Document No: 125-EPS-002

Rev: 00

PnU Engineering Private Limited


132KV Switchyard at ICL, Vishnupuram
Customer: India Cements Limited, Vishnupauram, Nalgonda, AP
Consultant: MN Dastur, Chennai
SN

Item

Units

Qtny

Start Date

End Date

Duration

Civil Works - Plant Side S/S

02/10/12

17/01/13

108

1.1
1.2
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6
1.3.7
1.3.8
1.4
1.5
1.6
1.7

Reference Point Finalization


Marking for Foundations
Foundations
Circuit Breaker with platform
Isolator
Current Transformer
Potential Transformer
BPI
LA
TND Towers
BMK Panel Foundation
Cable Trench
Road
Fencing
Back filling, Compacting, Levelling and
Gravel Spreading
Miscellaneous works like cable pull pits,
earthing chambers etc.
Erection - Plant Side S/S
Earthing
Earth Mat
Structure Earthing
Equipment Earthing
Cable Tray Earthing
Panel Earthing
Electrodes
Auxiliary Earth Mats
Lighting Protection
Cable Tray
Cable Trench
Buried pipes
Structure Erection
Isolator
Current Transformer
Potential Transformer
BPI
Circuit Breaker
LA
TND Towers
Beams
Equipment/Panel Erection
Isolator
Current Transformer
Potential Transformer
BPI
Circuit Breaker
LA
CT, PT JBs
BMK Panel

48
1
24
3
6
4
3
6
1
60
32
135
2000

02/10/12
06/10/12
15/10/12
15/10/12
15/10/12
15/10/12
15/10/12
15/10/12
15/10/12
15/10/12
05/11/12
25/10/12
11/11/12
20/11/12
01/12/12

02/10/12
06/10/12
13/11/12
20/10/12
05/11/12
24/10/12
24/10/12
28/10/12
28/10/12
13/11/12
06/11/12
15/11/12
30/11/12
30/11/12
15/12/12

1
1
30
6
22
10
10
14
14
30
2
22
20
11
15

21/11/12

30/11/12

10

23/10/12
28/10/12
01/11/12
28/10/12
10/12/12
20/11/12
20/12/12
15/12/12
15/12/12
20/12/12
20/11/12
20/11/12
20/11/12
23/10/12
08/11/12
27/10/12
27/10/12
31/10/12
10/11/12
25/10/12
23/10/12
23/10/12
15/11/12
10/12/12
10/12/12
10/12/12
10/12/12
15/11/12
10/12/12
23/12/12
23/12/12

30/12/12
30/12/12
15/11/12
20/11/12
30/12/12
30/11/12
22/12/12
20/12/12
20/12/12
25/12/12
30/11/12
30/11/12
30/11/12
15/11/12
15/11/12
15/11/12
05/11/12
10/11/12
12/11/12
01/11/12
13/11/12
13/11/12
28/12/12
23/12/12
15/12/12
20/12/12
15/12/12
20/11/12
17/12/12
28/12/12
28/12/12

69
64
15
24
21
11
3
6
6
6
11
11
11
24
8
20
10
11
3
8
22
22
44
14
6
11
6
6
8
6
6

1.8
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.2
2.2.1
2.2.2
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.3.8
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
2.4.7
2.4.8

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Mtrs
Mtrs
Mtrs
Sq. Mtrs
Lot

Set
Nos
Nos
Nos
Nos
Nos
Nos
Nos

4
3
6
4
1
3
6
3

Nos
Set
Set
Nos
Nos
Nos
Nos
Nos

4
1
2
4
1
3
3
1

11-10-2012

Remarks

1 of 3

Document No: 125-EPS-002


Rev: 00
2.4.9
2.4.10
2.4.11
2.4.12
2.5
2.5.1
2.5.2
2.6
2.6.1
2.6.2
2.6.3
2.7
3
4
5

C&R Panel
DC System & battery
DCDB
ACDB
Bus Formation
Stringing and Jumpering
IPS Tubeand Equip Connection
Cabling
Cable Laying
Cable Glanding and Terminations
Loop Checking
Illumination
Testing - Plant Side S/S
Commisioning - Plant Side S/S

5.1
5.2
5.3
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
5.4
5.5

Reference Point Finalization


Marking for Foundations
Foundations
Circuit Breaker with platform
Isolator
Current Transformer
Potential Transformer
BPI
LA
TND Towers
BMK Panel Foundation
Cable Trench
Back filling, Compacting, Levelling and
Gravel Spreading
Miscellaneous works like cable pull pits,
earthing chambers etc.
Erection - Transco Side S/S
Earthing
Earth Mat
Structure Earthing
Equipment Earthing
Cable Tray Earthing
Panel Earthing
Electrodes
Auxiliary Earth Mats
Lighting Protection
Cable Tray
Cable Trench
Buried pipes
Structure Erection
Isolator
Current Transformer
Potential Transformer
BPI
Circuit Breaker
LA
TND Towers
Beams
Equipment/Panel Erection
Isolator
Current Transformer
Potential Transformer

5.6
6
6.1
6.1.1
6.1.2
6.1.3
6.1.4
6.1.5
6.1.6
6.1.7
6.1.8
6.2
6.6.1
6.6.2
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
6.3.7
6.3.8
6.4
6.4.1
6.4.2
6.4.3

Nos
Nos
Nos
Nos

1
1
1
1

15/12/12
15/12/12
15/12/12
15/12/12
25/12/12
25/12/12
25/12/12
15/12/12
15/12/12
15/12/12
15/12/12
15/12/12
03/01/13
12/01/13
01/12/12

16/12/12
20/12/12
20/12/12
20/12/12
30/12/12
30/12/12
30/12/12
30/12/12
30/12/12
30/12/12
30/12/12
30/12/12
10/01/13
17/01/13
18/02/13

2
6
6
6
6
6
6
16
16
16
16
16
8
6
80

Lot
Lot

1
1

Lot
Lot
Lot
Lot
Lot
Lot

1
1
1
1
1
1

30
1
6
3
6
4
3
6
1
45
1000

01/12/12
02/12/12
05/12/12
05/12/12
05/12/12
05/12/12
05/12/12
05/12/12
05/12/12
05/12/12
25/12/12
25/12/12
10/01/13

01/12/12
02/12/12
26/12/12
10/12/12
15/12/12
24/12/12
24/12/12
15/12/12
15/12/12
25/12/12
26/12/12
30/12/12
20/01/13

1
1
22
6
11
20
20
11
11
21
2
6
11

21/01/13

30/01/13

10

13/12/12
15/12/12
26/12/12
15/12/12
18/12/12
07/01/13
20/12/12
15/12/12
15/12/12
20/12/12
03/01/13
03/01/13
13/01/13
13/12/12
18/12/12
27/12/12
27/12/12
18/12/12
13/12/12
18/12/12
28/12/12
28/12/12
15/12/12
24/12/12
02/01/13
08/01/13

02/02/13
21/01/13
30/12/12
15/01/13
21/01/13
15/01/13
22/12/12
20/12/12
20/12/12
25/12/12
17/01/13
11/01/13
17/01/13
13/01/13
23/12/12
30/12/12
05/01/13
22/12/12
15/12/12
21/12/12
13/01/13
13/01/13
18/01/13
29/12/12
04/01/13
12/01/13

52
38
5
32
35
9
3
6
6
6
15
9
5
32
6
4
10
5
3
4
17
17
35
6
3
5

Civil Works - Transco Side S/S


Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Mtrs
Sq. Mtrs
Lot

Set
Nos
Nos
Nos
Nos
Nos
Nos
Nos

4
3
6
4
1
3
6
3

Nos
Set
Set

4
1
2

11-10-2012

2 of 3

Document No: 125-EPS-002


Rev: 00
6.4.4
6.4.5
6.4.6
6.4.7
6.4.8
6.4.9
6.4.10
6.4.11
6.4.12
6.5
6.5.1
6.5.2
6.6
6.6.1
6.6.2
6.6.3
7
8

BPI
Circuit Breaker
LA
CT, PT JBs
BMK Panel
C&R Panel
DC System & battery
DCDB
ACDB
Bus Formation
Stringing and Jumpering
IPS Tubeand Equip Connection
Cabling
Cable Laying
Cable Glanding and Terminations
Loop Checking
Testing - Plant Side S/S
Commisioning - Plant Side S/S

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

4
1
3
3
1
1
1
1
1

Lot
Lot

1
1

Lot
Lot
Lot
Lot
Lot

1
1
1
1
1

Note:

1. We considered all fronts are availble at Aptransco end by 01-12-2012.( Like permissions from EB Officials for Second
Circuit..etc)

11-10-2012

24/12/12
17/12/12
23/12/12
14/01/13
17/01/13
15/12/12
15/12/12
15/12/12
15/12/12
23/01/13
23/01/13
26/01/13
20/01/13
20/01/13
22/01/13
29/01/13
03/02/13
11/02/13

28/12/12
19/12/12
27/12/12
16/01/13
18/01/13
16/12/12
20/12/12
20/12/12
20/12/12
02/02/13
28/01/13
02/02/13
01/02/13
25/01/13
28/01/13
01/02/13
10/02/13
18/02/13

5
3
5
3
2
2
6
6
6
11
6
8
13
6
7
4
8
8

3 of 3