Professional Documents
Culture Documents
Workshop overview
MSEP enhancements
MSEP workflow
Workshop overview
MSEP enhancements
MSEP workflow
MSEP enhancements
Expanded GSF
200 pits!
Design
Series/AutoP/Starter pit
MSVALP
Series/Worst Scheduling
Additional items
Complex slopes Continues to support current slopes Soon to allow more slope detail
No need for multiple GSF files Easily create GSF using procedure p60110.dat Support for old GSF files
More TOPO items TOPO1TOPO5 More Area items AREA1AREA5 More slope estimate items
OPTIONS
BASE option for selected areas MULTP limit pushback size MULTV vary value MULTZ vary bottom elevation AUTOP pushbacks limited by face angle BASE - option with vary prices feature Starter pit for AUTOP and MULTP options
THE GAP
AutoP parameters
Mining face arc degrees
Calculated Azimuth
The GAP
Worst
No phases or COG optimization used Mines each pit independently top down
Base
Schedules pits sequentially ending with each pit No COG optimization used
Best
Schedules pits sequentially ending with each pit COG optimization used
Workshop overview
MSEP enhancements
MSEP workflow
Workshop overview
MSEP enhancements
MSEP workflow
MSEP workflow
Design
Redesign
Circular Analysis
Calculate
Analyze
MSEP workflow
Pit phase design
MultP AutoP
Evaluation - MSEPc
Select phases
Workshop overview
MSEP enhancements
MSEP workflow
Workshop overview
MSEP enhancements
MSEP workflow
MSEP results
3DBM and GSF Model views
Analyze MSEP results:
MSVALP report
Summary of pushback economics Pushback size Stripping ratio Value per ton
MSVALP report
Analysis of schedules - example Best case improves NPV from Base case 2.4B to 3.2B in the first 5 years Stockpiled tons 83M
Selection of phases
Sensitivity on strategy
Production rates Stockpile strategy Cutoff strategy