Cost Estimate

Description
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 IMPORTANT: BE SURE TO INCLUDE SALES TAX AND DELIVERY CHARGES

Page 1 Qty Price UM Draw Me Total

LAND
Lot Price Closing Costs on Lot Interest On Lot TOTAL LAND (LINES 5-7)

DESIGN
* Architecture Engineering Blueprints TOTAL DESIGN (LINES 12-14)

CONSTRUCTION LOAN
Appraisal Point(s) Closing Costs Interest Builder's Risk Insurance Initial Survey

TOTAL LOAN (LINES 19-24) PERMITS


Septic Tank Building Electrical (usually included in electrician's quote) Mechanical (HVAC) (usually included in heating quote) Plumbing (usually included in plumber's quote) Tree Removal Curb Cut

TOTAL PERMITS (LINES 29-35) UTILITIES


Underground Electric Service Water Tap and Meter Sewer Tap and Connect Fee Temporary Electric Power

TOTAL UTILITIES (LINES 40-43)

PAGE TOTALS (LINES 9, 16, 26, 37, 45)

UM = Unit Measure (ea, sq ft, etc.)

2001 Institute of Residential Contracting

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Cost Estimate
Description
51 SITE PREPARATION 52 Rough Stake 53 Clearing, Grading, Hauling 54 Fill Dirt 55 Locate Corners 56 57 58 59 FOOTINGS 60 Layout, Dig, and Pour 61 Steel 62 Concrete 63 Drains 64 65 66 FOUNDATIONS 67 Concrete 68 Brick 69 Block 70 Mortar 71 Sand 72 Steel 73 Vents 74 Damp Proofing 75 Backfill 76 Labor 77 Foundation Survey 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 UM = Unit Measure (ea, sq ft, etc.)

Qty

Price

UM

Draw

Me

Page 2 Total

TOTAL SITE PREP (LINES 52-55)

TOTAL FOOTINGS (LINES 60-63)

TOTAL FOUNDATIONS (LINES 67-77)

PAGE TOTALS (LINES 57, 64, 79)

2001 Institute of Residential Contracting

Cost Estimate
Description 101 SLAB (IF APPLICABLE)
102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 Fill Dirt Sand Backfill Labor Polyethelene Wire Mesh Styrofoam (Perimeter Insulation) Steel Grade Stakes Form Materials Concrete Set Up and Finishing

Qty

Price

UM

Draw

Me

Page 3 Total

TOTAL SLAB (LINES 102-112) SOIL TREATMENT FOR TERMITES FRAMING - FLOORS
Sills Steel Posts Steel Beams Microlams Joists Hangers Cross Bracing Floor Decking Glue

FRAMING - WALLS
Base Plates Studs Top Plates Header Materials Corner Bracing Sills, Jacks, and Cripples Back Out Materials Insulated Sheathing Chimney Framing Materials Bracing Materials

TOTAL FLOOR AND WALL FRAMING (LINES 119-139)

PAGE TOTAL (LINES 114, 116, 143)

q y ( y) p ( ) 2001 Institute(of Residential y) y p Contracting p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty
UM = Unit Measure (ea, sq y ft, etc.)

Cost Estimate
Description 151 FRAMING - CEILINGS
152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 Beams Ceiling Joists Headers and Trimmers

Qty

Price

UM

Draw

Me

Page 4 Total

FRAMING - ROOF
Truss Package Bracing Materials Ridge Board Ridge Rafter Valley Rafter Rafters Lookout Material Barge Rafter Dormer Materials Cricket Materials Roof Decking Roof Clips 15# Felt Gable Vents Strong Ties Framing Labor

CEILING AND ROOF FRAMING (152-172) TOTAL FRAMING (LINES 143, 174) MASONRY WALLS
Block Sills Lintels Block Ties Sand Mortar Steel Concrete Masonry Labor

TOTAL MASONRY WALLS (LINES 179-187)

PAGE TOTAL (LINES 174, 189)

UM = Unit Measure (ea, sq y ft, etc.)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty

Cost Estimate
Description
201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250

Qty

Price

UM

Draw

Me

Page 5 Total

ROOF
Roofing Shingles Eave Drip Flashing Ridge Vents Roof Ventilators Nails Roofing Labor

TOTAL ROOFING (LINES 202-208)

WINDOWS EXTERIOR DOORS


Exterior Doors Garage Door

TOTAL EXTERIOR DOORS (LINES 216, 217) CORNICE, VENEER, & EXTERIOR TRIM
Siding Masonry Veneer Brick Stone Sand Mortar Ties Lintel Masonry Labor Stucco (Including Materials) Cornice Materials Sub Fascia Fascia Soffit Soffit Vents Frieze Board Shingle Mould Dental Mould Crown Moulding Corner Trim Window Trim/Mould Door Trim and Mould Flashing

CORNICE, VENEER, EXTERIOR TRIM CONTINUED ON NEXT PAGE PAGE TOTAL (LINES 210, 213, 219, 246)

UM = Unit Measure (ea, sq y ft, etc.)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty

Cost Estimate
Description
251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 CORNICE, VENEER, EXT. TRIM CONTINUED Shutters Porch Columns Pediment and Pilasters Porch Materials Flooring Ceiling Columns/Posts Handrail Trim Nails Siding and Trim Labor

Qty

Price

UM

Draw

Me

Page 6 Total

TOTAL CORNICE, VENEER, EXTERIOR TRIM (222-262)


FIREPLACE Face Brick Fire Brick Flue Liner Mortar Sand Lintel Damper Ash Dump Gas Lighter (Including Gas Line) Masonry Labor Prefab Fireplace Chase Top Hearth and Profile (Materials and Labor)

TOTAL FIREPLACE (LINES 267-279)


ELECTRICAL Subcontract - Includes: Labor, Wire, Outlets, Switches, Boxes, Connectors, Meter, Service Entrance, Panel and Breakers, Lighting Fixture (Allowance) Includes: Door Bell, and Smoke Detectors Ceiling Fan Whole House Fan

TOTAL ELECTRICAL (LINES 284-290)

PAGE TOTAL (LINES 264, 281, 292)

UM = Unit Measure (ea, sq y ft, etc.)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty

Cost Estimate
Description
301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 APPLIANCES AND SPECIAL EQUIPMENT Range Range Hood Cook Top Oven Microwave Trash Compactor Disposal Refrigerator Dishwasher Electronic Air Filter Intercom System Built-In Vacuum System Security System Garage Door Opener

Qty

Price

UM

Draw

Me

Page 7 Total

TOTAL APPLIANCES (LINES 302-315)


HVAC SYSTEM Subcontract - Includes: Labor; Heating/Air Conditioning System; Humidifier and Dehumidifier; Ducts, Dampers, and Vents For Range Hood, Fireplace, Bath Fans, and Dryer.

TOTAL HVAC (LINE 320)


PLUMBING Subcontract - Includes: Labor; Supply, Waste, and Vent Pipes, and Fittings; Bathtubs, Prefab Showers and Shower Pans, Sinks, Vanity Bowls, and Toilets; Shower Heads, Faucets, Sill Cocks; Water Heater; Gas Lines

TOTAL PLUMBING (LINE 329) WELL SEPTIC TANK SOLAR SYSTEM (LABOR AND MTLS)

PAGE TOTAL (LINES 317, 326, 336, 338, 340, 342)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty UM = Unit Measure (ea, sq y ft, etc.)

Cost Estimate
Description
351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 INSULATION - Materials and Subcontract DRYWALL - Materials and Subcontract INTERIOR DOORS AND TRIM Doors Base Moulding Base Cap Casing Crown Moulding Chair Rail Shoe Mould Shelving Closet Rods Rod Cups Shelf and Rod Brackets Shelf Cleating Stairs Stringers Treads Risers Handrail & Fittings Newells Balusters Skirt Board Pre-Fab Unit Panelling Plywood Picture Mould Panel Mould 1x Materials Window Trim Stool Mull Stop Apron Drop Ceiling Mtls. Disappearing Stairs Nails Glue Trim Labor Incl Shoe Mould and Undercut Doors

Qty

Price

UM

Draw

Me

Page 8 Total

TOTAL INTERIOR DOORS AND TRIM (LINES 356 -391)

PAGE TOTALS (LINES 351, 353, 393)

UM = Unit Measure (ea, sq y ft, etc.)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty

Cost Estimate
Description
401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 HARDWARE Entry Lockset Bedroom Locksets Bathroom Locksets Passage Doorsets Dummy Locksets Deadbolts Window Locks And Sash Lifts Door Stops (Base Board) Door Stops (Hinge Type) Bath Accessories Towel Holders Soap Dish Toothbrush Holder Tumbler Holder Medicine Cabinet Shower Curtain Rod Glass Fireplace Door Hardware Labor

Qty

Price

UM

Draw

Me

Page 9 Total

TOTAL HARDWARE (LINES 402-419) CABINETS AND VANITIES


Wall Cabinets, Base Cabinets, and Vanities Including Installation "Cultured" Marble Vanity Tops

TOTAL CABINETS AND VANITIES (PAGES 424-426) PAINTING (Mtls and Labor) WALLPAPER
Wallpaper Labor Including Sizing And Paste

TOTAL WALLPAPER (LINES 433, 434) WROUGHT IRON (Mtls and Labor) GLASS
Mirror Tub Enclosure Shower Enclosure Installation Of Glass Products

TOTAL GLASS (LINES 441-444)

PAGE TOTAL (LINES 421, 428, 430, 436, 438, 446)

UM = Unit Measure (ea, sq y ft, etc.)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty

Cost Estimate
Description 451 CERAMIC TILE - Materials and Labor
452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500

Qty

Price

UM

Draw

Me

Page 10 Total

FLOORS AND FLOOR COVERINGS


Carpet Including Pads and Installation Vinyl Tile Including Installation Wood Floors Including Installation

TOTAL FLOOR COVERING (LINES 454-456) SCREEN PORCH


Framing And Ceiling Materials Screening Screen Mould Screen Door Screen Door Hardware Labor

TOTAL SCREEN PORCH (LINES 461-466) DECK


Concrete (Footings) Framing Materials Decking Handrail Materials Nails Labor

TOTAL DECK (LINES 471-476) WALKS, DRIVES, AND PATIOS


Form Materials and Stakes Wire Mesh Joint Materials Concrete Labor River Rock Or Other Special Finishes - Materials and Subcontract

TOTAL WALKS, DRIVES, PATIOS (LINES 481-487)

PAGE TOTAL (LINES 451, 458, 468, 478, 489)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty UM = Unit Measure (ea, sq y ft, etc.)

Cost Estimate
Description
501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550

Qty

Price

UM

Draw

Me

Page 11 Total

LANDSCAPING
Subcontract - Includes: Finish Grading, Seeding, Sodding, Shrubs, Ground Covers, and Trees. Other Landscape Construction (Retaining Walls, Steps, Etc.) Including Materials and Labor

TOTAL LANDSCAPING (502-506) GUTTERS AND DOWNSPOUTS CLEANING


Site Clean Up - Haul Trash Clean Out House During Construction Final House Cleaning Incl. Windows Cleaning Brick and Concrete Surfaces

TOTAL CLEANING (LINES 513-516) EQUIPMENT RENTAL INSPECTIONS SUPERINTENDING CONTINGENCY

PAGE TOTALS (LINES 508, 510, 518, 520, 522, 524, 526)

GRAND TOTALS (FROM PAGE TOTALS)

UM = Unit Measure (ea, sq y ft, etc.)

Residential q y ( y) p ( ) 2001 Institute of ( y) y Contracting p p y personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty

Cost Estimate
Description
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 LAND DESIGN CONSTRUCTION LOAN PERMITS UTILITIES SITE PREPARATION FOOTINGS FOUNDATIONS SLAB SOIL TREATMENT FRAMING MASONRY WALLS ROOFING WINDOWS EXTERIOR DOORS CORNICE, VENEER, & EXTERIOR TRIM FIREPLACE ELECTRICAL APPLIANCES AND SPECIAL EQUIPMENT HVAC SYSTEM PLUMBING WELL SEPTIC TANK SOLAR SYSTEM INSULATION DRYWALL INTERIOR DOORS AND TRIM HARDWARE CABINETS AND VANITIES PAINTING WALLPAPER WROUGHT IRON GLASS CERAMIC TILE FLOORS AND FLOOR COVERINGS SCREEN PORCH DECK WALKS, DRIVES, AND PATIOS LANDSCAPING GUTTERS AND DOWNSPOUTS CLEANING EQUIPMENT RENTAL INSPECTIONS SUPERINTEND CONTINGENCY Line 9 Line 16 Line 26 Line 37 Line 45 Line 57 Line 64 Line 79 Line 114 Line 116 Line 176 Line 189 Line 210 Line 213 Line 219 Line 264 Line 281 Line 292 Line 317 Line 326 Line 336 Line 338 Line 340 Line 342 Line 351 Line 353 Line 393 Line 421 Line 428 Line 430 Line 436 Line 438 Line 446 Line 451 Line 458 Line 468 Line 478 Line 489 Line 508 Line 510 Line 518 Line 520 Line 522 Line 524 Line 526

Draw

Me

Summary Total

GRAND TOTAL

UM = Unit Measure

2001 Institute of Residential Contracting