You are on page 1of 1

1.

Page |1 STO : Stock transport order has got the following scenarios : A) Stock replenishment between two storage locations of one plant : 1) one step procedure - 311 2) Two step procedure - 313 & 315 B) Stock replenishment between two plants of one company code : a) without SD delivery : i) without UB (STO): 1) One step procedure 301, 2) Two step procedure 303 & 305 ii) With UB (STO) : ME21N MB1B (movement type 351) MIGO b) with SD delivery - UB (Stock transport order) Perform the STO related IMG settings ME21N (STO) VL10B VL02N *Subsequent functions > Create Transfer Order (LT03)+ and carry out the PGI C) Stock transfer between two plants of two different company code by using document type NB with SD delivery. Movement types : A) 1 plant; 2 storage locations 1 step procedure : Movement type 311 (transfer posting from storage loc. to storage loc.) 2 step procedure : Movement type 313 (transfer stock from sl to sl1 - remove from sl) Movement type 315 (transfer stock from sl to sl1 - in storage) B) 2 plants, 1 company code 1 step proc. movmnt. type 301 (Transfer posting from plant to plant) 2 step proc. movmnt type 303, 305 (transfer posting plant to plant- remove from storage &, to storage respectively) (With UB) movmnt. type 351 (transfer posting to stock in transit from unrestricted use) = Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com) 2. Page |2 PROCESS FLOW : A), 1) : 1000/0001 to 1000/0002 : MM01 with warehouse view : warehouse no. 010 Storage type 005 Extend the material to both SLs. MB1C will be used for initializing the stock MB1B will be used for stock transfer with movmnt. type 311 A), 2) : At MB1B change in mvmnt. types will take place. B) : 1000/0001 to 1100/0001 B), a), i), 1) : Extend the MM01 to 1100/0001 MB1B, movmnt. type : 301 , i), 2) : MB1B, movmnt. type : 303 & 305 B), a), ii) : ME21N, create PO with UB document type ( Create an STO) Supplying plant 1000, receiving plant 1100 1100 raises PO against 1000 Note PO number , Go to MB1B Go to MIGO & post the stock with reference to UB. B), b) : set up STO (also with the activation/deactivation of the one step button) ME21N (Create STO) VL10B (Purchase orders due for delivery) VL02N (To create transfer order through subsequent functions, LT03) Do the PGI under VL02N. C) Configuration Settings to be done for this NB i.e. PO. with a pricing procedure ZIV002 & cond. type ZIVU. Then ME21N VL10B PGI VF01 (Doc type ZIVU) = Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com) Checking rule (related to availability check): Define Shipping data for plant 3. Page |3 There are 3 settings under the IMG which needs to be made for the STO and they are: & Document type and one step procedure = Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)Assign

You might also like