You are on page 1of 5

DevelopmentofHydropowerandRenewableEnergy(HRE) ProjectinKhyberPakhtunkhwa(PhaseI)

PakistanKhyberPakhtunkhwa(KPK):SupplyandInstallationofCommunity BasedPVSystems PreQualificationNotice Pakistan


1. 2. 3. 4. 5. Publicationreference: PPAF/PV001/2013 Procedure: unrestricted Programme: DevelopmentofHydropower&RenewableEnergy(HRE)inKhyberPakhtunkhwa Financing: FinancingAgreementKfWPPAF ContractingAuthority: Project Procurement Committees including Third Tier Community Organizations and PartnerOrganizationsofPakistanPovertyAlleviationFund(PPAF). Natureofcontract: SupplyandInstallation Contractdescription: ThepurposeofthiscontractistosupplyandinstallcommunitybasedPVsystemsfor security street lighting and basic electrification of households. The systems shall comprise of a centralized PV generator, a battery storage facility and an inverter supplying230V/50Hzpowertothedistributionsystem.Dependingonthenumberof householdsthesystemsizesvaryfrombetween: 1. Cluster 1 5 households: 1.4 kW PV generator; 1 kW Inverter, 14.4 kWh nominal battery capacity; batteries: sealed gel batteries, 100% maintenance free;expectedlifetime>15years 2. Cluster 2 10 households: 2.9 kW PV generator; 1.8 kW Inverter, 19.2 kWh nominal battery capacity; batteries: sealed gel batteries, 100% maintenance free;expectedlifetime>15years 3. Cluster 3 15 households: 4.9 kW PV generator; 2.5 kW Inverter, 19.2 kWh nominal battery capacity; batteries: sealed gel batteries, 100% maintenance free;expectedlifetime>15years 4. Cluster 4 20 households: 6.3 kW PV generator; 3.6 kW Inverter, 24.0 kWh nominal battery capacity; batteries: sealed gel batteries, 100% maintenance free;expectedlifetime>15years

ContractSpecification 6. 7.

DevelopmentofHydropowerandRenewableEnergy(HRE) ProjectinKhyberPakhtunkhwa(PhaseI)

8.

Numberattitleoflots: Thesystemswillbeinstalledinupto6DistrictsofKPKProvince,whichare: 1. Sawabi:estimated110systems 2. Buner:estimated110systems 3. Bannu:estimated45systems 4. LakkiMarwat:estimated45systems 5. Hangu:estimated45systems 6. Karak:estimated45systems. Onedistrictformsonelot.Totalnumberoflots:6. Totalnumberofsystems(maybesubjecttovariation):265.

9. 10.

Maximumbudget: notdefinedyet Scopeforadditionalservices: The contracting authority may, at its own discretion, extend the supply duration and/or supply scope subject to the availability of funding. Any extension of supply orderwouldbesubjecttosatisfactoryperformancebythesupplier. Eligibility: Participation is open to all legal entities (participating either individually or in a grouping(consortium)oflegalentitiesregisteredinPakistan.Legalentitiesregistered inothercountriesshallprovideevidenceofaconsortium/jointventureorassociation withaPakistanilegalentitylatestwithinthetenderprocess. Candidature: All eligible legal entities (as per item 11 above) or groupings of such entities (consortia)mayapply. A consortium may be permanent, legallyestablished grouping or grouping which has been constituted informally for a specific tender procedure. All members of a consortium (i.e. leader and all other members are jointly and severally liable to the contractingauthority. The participation of an ineligible legal entity (as per item 11) will result in the automaticexclusionofthatentity.Inparticular,ifthatineligibleemntitybelongstoa consortium,thewholeconsortiumwillbeexcluded.

Conditionsofparticipation 11.

12.

13.

Numberofapplication: No more than 1 application can be submitted by a legal entity whatever the form of participation (as an individual legal entity or as leader or member of a consortium submitting an application). In the event that a legal entity submits more than 1 application,allapplicationsinwhichthatentityhasparticipatedwillbeexcluded. The legal entitities may submit an application for 1 lot only, several lots or all of the lots, but only 1 application per lot. Contracts will be awarded lot by lot and each lot willformaseparatecontract.

DevelopmentofHydropowerandRenewableEnergy(HRE) ProjectinKhyberPakhtunkhwa(PhaseI)

14.

Shortlistalliancesprohibited: Anytendersreceivedfromtendererscomprisingfirmsotherthanthosementionedin the shortlisted application forms will be excluded from this tender procedure unless prior approval from the contracting authority has been obtained (see PRAG 2.4.3). Shortlisted entities may not form alliances or subcontract to each other for the contractinquestion. Groundsforexclusion: As part of the application form, entities submit a signed declaration, included in the standards application form, to the effect that they are not in any of the exclusion situations as per example listed in Section 2.3.3 of the Practical Guide to contract procedurestoEUexternalactions. Subcontracting: Subcontractingisallowedforworksrelatedtoinstallation(e.g.foundations,fencing). Numberofentitiestobeshortlisted: On the basis of applications received, between 3 to 4 entities per District will be invited to submit detailed tenders for this contract. If the number of eligible entities meetingtheselectioncriteriaislessthantheminimumof4,thecontractingauthority mayinvitetheentitieswhosatisfythecriteriatosubmitatender. Provisionaldateofinvitationtotender: 01.01.2014 Provisionalcommencementdateofcontract: 01.04.2014 Initialperiodofimplementationoftasks: Durationinmonths:6 Selectioncriteria: Thefollowingselectioncriteriawillbeappliedtolegalentities.Incaseofapplications submitted by a consortium, these selection criteria will be applied to the consortium asawhole: 1. Economicandfinancialcapacityoftheentity.Inthecaseoftheentitybeinga publicbody,equivalentinformationshouldbeprovided: The average annual turnover of the entity must exceed US$ 250,000 withinthelast5yearsforeveryonelot. 2. Sufficient financial resources to meet the financial requirements of the contractamount;

15.

16. 17.

Provisionaltimetable 18. 19. 20.

Selectionandawardcriteria 21.

Technicalcapacityofentity: Atleast3contracts(inrelevantsector)withinthelast5years,eachwitha value of at least US$ 100,000 that have been successfully or are substantiallycompletedandthataresimilartotheproposedworks At least 5 contracts in construction of PV supply and installation executed duringthelast5years

DevelopmentofHydropowerandRenewableEnergy(HRE) ProjectinKhyberPakhtunkhwa(PhaseI)

3.

Professionalcapacityofentity: keypersonnelofsufficientexperience keyequipmentforinstallation,testing,andcommissioning referenceprojects additionalusefulinformation(e.g.manufacturerscatalogues,datasheets, drawings,etc.)ofequipmentplannedtobesuppliedunderthiscontract.

22.

Awardcriteria: Bestvalueformoney. Deadlineforreceiptofapplication: 25.11.2013(09:00amlocaltime) Anyapplicationreceivedafterthisdeadlinewillnotbeconsidered. Applicationformatanddetailstobeprovided: Applications must be submitted using standard A4 format. All documentation must be duly signed by an authorized person, financial information need to be signed by anauditor. Howapplicationsmaybesubmitted: ApplicationsmustbesubmittedinEnglishexclusivelytothecontractingauthorityina sealedenvelope;eitherbyrecordeddelivery(officialpostalservice)to: TeamLeaderProjectConsultants,(INTEGRATIONenvironment&energyLtd.), PakistanPovertyAlleviationFund(PPAF) 1HillViewRoad,Banigalla,Islamabad Pakistan Or hand delivered (including courier services) directly to the contracting authority in returnforasignedanddatedreceiptto: Asinabovementionedaddress. The contract title and publication reference (see item 1 above) must be clearly markedontheenvelopecontainingtheapplicationandmustalwaysbementionedin allsubsequentcorrespondencewiththecontractingauthority. Applicationssubmittedbyanyothermeanswillnotbeconsidered.

Application 23.

24.

25.

26.

Alterationorwithdrawalofapplications: entities may alter or withdraw their applications by written notification prior to the deadline for submission of applications. No application may be altered after this deadline. Any such notification of alteration or withdrawal shall be prepared and submitted in accordance with item 25. The pouter envelope (and the relevant inner envelope if used)mustbemarkedalterationorwithdrawalasappropriate.

27.

Operationallanguage: AllwrittencommunicationsforthistenderprocedureandcontactmustbeinEnglish.

DevelopmentofHydropowerandRenewableEnergy(HRE) ProjectinKhyberPakhtunkhwa(PhaseI)

28.

Additionalinformation: The final selected supplier shall possess of a service point in each of the awarded district to provide after sales services for at minimum 5 years. The service point may beabranchofthesupplierscompanyorapartnerfirmwhichactsonalegalbasison behalfofthesupplier.

You might also like