Construction Project Diary

THE CALIFORNIA STATE UNIVERSITY

Campus Project Contract No. From


(Month, Day, Year)

to
(Month, Day, Year)

Do Not Remove From This Project


Construction Mgmt. 703.00 10/06

INSTRUCTIONS 1. 2. 3. 4. 5. 6. 7. 8. This diary is for the exclusive use of the construction inspector employed on state university projects. The information in this journal shall be treated as private. Access to the contents by others is denied except by specific permission from the construction administrator. The diary shall be filled out daily by the project inspector, and any unused portion of the page lined to prevent additions at a later date. Use left hand column check control to check a delinquent item that needs picking up later. When item is approved, circle the check () and initial and date. This diary might be used as evidence in litigation; therefore, write legibly and in ink (or with a ballpoint pen). Cover salient points of the daily construction progress and unusual events that occur on the project. The project construction inspector is the only one who shall make entries into the diary. At the completion of the project, the diary must be filed in the office of the construction administrator.

PROJECT DATA
Campus Contract No. Bid NAME
General Contractor Architect Structural Engineer Mechanical Engineer Electrical Engineer Testing Lab Inspector

Project Open Award ADDRESS Amount $ TELEPHONE/FAX

SUBCONTRACTORS LISTED BY GENERAL


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. Acoustical Tile A. C. Paving Air Conditioning Asphalt Tile Chalk & Tackboard Cement Finishing Concrete Communication System Demolition Doors Electrical Equipment Excavation & Grading Fencing Flooring Glass & Glazing Gunite Hardware Finish Heating & Ventilation Insulation Landscaping Marble & Ceramic Tile Masonry Materials & Equipment Metal, Misc. Millwork Painting & Decorating Partitions Plaster-Lath Plumbing Roofing Sash Sealing Shades & Sun Control Sheet Metal Sprinkler Steel, Reinforcing Steel, Structural

PROJECT PAYMENT RECORD


PAYMENTS
DATE NO. AMOUNT TIME EXT.

CHANGE ORDERS
EXTRA CREDIT DATE AUTH. MATERIALS DELIVERED NOTES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 TOTALS
Insurance Carrier Contract Start Date Physical Completion Date Contract Time Surety Contract Completion Date Actual Construction Time

Date Visitors

Weather

Remarks: Average No. of Men General Plumbing Heating & Vent. Electrical Painting Misc. Total Check Control Skilled Semi-Skill Unskilled Work Progress Supervision Labor Supply Material Supply Remarks: Normal ( Superior ( Adequate ( Adequate ( ) ) ) ) Slow ( Capable ( Inadeq. ( Inadeq. ( ) ) ) ) Susp. ( Incomp. ( None ( None ( ) ) ) )

Log of Work Performed

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Inspectors Diary Form 703.00

Date Visitors

Weather

Remarks: Average No. of Men General Plumbing Heating & Vent. Electrical Painting Misc. Total Check Control Skilled Semi-Skill Unskilled Work Progress Supervision Labor Supply Material Supply Remarks: Normal ( Superior ( Adequate ( Adequate ( ) ) ) ) Slow ( Capable ( Inadeq. ( Inadeq. ( ) ) ) ) Susp. ( Incomp. ( None ( None ( ) ) ) )

Log of Work Performed

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Inspectors Diary Form 703.00