TUGAS ANALISA BEBAN DAN TENAGA 1. Diketahui : 1.Kelandaian ( K ) 2.Koef. Tahanan Gelinding ( r ) 3.Berat Traktor ( W ) 4.Berat Scraper ( W ) 5.

Muatan Scraper = = = = = 5% 5% 26 16 4

ton ton ton

Ditanyakan K = 5% Jawab

: :

Berapa besar tenaga yang dibutuhkan untuk menarik scraper ?

Tenaga yang dibutuhkan 1. Traktor ( Roda Rantai ) TR = Tahanan Kelandaian (GR) = Wx%K = 1.3 ton

= Beban Total ( TR )

2.

Scraper ( Roda Karet ) TR = Tahanan Kelandaian (GR) + Tahanan Gelinding (RR) = (Wx%K)+(Wx%r) = 2 ton = 3.3 ton

Jadi tenaga yang dibutuhkan traktor adalah

2.

Diketahui

1.Kelandaian ( K ) 2.Harraw ditarik pada datar 3.Berat Bulldozer ( W ) 4.Berat Harraw ( W ) 5.Koef. Traksi Kritis ( ct )

= = = = =

8% 4500 18 4 0.65

kg ton ton

K = 8%

Ditanyakan Jawab 1.

: :

Mampukah Bulldozer menarik harraw ?

Bulldozer ( Roda Rantai ) TR = Tahanan Kelandaian (GR) = Wx%K = 1.44 ton

2.

Scraper ( Roda Rantai ) TR = 4500 kg + Tahanan Kelandaian (GR) = 4500 kg + ( W x % K ) = 4.82 ton = 6.26 ton

Tenaga yang dibutuhkan Bulldozer (TR) Traksi Kritis Bulldozer (TK)

= W x ct = 11.7 = Mampu

ton

TK

>

TR

Latihan 1

Proyek jalan raya = STA 00 galian timbunan galian


timbunan

24

STA 6000 galian

Diketahui : a. Data Pekerjaan & alat Galian p = 4000 t = 1.8 Timbunan p = 2000 t = 1.2 1. 2. 3. 4. 5. 6. 7. 8. 9. Alat Bulldozer type s Lebar blade Tinggi blade Biaya Pemblian Nilai Sisa Waktu Investasi Masa guna alat Biaya Operasional Biaya Investasi

m m m m = = = = = = = = = =

b. Kondisi Tanah 1. Tanah Biasa = 2. Sweel =

0.83 20%

3.2 m 1.1 m Rp19,000,000,000 10% 8 thn 10000 jam Rp900,000 18% dari harga pembelian Rp3,420,000,000

1 2 3 4 5 6 7 8

c. Metode kerja Metode kerja Waktu kerja 50 menit/jam Operator Pandai V mendorong V mundur Bekerja waktu kemarau Durasi 20 hari @ 7 jam Perataan timbinan perlapis Ditanyakan : 1 2 3 4 5 6

= = = = = = = =

Slot and Dozing 0.83 4.5 km/jam 6 km/jam 140 jam 0.3 m

= =

75 100

m/menit m/menit

Produksi alat dalam 1 jam ( Q ) Hitung jumlah alat Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal GALIAN

Jawab

Volume Pekerjaan Galian ( bank ) sweel Volume Pekerjaan Galian ( loose ) Kapasitas Blade ( B ) Jarak Operasi Blade , dengan kedalaman 0.02 m (J) CT E Q = Q' = = Q = Q' x E 60 x B CT 232.32 = 164.571 Lm/jam 1.412 134.949 Lm/jam = = Jumlah Alat Jumlah Alat = = 207360 134.9485714 1537 1537 140 10.9756

= = = = = = =

172800 20% 207360 3.872 60.5 1.412 0.82

m Lm Lm m menit

Durasi Alat

Lm Lm/jam Jam Jam Jam

11

UNIT

BP

Depresiasi / jam Investasi / jam BP O BP & O

= = = = = x x +

Rp1,710,000 Rp342,000 Rp2,052,000 Rp900,000 Rp2,952,000 BP & O Rp2,952,000

+ /jam /jam + /jam

Biaya Aktual

= = = = =

Profit 10 % Biaya Aktual

Vol. Loose Q 207360 134.949 Rp4,536,000,000 Rp453,600,000 Rp4,989,600,000

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit vol . Bank Rp4,989,600,000 172800 Rp28,875

Rp m Rp m Rp/m

Harga Penawaran

Biaya Actual

Profit

Pajak 15%

Harga Penawaran

= =

Rp4,989,600,000 Rp5,738,040,000

Rp748,440,000

TIMBUNAN

Volume Pekerjaan Galian ( bank ) sweel Volume Pekerjaan Galian ( loose ) Kapasitas Blade ( B ) Jarak Operasi Blade , dengan kedalaman 0.3 m (J) CT E Q = Q' = = Q = Q' x E 60 x B CT 232.32 = 0.094 2024.229 Lm/jam = = Jumlah Alat Jumlah Alat = =

= = = = = = =

57600 20% 69120 3.872 4.033 0.094 0.82

m Lm Lm m menit

2468.571 Lm/jam

Durasi Alat

69120 2024.228571 34 34 140 0.243902

Lm Lm/jam Jam Jam Jam

UNIT

BP

Depresiasi / jam Investasi / jam BP O BP & O

= = = = = x x +

Rp1,710,000 Rp342,000 Rp2,052,000 Rp900,000 Rp2,952,000 BP & O Rp2,952,000

Biaya Aktual

= = = = =

Profit 10 % Biaya Aktual

Vol. Loose Q 69120 2024.229 Rp100,800,000 Rp10,080,000 Rp110,880,000

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit vol . Bank Rp110,880,000 57600 Rp1,925

Rp m Rp m Rp/m

Pajak 15%

Harga Penawaran

Biaya Actual

Profit

Rp748,440,000 Harga Penawaran

= =

Rp110,880,000 Rp127,512,000

+ /jam /jam + /jam

Pajak 15%

Rp16,632,000

Latihan 2

4.47 4m 2 :1

CL

2.5 m Diketahui : 1. Data alat Excavator PC 180 Kapasitas ( q ' ) 2. Ditanyakan : 1. 2. 3. 4. 5. 6. 1. Data pekerjaan panjang galian tanah biasa ( K ) sweel digging condition 60 % swing angle 70 Koefisien efesiensi ( E ) "good" Durasi 30 hari @ 7 jam kerja BP & O Produksi alat dalam 1 jam ( Q ) Hitung jumlah alat Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal Volume pekerjaan galian ( bank ) Volume pekerjaan galian ( loose ) = = = = = Q'xE 60 x q CT (menit ) q'xK 46.563 0.25 186.252 = = 22350 m 26820 Lm

= =

0.85 m

= = = = = = = =

2000 m 1.1 20% 1 15 detik 0.83 210 jam Rp1,200,000

Jawab

Q Q' q Q Q

Lm/jam

2. Durasi alat

= =

26820 186.252 143.998 143.998 210 0.685706922

Lm Lm/jam Jam Jam Jam

Jumlah Alat Jumlah Alat

= =

~
X X +

UNIT

3. Biaya Aktual

= = = = =

Profit 10% Biaya Aktual

Vol. Loose Q 26820 186.252 Rp172,798,144 Rp17,279,814 Rp190,077,959

BP & O Rp1,200,000

4. HSP pekerjaan

HSP pekerjaan

Biaya act + profit vol . Bank = Rp190,077,959 22350 = Rp8,505

Rp m Rp m Rp/m

5. Harga Penawaran = = Harga Penawaran =

Biaya actual + Rp190,077,959 Rp218,589,653

Profit

+ +

/jam

Pajak 15 % Rp28,511,694

Latuhan 3

Tanah

12 m 12 m

DT

Diketahui

a. Data pekerjaan & alat 1 Pengangkutan tanah dengan Vol. Pekerjaan 2/3 dari hasil galian bulldozer 2 3 4 5 6 Bucket Kapasitas ( q ' ) Faktor Bucket ( K ) BP & O FT Koefisien efesiensi ( E ) "good"

= 138240 Lm

m = 3.4 = 0.95 = Rp1,250,000 = 0.2 menit = 0.83

/Jam

b. Metode kerja 1 V shape ,dengan jarak 2 kecepatan isi 3 kecepatan kosong 4 waktu 30 hari @ 7 jam Ditanyakan : 1. 2. 3. 4. 5. 6. Produksi alat dalam 1 jam ( Q ) Hitung jumlah alat Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal

= = = =

12 2.5 4 210

m km/jam km/jam jam

= =

41.67 66.67

Jawab

1.

CT

= = = =

J1 = J2 2J + kecp. Isi 0.576 + 1.136 menit

2J kecp. Kosong 0.36

+ +

FT 0.2

volume pekerjaan ( bank ) sweel volume pekerjaan ( loose ) Q Q' q Q Q = Q'xE = 60 x q CT (menit ) = q'xK = = 160.854 1.136 141.597

= = =

115200 m 20% 138240 Lm

Lm/jam

2. Durasi alat

= =

138240 141.597 976.293 976.293 210 4.649014457

Lm Lm/jam jam jam jam

Jumlah alat Jumlah alat

= =

~
X X +

3. Biaya Aktual

= = = = =

Profit 10% Biaya Aktual

Vol. Loose Q 138240 141.597 Rp1,220,366,295 Rp122,036,629 Rp1,342,402,924

BP&O Rp1,250,000

4. HSP Pekerjaan

= =

HSP Pekerjaan

Biaya Act. + profit Vol. Bank Rp1,342,402,924 115200 Rp11,653

Rp m Rp m Rp/jam

5. Harga Penawaran Harga Penawaran

= = =

Biaya Act. + Profit Rp1,342,402,924 Rp 1,543,763,363

m/menit m/menit

UNIT

Rp1,250,000

Profit

Rp1,342,402,924

+ +

Pajak 15% Rp 201,360,439

Latihan 4

DUMP TRUCK
600 m

10% 750 m

Diketahui

1.

Data Alat Dump Truck HD 325 Berat Kosong Berat Bermuatan Max Batasan Kacapatan

= 27.2 ton = 52.3 ton = V max Flat = Isi Kosong = V max = Isi Turunan/ Kosong tanjakan Rp2,100,000 /hari =

= = = =

40 60 20 40

2. Ditanyakan : 1 2 3 4 5 6 1

Sewa Dump Truck Data Pekerjaan Volume Pekerjaan Route Pengangkutan Kondisi Jalan Tanah Managemen Baik Dumping Spot & Delay

Rp262,500

= = = = = = = =

115200 m 138240 lm Membawa sama dengan kembali Kering dan kurang terpelihara 1.6 ton/m Lancar Tanpa Ada Hambatan Lancar Tanpa Ada Hambatan

Produksi alat dalam 1 jam ( Q ) Hitung Durasi Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal CT = T1 + T2 + T3 + T4 + T5 Tabel T2 dan T4 T1 = n X CT wheel loader n= q DT ( kg ) q WL x K x t tipe angkut Membawa (isi) Segmen kondisi Datar

Jawab

n= n=

(52,3 t - 27,2 t )x 1000 3,4 x 0,95 x 1600 25100 5168

Membawa (isi)

n = 4.8568111

Kembali kosong )

Tanjakan Datar Datar Turunan Datar 0.6 0.15

T1 = 5 x 1,136 menit T1 = 5.68 menit CT = T1 + T2 + T3 + T4 + T5 CT = 8.69 menit M= CT dt n X CT wl M= 8.69 5.68 M= 1.53

T3 T5

= =

2 E ( GOOD )

unit = 0.83

Q = Q' x E x M Q' = 60 x q DT CT q DT = n x q L

Q' = 60 x 9 x 3,4 8.69 Q' = 46.95 Lm/jam Q = 194,48 x 0,83 x 9 Q= 77.93 Lm/jam 2 Hitung Durasi Volume ( Bank ) Sweel Volume ( Loose ) Waktu Pelaksanaan = = = = = = Waktu Pelaksanaan 3. Biaya Aktual = = = = 115200 m 20% 138240 Lm Vol. loose Q 138240 77.93 1773.88 253.41

jam Hari

~
x x

254 Hari BP & O Rp262,500

Vol. Loose Q 138240 77.931 Rp465,644,005

Profit 10 % Biaya Aktual

= =

Rp46,564,400 Rp512,208,405

4.

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit vol . Bank Rp512,208,405 115200 Rp4,446

Rp m Rp m Rp/m

5.

Harga Penawaran Harga Penawaran

= = =

Biaya Actual

+ Rp512,208,405 Rp589,039,666

Profit

350 m

Km/jam Km/jam Km/jam Km/jam /jam

= = = =

667 1000 333 667

m/menit m/menit m/menit m/menit

8%

Segmen kondisi jarak Datar 600

tahanan RR GR TR 8% 0% 8%

kecepatan Vmax SF V rata2 667 0.72 480

Time T2 1.393443

Tanjakan Datar Datar Turunan Datar menit menit

750 350 600 750 350

8% 10% 18% 8% 0% 8% 8% 0% 8% 8% -10% -2% 8% 0% 8%

333 667 1000 667 1000

0.78 0.72 0.72 0.78 0.72

260 480 1.393443 720 520 720 0.867347

T2

T4

BP & O Rp262,500

Profit

08,405

+ +

Pajak 15% Rp76,831,261

Latihan 5 Return 200 m

175 m Houling

Diketahui

1. 2.

Data Alat Kapasitas bowel (q ) Kecp. Digging (VD) Kecp. Houling (VH) Kecp. Spreading (VS) Kecp. Returning (VR) Data Pekerjaan Jarak Digging (D) Jarak Houling (H) Jarak Spreading (S) Jarak Returning (R) Vulome Galian Volume Urugan Banyak Alat BP & O FT

= = = = =

10 1.5 10 3 12

m km/jam km/jam km/jam km/jam

= = = =

25 166.6667 50.00 200

= = = = = = = = =

35 175 25 200 500000 500000 5 Rp1,500,000 1

m m m m m m Unit per jam

Ditanyakan

1. 2. 3. 4. 5. 6. 1.

Produksi alat dalam 1 jam ( Q ) Hitung waktu pelaksanaa Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal

Dijawab

CT = CT =

+ FT
175 25

35

CT =

25 4.95

+ menit

166.67

50.00

E = E1 X E2 X E3 E= 1.008

Dimana :

E1 = Waktu Kerja 50m/j E2 = Operator Baik E3 = Tanah Biasa

Q' = Q' = Q' =

60 X q CT 600 4.95 121.212121 Lm/jam

Q' = Q' X E Q = 122.181818 Lm/jam 2. Volume ( Bank ) Sweel Volume ( Loose ) Waktu Pelaksanaan = = = = = = = Waktu Pelaksanaan = 500000 m 20% 600000 Lm Vol. loose Q 600000 122.18 4910.71 982.14 140.31

jam / 5 unit per unit Hari

141

3.

Biaya Aktual

= = = = =

Profit 10 % Biaya Aktual

Vol. Loose Q 600000 122.182 Rp7,366,071,429 Rp736,607,143 Rp8,102,678,571

x x +

BP &

Rp1,500

4.

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit vol . Bank Rp8,102,678,571 500000 Rp16,205

Rp m Rp m Rp/m

5.

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp9,318,080,357

+ Rp8,102,678,571

Profit

m/menit m/menit m/menit m/menit

200

200

= = =

0.84 1 1.2

Hari

BP & O Rp1,500,000

Profit

2,678,571

+ +

Pajak 15% Rp1,215,401,786

lo 6 6 L le

6000

Diketahui

1. 2.

Data Alat Lebar Blade ( L ) Sudut Kerja ( ) Kecepatan rata2 BP & O / jam Jumlah alat Data Pekerjaan Lebar lapisan Laluan Subgrade (n) Laluan sub base (n) Laluan base course (n) Lebar overlap (lo) E faktor ( good )

= = = = =

3.1 m 60 4 km/jam Rp2,200,000 1 unit =

= = = = = =

12 6 4 3 0.25 0.83

m kali kali kali m

Ditanyakan

1. 2. 3. 4. 5. 6.

Produksi alat dalam 1 jam ( Q ) Hitung waktu pelaksanaa Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal

Dijawab

SUBGRADE 1. Q = Q' X E Q' = 60 X V .( le - lo ) n Q' = 60 x 66,67 . ( 2,68 - 0,25 ) 6 Q' = 9720 6 Q' = 1620.00 Q = 1620 x 0,83 Q= 1344.60 2. Luas Perataan Waktu Pelaksanaan

le = sin x L le = sin 60 x 3,1 le = 2.68

m/jam = = 72000 m Luas Q

= = = Waktu Pelaksanaan =

72000 1344.60 53.55 jam 53.55 per unit 7.65 Hari

~
x x +

3.

Biaya Aktual

= = = = =

Profit 10 % Biaya Aktual

Luas Q 72000 1344.600 Rp117,804,552 Rp11,780,455 Rp129,585,007

4.

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit Luas Rp129,585,007 72000 Rp1,800

Rp m Rp m Rp/m

5.

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp149,022,758

+ Rp129,585,007

66.67 m/menit

SUB BASE 1. sin 60 x 3,1 m

2.

Hari

BP & O Rp2,200,000

3.

4.

Profit Rp129,585,007

+ +

Pajak 15% Rp19,437,751

5.

SUB BASE Q = Q' X E Q' = 60 X V .( le - lo ) n Q' = 60 x 66,67 . ( 2,68 - 0,25 ) 4 Q' = 9720 4 Q' = 2430.00 Q = 2430 x 0,83 Q= 2016.90 Luas Perataan Waktu Pelaksanaan le = sin x L le = sin 60 x 3,1 le = 2.68 m

m/jam = = 72000 m Luas Q

= = = Waktu Pelaksanaan =

72000 2016.90 35.70 jam 35.70 per unit 5.10 Hari

~
x x +

Hari

Biaya Aktual

= = = = =

Profit 10 % Biaya Aktual

Luas Q 72000 2016.900 Rp78,536,368 Rp7,853,637 Rp86,390,004

BP & O Rp2,200,000

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit Luas Rp86,390,004 72000 Rp1,200

Rp m Rp m Rp/m

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp99,348,505

+ Rp86,390,004

Profit

BASE COURSE 1. Q = Q' X E Q' = 60 X V .( le - lo ) n Q' = 60 x 66,67 . ( 2,68 - 0,25 ) 3 Q' = 9720 3 Q' = 3240.00 Q = 3240 x 0,83 Q= 2689.20 2. Luas Perataan Waktu Pelaksanaan

m/jam = =

= = = Waktu Pelaksanaan =

BP & O Rp2,200,000

3.

Biaya Aktual

= = = = =

Profit 10 % Biaya Aktual

4.

HSP Pekerjaan

= =

HSP Pekerjaan

+ +

Pajak 15% Rp12,958,501

5.

Harga Penawaran Harga Penawaran

= = =

le = sin x L le = sin 60 x 3,1 le = 2.68 m

72000 m Luas Q

72000 2689.20 26.77 jam 26.77 per unit 3.82 Hari

~
x x +

Hari

Luas Q 72000 2689.200 Rp58,902,276 Rp5,890,228 Rp64,792,503

BP & O Rp2,200,000

Biaya act + profit Luas Rp64,792,503 72000 Rp900

Rp m Rp m Rp/m

Biaya Actual Rp74,511,379

+ Rp64,792,503

Profit

+ +

Pajak 15% Rp9,718,876

ak 15% 9,718,876

Diketahui

1. 2.

Data Alat Lebar roda (w) Kecp. Rata2 Overlap (wo) BP & O Data Pekerjaan Laluan Subgrade Laluan Subbase Laluan Base course

= = = =

2 3 0.3 Rp2,000,000

m km/jam m /jam

= = =

4 3 3

kali kali kali

Ditanyakan

1. 2. 3. 4. 5. 6.

Produksi alat dalam 1 jam ( Q ) Hitung waktu pelaksanaa Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal

Dijawab

SUBGRADE 1.

Q= Q' X E Q'= 1000 . V . ( w - Wo ) n Q'= 85000 4 Q'= 21250 m/jam Q= Q' X E Q= 21250 x 0,83 Q= 17637.5 m/jam E faktor ( good ) =

2.

Luas Perataan Waktu Pelaksanaan

= = = = =

72000 m Luas Q 72000 17637.50 4.08 4.08 0.58

jam per unit Hari

Waktu Pelaksanaan 3. Biaya Aktual

= = = = = =

~
x x +

Profit 10 % Biaya Aktual

Luas Q 72000 17637.500 Rp8,164,422 Rp816,442 Rp8,980,865

4.

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit Luas Rp8,980,865 72000 Rp125

Rp m Rp m /m

5.

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp10,327,994

+ Rp8,980,865

50 m/menit

SUB BASE 1.

0.83

2.

Hari BP & O Rp2,000,000 3.

4.

Profit Rp8,980,865

+ +

Pajak 15% Rp1,347,130

5.

SUB BASE Q= Q' X E Q'= 1000 . V . ( w - Wo ) n Q'= 85000 3 Q'= 28333.33 m/jam Q= Q' X E Q= 28333,3 x 0,83 Q= 23516.67 m/jam Luas Perataan Waktu Pelaksanaan = = = = = Waktu Pelaksanaan Biaya Aktual = = = = = = E faktor ( good ) = 0.83

72000 m Luas Q 72000 23516.67 3.06 jam 3.06 per unit 0.44 Hari

~
x x +

Hari BP & O Rp2,000,000

Profit 10 % Biaya Aktual

Luas Q 72000 23516.667 Rp6,123,317 Rp612,332 Rp6,735,648

HSP Pekerjaan

= =

HSP Pekerjaan

Biaya act + profit Luas Rp6,735,648 72000 Rp94

Rp m Rp m Rp/m

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp7,745,996

+ Rp6,735,648

Profit

BASE COURSE 1. Q= Q' X E Q'= 1000 . V . ( w - Wo ) n Q'= 85000 3 Q'= 28333.33 m/jam Q= Q' X E Q= 28333,3 x 0,83 Q= 23516.67 m/jam 2. Luas Perataan Waktu Pelaksanaan = = = = = Waktu Pelaksanaan BP & O Rp2,000,000 Profit 10 % Biaya Aktual 3. Biaya Aktual = = = = = =

4.

HSP Pekerjaan

= =

HSP Pekerjaan

+ +

Pajak 15% Rp1,010,347

5.

Harga Penawaran Harga Penawaran

= = =

E faktor ( good )

0.83

72000 m Luas Q 72000 23516.67 3.06 jam 3.06 per unit 0.44 Hari

~
x x +

Hari BP & O Rp2,000,000

Luas Q 72000 23516.667 Rp6,123,317 Rp612,332 Rp6,735,648

Biaya act + profit Luas Rp6,735,648 72000 Rp94

Rp m Rp m Rp/m

Biaya Actual Rp7,745,996

+ Rp6,735,648

Profit

+ +

Pajak 15% Rp1,010,347

ak 15% 1,010,347

Diketahui

1. 2. 1. 2. 3. 4. 5. 6. 1.

Data Alat Lebar roda (w) Kecp. Rata2 BP & O

= = =

3 m 2.5 km/jam Rp2,500,000 /jam

Ditanyakan

Data Pekerjaan Tebal = Produksi alat dalam 1 jam ( Q ) Hitung waktu pelaksanaa Biaya aktual apabila profit 10% HSP pekerjaan Biaya penawaran dengan pajak 15% Jadwal Q = Q' X E Q' = 60 X V X W Q' = 60 X 41,67 X 3 Q' = 7500 m/jam Q = Q' X E Q = 7500 X 0,83 Q= 6225 m/jam

cm

Dijawab

E faktor ( good )

2.

Luas Permukaan Waktu Pelaksanaan

= = = = =

72000 m Luas Q 72000 6225.00 11.57 11.57 1.65

jam per unit Hari

Waktu Pelaksanaan

~
x x +

3.

Biaya Aktual

= = = = = =

Profit 10 % Biaya Aktual 4. HSP Pekerjaan

Luas Q 72000 6225.000 Rp28,915,663 Rp2,891,566 Rp31,807,229 Biaya act + profit vol . Bank Rp m

= HSP Pekerjaan =

Rp31,807,229 72000 Rp442

Rp m m

5.

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp36,578,313

+ Rp31,807,229

41.66667 m/menit

0.83

Hari

BP & O Rp2,500,000

Profit Rp31,807,229

+ +

Pajak 15% Rp4,771,084

Pemancangan pada abutmen jembatan dengan data sebagai berikut Diketahui : 1. Data Tiang Pancang Ukuran Panjang Bj Beton Jumlah 1 abutmen Berat Pondasi ( P ) BP & O Daya dukung pondasi Faktor keamanan 2. Ditanyakan : 1. 2. 3. 4. 5. 6. Data Hammer Type Vulcan size 1 (SAS) Waktu setting BP & O Berat Hammer (w) Tinggi Jatuh Hammer ( h ) Faktor Hammer (e) Nilai Restritusi (k)

= = = = = = = =

14 inchi x 14 inchi 50 Ft 150 Cuft/ton 36 batang ton Rp 5,000,000 /jam 40 ton 1.2

= = = = = =

10 Rp 5,000,000 9700 36 0.8 0.25

menit /jam lbs inches

Apakah Hammer sudah memadai ? Jika tidak , tentukan hammer yang memadai . Hitung waktu untuk memancang tiap batang ! Hitung untuk semua pek. Pemancangan . Hitung biaya pek. Pemancangan . Hitung HSP Hitung biaya penawaran.

Ditanyakan

: Energi yang dihasilkan hammer E= e x w x h E= 0,8 x 9700 x 36 E= 279360 inch-lb Energi yang hilang akibat pukulan (I) I= exwxhxpx

1 - k w+p I = 0,8 x 9700 x 36 x 8166,67 x

1 - 0,25 9700 + 8166,67

I=

119711.78

inch-lb

akibat head tiang pancang (CL) U = daya dukung pondasi x faktor keamanan U = 240000 x 1,2 U = 288000 CL = UxC1 C1 = tekanan izin sementara kepada

CL = CL = CL =

2 288000 x 0,394 2 113385.83 2 56692.91

C1 =

0.01

akibat tiang pancang (PL) PL = UxC2 2 PL = 288000 x 0,197 2 PL = 56692.91 2.00 PL = 28346.46

C2 = simpanan tiang akibat tekana izi C2 = 0.005

akibat ujung tiang pancang (SL) SL = UxC3 2 SL = 288000 x 0,118 2 SL = 34015.75 2 SL = 17007.87

C3 = tekanan izin sementara C3 = 0.003

1.

Energi bersih yang dapat digunakan US = e x w x h - I - CL - PL - SL US = 279360 - 119711,78 -56692,91 - 28346,46 - 17007,87 US = 57600.98 hammer memadai S = US / U S = 57600,98 / 288000 S= 0.200 inchi S= 0.0051 meter Le S x V xFo T= 10.16 0,0051 x 60 x 0,83 T= 40.16 Menit T= Le = 2/3 dari L Le = 33.33 Le = 10.16 V= 60 Fo = 0.83

2. 3.

Waktu yang dibutuhkan untuk memancang 1 tiang pancang adalah = Waktu yang dibutuhkan untuk memancang semua tiang pancang adalah =

4.

Biaya pemancangan = waktu pek. Pemancangan X BP&O = 30,10 jam X Rp. 5.000.000/jam = Rp 150,479,886.44

Profit 10% = Rp Biaya pemancangan = Rp 5. HSP Pekerjaan = = HSP Pekerjaan =

15,047,988.64 + 165,527,875.09 Biaya act + profit Jumlah tiang pancang Rp165,527,875 36 Rp4,597,997 Rp m Rp m /batang

6.

Harga Penawaran Harga Penawaran

= = =

Biaya Actual Rp190,357,056

+ Rp165,527,875

= =

8166.67 240000

lb lb

an hammer yang memadai .

tekanan izin sementara kepada kepala tiang dan cap

0.394 Inchi

simpanan tiang akibat tekana izin sementara m 0.197 Inchi

tekanan izin sementara m

0.118 Inchi

ft meter

50.16 menit 30.10 jam

Profit Rp165,527,875

+ +

Pajak 15% Rp24,829,181

UNIT PRICE ANALYSIS


ITEM NUMBER UNIT OF WORK QUANTITY OF WORK DAILY/HOURLY OUTPUT : : : : Sta. 0+000 s/d 20+000 Cu.m

NO. A. A.1 A.2

DESCRIPTION Pekerjaan Badan Jalan (Subgrade) Penggalian Badan Jalan Buldozer Pengangkutan Galian Wheel Loader Dump Truck Pemadatan Badan Jalan Tandem Roller Perapian Badan Jalan Motor Grader Sub Total Pekerjaan Tebing Penggalian Tebing Excavator PC 200 Sub Total Sub Total = (A + B ) Overhead and Profit TOTAL Before Tax Tax TOTAL

UNIT ALAT

QUANTITY

UNIT

11 5 10 1 1

172,800 138,240 138,240 72,000 72,000

M3 M3 M3 M3 M2

A.3 A.4

B. B.1

22,350

M3

Q ( m3/hour)

BP & O (Rp/hour)

Real Cost (Rp/m3)

Durasi hari

134.95 141.60 77.93 17,637.50 1,344.60

2,952,000 1,250,000 262,500 2,000,000 2,200,000

240,625.00 44,139.41 33,683.74 113.39 1,636.17 320,197.71

20.0 33.5 30.4 0.7 9.2

186.25

1,200,000

6,442.88 6,442.88 326,640.60 48,996.09 375,636.69 56,345.50 431,982.19

0.7

% Profit = % Tax =

15% 15%