Professional Documents
Culture Documents
I V E R L A G A N
S T R
A N
I L L I S E M B A N
K M
E N
RIDGEWAY STREET
ND SA ND RA ST HU ET RE ST EW VI TD RS VE RI
12
4 11
8 5 6
3 8
1 2 3 4 9 10 5 6 7 8 9
Entrance / Lower Foyer Box Office Education Room Boardroom Toilets Backstage Green Room Dressing Room Classroom Storage Prop Store Understage
10 11 12
10
LEVEL 01
11
1 8
3 7
1 2 3 6 5 10 4 5 6 6 4 7 8 9 10 11
Upper entrance Upper Foyer Bar / Cafe Kitchen Studio Dressing Room Backstage Stage Scene Dock Loading Bay Terrace
10
LEVEL 02
0 5 5 0 V
7 3 1 1 2 3 4 5 6 6 7 8 8 9 2 2 10 11 12 Rehearsal Office Foyer Void Auditorium Studio Gallery Backstage Wardrobe Prop Workshop Storage Prop Store Understage
10
LEVEL 03
7 10
6 11 3 2
1 2 1 3 4 5 4 8 6 7 8 9 2 2 2 12 10 10 11 12
Rehearsal Void Office Staff Room Studio Grid Foyer (admin level) Control Room Translation Room Events Room Fly-tower Terrace Storage Plant
10
LEVEL 04
C A N T A T A 1 1 / 2 6
C A N T A T A
C
A
1 1 / 2 6
N T A T A
1
1 / 2 6
C
A
N
T
A
T
A
1
1/
2
10
SECTION A-A
10
SECTION B-B
95mm
100mm concrete roof screed with Larsen Fiberflex admixture on 80mm extruded polystyrene insulation on hydrotech roof membrane system on structural precast concrete slabs supported on steel trusses
Perimeter in-situ concrete coping with ss structural dowel bar connection to concrete roof screed
3 4 5
Continuous roof membrane lapped and sealed into cavity 100mm Ibstock Heritage Red blend brick 28mm BOEN Boflex Stadium flooring with iroko hardwood finish on 18mm plywood substrate on supporting timber joists @ 400 ctrs on in-situ rc slab upstand structure with 75mm mineral wool acoustic insulation between
6 7 8 9
Acon cavity wall tie Full fill cavity wall insulation 215mm reinforced concrete wall Untreated hardwood iroko screens with 3 coats clear bondex seal to internal face
10 11 12
Continuous galvanised steel fixing plate to support coping Folding Aluminium coping PPC RAL 9006 Roof build-up: 100mm pebbles layer on protection sheet on extruded polystyrene unsulation on Hydrotech roof membrane system on 200mm RC slab structure
13 14 15 16 17 18
Continuous galvanised steel angle supporting brick Low-e double glazing Solid iroko bar counter supported off external screen Meinertz Finned Tube radiator 5mm PPC interior steel cover plate (colour red oxide) Schoeck Isokorb loadbearing connection providing thermal break within cantilvered concrete structure
19
Floor Build-up: 220x54x54 Wienerberger Terre De Rose brick paver with sand cement grout (sealed) on 75mm concrete screed with underfloor heating on 75mm extruded polystyrene insulation on reinforced concrete slab with soffit lightly sandblasted & sealed externally
6 7 9 10 11 12 8
20 21 22 23
Untreated hardwood iroko bottom rail Galvanised steel insulated exterior fascia Galvanised plate steel exterior cladding Louvre system fixed to mechanical ventilation units
13
14
15
18 16 19
17
20
14
16
21
22
23
2 4 5 mm