DELHI SCHEDULE OF RATES-2012 SUPPLEMENT

(GREEN BUILDING AND NEW TECHNOLOGY ITEMS) Published by CPWD- Converted by Rambabu Jalli, Hyderabad e-mail : rambabujalli@gmail.com (Very Long description divided into multiple cells to improve readability) DSR-12 Description of Item Code 5.44 Providing and fixing of expansion joint system related with floor location as per drawings and direction of Engineer-In-Charge. The joints system will be of extruded aluminum base members, self aligning / self centering arrangement and support plates etc. as per ASTM B221-02. The system shall be such that it provides floor to floor /floor to wall expansion control system for various vertical location in load application areas that accommodates multi directional seismic movement without stress to it's components. System shall consist of metal profiles with a universal aluminum base member designed to accommodate various project conditions and finish floor treatments. The cover plate shall be designed of width and thickness required to satisfy projects movement and loading requirements and secured to base members by utilizing manufacturer's pre-engineered self-centering arrangement that freely rotates / moves in all directions. The Self -centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions including vertical displacement. Provision of Moisture Barrier Membrane in the Joint System to have watertight joint is mandatory requirement all as per the manufactures design and as approved by Engineer in-Charge . (Material shall confirm to ASTM 6063.) 5.44.1 5.44.2 5.44.3 5.45 Floor Joint of 100 mm gap Floor Joint of 150 mm gap Floor Joint of 200 mm gap Providing and fixing of expansion joint system related with wall joint (internal/external) location as per drawings and direction of Engineer-InCharge. The joints shall be of extruded aluminum base members, self aligning / centering arrangement and support plates as per ASTM B221-02. The material shall be such that it provides an Expansion Joints System suitable for vertical wall to wall/ wall to corner application, both new and existing construction in office Buildings & complexes with no slipping down tendency amongst the components of the Joint System. The Joint System shall utilize light weight aluminum profiles exhibiting minimal exposed aluminum surfaces mechanically snap locking the multi- cellular to facilitate movement. (Material shall confirm to ASTM 6063.) Wall Joint of 100 mm gap Wall Joint of 150 mm gap Wall Joint of 200 mm gap One Metre One Metre One Metre Unit

5.45.1 5.45.2 5.45.3

One Metre One Metre One Metre

Providing and fixing of expansion joint system of approved make and manufactures for various roof locations as per approved drawings and direction of Engineer-In-Charge. The joints shall be of extruded aluminum base members with, self aligning and self centering arrangement support plates as per ASTM B221-02. The system shall be such that it provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components. System shall consist of metal profile that incorporates a universal aluminum base member designed to accommodate various project conditions and roof treatments. 5.46 The cover plate shall be designed of width and thickness required to satisfy movement and loading requirements and secured to base members by utilizing manufacturer's pre-engineered self-centering arrangement that freely rotates / moves in all directions. The Self centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions including vertical displacement. The Joint System shall resists damage or deterioration from the impact of falling ice, exposure to UV, airborne contaminants and occasional foot traffic from maintenance personnel. Provision of Moisture Barrier Membrane in the Joint System to have water tight joint is mandatory requirement. Material shall confirm to ASTM 6063. Roof Joint of 100 mm gap Roof Joint of 150 mm gap Roof Joint of 200 mm gap Providing and fixing machine cut, mirror / eggshell polished , Marblestone work for wall lining (veneer work) including dado, skirting, risers of steps etc., in required design and pattern wherever required, stones ofdifferent finished surface texture, on 12 mm (average) thick cementmortar 1:3 (1 cement : 3 coarse sand) laid and jointed with white cementslurry @ 3.3 kg/sqm including pointing with white cement slurry admixedwith pigment of matching shade, including rubbing, curing, polishingetc. all complete as per Architectural drawings, and as directed by theEngineer-in-Charge One Metre One Metre One Metre

5.46.1 5.46.2 5.46.3

8.11

(a) 18 mm thick Italian Marble stone slab,Perlato, Rosso verona, Fire Red or One Square Metre Dark Emperadore etc. Providing and laying flamed finish Granite stone flooring in required designand patterns, in linear as well as curvilinear portions of the building allcomplete as per the architectural drawings with 18 mm thick stoneslab over 20 mm (average) thick base of cement mortar 1:4 (1 cement :4 coarse sand) laid and jointed with cement slurry and pointing withwhite cement slurry admixed with pigment of matching shade includingrubbing , curing and polishing etc. all complete as specified and asdirected by the Engineer-inCharge :

8.12

(a) Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye One Square Metre or equivalent Providing and laying machine cut, mirror polished, Italian Marble stone flooring laid in required pattern in linear portion of the building all complete as per architectural drawings, with 18 mm thick stone slab laid over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with white cement slurry @ 4.4 kg/sqm including pointing with white cement slurry admixed with pigment to match the marble shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. (a) 18 mm thick Italian Marble stone slab,Perlato, Rosso verona, Fire Red or One Square Metre Dark Emperadore etc. Providing and laying machine cut, mirror polished Marble stone flooring, in required design (Simple geometrical, abstract etc.) and in patterns in combination with Italian marble stones of different colours, shades and finished surface texture etc., in linear portions of the building, all complete as per the architectural drawings, with 18 mm thick stone slab laid over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with white cement slurry @ 4.4 kg/sqm including pointing with white cement slurry admixed with pigment to match the marble shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. (a) 18 mm thick Italian Marble stone slab, Perlato, Rosso verona, Fire Red or One Square Metre Dark Emperadore etc. Providing and fixing Glass mossaic tiles at finished plain wall surface of size 20 One Square Metre mm x 20 mm x 4 mm in all colour, design , fixing in customize design as per direction of Engineer-in- Charge. The glass mosaic tiles to be fixed on the wall surface with the help of approved adhesive applied at the rate of 2.5 kg per sqm and grouting of the same. The rate is inclusive of all operation, material and required pattern approved by Engineer-in-Charge: Providing and fixing removable raised/false access flooring with system and its components of approved make for different plenum height with possible height adjustment upto 50mm, comprising of modular load bearing floor panels supported on G.I. rectangular stinger frame work and G.I. Pedestal etc. all complete, as per the architectural drawings, as specified and as directed by Engineer-in-charge consisting of :

11.51

11.52 11.53

(a) Providing at required spacing to form modular framework, pedestals made out of GI tube of thickness minimum 2 mm and 25mm outer diameter, fully welded on to the G.I. Base plate of size 100mmx100mmx3mm at the bottom of the pedestal tube, G.I. pedestal head of size 75mmx75mmx3.5mm welded with GI fully threaded stud16mm outer diameter with two GI Check nuts screwed on the stud for level adjustment upto 50mm, locking and stabilizing the pedestal head in position at the required level. The pedestals shall be fixed to the subfloor (base) through base plate using epoxy based adhesive of approved make or the machine screw with rawl plug.

(b) Stringers system in all steel construction hot dipped galvanized of rectangular size 570x20x30x0.80mm thick having holes at both ends for securing the stringers on to the pedestal head using fully threaded screws ensuring maximum lateral stability in all directions, the grid formed by the pedestal and stringer assembly shall receive the floor panel, this system shall provide adequate solid, rigid support for access floor panel, the system shall provide a minimum clear uninterrupted clearance between the bottom of the floor for electrical conduits and wiring etc. all complete as per the architectural drawings, as specified and as directed by the Engineer-in-charge.

(c) Providing and fixing Access Floor panel of 600x600x32 mm medium grade Filled Steel anti static high pressure Lamination of 800H grade(FS800H). Access Floor panel shall be steel welded construction with an enclosed bottom pan with uniform pattern of 64 hemispherical cones. The top and bottom plates of Steel Gauges: top 0.6 mm and bottom 0.7 mm fused spot welded together (minimum 64 welds in each dome and 20 welds along each flange). The panel should be Corroresist epoxycoated for lifetime rust protection and cavity formed by the top andbottom plate is filled with Pyrogrip non-combustible Portland cementitious core mixed with lightweight foaming compound. The accessfloor shall be factory finished with Anti-static High Pressure laminatewith Non Warp technology upto 1mm thickness for superior adhesionand Surface flatness within 0.75mm.

11.54

The panel is to withstand a Concentrated Load of 363 kgs applied on area 25mm x 25mm without collapse in the centre of the panel which is placed on four steel blocks.The panel will withstand and Uniformly Distributed Load (UDL) minimum1250 kg/sqm and an impact load of 50kg all complete as per the approved manufacturers specification and as per the direction of Engineerincharge.All specification must be printed on the side of the panel toensure the quality of the product. One Square Metre

11.54.1 300 mm Finished Floor Height

11.54.2 450 mm Finished Floor Height Providing and fixing tiled false ceiling of approved materials of size 595x595 mm in true horizontal level, suspended on interlocking metal grid of hot dipped galvanized steel sections ( galvanized @ 120 grams/ sqm, both side inclusive) consisting of main "T" runner with suitably spaced joints to get required length and of size 24x25 mm made from 0.30 mm thick (minimum) sheet, spaced at 1200 mm center to center and cross "T" of size 24x25 mm made of 0.30 mm thick (minimum) sheet, 1200 mm long spaced between main "T" at 600 mm center to center to form a grid of 1200x600 mm and secondary cross "T" of length 600 mm and size 24x25 mm made of 0.30 mm thick (minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of size 24x24x0.3 mm and laying false ceiling tiles of approved texture in

One Square Metre

12.58

the grid including, required cutting/making, opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main "T" runners to be suspended from ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm GI adjustable rods with galvanized butterfly level clips of size 85 x 30 x 0.8 mm spaced at 1200 mm center to center along main T, bottom exposed width of 24 mm of all T-sections shall be pre-painted with polyester paint, all complete for all heights as per specifications, drawings and as directed by Engineer-incharge.

12.58.1 8 mm thick fully perforated calcium silicate tile made with Calcareous & One Square Metre Siliceous materials reinforced with cellulose fiber manufactured through autoclaving process to give stable crystalline structure with minimum compressive strength 225 kg/ sq. cm, bending strength 100 kg/sq. cm , of size 595x595 mm, having perforation of dia. 10 mm with minimum perforated area 18 % with non woven tissue on the back side, having an NRC ( Noise Reduction Coefficient) of 0.85, with 50 mm thick rockwool of 48 kg /cum backing.

Providing & fixing false ceiling at all height including providing & fixing of framework made of special section, power pressed from M.S. sheets and galvanised with zinc coating of 120 gms/ sqm ( both side inclusive) as per IS : 277 and consisting of angle cleat of size 25mm wide x 1.6mm thick with flanges of 27mm and 37mm, at 1200mm c/c, one flange fixed to the ceiling with dash fastener 12.5mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25 x10 x0.50mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I chanels 45 x15 x 0.90mm running at the spacing of 1200 mm c/c, to which the ceiling section 0.5mm thick bottom wedge of 80mm with tapered flanges of 26 mm each having lips of 10.5mm, at 450mm c/c, shall be fixed in a direction perpendicular to G.I intermediate channel with connecting clip made out of 2.64mm dia x 230mm long G.I wire at every junction, including fixing perimeter channels 0.50mm thick 27mm high having flanges of 20mm and 30mm long, the perimeter of ceiling fixed to wall/ partitions with the help of Rawl plugs at 450mm centre, with 25mm long dry wall screws @ 230mm interval, including fixing of Calcium Silicate Board to ceiling section and perimeter channels with the help of dry wall screws of size 3.5 x25mm at 230mm c/c, including jointing & finishing to a flush finish of tapered and square edges of the board with recommended jointing compounds, jointing tapes, finishing with jointing compounds in three layers covering up to 150mm on both sides of joints and two coats of primer suitable for boards, all as per manufacture's specification and also including the cost of making opening for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitably fixed, all complete as per drawings, specificaton and direction of the Engineer in charge but excluding the cost of painting with:

12.59

12.59.1 8 mm thick Calcium Silicate Board made with Calcareous & Siliceous materials One Square Metre reinforced with cellulose fiber manufactured through autoclaving process. 12.60 Providing and fixing thermal insulation of ceiling (under deck insulation) with One Square Metre Resin Bonded Rockwool conforming to IS: 8183,density 48 kg/ m3, 50 mm thick, wrapped in 200 G Virgin Polythene bags fixed to ceiling with metallic cleats (50x50x3 mm) @ 60 cm and wire mesh of 12.5mm x 24 gauge wire mesh, for top most ceiling of building. Providing and fixing thermal insulation with Resin bonded rock wool One Square Metre conforming to IS: 8183, density 48 kg/m3, 50 mm thick, wrapped in 200 G virgin Polythene bags placed over existing false ceiling and held in position by criss- crossing GI wire.

12.61

12.62

12.63

Providing and fixing thermal insulation with Resin Bonded rock wool One Square Metre conforming to IS: 8183, having density 48 kg/m3, 50 mm thick, wrapped in 200 G Virgin Polythene Bags fixed to wall with screw, rawel plug & washers and held and in position by criss crossing GI wire etc. complete as per directions of Engineer-in-Charge. Providing and applying two coats of High Albedo paint having minimum Solar One Square Metre Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C 1549 and ASTM C 1371 respectively), VOC less than 10 cc/gm. The coating thickness and the methodology of application shall strctly as per manufacturer's specifications and as approved by engineer In charge. Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc., washing with water all complete. The contractor shall give guarantee for the perfomance of SRI and also the durabitity of coating, all complete as per direction of Engineer-in-incharge.

16.86

Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge. One Square Metre

16.86.1 Area less than 0.50 sqm 16.87 Providing and laying gang saw cut 30 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge.

16.87.1 Area less than 0.50 sqm 16.88

One Square Metre

Providing and laying matt finished vitrified tile of size 100x100x16mm having One Square Metre water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in out door floors such as footpath, court yard multi models etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as direction of Engineerin-Charge.

16.89

Providing and laying matt finished vitrified tile of size 300x300x9.8mm having One Square Metre with water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-in-Charge. Providing and laying tactile tile (for vision impaired persons as per standards) One Square Metre of size 300x300x9.8mm having with water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. Providing and laying factory made coloured chamfered edge Cement Concrete paver blocks of required strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of fine sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. complete as per manufacturer's specifications & direction of Engineer-in-Charge.

16.90

16.91 16.92

16.93

60mm thick C.C. paver block of M-35 grade with approved colour, complete One Square Metre design & pattern. Providing and fixing 10x10x7.50 cm Granite stone block hand cut and chisel One Square Metre dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1cement:4 coarse sand) with joints 10mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in charge. Construction of un-reinforced, dowel jointed, plain quality concrete of M-40 grade in road/pavement/taxi track etc. for all leads and lifts over a prepared sub base with 43 grade cement @ 360 kg. (minimum)per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batchingand mixing plant as per approved mix design, transported to site, in transit mixture, laid with fully automatic slip form paver with electronic sensor with dowel bar and tie rod insertor, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per

19.35

19.35.1 19.35.2 19.35.3 19.35.4 19.35.5 19.35.6 19.36

19.36.1 19.36.2 19.36.3 19.36.4 19.36.5 19.36.6 26.1

drawing and as per direction of Engineer-in-charge (including all cost of form One Cubic Metre work, dowel bars and tie bars). Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C.pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 450 mm dia RCC pipes. One Metre 600 mm dia RCC pipes. One Metre 900 mm dia RCC pipes. One Metre 1000 mm dia RCC pipes. (Laying by manual/ mechanical means) One Metre 1200 mm dia RCC pipes. (Laying by manual/ mechanical means) One Metre 1800 mm dia RCC pipes. (Laying by manual/mechanical means) One Metre Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C.pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 450 mm dia RCC pipes. One Metre 600 mm dia RCC pipes. One Metre 900 mm dia RCC pipes. One Metre 1000 mm dia RCC pipes. (Laying by manual/mechanical means) One Metre 1200 mm dia RCC pipes. (Laying by manual/mechanical means) One Metre 1800 mm dia RCC pipes. (Laying by manual/mechanical means) One Metre Providing and supplying aluminium extruded tubular and other aluminium One Kilogram sections as per the architectural drawings and approved shop drawings , the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer-in-Charge. (The item includes cost of material such as cleats, sleeves, screws etc. necessary for fabrication of extruded aluminium frame work. Nothing extra shall be paid on this account). Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels including: (a) Structural analysis, design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:

(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimensional movement for achieving perfect verticality and proper fixing of structural glazing system with the RCC/ masonry/structural steel framework of building structure, using stainless steel anchor fasteners/ bolts, nylon separator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. (c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment , including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacturer, as per the approved sealant design, within and all around the perimeter for holding glass. (d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. (e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design checked and all the shop drawings vetted by the Principals of the structural glazing system. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural

26.2

glazing having all the performance characteristics etc. all complete as One Square Metre required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineerin-Charge.

Note:- 1 The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub-head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up to two decimal places. Note-2 : The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL (National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of structural glazing system Tests to be conducted in the NABL certified laboratories 1. Performance Laboratory Test for Air Leakage Test (-50pa to - 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr. 2. Static Water Penetration Test. (50pato 1500pa) as per ASTME- 331-09 testing method for a range upto 2000 ml. 3. Dynamic Water Penetration (50pato 1500pa) as per AAMA 501.01-05 testing method for a range upto 2000 ml 4. Structural Performance Deflection and deformation by static air pressure test ( 1.5 times design wind pressure without any failure) as per ASTME-33010 testing method for a range upto 50 mm 5. Seismic Movement Test (Upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test Tests to be conducted on site 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35 psi) upto 2000 ml . Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12-6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer high performance heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthened clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor.

(Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.1) For payment, only the actual area of glass on face # 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm. 26.3 (i) Coloured tinted float glass 6mm thick substrate with reflective soft coating One Square Metre on face # 2, + 12mm Air gap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. Extra for openable side / top hung vision glass panels (IGUs) including One Square Metre providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. Providing, fabricating and supplying shadow box of required size and shape, One Square Metre for fixing in the spandrel portion of the structural glazing, in linear as well as curvilinear portions of the building by providing semi- rigid, inorganic, noncombustible fibre glass wool insulation 50 mm thick having density 48 Kg/cum, conforming to IS: 8183 and BS: 3958 Part 5. The insulation layer shall have facing (factory bonded on surface # 1of the fibre glass insulation layer), of black non-woven fibre glass tissue of nominal thickness 0.5 mm and nominal mass not less than 60 gm / sqm, made of randomly oriented glass fibres distributed in a binder by a wet-lay process including fixing 1.5 mm thick solid aluminum sheet backing using, 6 mm thick cement board including SS rivets, nuts, bolts, washers etc complete. Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in-Charge. For payment, only the actual area of glass on face # 1 of the glass panels (but excluding the area of grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm.(Payment for fixing of Spandrel Glass Panels in the curtain glazing is included in cost of relevant Item).

26.4

26.5

26.6

(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating One Square Metre on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc.

(c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing. The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. 26.7 However, for the purpose of payment, only the actual area on the external One Square Metre face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.

Note : The following performance test are to be conducted on ACP system if area of ACP system exceeds 4500 Sqm from the certified laboratories accreditated by NABL (National Accreditation Board for Testing and Calibration Laboratories), Department of Science &Technologies, India. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of ACP system Tests to be conducted in the NABL certified laboratories (1). Performance Laboratory Test for Air Leakage Test (-50pa to -300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr (2). Static Water Penetration Test. (50pato 1500pa) as per ASTME-331-09 testing method for a range upto 2000 ml. (3). Dynamic Water Penetration (50pato 1500pa) as per AAMA501.01-05 testing method for a range upto 2000 ml (4). Structural Performance Deflection and deformation by static air pressure test ( 1.5 times design wind pressure without any failure) as per ASTME-33010 testing method for a range upto50 mm (5). Seismic Movement Test (Upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test. Tests to be conducted on site. (6). Onsite Test for Water Leakage for a pressure range 50 kpa to240 kpa (35 psi) upto 2000 ml.

Rate (Rs)

6374.30 6998.60 7506.80

5096.65 5488.65 5880.70

6374.30 6766.30 7042.20

6732.05

2667.60

4995.25

5215.05 1551.35

3875.95

3917.75

1285.25

945.10

440.65

310.40

313.85

240.60

2497.35

3412.05 1387.50

899.65

1315.50

703.80 1259.65

4845.80

1874.95 2458.70 3874.70 4790.85 6274.00 11575.65

2150.20 2824.55 5553.05 6742.20 7981.40 16453.95 363.85

2282.65

3862.85

2966.80

1582.05

2796.45

3465.00

ANALYSIS OF RATES (FOR DSR-2012 SUPPLEMENT)


Compiled by J.Ramababu, SDE(Civil), Hyderabad. rambabujalli@gmail.com Read from Page 5

Sub-Data Analysis - without water charges and without CP & OH


Item Code : 2607-A Cost of material, Fabrication, Installation, transportation, scaffolding - To calculate design charges. [Ref: ] Details of Cost for : 1.00 Description Code Unit Quantity Rate MATERIALS: Weather Sealant - Non Staining (600ml) 7390C Nos 2.00 459.15 Weather Sealant - Normal (300ML) 7390D Nos 2.00 143.21 MS Brackets 7390E Kg 10.00 100.00 EPDM Gasket in Kg (Above 60 g / m) 7390G Kg 0.70 163.98 Anchor Fastner - M10 7390H Nos 2.00 110.93 SS Bolt with Washer 7390J Nos 2.00 35.00 SS Screws 7390K Nos 49.00 5.00 Protective Tape 7390N Sqm 7.00 25.00 Baker Rod 7390P m 5.00 5.00 GI flashing - 1.2mm Thk. 7390Q Kg 4.00 65.99 4mm thick ACP 7393N Sqm 7.06 1200.00 Sundries 9999 L.S. 451.00 1.49 Fabrication / Installation / Transport / Scaffolding Fabrication 7393P Sqm 7.06 400.00 Installation cherges for ACP cladding 7393Q Sqm 7.06 400.00 Transportation charges for ACP cladding 7393R Sqm 7.06 100.00 Scaffolding 7393S Sqm 7.06 127.10 Cost for 1.00 Rate per : Rs 19715.65

Amount 918.30 286.42 1000.00 114.79 221.86 70.00 245.00 175.00 25.00 263.96 8472.00 671.99 2824.00 2824.00 706.00 897.33 19715.65

Item Code : 3.3 Cement mortar 1:3 (1 cement : 3 fine sand) [Ref: DAR-2012, Volume-I, Item No.: 3.3] Description Code MATERIALS (0.375 cum. of cement = 0.51 tonne) Cement 0367 Carriage of Cement 2209 Fine sand 0983 Carriage of fine sand 2261 LABOUR For measuring, carrying, depositing and mixingBeldar 0114 Bhisti 0101 Hire and running charges of mechanical mixer 9999 Sundries 9999

Details of Cost for : 1.00 Cum Unit Quantity Rate

Amount

tonne tonne cum cum

0.51 0.51 1.07 1.07

5000.00 77.87 640.00 87.60

2550.00 39.71 684.80 93.73

Day Day L.S. L.S.

0.75 247.00 0.07 260.00 26.91 1.49 13.52 1.49 Cost for 1.00 Cum

185.25 18.20 40.10 20.14 3631.93

Rate per One Cum : Rs 3631.93

Item Code : 2603-A Cost of glass in item code 26.3 (for calculating insurance) [Ref: ] Description Code 6mm thick High performance Glass 7391A

Details of Cost for : 1.00 No. Unit Quantity Rate Sqm 7.02 1910.00

Amount 13408.20

C/o new building..

Page 29 of 59

7391B

6mm thick clear heat strengthened Glass

Sqm

7.02 770.00 Cost for 1.00 No.

5405.40 18813.60

Rate per Each : Rs 18813.60

Item Code : 2602-A Cost of materials, Fabrication, Installation, Transporatation, Scaffolding in item 26.2 [Ref: ] Details of Cost for : 1.00 Description Code Unit Quantity ANALYSIS OF RATE Width of the unit 1.6 m Height of the unit 4.2 m Area of Single Unit 6.72 m2 Total Area 6.72 m2 Aluminium Weight per m2 : 6.50 Kg/m2 No. of panels : 1 Vision Height : 2.2m Spandral height : 2m MATERIALS: Structural Sealant - 6mm x 12mm Spacer Tape 6.4mm (Thick) x 6mm (W) Weather Sealant - Non Staining (600ml) Weather Sealant - Normal (300ML) MS Brackets/Aluminium Alloy Brackets Silicon Gasket in Kg (Above 50 g / m) EPDM Gasket in Kg (Above 60 g / m) Anchor Fastner - M10 SS Bolt with Washer SS Screws Fire Stop Protective Tape Baker Rod GI flashing - 1.2mm Thk. Masking Tape MISC (In item 26.2) Fabrication / Installation / Transport / Scaffolding / Labour PF + ESIS Fabrication charges - Semi-unitized Glazing Installation charges - Semi-unitized Glazing Transportation for Semi-unitized Glazing Scaffolding / Loading / Unloading for Semi-unitized Glazing

Rate

Amount

7390A 7390B 7390C 7390D 7390E 7390F 7390G 7390H 7390J 7390K 7390M 7390N 7390P 7390Q 7390R 7390S

m m Nos Nos Kg Kg Kg Nos Nos Nos m Sqm m Kg Sqm Sqm

17.02 20.11 1.96 2.55 9.78 0.78 0.70 2.00 2.00 51.38 1.60 6.72 5.04 3.96 6.72 6.72

31.62 18.00 459.15 143.21 100.00 601.26 163.98 110.93 35.00 5.00 561.94 25.00 5.00 65.99 2.50 50.00

538.17 361.98 899.93 365.19 978.00 468.98 114.79 221.86 70.00 256.90 899.10 168.00 25.20 261.32 16.80 336.00

7390T 7390U 7390V 7390VA

Sqm Sqm Sqm Sqm

6.72 6.72 6.72 6.72

400.00 400.00 100.00 127.10

2688.00 2688.00 672.00 854.11 12884.33

Cost for 1.00 Rate per : Rs 12884.33

Item Code : 3.9 Cement mortar 1:4 (1 cement : 4 coarse sand). [Ref: DAR-2012, Volume-I, Item No.: 3.9] Description Code MATERIALS (0.214 cum. of cement = 0.31 tonne) Cement 0367 Carriage of Cement 2209 Coarse sand 0982 Carriage of Coarse sand 2203 LABOUR For measuring, carrying, depositing and mixingBeldar 0114

Details of Cost for : 1.00 Cum Unit Quantity Rate

Amount

tonne tonne cum cum

0.38 0.38 1.07 1.07

5000.00 77.87 1120.00 87.60

1900.00 29.59 1198.40 93.73

Day

0.75

247.00

185.25

C/o new building..

Page 30 of 59

0101 9999 9999

Bhisti Hire and running charges of mechanical mixer Sundries

Day L.S. L.S.

0.07 260.00 26.91 1.49 13.52 1.49 Cost for 1.00 Cum

18.20 40.10 20.14 3485.41

Rate per One Cum : Rs 3485.41

Item Code : 3.8 Cement mortar 1:3 (1 cement : 3 coarse sand) [Ref: DAR-2012, Volume-I, Item No.: 3.8] Description Code MATERIALS (0.357 cum. of cement = 0.51 tonne) Cement 0367 Carriage of Cement 2209 Coarse sand 0982 Carriage of Coarse sand 2203 LABOUR For measuring, carrying, depositing and mixingBeldar 0114 Bhisti 0101 Hire and running charges of mechanical mixer 9999 Sundries 9999

Details of Cost for : 1.00 Cum Unit Quantity Rate

Amount

tonne tonne cum cum

0.51 0.51 1.07 1.07

5000.00 77.87 1120.00 87.60

2550.00 39.71 1198.40 93.73

Day Day L.S. L.S.

0.75 247.00 0.07 260.00 26.91 1.49 13.52 1.49 Cost for 1.00 Cum

185.25 18.20 40.10 20.14 4145.53

Rate per One Cum : Rs 4145.53

Item Code : 1693-A Cost of materials in item No. 16.93 (with out CP / OH) [Ref: DAR-2012, Volume-II, Item No.: .1693-A] Details of Cost for : 1.00 Description Code Unit Quantity MATERIALS: Crushed stone coarse aggregates of 25mm nominal size cum 0294 472.50 @ 0.45 cum/cum of concrete conforming 0296 2202 0982 2203 0367 2209 1003 1005 2205 0323 0374 0314 0371 0369 0349 7318 Crushed stone coarse aggregates 12.5mm nominal size @ 0.45 cum/cum of concrete conforming Carraige of Stone aggregate Sand as per IS: 383 and conforming to clause 602.2.4 @ 0.45 cum/cum of concrete Carraige of Coarse sand Cement 43 grade @ 360 kg/cum of concrete Carraige of Cement Mild steel round bar above 12 mm dia 16 mm deformed steel tie bars of grade S 415 Carraige of Steel Separation Membrane of impermeable plastic sheeting 125 micron thick Pre moulded Joint filler, 25 mm thick for expansion joint. cum cum cum cum tonne tonne quint quint tonne sqm sqm 472.50 945.00 472.50 472.50 378.00 378.00 99.20 12.30 11.15 3675.00 16.33 875.00 116.67 46.67 1850.00 1890.00

Rate 1000.00

Amount 472500.00

1050.00 87.60 1120.00

496125.00 82782.00 529200.00

87.60 41391.00 5000.00 1890000.00 77.87 29434.86 4000.00 396800.00 4500.00 55350.00 77.87 868.25 12.00 44100.00 500.00 26.00 125.00 30.00 50.00 36.50 8165.00 22750.00 14583.75 1400.10 92500.00 68985.00

Bitumen Joint sealant kilog Sealant primer kg Plastic sheath,1.25 mm thick for dowel bars sqm Curing compound litre Super plastisizer admixture IS marked as per 9103-1999 kilog @ 0.5 per cent by weight of cemen

Cost for 1.00 4246934.96 Rate per : ##########

C/o new building..

Page 31 of 59

Item Code : 13.33.1 Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) : Flush/ Ruled pointing [Ref: ] Details of Cost for : 10.00 Sqm Description Code Unit Quantity Rate MATERIALS Cement mortar 1:3 (1 cement : 3 fine sand) 03.003 Cum 0.023 3631.93 (rate as per item no. 3.3) Sundries 9999 L.S. 7.15 1.49 LABOUR Mason 0155 Day 0.92 287.00 Coolie 0115 Day 1.37 247.00 Bhisti 0101 Day 0.93 260.00 Scaffolding and racking out joints including sundries 9999 L.S. 16.12 1.49 Cost for 10.00 Sqm Rate per One Sqm : Rs 96.24

Amount 83.53 10.65 264.04 338.39 241.80 24.02 962.43

C/o new building..

Page 32 of 59

Analysis for Estimate Items : With water charges and with CP & OH (15%)
Item Sl.No. : 1-a Item Code: 5.44.1 P/F expansion joint system of aluminium members as per ASTM B221-02 floor to floor /floor to wall expansion control system for various vertical localtion Floor Joint of 100 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.44.1] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Floor Joint of 100 mm 2403 metre 1.00 4500.00 4500.00 Epoxy adhesive 2402 kg 4.25 150.00 637.50 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 5488.00 Add water charges @ 1% on 5488.00 54.88 5542.88 Add C.P & OH @15% on 5542.88 831.43 Cost for 1.00 m 6374.31 Rate per One Metre: Rs 6374.31

Item Sl.No. : 1-b Item Code: 5.44.2 P/F expansion joint system of aluminium members as per ASTM B221-02 floor to floor /floor to wall expansion control system for various vertical localtion Floor Joint of 150 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.44.2] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Floor Joint of 150 mm 2404 metre 1.00 5000.00 5000.00 Epoxy adhesive 2402 kg 4.50 150.00 675.00 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 6025.50 Add water charges @ 1% on 6025.50 60.26 6085.76 Add C.P & OH @15% on 6085.76 912.86 Cost for 1.00 m 6998.62 Rate per One Metre: Rs 6998.62

Item Sl.No. : 1-c Item Code: 5.44.3 P/F expansion joint system of aluminium members as per ASTM B221-02 floor to floor /floor to wall expansion control system for various vertical localtion Floor Joint of 200 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.44.3] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Floor Joint of 200 mm 2405 metre 1.00 5400.00 5400.00 Epoxy adhesive 2402 kg 4.75 150.00 712.50 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 6463.00 Add water charges @ 1% on 6463.00 64.63

C/o new building..

Page 33 of 59

Add C.P & OH @15% on 6527.63 Cost for 1.00 m Rate per One Metre: Rs 7506.77

6527.63 979.14 7506.77

Item Sl.No. : 2-a Item Code: 5.45.1 P/F expansion joint system related with wall joint - Aluminium members as per ASTM B221-02 vertical wall to wall/ wall to corner application : Wall Joint of 100 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.45.1] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Wall Joint of 100 mm 2409 metre 1.00 3400.00 3400.00 Epoxy adhesive 2402 kg 4.25 150.00 637.50 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 4388.00 Add water charges @ 1% on 4388.00 43.88 4431.88 Add C.P & OH @15% on 4431.88 664.78 Cost for 1.00 m 5096.66 Rate per One Metre: Rs 5096.66

Item Sl.No. : 2-b Item Code: 5.45.2 P/F expansion joint system of aluminium members as per ASTM B221-02 for vertical wall to wall/ wall to corner application, both new and existing construction in office Buildings & complexes with no slipping down tendency Wall Joint of 150 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.45.2] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Wall Joint of 150 mm 2410 metre 1.00 3700.00 3700.00 Epoxy adhesive 2402 kg 4.50 150.00 675.00 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 4725.50 Add water charges @ 1% on 4725.50 47.26 4772.76 Add C.P & OH @15% on 4772.76 715.91 Cost for 1.00 m 5488.67 Rate per One Metre: Rs 5488.67

Item Sl.No. : 2-c Item Code: 5.45.3 P/F expansion joint system of aluminium members as per ASTM B221-02 for vertical wall to wall/ wall to corner application, both new and existing construction in office Buildings & complexes with no slipping down tendency Wall Joint of 200 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.45.3] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Wall Joint of 200 mm 2411 metre 1.00 4000.00 4000.00 Epoxy adhesive 2402 kg 4.75 150.00 712.50

C/o new building..

Page 34 of 59

9999 0102 0123 0114

Carriage of material etc. LABOUR: Blacksmith 1st class Mason (brick layer) 1st class Beldar

L.S. Day Day Day

124.90 0.15 0.15 0.30

1.49 301.00 301.00 247.00 Total: 5063.00

186.10 45.15 45.15 74.10 5063.00 50.63 5113.63 767.04 5880.67

Add water charges @ 1% on

Add C.P & OH @15% on 5113.63 Cost for 1.00 m Rate per One Metre: Rs 5880.67

Item Sl.No. : 3-a Item Code: 5.46.1 P/F expansion joint system - that provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components Roof Joint of 100 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.46.1] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Complete Roof Joint of 100 mm 2399 metre 1.00 4500.00 4500.00 Epoxy adhesive 2402 kg 4.25 150.00 637.50 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 5488.00 Add water charges @ 1% on 5488.00 54.88 5542.88 Add C.P & OH @15% on 5542.88 831.43 Cost for 1.00 m 6374.31 Rate per One Metre: Rs 6374.31

Item Sl.No. : 3-b Item Code: 5.46.2 P/F expansion joint system - that provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components Roof Joint of 150 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.46.2] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Complete Roof Joint of 150 mm 2400 metre 1.00 4800.00 4800.00 Epoxy adhesive 2402 kg 4.50 150.00 675.00 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 5825.50 Add water charges @ 1% on 5825.50 58.26 5883.76 Add C.P & OH @15% on 5883.76 882.56 Cost for 1.00 m 6766.32 Rate per One Metre: Rs 6766.32

Item Sl.No. : 3-c

Item Code: 5.46.3

C/o new building..

Page 35 of 59

P/F expansion joint system - that provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components Roof Joint of 200 mm gap [Ref: DAR-2012, Volume-I, Item No.: 5.46.3] Details of Cost for : 1.00 m Description Code Unit Quantity Rate Amount MATERIALS: Complete Roof Joint of 200 mm 2401 metre 1.00 5000.00 5000.00 Epoxy adhesive 2402 kg 4.75 150.00 712.50 Carriage of material etc. 9999 L.S. 124.90 1.49 186.10 LABOUR: Blacksmith 1st class 0102 Day 0.15 301.00 45.15 Mason (brick layer) 1st class 0123 Day 0.15 301.00 45.15 Beldar 0114 Day 0.30 247.00 74.10 Total: 6063.00 Add water charges @ 1% on 6063.00 60.63 6123.63 Add C.P & OH @15% on 6123.63 918.54 Cost for 1.00 m 7042.17 Rate per One Metre: Rs 7042.17

Item Sl.No. : 4 Item Code: 8.11 P/F machine cut, mirror / eggshell polished , Marblestone work for wall lining (veneer work) - 18 mm thick Italian Marble stone slab,Perlato, Rosso verona, Fire Red or Dark Emperadore etc. [Ref: DAR-2012, Volume-I, Item No.: 8.11] Description MATERIALS: 18 mm thick Italian Marble stone slab, Perlato (slab area up to 0.5 sqm). Carraige of Stone blocks white & red sand stone & kota stone slab Cement mortar 1:3 (1 cement : 3 coarse sand) White Cement Slurry @ 3.3kg/ sqm Carraige of Cement Mortar for pointing in white cement (11.22) LABOUR: For Fixing Mason (for ornamental stone work) 1st class Bandhani Beldar Coolie Bhisti Mate Blacksmith 1st class Scaffolding Details of Cost for : 0.50 Sqm Unit Quantity Rate sqm tonne Cum tonne tonne L.S. 0.60 0.03 0.008 0.0165 0.0165 25.35 3330.00 77.87 4145.53 12000.00 77.87 1.49

Code 1240 2216 03.008 0368 2209 9999

Amount 1998.00 2.34 33.16 198.00 1.28 37.77

0126 0100 0114 0115 0101 0128 0102 9999

Day Day Day Day Day Day Day L.S.

0.335 0.335 0.033 0.335 0.335 0.165 0.135 25.74

Add water charges @ 1% on

301.00 260.00 247.00 247.00 260.00 260.00 301.00 1.49 Total: 2758.38

Add C.P & OH @15% on 2785.96 Cost for 0.50 Sqm Rate per One Sqm: Rs 6407.70

100.84 87.10 8.15 82.75 87.10 42.90 40.64 38.35 2758.38 27.58 2785.96 417.89 3203.85

Item Sl.No. : 5 Item Code: 8.12 P/L flamed finish Granite stone flooring in linear, curvilinear portions with 18mm slab over CM 1:4 bed - Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye [Ref: DAR-2012, Volume-I, Item No.: 8.12] Details of Cost for : 10.00 Sqm

C/o new building..

Page 36 of 59

Code 1239 2216 03.009 0367 2209 9999 0124 0114 0115 0139 9999

Description Unit MATERIALS: 18 mm thick Flamed finish granite stone slab sqm Carraige of Stone blocks white & red sand stone & kota tonne stone slab Cement mortar 1:4 (1 cement : 4 coarse sand). Cum Portland Cement slurry@, 3.3 kg/sqm tonne Carraige of Cement tonne Mortar for pointing in white cement (11.22) L.S. LABOUR: Mason (brick layer) 2nd class Day Beldar Day Coolie Day Skilled Beldar (for floor rubbing etc.) Day Sundries L.S.

Quantity 11.50 0.67 0.224 0.064 0.064 25.35 1.20 1.00 1.00 5.00 208.13

Rate 1695.00 77.87 3485.41 5000.00 77.87 1.49 273.00 247.00 247.00 260.00 1.49 Total: 23119.86

Amount 19492.50 52.17 780.73 320.00 4.98 37.77 327.60 247.00 247.00 1300.00 310.11 23119.86 231.20 23351.06 3502.66 26853.72

Add water charges @ 1% on

Add C.P & OH @15% on 23351.06 Cost for 10.00 Sqm Rate per One Sqm: Rs 2685.37

Item Sl.No. : 6 Item Code: 11.51 18 mm thick Italian Marble stone slab,Perlato, Rosso verona, Fire Red or Dark Emperadore etc. [Ref: DAR-2012, Volume-I, Item No.: 11.51] Details of Cost for : 10.00 Sqm Description Code Unit Quantity Rate MATERIALS: 18 mm thick italian marble stone slab 10.00 sqm Add for wastage 15%= 1.50 sqm Total: 11.50 sqm 18 mm thick Italian Marble stone slab 1240 sqm 11.50 3330.00 Base mortar1:4 (1 cement :4 coarse sand) Cement mortar 1:4 (1 cement : 4 coarse sand). 03.009 Cum 0.224 3485.41 Cemnt for slurry@, 4.4 kg/sqm (i) for bedding=44 kg+ (ii) for jointing= 6 kg Total=50 kg White Cement 0368 tonne 0.05 12000.00 Carraige of Cement 2209 tonne 0.05 77.87 Carriage of marble slab 9999 L.S. 26.91 1.49 LABOUR: (for finishing , polishing and fixing) Mason (brick layer) 1st class 0123 Day 1.20 301.00 Beldar 0114 Day 1.00 247.00 Coolie 0115 Day 1.00 247.00 Bhisti 0101 Day 0.33 260.00 Skilled Beldar (for floor rubbing etc.) 0139 Day 5.00 260.00 Machine for rubbing of floors 0013 Day 4.00 300.00 Mortar for pointing in white cement 9999 L.S. 25.74 1.49 Total: Add water charges @ 1% on 43199.07 Add C.P & OH @15% on 43631.06 Cost for 10.00 Sqm Rate per One Sqm: Rs 5017.57

Amount

38295.00 780.73

600.00 3.89 40.10

361.20 247.00 247.00 85.80 1300.00 1200.00 38.35 43199.07 431.99 43631.06 6544.66 50175.72

Item Sl.No. : 7

Item Code: 11.52

C/o new building..

Page 37 of 59

18 mm thick Italian Marble stone slab,Perlato, Rosso verona, Fire Red or Dark Emperadore etc. (Geometrical Design) [Ref: DAR-2012, Volume-I, Item No.: 11.52] Description MATERIALS: 18 mm thick italian marble stone slab 10.00 sqm Add for wastage 20%= 2.00 sqm Total: 12.00 sqm 18 mm thick Italian Marble stone slab, Perlato (slab area up to 0.5 sqm). Base mortar1:4 (1 cement :4 coarse sand) Cement mortar 1:4 (1 cement : 4 coarse sand). Cemnt for slurry@, 4.4 kg/sqm (i) for bedding=44 kg+ (ii) for jointing= 6 kg Total=50 kg White Cement Carraige of Cement Carriage of marble slab LABOUR: (for finishing , polishing and fixing) Mason (brick layer) 1st class Beldar Coolie Bhisti Skilled Beldar (for floor rubbing etc.) Machine for rubbing of floors Mortar for pointing in white cement Details of Cost for : 10.00 Sqm Unit Quantity Rate

Code

Amount

1240

sqm

12.00

3330.00

39960.00

03.009

Cum

0.224

3485.41

780.73

0368 2209 9999

tonne tonne L.S.

0.05 0.05 26.91

12000.00 77.87 1.49

600.00 3.89 40.10

0123 0114 0115 0101 0139 0013 9999

Day Day Day Day Day Day L.S.

1.75 1.25 1.00 0.33 5.00 4.00 25.74

Add water charges @ 1% on

301.00 247.00 247.00 260.00 260.00 300.00 1.49 Total: 45091.37

Add C.P & OH @15% on 45542.28 Cost for 10.00 Sqm Rate per One Sqm: Rs 5237.36

526.75 308.75 247.00 85.80 1300.00 1200.00 38.35 45091.37 450.91 45542.28 6831.34 52373.62

Item Sl.No. : 8 P/F Glass mossaic tiles to wall surface [Ref: DAR-2012, Volume-I, Item No.: 11.53] Description Code MATERIALS: Glass mossaic tiles (20 mm x 20 mm x 4mm) Add for wastage 2.5%= 0.2 sqm Total: 8.20 sqm Glass mossaic tiles (20 mm x 20 mm x 4 mm ) 1242 Tile fixing chemical adhesive 1243 Cement Polymer Grout Compound 1244 Acid for cleaning tiles 1245 Carriage of tiles ( 8x6.24=49.92) Based on item 11.49.1 9999 LABOUR: (for finishing , polishing and fixing) Mason (brick layer) 1st class Coolie Sundries including carriage of adhesive etc.

Item Code: 11.53 Details of Cost for : 8.00 Sqm Unit Quantity Rate

Amount

sqm kg kg litre L.S.

8.20 20.00 10.00 4.00 49.92

1050.00 34.00 34.00 16.00 1.49

8610.00 680.00 340.00 64.00 74.38

0123 0115 9999

Day Day L.S.

1.60 1.60 26.91

Add water charges @ 1% on

301.00 247.00 1.49 Total: 10685.28

Add C.P & OH @15% on 10792.13 Cost for 8.00 Sqm

481.60 395.20 40.10 10685.28 106.85 10792.13 1618.82 12410.95

C/o new building..

Page 38 of 59

Rate per One Sqm: Rs 1551.37

Item Sl.No. : 9-a Item Code: 11.54.1 P/F removable raised/false access flooring 300 mm Finished Floor Height [Ref: DAR-2012, Volume-I, Item No.: 11.54.1] Details of Cost for : 100.00 Sqm Description Code Unit Quantity Rate MATERIALS: FS800H Grade Flooring Panel including 5% wastage 2711 each 292.00 750.00 Zinc Electroplated Pedestals - 300 mm 2712 each 360.00 140.00 Zinc Electroplated Tube Stinger 2714 each 570.00 70.00 Machine Screw for Fixing 2715 each 1140.00 2.00 Rawl plug 50 mm (designation 10 no.) 7048 each 1440.00 10.00* Carriage of material 9999 L.S. 490.00 1.49 LABOUR: Carpenter 1st class 0111 Day 25.00 301.00 Beldar 0114 Day 25.00 247.00 Sundries 9999 L.S. 329.00 1.49 Total: Add water charges @ 1% on 340900.31 Add C.P & OH @15% on 344309.31 Cost for 100.00 Sqm Rate per One Sqm: Rs 3959.56 * Rate for 7048 taken as Rs. 5/- in the rate analysis in DSR-2012 Supplement Item Sl.No. : 9-b Item Code: 11.54.2 P/F removable raised/false access flooring 450 mm Finished Floor Height [Ref: DAR-2012, Volume-I, Item No.: 11.54.2] Details of Cost for : 100.00 Sqm Description Code Unit Quantity Rate MATERIALS: FS800H Grade Flooring Panel including 5% wastage 2711 each 292.00 750.00 Zinc Electroplated Pedestals - 450 mm 2713 each 360.00 150.00 Zinc Electroplated Tube Stinger 2714 each 570.00 70.00 Machine Screw for Fixing 2715 each 1140.00 2.00 Rawl plug 50 mm (designation 10 no.) 7048 each 1440.00 10.00* Carriage of material 9999 L.S. 490.00 1.49 LABOUR: Carpenter 1st class 0111 Day 25.00 301.00 Beldar 0114 Day 25.00 247.00 Sundries 9999 L.S. 329.00 1.49 Total: Add water charges @ 1% on 344500.31 Add C.P & OH @15% on 347945.31 Cost for 100.00 Sqm Rate per One Sqm: Rs 4001.37 * Rate for 7048 taken as Rs. 5/- in the rate analysis in DSR-2012 Supplement Item Sl.No. : 10-a Item Code: 12.58.1 P/F tiled false ceiling 595x595mm 8 mm thick fully perforated calcium silicate tile [Ref: DAR-2012, Volume-I, Item No.: 12.58.1] Details of Cost for : 100.00 Sqm Description Code Unit Quantity Rate MATERIALS: Ceiling area = 100 sq.m Add wastage @ 5% = 5.00 Sqm Total =105 Sq.m

Amount 219000.00 50400.00 39900.00 2280.00 14400.00 730.10 7525.00 6175.00 490.21 340900.31 3409.00 344309.31 51646.40 395955.71

Amount 219000.00 54000.00 39900.00 2280.00 14400.00 730.10 7525.00 6175.00 490.21 344500.31 3445.00 347945.31 52191.80 400137.11

Amount

C/o new building..

Page 39 of 59

8784 8611

8mm thick Calcium silicate perforated tiles of size 595 sqm x595mm Main T ceiling sections 24x38x0.3 mm (3 metre long) each (3 meter long) including wastage of 10% Perimeter wall angle 21x21 mm (3 metre long) (3 meter long) including wastage of 10% Intermediate cross channel (1.2 mtrs) (1.2 m long) including wastage of 10% on grid for cut outs Intermediate cross channel (1.6 mtrs) (0.6 m long) including wastage of 10% on grid for cut outs Hanger rod 0.5 mm thick Adjustment clip 85x 30 x0.8mm Soffit cleat (Size 27x37x25x1.60mm) Dash hold fastener 12.5 mm dia, 40 mm long with 6 mm dia bolt Cariage of materials Sundries i.e scaffolding etc. LABOUR: Carpenter 1st class Beldar

105.00 29.50

688.00 187.00

72240.00 5516.50

8612 8613

each each

13.50 147.00

118.00 72.00

1593.00 10584.00

8614

each

147.00

34.00

4998.00

8615 8616 8617 7388 9999 9999 0111 0114

each each each each L.S. L.S. Day Day

72.00 72.00 72.00 72.00 89.28 187.95 28.00 23.00

7.00 6.00 3.00 48.00 1.49 1.49

504.00 432.00 216.00 3456.00 133.03 280.05 8428.00 5681.00 114061.58 1140.62 115202.20 17280.33 132482.53

301.00 247.00 Total: Add water charges @ 1% on 114061.58 Add C.P & OH @15% on 115202.20 Cost for 100.00 Sqm

Rate per One Sqm: Rs 1324.83

Item Sl.No. : 11-a Item Code: 12.59.1 P/F false ceiling power pressed from M.S. sheets 8 mm thick Calcium Silicate Board [Ref: DAR-2012, Volume-I, Item No.: 12.59.1] Details of Cost for : 103.68 Sqm Description Code Unit Quantity Rate MATERIALS: Area = 103.68 sq.m + Add. Wastage of 5% = 5.18 Sq.m Total = 108.86 Sqm 8 mm thick tapered edge calcium silicate board 8785 sqm 108.86 368.00 G.I Ceiling Section (80 x26mm x26mm x 10.5mm each lip metre 7010 238.14 39.00 x 0.55 mm) Galvanised Steel perimetre Channel 7011 (Size 20x27x30x0.50 mm) metre 41.84 27.00 G.I Intermediate Channel (Size 15 x45 x 15 x 0.90mm) 7012 metre 90.72 42.00 7013 7014 1022 8617 7020 7016 7017 7388 7018 7021 G.I Steel angle hanger (Ceiling Angle) (Size 25 x 10x 0.50mm) G.I steel connecting clips (2.64mm dia & 230mm long G.I wire) G.I steel bolts & nuts 6mm dia and 25mm long round head with slots G.I steel soffit cleat ( size 27x37x25x1.60mm) All drive screws(for gypsum board / calcium silicate board) Joint filler Joint finisher Dash hold fastener 12.5 mm dia, 40 mm long with 6 mm dia bolt Joint tape roll Primer ( for gypsum board) metre each 10 No each 100 N kilog kilog each roll litre 10.80 189.00 216.00 72.00 1000.00 22.81 34.21 72.00 1.27 18.66 19.00 6.20 20.00 3.00* 56.00 22.00 24.00 48.00 140.00 85.00

Amount

40060.48 9287.46

1129.68 3810.24 205.20 1171.80 432.00 216.00 560.00 501.82 821.04 3456.00 177.80 1586.10

C/o new building..

Page 40 of 59

9999 9999 0111 0114 0131

Cariage of materials Sundries i.e rawl plug, scaffolding etc. LABOUR: Carpenter 1st class Beldar Painter

L.S. L.S. Day Day Day

447.20 807.30 31.10 31.10 10.37

1.49 1.49 301.00 247.00 273.00 Total: 85158.64

666.33 1202.88 9361.10 7681.70 2831.01 85158.64 851.59 86010.23 12901.53 98911.76

Add water charges @ 1% on

Add C.P & OH @15% on 86010.23 Cost for 103.68 Sqm Rate per One Sqm: *Rate wrongly taken in DSR-12 supplement Item Sl.No. : 12 Item Code: 12.60 P/F thermal insulation of ceiling with Resin Bonded Rockwool [Ref: DAR-2012, Volume-I, Item No.: 12.60] Details of Cost for : 10.00 Sqm Description Code Unit Quantity Rate MATERIALS: Area for 10.00sqm. (Finished surface)= 10.00sqm.+ Add 10% for ovelappings & wastage = 1.00sqm. Total = 11.00sqm Resin Bonded Rockwool 48 kg/m3 7273 sqm 11.00 211.00 Sundries including GI wire 20 SWG and polythene bags L.S. 9999 104.00 1.49 200gms GI chiken mesh 12.5mm x 24 SWG 9999 L.S. 351.00 1.49 LABOUR: Carpenter 1st class 0111 Day 1.00 301.00 Beldar 0114 Day 2.00 247.00 Total: Add water charges @ 1% on 3793.95 Add C.P & OH @15% on 3831.89 Cost for 10.00 Sqm Rate per One Sqm: Rs 440.67 Rs 954.01

Amount

2321.00 154.96 522.99 301.00 494.00 3793.95 37.94 3831.89 574.78 4406.67

Item Sl.No. : 13 Item Code: 12.61 P/F thermal insulation - Resin bonded rock wool [Ref: DAR-2012, Volume-I, Item No.: 12.61] Details of Cost for : 10.00 Sqm Description Code Unit Quantity Rate MATERIALS: Area for 10.00 sqm. (Finished surface) = 10.00sqm.+ Add 10 % for overlapping and wastage =1.00 sqm Total=11.00sqm Resin Bonded Rockwool 48 kg/m3 7273 sqm 11.00 211.00 Sundries including GI wire 20 SWg and Virgin polythene L.S. 9999 52.00 1.49 bags 200 gram and Carriage LABOUR: Carpenter 1st class 0111 Day 0.50 301.00 Beldar 0114 Day 0.50 247.00 Total: Add water charges @ 1% on 2672.48 Add C.P & OH @15% on 2699.20 Cost for 10.00 Sqm Rate per One Sqm: Rs 310.41

Amount

2321.00 77.48

150.50 123.50 2672.48 26.72 2699.20 404.88 3104.08

C/o new building..

Page 41 of 59

Item Sl.No. : 14 Item Code: 12.62 P/F thermal insulation - Resin bonded rock wool having density 48 kg/m3,50 mm thick,wrapped in 200 Polythene Bags [Ref: DAR-2012, Volume-I, Item No.: 12.62] Details of Cost for : 10.00 Sqm Description Code Unit Quantity Rate MATERIALS: Area for 10.00 sqm. (Finished surface) = 10.00sqm.+ Add 10 % for overlapping and wastage =1.00 sqm Total=11.00sqm Resin Bonded Rockwool 48 kg/m3 7273 sqm 11.00 211.00 Sundries including GI wire 20 SWg and Virgin polythene L.S. 9999 52.00 1.49 bags 200 gram and Carriage LABOUR: Carpenter 1st class 0111 Day 0.50 301.00 Beldar 0114 Day 0.50 247.00 sundries (screws & washers) 9999 L.S. 20.00 1.49 Total: Add water charges @ 1% on 2702.28 Add C.P & OH @15% on 2729.30 Cost for 10.00 Sqm Rate per One Sqm: Rs 313.87

G Virgin

Amount

2321.00 77.48

150.50 123.50 29.80 2702.28 27.02 2729.30 409.40 3138.70

Item Sl.No. : 15 [Ref: DAR-2012, Volume-I, Item No.: 12.63] Description Code MATERIALS: High Albedo paint 7238 Carriage of paint 9999 LABOUR: Beldar (for cleanign the surface) 0114 Painter 0131 Sundries (Brushes & T&P) etc. 9999

Item Code: 12.63 Details of Cost for : 10.00 Sqm Unit Quantity Rate Kg. L.S. Day Day L.S. 7.17 4.53 0.54 0.54 13.52 246.00 1.49 247.00 273.00 1.49 Total: 2071.51

Amount 1763.82 6.75 133.38 147.42 20.14 2071.51 20.72 2092.23 313.83 2406.06

Add water charges @ 1% on

Add C.P & OH @15% on 2092.23 Cost for 10.00 Sqm Rate per One Sqm: Rs 240.61

Item Sl.No. : 16-a Item Code: 16.86.1 P/L gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone Area less than 0.50 sqm [Ref: DAR-2012, Volume-II, Item No.: 16.86.1] Details of Cost for : 0.50 Sqm Description Code Unit Quantity Rate Amount MATERIALS: Mirror polished granite 0.5 sqm. Waste @5% = 0.025 +0.5 = 0.525 sqm. Granite stone slab 18mm thick 7295 sqm 0.525 1550.00 813.75 Cement mortar 1:4 (1 cement : 4 coarse sand). 03.009 Cum 0.012 3485.41 41.82 LABOUR: Mason (brick layer) 1st class 0123 Day 0.56 301.00 168.56 Beldar 0114 Day 0.05 247.00 12.35 Coolie 0115 Day 0.05 247.00 12.35 Sundries including carriage of stone& cement 9999 L.S. 17.60 1.49 26.22 Total: 1075.05

C/o new building..

Page 42 of 59

Add water charges @ 1% on

1075.05

Add C.P & OH @15% on 1085.80 Cost for 0.50 Sqm Rate per One Sqm: Rs 2497.34

10.75 1085.80 162.87 1248.67

Item Sl.No. : 17-a Item Code: 16.87.1 P/L gang saw cut 30 mm thick, mirror polished pre moulded and pre polished machine cut granite stone Area less than 0.50 sqm [Ref: DAR-2012, Volume-II, Item No.: 16.87.1] Details of Cost for : 0.50 Sqm Description Code Unit Quantity Rate Amount MATERIALS: Mirror polished granite 0.5 sqm. Waste @5% = 0.025 +0.5 = 0.525 sqm. Granite stone slab 30mm thick 7296 sqm 0.525 2300.00 1207.50 Cement mortar 1:4 (1 cement : 4 coarse sand). 03.009 Cum 0.012 3485.41 41.82 LABOUR: Mason (brick layer) 1st class 0123 Day 0.56 301.00 168.56 Beldar 0114 Day 0.05 247.00 12.35 Coolie 0115 Day 0.05 247.00 12.35 Sundries including carriage of stone& cement 9999 L.S. 17.60 1.49 26.22 Total: 1468.80 Add water charges @ 1% on 1468.80 14.69 1483.49 Add C.P & OH @15% on 1483.49 222.52 Cost for 0.50 Sqm 1706.01 Rate per One Sqm: Rs 3412.02

Item Sl.No. : 18 Item Code: 16.88 P/L matt finished vitrified tile 100x100x16mm laid on 20mm base of CM 1:4 [Ref: DAR-2012, Volume-II, Item No.: 16.88] Details of Cost for : 1.00 Sqm Description Code Unit Quantity Rate MATERIALS: Matt finished vitrified tile 100x100 x16mm 7805 sqm 1.00 930.00 Cartage of tile 9999 L.S. 6.24 1.49 Cement mortar 1:4 (1 cement : 4 coarse sand). 03.009 Cum 0.024 3485.41 Mortar for pointing in white cement 9999 L.S. 3.64 1.49 Cement for slurry over bed @ 3.30 Kg. per sqm 0367 tonne 0.0033 5000.00 LABOUR: Mason - 1st class 0123 Day 0.20 301.00 Coolie 0115 Day 0.20 247.00 Sundries including carriage of cement etc. 9999 L.S. 26.91 1.49 Total: Add water charges @ 1% on 1194.57 Add C.P & OH @15% on 1206.52 Cost for 1.00 Sqm Rate per One Sqm: Rs 1387.50

Amount 930.00 9.30 83.65 5.42 16.50 60.20 49.40 40.10 1194.57 11.95 1206.52 180.98 1387.50

Item Sl.No. : 19 Item Code: 16.89 P/L matt finished vitrified tile 300x300x9.8mm laid on 20mm base of CM 1:4 [Ref: DAR-2012, Volume-II, Item No.: 16.89] Details of Cost for : 1.00 Sqm Description Code Unit Quantity Rate MATERIALS: Vitrified tile 300x300 x9.8mm 7806 sqm 1.00 510.00

Amount 510.00

C/o new building..

Page 43 of 59

9999 03.009 9999 0367 0123 0115 9999

Cartage of tile Cement mortar 1:4 (1 cement : 4 coarse sand). Mortar for pointing in white cement Cement for slurry over bed @ 3.30 Kg. per sqm LABOUR: Mason - 1st class Coolie Sundries including carriage of cement etc.

L.S. Cum L.S. tonne Day Day L.S.

6.24 0.024 3.64 0.0033 0.20 0.20 26.91

1.49 3485.41 1.49 5000.00 301.00 247.00 1.49 Total: 774.57

9.30 83.65 5.42 16.50 60.20 49.40 40.10 774.57 7.75 782.32 117.35 899.67

Add water charges @ 1% on

Add C.P & OH @15% on 782.32 Cost for 1.00 Sqm Rate per One Sqm: Rs 899.67

Item Sl.No. : 20 P/L tactile tile 300x300x9.8mm laid on 20mm base of CM 1:4 [Ref: DAR-2012, Volume-II, Item No.: 16.90] Description Code MATERIALS: Tactile tile 7803 Cartage of tile 9999 Cement mortar 1:4 (1 cement : 4 coarse sand). 03.009 Mortar for pointing in white cement 9999 Cement for slurry over bed @ 3.30 Kg. per sqm 0367 LABOUR: Mason - 1st class 0123 Coolie 0115 Sundries including carriage of cement etc. 9999

Item Code: 16.90 Details of Cost for : 1.00 Sqm Unit Quantity Rate sqm L.S. Cum L.S. tonne Day Day L.S. 1.00 6.24 0.024 3.64 0.0033 0.20 0.20 26.91 868.00 1.49 3485.41 1.49 5000.00 301.00 247.00 1.49 Total: 1132.57

Amount 868.00 9.30 83.65 5.42 16.50 60.20 49.40 40.10 1132.57 11.33 1143.90 171.59 1315.49

Add water charges @ 1% on

Add C.P & OH @15% on 1143.90 Cost for 1.00 Sqm Rate per One Sqm: Rs 1315.49

Item Sl.No. : 21 P/L coloured chamfered edge CC paver block - 60mm of M-35 grade. [Ref: DAR-2012, Volume-II, Item No.: 16.91] Description Code MATERIALS: Coloured inter locking C.C. paver Block Bedding layer 7743 0983 2261 0123 0124 0114 0115 9999 Fine Sand for bed fitting joints Carriage of fine sand LABOUR: Mason 1st class Mason 2nd class Beldar Coolie Sundries including plate vibrator etc

Item Code: 16.91 Details of Cost for : 10.00 Sqm Unit Quantity Rate sqm. cum cum Day Day Day Day L.S. 10.00 0.50 0.65 0.50 0.50 1.00 0.50 25.00 500.00 640.00 87.60 301.00 273.00 247.00 247.00 1.49* Total: 6071.69

Amount 5000.00 320.00 56.94 150.50 136.50 247.00 123.50 37.25 6071.69 60.72 6132.41 919.86 7052.27

Add water charges @ 1% on

Add C.P & OH @15% on 6132.41 Cost for 10.00 Sqm

C/o new building..

Page 44 of 59

Rate per One Sqm: *Rate for sundries wrongly taken in DSR-2012 Supplement. Item Sl.No. : 22 P/F 10x10x7.50 cm Granite stone block - laid on 20mm CM 1:4 base [Ref: DAR-2012, Volume-II, Item No.: 16.92] Description Code MATERIALS: Stone size 10x10x7.50cm 7744 10/(0.11x0.11) = 826.4 i.e.827 Nos Cement mortar 1:4 (1 cement : 4 coarse sand). Cement for slury Mason (brick layer) 2nd class Beldar LABOUR: Coolie 0115 Bhisti 0101 13.033.01 Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) : Flush/ Ruled point 03.009 0367 0124 0114

Rs 705.23

Item Code: 16.92 Details of Cost for : 10.00 Sqm Unit Quantity Rate

Amount

each Cum tonne Day Day Day Day Sqm

827.00 0.434 0.02 1.08 0.25 1.62 0.27 10.00

9.00 3485.41 5000.00 273.00 247.00 247.00 260.00 96.24 Total: 10845.00

7443.00 1512.67 100.00 294.84 61.75 400.14 70.20 962.40 10845.00 108.45 10953.45 1643.02 12596.47

Add water charges @ 1% on

Add C.P & OH @15% on 10953.45 Cost for 10.00 Sqm Rate per One Sqm: Rs 1259.65

Item Sl.No. : 23 Item Code: 16.93 Construction of un-reinforced, dowel jointed, plain quality concrete of M-40 grade in road/pavement/taxi track etc [Ref: DAR-2012, Volume-II, Item No.: 16.93] Details of Cost for : 1050.00 Cum Description Unit Quantity Rate MATERIALS: Crushed stone coarse aggregates of 25mm nominal size cum 472.50 1000.00 @ 0.45 cum/cum of concrete conforming Crushed stone coarse aggregates 12.5mm nominal size @ 0.45 cum/cum of concrete conforming Carraige of Stone aggregate Sand as per IS: 383 and conforming to clause 602.2.4 @ 0.45 cum/cum of concrete Carraige of Coarse sand Cement 43 grade @ 360 kg/cum of concrete Carraige of Cement Mild steel round bar above 12 mm dia 16 mm deformed steel tie bars of grade S 415 Carraige of Steel Separation Membrane of impermeable plastic sheeting 125 micron thick Pre moulded Joint filler, 25 mm thick for expansion joint. Bitumen Joint sealant Sealant primer Plastic sheath,1.25 mm thick for dowel bars Curing compound Super plastisizer admixture IS marked as per 9103-1999 @ 0.5 per cent by weight of cemen cum cum cum cum tonne tonne quint quint tonne sqm sqm kilog kg sqm litre kilog 472.50 945.00 472.50 472.50 378.00 378.00 99.20 12.30 11.15 3675.00 16.33 875.00 116.67 46.67 1850.00 1890.00 1050.00 87.60 1120.00

Code 0294

Amount 472500.00

0296 2202 0982 2203 0367 2209 1003 1005 2205 0323 0374 0314 0371 0369 0349 7318

496125.00 82782.00 529200.00

87.60 41391.00 5000.00 1890000.00 77.87 29434.86 4000.00 396800.00 4500.00 55350.00 77.87 868.25 12.00 44100.00 500.00 26.00 125.00 30.00 50.00 36.50 8165.00 22750.00 14583.75 1400.10 92500.00 68985.00

C/o new building..

Page 45 of 59

Add 1 per cent of material for cost of miscellaneous materials like tarpauline, Hessian cloth, metal cap, cotton / compressible sponge and cradle for dowel bars, work bridges for men to approach concrete surface without walking over it, cutting blades and bites, minor equipments like scabbling machine, threads, ropes, guide wires and any other unforeseen items. 1693-A Cost of materials in item No. 16.93 (with out CP / OH) MACHINERY : Road sweeper (Mechamical Broom) @ 1250 sqm per hour Front end loader 1 cum bucket capacity (incl POL) C.C .batch mix plant. Generator 250 kVA Fully automatic slip form paver with electronic sensor with dowel bar and tie rod insertor Water Tanker 5 to 6 KL capacity Carriage of concrete by transit mixer. Joint cutting machine with 2-3 blades Texturing machine. LABOUR: Mate Skilled Beldar Beldar 0.01 ######### 42469.35

0075 0052 0042 0069 0045 0057 0029 0041 0048 0128 0139 0114

hour Hours day hours day hour km/ c per d day Day Day Day

2.80 18.00 0.75 6.00 0.75 36.00 1050.00 2.00 1.50 2.00 15.00 35.00

360.00 800.00 10000.00 900.00 13000.00 150.00 30.00 900.00 925.00

1008.00 14400.00 7500.00 5400.00 9750.00 5400.00 31500.00 1800.00 1387.50

260.00 520.00 260.00 3900.00 247.00 8645.00 Total: 4380614.81 Add water charges @ 1% on ######### 43806.15 4424420.96 Add C.P & OH @15% on ######### 663663.14 Cost for 1050.00 Cum 5088084.10

Rate per One Cum: Rs 4845.79

Item Sl.No. : 24-a Item Code: 19.35.1 P/L Non-pressure NP-3 class RCC pipes 450 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.35.1] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: RCC pipe 450 mm dia (in 2.5 mtr length = 4 Nos. with metre 1728 10.00 1496.00 collars/spigot) Carraige of R.C.C. pipes 450 & 500 mm dia 2299 100 m 10.00 2127.50 Cement of 4 joints = 4x0.0041=0.0164 0367 cum = 0.24/2 tonne tonne 0.012 5000.00 Carraige of Cement 2209 tonne 0.012 77.87 Fine sand for 4 joints = 0.0082x4= 0.033 cum/2 0983 cum 0.017 640.00 Carraige of Fine sand 2261 cum 0.017 87.60 LABOUR: Mason 1st class 0123 Day 0.375 301.00 Mason - 2nd class 0124 Day 0.375 273.00 Beldar 0114 Day 2.41 247.00 Bhisti 0101 Day 0.33 260.00 Total: Add water charges @ 1% on 16142.38 Add C.P & OH @15% on 16303.80 Cost for 10.00 m Rate per One Metre: Rs 1874.94

Amount 14960.00 212.75 60.00 0.93 10.88 1.49 112.88 102.38 595.27 85.80 16142.38 161.42 16303.80 2445.57 18749.37

C/o new building..

Page 46 of 59

Item Sl.No. : 24-b P/L Non-pressure NP-3 class RCC pipes 600 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.35.2] Description Code MATERIALS: RCC pipe 600 mm dia (in 2.5 mtr length = 4 Nos. with 1729 collars/spigot) Carraige of R.C.C. pipes 600, 700, 750 & 800 mm dia 2303 Cement of 4 joints = 4x0.0054=0.0216 0367 cum = 0.32/2 tonne Carraige of Cement 2209 Fine sand for 4 joints = 0.0108x4= 0.043 cum/2 0983 Carraige of Fine sand (1 part badarpur sand : 2 parts 2261 jamuna sand) LABOUR: Mason 1st class 0123 Mason - 2nd class 0124 Beldar 0114 Bhisti 0101

Item Code: 19.35.2 Details of Cost for : 10.00 m Unit Quantity metre 100 m tonne tonne cum cum 10.00 10.00 0.016 0.016 0.022 0.022

Rate

Amount 19950.00 319.13 80.00 1.25 14.08 1.93

1995.00 3191.25 5000.00 77.87 640.00 87.60

Day Day Day Day

0.46 0.46 1.83 0.33

Add water charges @ 1% on

301.00 273.00 247.00 260.00 Total: 21168.24

Add C.P & OH @15% on 21379.92 Cost for 10.00 m Rate per One Metre: Rs 2458.69

138.46 125.58 452.01 85.80 21168.24 211.68 21379.92 3206.99 24586.91

Item Sl.No. : 24-c Item Code: 19.35.3 P/L Non-pressure NP-3 class RCC pipes 900 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.35.3] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: RCC pipe 900 mm dia (in 2.5 mtr length = 4 Nos. with metre 1730 10.00 3150.00 collars/spigot) Carraige of R.C.C. pipes 900 mm dia 2331 100 m 10.00 4786.87 Cement of 4 joints = 4x0.0082=0.0328 0367 cum = 0.049/2 tonne tonne 0.025 5000.00 Carraige of Cement 2209 tonne 0.025 77.87 Fine sand for 4 joints = 0.0164x4= 0.066 cum/2 0983 cum 0.033 640.00 Carraige of Fine sand 2261 cum 0.033 87.60 LABOUR: Mason 1st class 0123 Day 0.625 301.00 Mason - 2nd class 0124 Day 0.625 273.00 Beldar 0114 Day 3.00 247.00 Bhisti 0101 Day 0.50 260.00 Total: Add water charges @ 1% on 33359.41 Add C.P & OH @15% on 33693.00 Cost for 10.00 m Rate per One Metre: Rs 3874.70

Amount 31500.00 478.69 125.00 1.95 21.12 2.89 188.13 170.63 741.00 130.00 33359.41 333.59 33693.00 5053.95 38746.95

Item Sl.No. : 24-d P/L Non-pressure NP-3 class RCC pipes 1000 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.35.4] Description Code MATERIALS:

Item Code: 19.35.4 Details of Cost for : 10.00 m Unit Quantity

Rate

Amount

C/o new building..

Page 47 of 59

1731 2332 0367 2209 0983 2261 0123 0124 0114 0101

RCC pipe 1000 mm dia (in 2.5 mtr length = 4 Nos. with metre collars/spigot) Carraige of R.C.C. pipes 1000 mm dia 100 m Cement of 4 joints = 4x0.0092=0.0368 cum = 0.055/2 tonne tonne Carraige of Cement tonne Fine sand for 4 joints = 0.0185x4= 0.074 cum/2 cum Carraige of Fine sand cum LABOUR: Mason 1st class Day Mason - 2nd class Day Beldar Day Bhisti Day

10.00 10.00 0.028 0.028 0.037 0.037 0.68 0.68 4.33 0.50

3885.00 6382.50 5000.00 77.87 640.00 87.60 301.00 273.00 247.00 260.00 Total: 41247.18

38850.00 638.25 140.00 2.18 23.68 3.24 204.68 185.64 1069.51 130.00 41247.18 412.47 41659.65 6248.95 47908.60

Add water charges @ 1% on

Add C.P & OH @15% on 41659.65 Cost for 10.00 m Rate per One Metre: Rs 4790.86

Item Sl.No. : 24-e P/L Non-pressure NP-3 class RCC pipes 1200 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.35.5] Description Code MATERIALS: RCC pipe 1200 mm dia (in 2.5 mtr length = 4 Nos. with 1732 collars/spigot) Carraige of R.C.C. pipes 1200 mm dia 2334 Cement of 4 joints = 4x0.0114=0.0456 0367 cum = 0.068/2 tonne Carraige of Cement 2209 Fine sand for 4 joints = 0.0229x4= 0.092 cum/2 0983 Carraige of Fine sand (1 part badarpur sand : 2 parts 2261 jamuna sand) LABOUR: Mason 1st class 0123 Mason - 2nd class 0124 Beldar 0114 Bhisti 0101

Item Code: 19.35.5 Details of Cost for : 10.00 m Unit Quantity metre 100 m tonne tonne cum cum 10.00 10.00 0.034 0.034 0.046 0.046

Rate

Amount 50400.00 638.28 170.00 2.65 29.44 4.03

5040.00 6382.80 5000.00 77.87 640.00 87.60

Day Day Day Day

0.795 0.795 8.67 0.67

Add water charges @ 1% on

301.00 273.00 247.00 260.00 Total: 54016.43

Add C.P & OH @15% on 54556.59 Cost for 10.00 m Rate per One Metre: Rs 6274.01

239.30 217.04 2141.49 174.20 54016.43 540.16 54556.59 8183.49 62740.08

Item Sl.No. : 24-f P/L Non-pressure NP-3 class RCC pipes 1800 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.35.6] Description Code MATERIALS: RCC pipe 1800 mm dia (in 2.5 mtr length = 4 Nos. with 1733 collars/spigot) RCC pipe above 1200 mm dia and upto 1800 mm dia 2336 0367 2209 Cement of 4 joints = Carraige of Cement

Item Code: 19.35.6 Details of Cost for : 10.00 m Unit Quantity metre 100 m tonne tonne 10.00 10.00 0.049 0.049

Rate

Amount 94500.00 733.99 245.00 3.82

9450.00 7339.87 5000.00 77.87

C/o new building..

Page 48 of 59

0983 2261

0123 0124 0114 0101

Fine sand for 4 joints = 0.0276x4= 0.1103 cum/2 cum Carraige of Fine sand (1 part badarpur sand : 2 parts cum jamuna sand) LABOUR: Mason 1st class Day Mason - 2nd class Day Beldar Day Bhisti Day

0.065 0.065

640.00 87.60

41.60 5.69

1.15 1.15 13.00 1.00

Add water charges @ 1% on

301.00 273.00 247.00 260.00 Total: 99661.20

Add C.P & OH @15% on 100657.81 Cost for 10.00 m Rate per One Metre: Rs 11575.65

346.15 313.95 3211.00 260.00 99661.20 996.61 100657.81 15098.67 115756.48

Item Sl.No. : 25-a Item Code: 19.36.1 P/L Non-Pressure NP-4 class heavy duty RCC pipes.. 450 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.36.1] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: 450 mm dia pipe (in 2.5 mtr length = 4 Nos. with metre 1734 10.00 1733.00 collars/spigot) Carraige of R.C.C. pipes 450 & 500 mm dia 2299 100 m 10.00 2127.50 Cement of 4 joints = 4*.0041=0.0164 cum = 0.24 tonne/2 0367 tonne tonne cum cum Day Day Day Day 0.012 0.012 0.017 0.017 0.375 0.375 2.41 0.33 5000.00 77.87 640.00 87.60 301.00 273.00 247.00 260.00 Total: 18512.38

Amount 17330.00 212.75

2209 0983 2261 0123 0124 0114 0101

Carraige of Cement Fine sand for 4 joints = .0082*4= 0.033 cum/2 Carraige of Fine sand LABOUR: Mason 1st class Mason 2nd class Beldar Bhisti

60.00 0.93 10.88 1.49 112.88 102.38 595.27 85.80 18512.38 185.12 18697.50 2804.63 21502.13

Add water charges @ 1% on

Add C.P & OH @15% on 18697.50 Cost for 10.00 m Rate per One Metre: Rs 2150.21

Item Sl.No. : 25-b Item Code: 19.36.2 P/L Non-Pressure NP-4 class heavy duty RCC pipes.. 600 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.36.2] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: 600 mm dia pipe (in 2.5 mtr length = 4 Nos. with metre 1735 10.00 2310.00 collars/spigot) Carraige of R.C.C. pipes 2303 100 m 10.00 3191.25 Cement of 4 joints = 4*.0054=0.0216 cum = 0.32 tonne/2 tonne 0367 0.016 5000.00 2209 0983 2261 Carraige of Cement tonne Fine sand for 4 joints = 0.0108*4= 0.043 cum/2 cum Carraige of Fine sand (1 part badarpur sand : 2 parts cum jamuna sand) LABOUR: Mason 1st class Day 0.016 0.022 0.022 77.87 640.00 87.60

Amount 23100.00 319.13 80.00 1.25 14.08 1.93

0123

0.46

301.00

138.46

C/o new building..

Page 49 of 59

0124 0114 0101

Mason 2nd class Beldar Bhisti

Day Day Day

0.46 1.83 0.33

Add water charges @ 1% on

273.00 247.00 260.00 Total: 24318.24

Add C.P & OH @15% on 24561.42 Cost for 10.00 m Rate per One Metre: Rs 2824.56

125.58 452.01 85.80 24318.24 243.18 24561.42 3684.21 28245.63

Item Sl.No. : 25-c Item Code: 19.36.3 P/L Non-Pressure NP-4 class heavy duty RCC pipes.. 900 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.36.3] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: 900 mm dia pipe (in 2.5 mtr length = 4 Nos. with metre 1736 10.00 4595.00 collars/spigot) Carraige of R.C.C. pipes 900 mm dia 2331 100 m 10.00 4786.87 Cement of 4 joints = 4*0.0082=0.0328 cum = 0.049 0367 tonne/2 tonne 0.025 5000.00 Carraige of Cement 2209 tonne 0.025 77.87 Fine sand for 4 joints =0.0164*4= 0.066 cum/2 0983 cum 0.033 640.00 Carraige of Fine sand (1 part badarpur sand : 2 parts cum 2261 0.033 87.60 jamuna sand) LABOUR: Mason 1st class 0123 Day 0.625 301.00 Mason 2nd class 0124 Day 0.625 273.00 Beldar 0114 Day 3.00 247.00 Bhisti 0101 Day 0.50 260.00 Total: Add water charges @ 1% on 47809.41 Add C.P & OH @15% on 48287.50 Cost for 10.00 m Rate per One Metre: Rs 5553.06

Amount 45950.00 478.69

125.00 1.95 21.12 2.89

188.13 170.63 741.00 130.00 47809.41 478.09 48287.50 7243.13 55530.63

Item Sl.No. : 25-d Item Code: 19.36.4 P/L Non-Pressure NP-4 class heavy duty RCC pipes.. 1000 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.36.4] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: RCC pipe 1000 mm dia pipe NP-4 spigot 1737 metre 10.00 5565.00 Carraige of R.C.C. pipes 1000 mm dia 2332 100 m 10.00 6382.50 Cement of 4 joints = 4*0.0092=0.0368 cum = 0.055 0367 tonne/2 tonne 0.028 5000.00 Carraige of Cement 2209 tonne 0.028 77.87 Fine sand for 4 joints =0.0185*4= 0.074 cum/2 0983 cum 0.037 640.00 Carraige of Fine sand 2261 cum 0.037 87.60 LABOUR: Mason 1st class 0123 Day 0.68 301.00 Mason 2nd class 0124 Day 0.68 273.00 Beldar 0114 Day 4.33 247.00 Bhisti 0101 Day 0.50 260.00 Total: Add water charges @ 1% on 58047.18

Amount 55650.00 638.25

140.00 2.18 23.68 3.24 204.68 185.64 1069.51 130.00 58047.18 580.47

C/o new building..

Page 50 of 59

Add C.P & OH @15% on 58627.65 Cost for 10.00 m Rate per One Metre: Rs 6742.18

58627.65 8794.15 67421.80

Item Sl.No. : 25-e Item Code: 19.36.5 P/L Non-Pressure NP-4 class heavy duty RCC pipes.. 1200 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.36.5] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: 1200 mm dia pipe (in 2.5 mtr length = 4 Nos. with metre 1738 10.00 6510.00 collars/spigot) Carraige of R.C.C. pipes 1200 mm dia 2334 100 m 10.00 6382.80 Cement of 4 joints = 4*0.0114=0.0456 cum = 0.068 0367 tonne/2 tonne 0.034 5000.00 Carraige of Cement 2209 tonne 0.034 77.87 Fine sand for 4 joints =0.0229*4= 0.0916 cum/2 0983 cum 0.046 640.00 Carraige of Fine sand 2261 cum 0.046 87.60 LABOUR: Mason 1st class 0123 Day 0.795 301.00 Mason 2nd class 0124 Day 0.795 273.00 Beldar 0114 Day 8.67 247.00 Bhisti 0101 Day 0.67 260.00 Total: Add water charges @ 1% on 68716.43 Add C.P & OH @15% on 69403.59 Cost for 10.00 m Rate per One Metre: Rs 7981.41

Amount 65100.00 638.28

170.00 2.65 29.44 4.03 239.30 217.04 2141.49 174.20 68716.43 687.16 69403.59 10410.54 79814.13

Item Sl.No. : 25-f Item Code: 19.36.6 P/L Non-Pressure NP-4 class heavy duty RCC pipes.. 1800 mm dia RCC pipes. [Ref: DAR-2012, Volume-II, Item No.: 19.36.6] Details of Cost for : 10.00 m Description Code Unit Quantity Rate MATERIALS: 900 mm dia pipe (in 2.5 mtr length = 4 Nos. with metre 1739 10.00 13650.00 collars/spigot) RCC pipe above 1200 mm dia and upto 1800 mm dia 2336 100 m 10.00 7339.87 0367 Cement of 4 joints = 4*0.0276=0.1103 cum = 0.075 tonne/2 Carraige of Cement Fine sand for 4 joints Carraige of Fine sand LABOUR: Mason 1st class Mason 2nd class Beldar Bhisti tonne tonne cum cum Day Day Day Day 0.049 0.049 0.065 0.065 1.15 1.15 13.00 1.00 5000.00 77.87 640.00 87.60

Amount 136500.00 733.99

2209 0983 2261 0123 0124 0114 0101

245.00 3.82 41.60 5.69 346.15 313.95 3211.00 260.00 141661.20 1416.61 143077.81 21461.67 164539.48

301.00 273.00 247.00 260.00 Total: Add water charges @ 1% on 141661.20 Add C.P & OH @15% on 143077.81 Cost for 10.00 m

C/o new building..

Page 51 of 59

Rate per One Metre: Rs 16453.95

Item Sl.No. : 26 Item Code: 26.1 P/S aluminium extruted sections - grade 6060 T5 or T6 including super duarable poweder coating 60-80 microns. [Ref: DAR-2012, Volume-II, Item No.: 26.1] Description Width of the unit : 1.6 m Height of the unit : 4.2 m Area of Single Unit : 6.72 m2 Total Area 6.72 m2 Aluminium Weight per sqm : 6.50 Kg/m2 : 6.50 kg Add for cleats, sleeves, screws etc.@5% : 0.33 kg Total : 6.83 Add Wastage @ 5% : 0.341 Weight of Aluminium = 7.17 kg No panels : 1 No. Vision height : 2.2m Spandrel height : 2.0m Aluminium / Finish Aluminium sections Super Durable Powder Coating Details of Cost for : 6.50 Kg Unit Quantity

Code

Rate

Amount

7306 7392

kilog kilog

7.17 7.17

Add water charges @ 1% on

220.00 64.00 Total: 2036.28

Add C.P & OH @15% on 2056.64 Cost for 6.50 Kg Rate per One Kg: Rs 363.87

1577.40 458.88 2036.28 20.36 2056.64 308.50 2365.14

Item Sl.No. : 27 Item Code: 26.2 Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions .. [Ref: DAR-2012, Volume-II, Item No.: 26.2] Description ANALYSIS OF RATE Width of the unit 1.6 m Height of the unit 4.2 m Area of Single Unit 6.72 m2 Total Area 6.72 m2 Aluminium Weight per m2 : 6.50 Kg/m2 No. of panels : 1 Vision Height : 2.2m Spandral height : 2m MATERIALS: Structural Sealant - 6mm x 12mm Spacer Tape 6.4mm (Thick) x 6mm (W) Weather Sealant - Non Staining (600ml) Weather Sealant - Normal (300ML) MS Brackets/Aluminium Alloy Brackets Silicon Gasket in Kg (Above 50 g / m) EPDM Gasket in Kg (Above 60 g / m) Anchor Fastner - M10 Details of Cost for : 6.72 Sqm Unit Quantity Rate

Code

Amount

7390A 7390B 7390C 7390D 7390E 7390F 7390G 7390H

m m Nos Nos Kg Kg Kg Nos

17.02 20.11 1.96 2.55 9.78 0.78 0.70 2.00

31.62 18.00 459.15 143.21 100.00 601.26 163.98 110.93

538.17 361.98 899.93 365.19 978.00 468.98 114.79 221.86

C/o new building..

Page 52 of 59

7390J 7390K 7390M 7390N 7390P 7390Q 7390R 7390S

7390T 7390U 7390V 7390VA

2602-A

SS Bolt with Washer SS Screws Fire Stop Protective Tape Baker Rod GI flashing - 1.2mm Thk. Masking Tape MISC (In item 26.2) Fabrication / Installation / Transport / Scaffolding / Labour PF + ESIS Fabrication charges - Semi-unitized Glazing Installation charges - Semi-unitized Glazing Transportation for Semi-unitized Glazing Scaffolding / Loading / Unloading for Semi-unitized Glazing Designing charges Cost of materials, Fabrication, Installation, Transporatation, Scaffolding in item 26.2

Nos Nos m Sqm m Kg Sqm Sqm

2.00 51.38 1.60 6.72 5.04 3.96 6.72 6.72

35.00 5.00 561.94 25.00 5.00 65.99 2.50 50.00

70.00 256.90 899.10 168.00 25.20 261.32 16.80 336.00

Sqm Sqm Sqm Sqm

6.72 6.72 6.72 6.72

400.00 400.00 100.00 127.10

2688.00 2688.00 672.00 854.11

0.025

12884.33 Total: 13206.44

322.11 13206.44 132.06 13338.50 2000.78 15339.28

Add water charges @ 1% on

Add C.P & OH @15% on 13338.50 Cost for 6.72 Sqm Rate per One Sqm: Rs 2282.63

Item Sl.No. : 28 Item Code: 26.3 Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12-6 mm insulated glass (double glazed) vision panel.. [Ref: DAR-2012, Volume-II, Item No.: 26.3] Details of Cost for : 6.72 Sqm Description Code Unit Quantity Rate Amount Width of the unit : 1.6 m Height of the unit : 4.2 m Area of Single Unit : 6.72 m2 Total Area 6.72 m2 Area of Glass deducting area of gap/grove 5% 6.38 m2 Wastage 10% 0.638 m2 Area of glass 7.02 m2 No of Panels 1 no Vision Height 2.2 m Spandrel Height 2.0 m GLASS : 6mm thick High performance Glass Sqm 6mm thick clear heat strengthened Glass Sqm Cost of glass in item code 26.3 (for calculating insurance) Fabrication charges inc silicon sealant, baker rod, Sqm desecant etc. Transporation including loading and unloading Sqm

7391A 7391B 2603-A 7391C 7391D

7.02 7.02 0.01 7.02 7.02

1910.00 770.00 18813.60 450.00 26.80 Total: 22348.88

13408.20 5405.40 188.14 3159.00 188.14 22348.88 223.49 22572.37 3385.86 25958.23

Add water charges @ 1% on

Add C.P & OH @15% on 22572.37 Cost for 6.72 Sqm Rate per One Sqm: Rs 3862.83

C/o new building..

Page 53 of 59

Item Sl.No. : 29 Extra for openable side / top hung vision glass panels (IGUs) [Ref: DAR-2012, Volume-II, Item No.: 26.4] Description Code Width of the unit 1.6 m Height of the unit 1.1 m Area 1.76 m2 Aluminium Weight per m2 7.78 Kg/m2 No of Locking Point 4 no Wedge Block 1 no Shuttter Weight Outer glass 6 mm Inner glass 6 mm Al weight 13.7 Kg Total 67 Kg Hinge size 0.512 m MATERIALS: Weather sealaant - Normal - Sika WS 305N - 600ml EPDM Gasket in Kg (Above 60 g / m) SS Screws Protective Tape ARMS GS HD -TOP HUNG -20"-TYPE P-COUPLE Connection Block Curtain wall striker Adjustable Fastening Pawl Corner drive Top wedge Block Sundries Fabrication charges for extra for openable side / top hung vision glass panels (IGUs) [In

Item Code: 26.4 Details of Cost for : 1.76 Sqm Unit Quantity Rate

Amount

7392A 7390G 7390K 7390N 7392B 7392C 7392D 7392E 7392F 7392G 9999 7392H

Nos Kg Nos Sqm pairs Nos Nos Nos Nos Nos L.S. Sqm

3.00 0.80 49.00 1.76 1.00 2.00 4.00 4.00 2.00 1.00 118.12 1.76

145.00 163.98* 5.00 25.00 1570.80 39.33 102.68 38.23 294.94 136.55 1.49 300.00 Total: 4498.71

435.00 131.18 245.00 44.00 1570.80 78.66 410.72 152.92 589.88 136.55 176.00 528.00 4498.71 44.99 4543.70 681.56 5225.26

Add water charges @ 1% on

Add C.P & OH @15% on 4543.70 Cost for 1.76 Sqm Rate per One Sqm: Rs 2968.90 *Rate taken as 160 in DSR-2012 Supplement Item Sl.No. : 30 Item Code: 26.5 Providing, fabricating and supplying shadow box of required size and shape [Ref: DAR-2012, Volume-II, Item No.: 26.5] Details of Cost for : 3.23 Sqm Description Code Unit Quantity Rate GLASS WOOL Denisity 48 Kg / m3 with Black Glass Tissue (BGT) 7393C Sqm 3.39 230.00 GI / ALUMINIUM SHEET 0.8mm thk. GI Sheet 7393D Kg 21.30 57.00 ACCESSORIES, FABRICATION, INSTALATION SS Screws - # 8 x 19 7393E Nos 32.00 10.00 Weather Sealant - DC 789 7393F Nos 2.00 135.00 Clip & Adhesive 7393G Nos 15.00 25.00 Sundries 9999 L.S. 56.82 1.49 Fabrication charges for shadow box 7393H Sqm 3.39 75.00 Installation charges for shadow box 7393J Sqm 3.39 75.00 Cement board 7393K Sqm 3.39 250.00 Total: Add water charges @ 1% on 4399.46 Add C.P & OH @15% on 4443.45

Amount 779.70 1214.10 320.00 270.00 375.00 84.66 254.25 254.25 847.50 4399.46 43.99 4443.45 666.52

C/o new building..

Page 54 of 59

Cost for 3.23 Sqm Rate per One Sqm: Rs 1582.03

5109.97

Item Sl.No. : 31 Item Code: 26.6 Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 [Ref: DAR-2012, Volume-II, Item No.: 26.6] Details of Cost for : 3.23 Sqm Description Unit Quantity Rate Glass 6mm thick High performance Glass Sqm 3.39 1910.00 Insurance charges at 1% on above Sqm 0.0339 1910.00 Fabrication : Fabrication charges including silicon sealant, baker rod, Sqm 3.39 300.00 desecant etc. Transportation including loading and unloading Sqm 3.39 64.87 Total: Add water charges @ 1% on 7776.56 Add C.P & OH @15% on 7854.33 Cost for 3.23 Sqm Rate per One Sqm: Rs 2796.43

Code 7391A 7391A 7393L 7393M

Amount 6474.90 64.75 1017.00 219.91 7776.56 77.77 7854.33 1178.15 9032.48

Item Sl.No. : 32 Item Code: 26.7 Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding.. [Ref: DAR-2012, Volume-II, Item No.: 26.7] Description MATERIALS: Weather Sealant - Non Staining (600ml) Weather Sealant - Normal (300ML) MS Brackets EPDM Gasket in Kg (Above 60 g / m) Anchor Fastner - M10 SS Bolt with Washer SS Screws Protective Tape Baker Rod GI flashing - 1.2mm Thk. 4mm thick ACP Sundries Fabrication / Installation / Transport / Scaffolding Fabrication Installation cherges for ACP cladding Transportation charges for ACP cladding Scaffolding Cost of material, Fabrication, Installation, transportation, scaffolding - To calculate de Details of Cost for : 6.72 Sqm Unit Quantity Rate Nos Nos Kg Kg Nos Nos Nos Sqm m Kg Sqm L.S. Sqm Sqm Sqm Sqm 2.00 2.00 10.00 0.70 2.00 2.00 49.00 7.00 5.00 4.00 7.06 451.00 7.06 7.06 7.06 7.06 0.025 459.15 143.21 100.00 163.98 110.93 35.00 5.00 25.00* 5.00 65.99 1200.00 1.49 400.00 400.00 100.00 127.10 19715.65 Total: 20208.54

Code 7390C 7390D 7390E 7390G 7390H 7390J 7390K 7390N 7390P 7390Q 7393N 9999 7393P 7393Q 7393R 7393S 2607-A

Amount 918.30 286.42 1000.00 114.79 221.86 70.00 245.00 175.00 25.00 263.96 8472.00 671.99 2824.00 2824.00 706.00 897.33 492.89 20208.54 202.09 20410.63 3061.59 23472.22

Add water charges @ 1% on

Add C.P & OH @15% on 20410.63 Cost for 6.72 Sqm Rate per One Sqm: Rs 3492.89 *Rate taken as 2.5 in DSR-2012 Supplement

C/o new building..

Page 55 of 59

BASIC RATES MARKET RATES (Basic Rates for Analysis of Rates for DSR-2012 Supplement) Sl.No. Rate Code Description of Rate MATERIALS : 01 0013 Machine for rubbing of floors 02 0029 Carriage of concrete by transit mixer. 03 0041 Joint cutting machine with 2-3 blades 04 0042 C.C .batch mix plant. 05 0045 Slip form paver with sensor. 06 0048 Texturing machine. 07 0052 Front end loader 1 cum bucket capacity (incl POL) 08 0057 Water Tanker 5 to 6 KL capacity 09 0069 Generator 250 kVA 10 0075 Road sweeper (Mechamical Broom) @ 1250 sqm per hour 11 0294 Stone Aggregate (Single size) : 25 mm nominal size 12 0296 Stone Aggregate (Single size) : 12.5 mm nominal size 13 0314 Bitumen hot sealing compound : grade A Separation Membrane of impermeable plastic sheeting 125 14 0323 micron thick 15 0349 Curing compound 16 0367 Portland Cement 17 0368 White Cement 18 0369 Plastic sheath,1.25 mm thick for dowel bars 19 0371 Sealant primer 20 0374 Pre moulded Joint filler, 25 mm thick for expansion joint. 21 0982 Coarse sand (zone III) 22 0983 Fine sand (zone IV) 23 1003 Mild steel round bar above 12 mm dia 24 1005 Twisted steel / deformed bars G.I steel bolts & nuts 6mm dia and 25mm long round head with 25 1022 slots 26 1239 18 mm thick Flamed finish granite stone slab 18 mm thick Italian Marble stone slab, Perlato (slab area up to 27 1240 0.5 sqm). 28 1242 Glass mossaic tiles (20 mm x 20 mm x 4 mm ) 29 1243 Tile fixing chemical adhesive 30 1244 Cement Polymer Grout Compound 31 1245 Acid for cleaning tiles 32 1728 RCC pipe 450 mm dia NP-3 spigot 33 1729 RCC pipe 600 mm dia NP-3 spigot 34 1730 RCC pipe 900 mm dia NP-3 spigot 35 1731 RCC pipe 1000 mm dia NP-3 spigot 36 1732 RCC pipe 1200 mm dia NP-3 spigot 37 1733 RCC pipe 1800 mm dia NP-3 spigot 38 1734 RCC pipe 450 mm dia NP-4 spigot 39 1735 RCC pipe 600 mm dia pipe NP-4 spigot 40 1736 RCC pipe 900 mm dia pipe NP-4 spigot 41 1737 RCC pipe 1000 mm dia pipe NP-4 spigot 42 1738 RCC pipe 1200 mm dia pipe NP-4 spigot 43 1739 RCC pipe 1800 mm dia pipe NP-4 spigot 44 2202 Carraige of Stone aggregate below 40 mm nominal size 45 2203 Carraige of Coarse sand 46 2205 Carraige of Steel 47 2209 Carraige of Cement C/o new building.. Unit Day km/ cum per day day day day hour One hour Hours One hour cum cum kilogram sqm litre tonne tonne sqm kg sqm cum cum quintal quintal 10 Nos sqm sqm sqm kg kg litre metre metre metre metre metre metre metre metre metre metre metre metre cum cum tonne tonne Rate 300.00 30.00 900.00 10000.00 13000.00 925.00 800.00 150.00 900.00 360.00 1000.00 1050.00 26.00 12.00 50.00 5000.00 12000.00 30.00 125.00 500.00 1120.00 640.00 4000.00 4500.00 20.00 1695.00 3330.00 1050.00 34.00 34.00 16.00 1496.00 1995.00 3150.00 3885.00 5040.00 9450.00 1733.00 2310.00 4595.00 5565.00 6510.00 13650.00 87.60 87.60 77.87 77.87

Local Market Rates : 56 of 59

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89

2216 2261 2299 2303 2331 2332 2334 2336 2399 2400 2401 2402 2403 2404 2405 2409 2410 2411 2711 2712 2713 2714 2715 7010 7011 7012 7013

(Basic Rates for Analysis of Rates for DSR-2012 Supplement) Carraige of Stone blocks white & red sand stone & kota stone tonne slab Carraige of Fine sand (1 part badarpur sand : 2 parts jamuna cum sand) Carraige of R.C.C. pipes 450 & 500 mm dia 100 metre Carraige of R.C.C. pipes 600, 700, 750 & 800 mm dia 100 metre Carraige of R.C.C. pipes 900 mm dia 100 metre Carraige of R.C.C. pipes 1000 mm dia 100 metre Carraige of R.C.C. pipes 1200 mm dia 100 metre RCC pipe above 1200 mm dia and upto 1800 mm dia 100 metre Complete Roof Joint of 100 mm Complete Roof Joint of 150 mm Complete Roof Joint of 200 mm Epoxy adhesive Floor Joint of 100 mm Floor Joint of 150 mm Floor Joint of 200 mm Wall Joint of 100 mm Wall Joint of 150 mm Wall Joint of 200 mm FS800H Grade Flooring Panel Zinc Electroplated Pedestals - 300 mm Zinc Electroplated Pedestals - 450 mm Zinc Electroplated Tube Stinger Machine Screw for Fixing G.I Ceiling Section (80 x26mm x26mm x 10.5mm each lip x 0.55 mm) Galvanised Steel perimetre Channel (Size 20x27x30x0.50 mm) G.I Intermediate Channel (Size 15 x45 x 15 x 0.90mm) G.I Steel angle hanger (Ceiling Angle) (Size 25 x 10x 0.50mm) G.I steel connecting clips (2.64mm dia & 230mm long G.I wire) metre metre metre Kg metre metre metre metre metre metre each each each each each metre metre metre metre each kilogram kilogram roll 100 Nos litre each Kg. sqm sqm sqm kilogram kilogram each One Metre

77.87 87.60 2127.50 3191.25 4786.87 6382.50 6382.80 7339.87 4500.00 4800.00 5000.00 150.00 4500.00 5000.00 5400.00 3400.00 3700.00 4000.00 750.00 140.00 150.00 70.00 2.00 39.00 27.00 42.00 19.00 6.20 22.00 24.00 140.00 56.00 85.00 10.00 246.00 211.00 1550.00 2300.00 220.00 36.50 48.00

7014 7016 7017 7018 7020 7021 7048 7238 7273 7295 7296 7306 7318 7388

Joint filler Joint finisher Joint tape roll All drive screws(for gypsum board / calcium silicate board) Primer ( for gypsum board) Rawl plug 50 mm (designation 10 no.) High Albedo paint Resin Bonded Rockwool 48 kg/m3 Granite stone slab 18mm thick Granite stone slab 30mm thick Aluminium T or L sections Plasticizer / super plasticizer Dash hold fastener 12.5 mm dia, 40 mm long with 6 mm dia bolt Structural Sealant - 6mm x 12mm

7390A

31.62

C/o new building..

Local Market Rates : 57 of 59

(Basic Rates for Analysis of Rates for DSR-2012 Supplement) Spacer Tape 6.4mm (Thick) x 6mm (W) One Metre 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 7390B 7390C 7390D 7390E 7390F 7390G 7390H 7390J 7390K 7390M 7390N 7390P 7390Q 7390R 7390S 7390T 7390U 7390V 7390VA 7391A 7391B 7391C 7391D 7392 7392A 7392B 7392C 7392D 7392E 7392F 7392G 7392H 7393C 7393D 7393E 7393F 7393G 7393H 7393J 7393K 7393L 7393M 7393N Weather Sealant - Non Staining (600ml) Weather Sealant - Normal (300ML) MS Brackets/Aluminium Alloy Brackets Silicon Gasket in Kg (Above 50 g / m) EPDM Gasket in Kg (Above 60 g / m) Anchor Fastner - M10 SS Bolt with Washer SS Screws Fire Stop Protective Tape Baker Rod GI flashing - 1.2mm Thk. Masking Tape MISC (In item 26.2) Fabrication charges - Semi-unitized Glazing Installation charges - Semi-unitized Glazing Transportation for Semi-unitized Glazing Scaffolding / Loading / Unloading for Semi-unitized Glazing 6mm thick High performance Glass 6mm thick clear heat strengthened Glass Fabrication charges inc silicon sealant, baker rod, desecant etc. (vision glass panels (I Transporation including loading and unloading (for vision glass panels in item 26.3 of DSR Powder coating 50 microns on aluminium sections. Weather sealaant - Normal - Sika WS 305N - 600ml ARMS GS HD -TOP HUNG -20"-TYPE P-COUPLE Connection Block Curtain wall striker Adjustable Fastening Pawl Corner drive Top wedge Block Fabrication charges for extra for openable side / top hung vision glass panels (IGUs) [In Denisity 48 Kg / m3 with Black Glass Tissue (BGT) 0.8mm thk. GI Sheet SS Screws - # 8 x 19 Weather Sealant - DC 789 Clip & Adhesive Fabrication charges for shadow box (In item 26.5) Installation charges for shadow box (In item 26.5) Cement board (In item 26.5) Fabrication charges including silicon sealant, baker rod, desecant etc. Transportation including loading and unloading for Spandrel Glass Panels (Item 26.6) 4mm thick ACP Each Each One Kg One Kg One Kg Each Each Each One Metre One Sqm One Metre One Kg One Sqm One Sqm One Sqm One Sqm One Sqm One Sqm One Sqm One Sqm One Sqm One Sqm kilogram Each Each Pair Each Each Each Each Each One Sqm One Sqm One Kg Each Catridge Each One Sqm One Sqm One Sqm One Sqm One Sqm One Sqm 64.87 1200.00 26.80 64.00 145.00 1570.80 39.33 102.68 38.23 294.94 136.55 300.00 230.00 57.00 10.00 135.00 25.00 75.00 75.00 250.00 300.00 18.00 459.15 143.21 100.00 601.26 163.98 110.93 35.00 5.00 561.94 25.00 5.00 65.99 2.50 50.00 400.00 400.00 100.00 127.10 1910.00 770.00 450.00

C/o new building..

Local Market Rates : 58 of 59

133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164

7393P 7393Q 7393R 7393S 7743 7744 7803 7805 7806 8611 8612 8613 8614 8615 8616 8617 8784 8785 9999 LABOUR : 0100 0101 0102 0111 0114 0115 0123 0124 0126 0128 0131 0139 0155

(Basic Rates for Analysis of Rates for DSR-2012 Supplement) Fabrication cahrges for Curtain Wall with Aluminium Composite One Sqm Panel Cladding Installation cherges for ACP cladding One Sqm Transportation charges for ACP cladding One Sqm Scaffolding charges for ACP cladding One Sqm Coloured inter locking C.C. paver Block sqm. Stone size 10x10x7.50cm each Tactile tile sqm Matt finished vitrified tile 100x100 x16mm sqm Vitrified tile sqm Main T ceiling sections 24x38x0.3 mm (3 metre long) each Perimeter wall angle 21x21 mm (3 metre long) each Intermediate cross channel (1.2 mtrs) each Intermediate cross channel (1.6 mtrs) each Hanger rod 0.5 mm thick each Adjustment clip each G.I steel soffit cleat ( size 27x37x25x1.60mm) each 8mm thick Calcium silicate perforated tiles of size 595 x595mm sqm 8 mm thick tapered edge calcium silicate board Co-efficeint for L.S. items (149/100) Bandhani Bhisti Blacksmith 1st class Carpenter 1st class Beldar Coolie Mason (brick layer) 1st class Mason (brick layer) 2nd class Mason (for ornamental stone work) 1st class Mate Painter Skilled Beldar (for floor rubbing etc.) Mason (average) sqm L.S. Day Day Day Day Day Day Day Day Day Day Day Day Day

400.00 400.00 100.00 127.10 500.00 9.00 868.00 930.00 510.00 187.00 118.00 72.00 34.00 7.00 6.00 3.00 688.00 368.00 1.49 260.00 260.00 301.00 301.00 247.00 247.00 301.00 273.00 301.00 260.00 273.00 260.00 287.00

C/o new building..

Local Market Rates : 59 of 59