Professional Documents
Culture Documents
GEI(P)L
Feed System Cylinder size Pull Back Pull Down Hoisting speed
: : : :
: :
Max operating pressure Hydraulic Tank capacity Filtration (Nom) Return line
: : :
Page 1of 2
TECHNICAL SPECIFICATION
8 Control Panel
GEI(P)L
All Necessary control and monitoring valves and gauges are installed at control panel located nearer to drilling point for driller convenience : : Hydraulically operated cylinders for rig leveling 80mm/500mm 3 Nos. The Jacks will be Shipped Individually and will be fitted to the plat form at the time of Rig Mounting. Hydraulically operated winch for Drill rod handling 1000 kgf 30m. Hydraulically operated screw pump is used for mud rotary drilling, 120 lpm 8bar Hydraulically operated SPT Hammer attachment will be provided for Standard penetration test. To Perform Core Drilling Operation the Rotary Head Gear box has to be to increased to High Speed and also Rod Handling Attachment should be provided at an Extra Cost. Specification of Core Drilling has to be Provided (NQ, HQ, NW) etc.
Stabilizer Cylinder bore/ Stroke No. Of Jacks Auxiliary Winch Hoisting capacity Wire rope length SCREW PUMP Max. Flow Max. Pressure
10 11
: : : : : :
12 13
Note: In view of continuous R&D and product improvement programme all specification; features etc. are subjected to amendments with out prior notice. Getech drilling rigs can be supplied in custom-built models in various configurations and Mounting features to suit all special requirements.
Page 2of 2