Duties of the RWC: Tasks and responsibilities of the welding coordination personnel: Identification of tasks involved in welding coordination

Formation of team, to include team members names (we need people that have been on the welding team for ages, in order to qualify for the technical knowledge bit) Position of team members in the company, and their responsibilities Extent of authorization given to these members

Proposed team members: Tasks: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Review of requirements Technical review Sub-contracting Welding personnel Equipment Production planning Qualification of the welding procedures Welding procedure specifications Work instructions Welding consumables Materials Inspection and testing before welding Inspection and testing during welding Inspection and testing after welding Post-weld heat treatment (if necessary) Non-conformance and corrective actions Calibration and validation of measuring, inspection and testing equipment Identification and traceability Quality records Liam (Team Leader) Jim (Initial & technical review) Graeme Jason Keith Michael Richard Peter

Technical understanding of the processes of welding was identified as the source of the difficulties encountered in establishing a proper welding structure for the company. Material behaviour when welded and its effect Joint design, material behaviour and general welding processes such as conditions for material preheat or post-weld heat treatment.

Analysis of the below outlined tasks, will indicate that most of them, can either with extra input, or are already being implemented in the companys design and manufacturing process. Further analysis will immediately point out the

Identification of external duties to be contracted out: European Welding Engineer for the design of weld joints Duties: Design of welded joints (to include weld details such as appropriate weld dimensions, appropriate welding consumables, edge preparation dimensions and specifications, appropriate welding process), preparation of required pWPS, qualifying them through an external company if necessary, involvement in production planning w.r.t detailing how welds are to be made i.e. monitoring the activities of the welding technicians), welding sequence descriptions, etc. assessment of such conditions as PWHT if necessary. Monitoring the drawing, because when the design is completed, he examines the drawings, to ensure that the correct symbols have been appended at the right places. Responsible Welding Coordinator (RWC): added duties of the weld engineer, coordinating the quality management system as required. External company to qualify the preliminary welding procedure specifications (pWPS) Equipment maintenance company (Internal candidate should be trained by this same company for simple periodic tests of the equipment in between maintenances) Equipment that should be handed to them: a. Exhaust system b. Calibration/maintenance of the welding equipment c. Welding helmets d. Crane maintenance

Responsible Welding Coordinator (RWC)

T&S Staff

T&S Staff

T&S Staff

T&S Staff

T&S Staff