=
400
30

2* 2
=
4 m2
P max / A
=
35.6 ton/m2
q max * L
71.22 ton/m
1
/2*qu*(1/2L -1/2C)2
0.5*71 * ( 0.5 * 2 - 0.5 * 0.6 ) ^ 2
17.4 tm
mpa
mpa

8 of 24

f = 21.80
x =
2
y =

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Mu
T
d'
f
d

min

max

: 0.9
Mu
Rn
m

r req

=
=
=
=

1.4 / fy
1.4 / 400
0.0035
0.75 * rb

0.75
0.75

=
=

0.75 x
0.024

17.449

m
0.06375
0.06375

use r min
=
Use r req.
Rebar size, D
Rebar nos, n
Rebar pitch ( s )
As required
As provide
r provide

tm
mm
mm
mm
mm

( Slab thickness )
( concrete cover )
( rebar size )
( efective width )

600
0.85*b1*f'c
x{
fy
600
+
0.85 * 0.85 *30
x
600
400
600 +400
0.054
x
0.60

17449366

0.037

15.686

* {( 1 - (1 - ( 2 * 15.686*0.037 ) / 400 ) ^0.5)}


*{(
1
- 0.9970707 ) }0.5 =
0.0035

<=
<
0.0035
19
10
96
2522

p*n* D2/4
As provide /(b*d)

2834
0.0039

Reinforcement
Use

kgmm

{( 1-(1-(2*m*Rn)/fy)0.5 )}

0.0035
=
=
=
(b-d'-d')/(n-1)
=
r req * b * d
=
=
=

fy

SK.SNI

tm

Mu / 0.9bd2
17449365.5 / ( 0.9 * 1000 * 720.5 ^ 2 )
fy / ( 0.85*f'c )
400
0.85 * 30

17.4
800
70
19
721

=
=
=
=
=

=
=
=
=
=

D 19

100

9 of 24

mm
nos/m'
mm
mm
mm2

O.K
O.K

r min
r max

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

6.d Shringkage Reinforcement


t
=
T /2
= 800 / 2 = 400 mm
As req
= 0.0018 * b * t
=
720 mm
2
A f 13 mm =
0.25 * p * d
use D 13
s

=
=
=

A x 1000
As req

2
132.67 mm
( 132.67* 1000 ) / 720
184 mm
~

Shringkage Reinforcement
Use
D 13

200

mm

200

6.e Pedestal Reinforcement


Load Factor
P tot
Pu

=
=
=

1.3
142.44
185.177 ton

Pu

1.3 * P tot

Pu

= f 0.8 * ( 0.85 *fc'*(Ag-As) + As*fy)

As

c
{Pu/(0.65*0.8)}-0.85fc'Ag
fy - 0.85fc'

c
=

0.6 m
=
As
2
=
0.36
m
Ag
= 3600 cm2
1 % * Ag
As min =
36
=
cm2
As req
= Max ( AS min, AS1 )
c

As req

=
=

36.00
24 D16

cm2

-150.04

Use

cm2

24

16

Stirups
H lateral =
=
=

Vc
Vs =
=
Try

453 kg
/6 fc'1/2 b d
30.12 ton
Vu/f - Vc
-29.34 ton

588.9 kg
0.5889 ton

mm
f 10 mm

smin

<
<

Av*fys

smin

<
<

Use

Vu = 1.3*H =
=

, f = 0.75
( Minimum Stirupps )
Av = 2. /4. p f
1

/3b
20.93 cm

/2 C
30.00

cm

f 10 -150

10 of 24

1.57 cm2

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

7 FOUNDATION TYPE 4

Width
Length
Thickness Slab
Depth

B
L
T
D
F
Concrete Cover
d'
Rebar Size
f
Efective width, d = T-d'-0.5 f
Pedestal
C
Spun Pile
dia
Pile Length
L
Design Single Pile Bearing
Capacity

=
=
=
=
=
=
=
=
=
=
=

1000
2000
800
1300
200
70
19
721
550
400
30

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
m

80

ton

7.a Control Compressive Strength


Reaction from Boiler Structure ( Grand Kartech )
Fx / kg
Fy / kg
-975
50530
BC 4B
=
-1545
34735
BC 4C
=

Fz / kg
-1024
-663

Estimate the number of Pile :


80 ton
Design Single Pile Bearing Capacity
Pa
=
30 mpa
Axial Compressive Strength
fc'
=
400
Diameter of Pile
=
mm
f
0.8
2.4
Pile Cap Selfweight
=
1.0
x
2.0
x
x
0.7
2.4
Selfweight of Pedestal
= 0.55
x
0.55 x
x
0.7
0.5
Selfweight of Soil
= 1.0
x
2.0
x
x
0.7
0.55
x 0.55 x
x 1.0
Total Load

P
N

Group Pile Bearing Capacity


Pile Number ( n )
=
Efficiency Group ( x )

=
=
=

disc. pile ( s )
disc. to the edge ( p ) =
foundation length ( L )
=

34.735
P
/
39.57

=
=
=

4.836
+
Pa
80
/

= 3.840
= 0.508
x 1.0
= 0.4883
4.836
39.57
ton

= 0.4946
. Select the pile number =2

2
(x 1) y ( y 1)x
1
1
tan ( D / s) / 90
yx

0.76

1.000
0.50
2.000

m
m
m

f = 21.80
x =
2
y =

7 of 24

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

Pile bearing capacity total


SF

7.b Shear Check


Pons Shear
Vc1
=
dia pile =
r pile
=
d
=
bo =
=
=
c =
=
Vc1
=
=
=
Vc2
=
=
=
=
Vc =
Vc =
=
Status :

121.24 ton
= n (x *Pbearing capacity single ) =
=
P comp. Total / P
=
121.24 / 39.57
=
(OK)
3.064 >
3.0

(1+(2/bc) (1/6 fc^0.5 ) bo d


400 mm
200 mm
721 mm ( effective width )
2*phi*(r+d)
2 *phi* ( 200 + 720.5 )
5780.74 mm
l/b
1.00
(1+ ( 2 /1 ) )*(1/6 fc' ^ 0.5 )*5780.74*720.5
11406385.71 N
1140.64 ton
(1/3*fc') bo d
( 1/3* 30 )* 5780.74*720.5
4.2E+07 N
4165.02 ton

min ( Vc1, Vc2 )


0.75 x 1141
855.48
ton
Vu
<
80.00
ton
<

( choose minimum )

1141

"SK SNI 11.3"

Vc
855.48

OK !
ton

7.c Pile Cap Reinforcement


Pmak
39.57 ton
=
A pile cap
q max
qu
Mu

fy
fc'

=
=

=
=
=
=
=
=
=
400
30

1* 2
=
2 m2
P max / A
=
19.8 ton/m2
q max * L
39.57 ton/m
1
/2*qu*(1/2L -1/2C)2
0.5*40 * ( 0.5 * 2 - 0.5 * 0.55 ) ^ 2
10.4 tm
mpa
mpa

Mu
T
d'
f
d

=
=
=
=
=

8 of 24

10.4
800
70
19
721

tm
mm
mm
mm
mm

( Slab thickness )
( concrete cover )
( rebar size )
( efective width )

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

min

max

: 0.9
Mu

=
=
=
=

1.4 / fy
1.4 / 400
0.0035
0.75 * rb

0.75

0.75

=
=

0.75 x
0.024

10.400

=
=
=
=
=

Rn
m

r req

m
0.06375
0.06375

1.33 * r req =

As provide
r provide

10399872

0.022

15.686

* {( 1 - (1 - ( 2 * 15.686*0.022 ) / 400 ) ^0.5)}


*{(
1
- 0.9982541 ) }0.5 =
0.0027

<
<
>
r min

0.0035
=
=
=
(b-d'-d')/(n-1)
=
r
req * b * d
=
p*n* D2/4
=
As provide /(b*d)
=

0.0035
19
10
96
2522
2834
0.0039

mm
nos/m'
mm
mm
mm2

Reinforcement
Use

D 19

100

7.d Shringkage Reinforcement


t
As req

use D
s

=
=
=
=

13
=

T /2
800 / 2 = 400
0.0018 * b * t
720 mm

A f 13 mm
A x 1000
As req

kgmm

{( 1-(1-(2*m*Rn)/fy)0.5 )}

0.003543

use r min
=
Use r req.
Rebar size, D
Rebar nos, n
Rebar pitch ( s )
As required

fy

SK.SNI

tm

Mu / 0.9bd2
10399871.7 / ( 0.9 * 1000 * 720.5 ^ 2 )
fy / ( 0.85*f'c )
400
0.85 * 30

600
0.85*b1*f'c
x{
fy
600
+
0.85 * 0.85 *30
x
600
400
600 +400
0.054
x
0.60
x

mm

=
=
=
=

Shringkage Reinforcement
Use
D 13

0.25 * p * d

2
132.67 mm
( 132.67* 1000 ) / 720
184 mm
~

200

9 of 24

200

mm

O.K
O.K

r min
r max

PLTU BUNTOK 2X7MW

NO T3125-CA/C/T0201-01-RV.A

7.e Pedestal Reinforcement


Load Factor
P tot
Pu

=
=
=

1.3
39.57
51.443

Pu

1.3 * P tot

ton

Pu

= f 0.8 * ( 0.85 *fc'*(Ag-As) + As*fy)

As

As

c
=
0.55
c
m
0.3 m2
Ag =
= 3025 cm2
As min

=
=

As req

=
=

-179.56

cm

1 % * Ag
30.25 cm2

As req

{Pu/(0.65*0.8)}-0.85fc'Ag
fy - 0.85fc'

Max ( AS min, AS1 )


30.25
20 D16

cm2

Use

20

16

Stirups
H lateral =
=
=

Vc

-22.43

2008.5

kg
2.0085 ton

, f = 0.75
ton

mm
f 10 mm

smin

<
<

Av*fys

smin

<
<

Use

Vu = 1.3*H =
=

/6 fc'1/2 b d
25.10 ton

Vu/f - Vc

Vs =
=
Try

1545 kg

( Minimum Stirupps )
Av = 2.1/4. p f2

/3b
22.84 cm

/2 C
27.50

cm

f 10 -150

10 of 24

1.57 cm2