Professional Documents
Culture Documents
Chris Batzer
Europe Learning Center November, 2009
Schlumberger Private
2009 Schlumberger. All rights reserved. (09-TS-0149 template) An asterisk is used throughout this presentation to denote a mark of Schlumberger. Other company, product, and service names are the properties of their respective owners.
Introduction to PVT Measurements Introduction to PVT Sampling Sampling Technology / Equipment Summary of Wellsite Fluid Analyses
Schlumberger Private
Onshore Services
PVT Software PVT
Wellsite Services
Well respected in Reservoir Fluid community Vast knowledge and experience (i.e. Peng-Robinson Equation) Services: studies - Laboratory PVT and advanced fluids /solids
- Manufacture HT/HP Mercury free PVT equipment - PVT software design - Research & Development
To combine our phase behaviour and sampling skills to provide our clients with solutions where others offer data
Schlumberger Private
Why Do We Sample?
Fluid property data is needed to: Help describe the reservoir Predict reservoir fluid behavior Assist in development planning Assess the environmental impact Evaluate economic potential
Schlumberger Private
Schlumberger Private
Schlumberger Private
Why? For oil gas breaks out For gas liquid drops out
* The GOR and compositions need to be representative of the true reservoir fluid.
This means: A pressurized fluid Oil with all the gas in solution Gas with heavy ends in the vapor phase
Sample Quality
Sample Quality is dependent on:
Schlumberger Private
Downhole, as close to the formation as possible, wherever reservoir and well conditions permit
Schlumberger Private
Temperature is normally held constant at reservoir temperature Pressure and Volume are varied Measurement of: - physical properties
- composition
Schlumberger Private
Schlumberger Private
Schlumberger Private
P1
P2 < P1
P3 < P2
P4 < P3
P5 < P4
P6 < P5
Schlumberger Private
Retrograde Gas
Wet Gas
Dry Gas
< 1750
> 15000
No liquid
Schlumberger Private
< 25
< 40
> 40
Up to 70
No liquid
Dark
Colored
No liquid
< 12.5
1. 2. 3. 4. 5. 6.
Quality Check Recombination/Restoration Compositional Analysis PVT Analysis Viscosity Measurement Report generation and QC
- Opening pressure Oil Sample - Bubble Point - GOR - Composition - Opening pressure Oil and Gas composition are recombined mathematically (using the separator GOR) to give reservoir fluid composition (exceptions for saturated reservoirs). Note: If the samples contain water, this would be removed as part of the validation check.
Schlumberger Private
Sampling Theory
Schlumberger Private
- Captured at the same time - Usually taken as back-up PVT samples (under-saturated reservoirs) - Can be used as the main PVT samples (saturated reservoirs) Quality dependant on: Separator stability GOR accuracy Sampling technique
Schlumberger Private
Schlumberger Private
Single-phase Sampling
History Single-phase Reservoir Sampler (SRS) developed by Oilphase in 1989 Became the industry benchmark for Cased Hole Bottomhole Sampling
Schlumberger Private
Single-Phase Multi-sample Chamber (SPMC) developed in 1998 Industry first Single-phase Open-hole Bottomhole sampler Why? Temperature reduction from TRes to TAmb causes sample pressure to drop below PSat Pressure Drop below PSat causes compositional changes How does it work? Nitrogen charge increases sample pressure above PRes Pressure drops on return to surface but not below PRes
Single-phase Sampling
Schlumberger Private
Schlumberger Private
Schlumberger Private
Conventional
MDT Petroleum Sample Receptacle:
Schlumberger Private
450 cc sample volume 20,000 psi MWP / 400 degF MWT 212 degF Max transfer temp. DOT Transportable
Schlumberger Private
MRSS Capabilities
Overall 5 OD 25,000 psig, 400F MSB 600 cc Sample Bottles 3 per module Transportable (UK, DOT, TC) and storable Single Phase Zero dead volume Self Closing Validation Cell 100 cc Onsite Validation PVT Express, OBM contamination
Schlumberger Private
At surface
Schlumberger Private
Specifications: Sample Volume = 600cc Length = 13ft 7 / 4.14m OD = 1.75 MWP = 15,000 psig MWT = 200C Sour Service
Schlumberger Private
can be integrated into any Schlumberger production logging operation. Specifications: Sample Volume = 100cc MWP = 10,000 psig MWT = 150C Sour Service
Schlumberger Private
Schlumberger Private
Schlumberger Private
SCAR Applications
HP/HT wells, H2S wells and Deepwater To avoid a high-pressure Wireline rig-up, avoid the release of H2S during Wireline rig-up and avoid Wireline in the hole during an emergency subsea disconnection
Schlumberger Private
Heavy oil wells To avoid the difficulty of running samplers in high viscosity fluids Reservoirs close to saturation pressure To avoid costly wireline intervention where there is uncertainty about the well flowing conditions and consequently some risk of not collecting representative samples Sampling with well shut it Environmental Concerns Non-emission testing To avoid hydrocarbon flow to surface
Schlumberger Private
Pu lse a t su r fa ce
Schlumberger Private
Tim e (m in ) Pu lse Do w n h o le
5000
Pr e ssu r e se e n b y to o l (p si)
4400 0 1 2 3 4 5 6
Tim e (m in )
Separator Sampling
Three(3) phase separation Phases in equilibrium at separator conditions (P&T) Oil & Gas recombined in PVT Lab at Sep. GOR
Schlumberger Private
Sampling Points
Oil Sample : Start of Oil line, upstream of the meters OR the manifold at the bottom of the oil-gas sight glass. Gas Sample : Highest point on gas line, closest to the outlet OR on the vertical section of gas line, w/ pitot tube inserted to the middle of the pipe.
Schlumberger Private
Schlumberger Private
Sample Bottles
Schlumberger Private
Specifications 700cc Sample Chamber (600cc max sample) 120cc Nitrogen Chamber MWP = 10,000 25,000 psig MWT = 200C Sour Service DOT & TC Approved
Schlumberger Private
Schlumberger Private
Transportation of Samples
Pressurised samples are only to be transported in Sample Bottles All bottles must have valid 5 year Pressure Certification All bottles must be approved for the country of destination and for the type of fluid e.g. DOT for USA TC for Canada ALL Dangerous Goods must be declared for Air, Sea and Land transport To ensure that all the transportation chain know what dangerous goods they are transporting So they know to properly load and handle them So they know what to do if an incident or accident occurs either in-flight, at sea or on the ground.
Schlumberger Private
Schlumberger Private
Schlumberger Private
64
Schlumberger Private
Schlumberger Private
Schlumberger Private