New for MineSight Economic Planner

Presentation by Jose Sanchez

Workshop overview
MSEP enhancements

MSEP workflow

Analyzing MSEP results

Workshop overview
MSEP enhancements

MSEP workflow

Analyzing MSEP results

MSEP enhancements
Expanded GSF
200 pits!

Design
Series/AutoP/Starter pit

MSVALP
Series/Worst Scheduling

MSEP expanded GSF


200 pits!

Additional items

Complex slopes Continues to support current slopes Soon to allow more slope detail

No need for multiple GSF files Easily create GSF using procedure p60110.dat Support for old GSF files

More TOPO items TOPO1TOPO5 More Area items AREA1AREA5 More slope estimate items

MSOPITCreating a series of pits


Design a series of pits Determine the ultimate pit limit Develop phases for scheduling
Multi-Run using BASE option

OPTIONS

BASE option for selected areas MULTP limit pushback size MULTV vary value MULTZ vary bottom elevation AUTOP pushbacks limited by face angle BASE - option with vary prices feature Starter pit for AUTOP and MULTP options

BASE option with vary price feature

Scheduling with economic sequential pits

THE GAP

Scheduling with economic sequential pits


360 degree mining

AutoP More realistic phase design


Create pits in a preferred direction

Create a series of non-concentric pit shells

Targets high grade material

Honors maximum mining width

Fixes the gap issue

AutoP How it works


Mineable area divided into 15 horizontal sectors Each sector evaluated based on mining arc angle range Economics calculated for each sector Sector economics weighted by factor (0-10) Factor could change mining direction

AutoP How it works

AutoP How it works

AutoP How it works

AutoP parameters
Mining face arc degrees

Calculated Azimuth

BASE-Vary price pits

The GAP

AUTOP series of pits

New MSOPIT Starter pit option


AutoP MultP Options

MSVALP enhancements - Scheduling


Standard run
Base Constant cutoff Best

Worst
No phases or COG optimization used Mines each pit independently top down

Base
Schedules pits sequentially ending with each pit No COG optimization used

Best
Schedules pits sequentially ending with each pit COG optimization used

SUM files for series options


Schedule by period for each pit

PIVSUM creates a pivoted file by pit

Workshop overview
MSEP enhancements

MSEP workflow

Analyzing MSEP results

Workshop overview
MSEP enhancements

MSEP workflow

Analyzing MSEP results

MSEP workflow Basic MSEP tools


P60110.dat build GSF file MSOPIT design pits GETREP extract data from report files MSVALP calculate schedules PIVSUM pivot SUM files MSEPc make charts and reports

MSEP workflow
Design

Redesign

Circular Analysis

Calculate

Analyze

MSEP workflow
Pit phase design
MultP AutoP

Evaluation - MSEPc

Select phases

Schedule with MSVALP

Workshop overview
MSEP enhancements

MSEP workflow

Analyzing MSEP results

Workshop overview
MSEP enhancements

MSEP workflow

Analyzing MSEP results

MSEP results
3DBM and GSF Model views
Analyze MSEP results:

Standard report files (rptval.*) MSEPc charts and reports

Model view periods and pushbacks

Model view Pit and pushback number

Model view Pit and pushback number

Model view AutoP pushback

MSVALP report
Summary of pushback economics Pushback size Stripping ratio Value per ton

MSVALP report
Analysis of schedules - example Best case improves NPV from Base case 2.4B to 3.2B in the first 5 years Stockpiled tons 83M

MSEPc Schedule analysis

Selection of phases

Sensitivity on strategy
Production rates Stockpile strategy Cutoff strategy

Examine results MSVALP to schedule


MSEPc charts, report MS3D model views

Cum PV & waste adjustment

Evaluating pits w/ MSEPc pgetrep.dat

$$$ effects of pushback design

MSVALP cutoff grade strategy

MSEPc sample report

MSEP Reporter the future