You are on page 1of 10

IT COLLEGE

Activity ID Activity Name Original Start Duration


938 20-Feb-13 172 20-Feb-13 172 20-Feb-13 Start Construction Works Start Mobilization Finish Construction Works Finish Mobilization Finish of Engneering 0 20-Feb-13 0 20-Feb-13 0 20-Feb-13 172 20-Feb-13 0 0 0 150 18-Mar-13 140 18-Mar-13 10 18-Mar-13 100 30-Mar-13 100 10-Apr-13 100 22-Apr-13 100 04-May-13 140 30-Mar-13 10 30-Mar-13 100 10-Apr-13 100 22-Apr-13 100 04-May-13 100 15-May-13 153 18-Mar-13 153 18-Mar-13 153 18-Mar-13 40 18-Mar-13 40 26-Mar-13 40 03-Apr-13 40 11-Apr-13 40 15-Apr-13 40 20-Apr-13 40 21-Apr-13 40 07-May-13 40 19-May-13 40 23-Jun-13 40 10-Jul-13 40 28-Jul-13 56 09-May-13 40 09-May-13 40 18-May-13 40 22-May-13 40 26-May-13 40 28-May-13 61 18-May-13 40 18-May-13 40 26-May-13 Milestone Summary Page 1 of 10 08-Sep-13 20-Feb-13 30-Apr-13 08-Sep-13 08-Sep-13 27-Aug-13 28-Mar-13 23-Jul-13 04-Aug-13 15-Aug-13 27-Aug-13 08-Sep-13 09-Apr-13 04-Aug-13 15-Aug-13 27-Aug-13 08-Sep-13 11-Sep-13 11-Sep-13 11-Sep-13 02-May-13 11-May-13 19-May-13 27-May-13 30-May-13 04-Jun-13 05-Jun-13 22-Jun-13 03-Jul-13 07-Aug-13 25-Aug-13 11-Sep-13 13-Jul-13 24-Jun-13 02-Jul-13 07-Jul-13 10-Jul-13 13-Jul-13 27-Jul-13 02-Jul-13 10-Jul-13

BASELINE SCHEDULE
Finish F
20-Feb-16 08-Sep-13 08-Sep-13 20-Feb-13 08-Sep-13, GENERAL 08-Sep-13, MILESTONES 20-Feb-13, START MILESTONES Start Construction Works Start Mobilization 08-Sep-13, FINISH MILESTONES Finish Construction Works Finish Mobilization Finish of Engneering 08-Sep-13, ENGNEERING 27-Aug-13, ENGNEERING SUBMITTAL Check Structural Safety Analyses STRUCTURAL SHOP DRAWING ARCHITECTURAL SHOP DRAWING MECHANICAL SHOP DRAWING ELECTRICAL SHOP DRAWING 08-Sep-13, ENGNEERING APPROVAL Check Structural Safety Analyses STRUCTURAL SHOP DRAWING ARCHITECTURAL SHOP DRAWING MECHANICAL SHOP DRAWING ELECTRICAL SHOP DRAWING 11-Sep-13, MATERIAL SUBMITTAL AND APPROVAL 11-Sep-13, MATERIAL SUBMITTAL 11-Sep-13, CIVIL AND ARCH MATIRIAL Back filling materials and structure filling Concrete and steel Black bituminius Paint & terminte treatment Masonry block Precast concret Door mat local draWg. Elevator Unglazed ceramic floor tiels marble stone Expansion joint & control joint& construction joint Metal door & hardware Al Windows & hardware Paint 13-Jul-13, Mechanical MATERIAL Storm drainage piping Hydronic piping Plumbing fixtures Fire protection piping Air handling unit 27-Jul-13, Electrical MATERIAL Basic electrical materials Transformers

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM
20-Feb-16

IT COLLEGE
GENERAL
MILESTONES
START MILESTONES MILESTO
AZKB-MS-4 AZKB-MS-2 AZKB-MS-5 AZKB-MS-3 AZKB-MS-15

FINISH MILESTONES MILESTO

ENGNEERING
ENGNEERING SUBMITTAL SU
A15510 A15530 A15520 A15540 A15550 A15560 A15580 A15570 A15590 A15600 Check Structural Safety Analyses STRUCTURAL SHOP DRAWING ARCHITECTURAL SHOP DRAWING MECHANICAL SHOP DRAWING ELECTRICAL SHOP DRAWING Check Structural Safety Analyses STRUCTURAL SHOP DRAWING ARCHITECTURAL SHOP DRAWING MECHANICAL SHOP DRAWING ELECTRICAL SHOP DRAWING

ENGNEERING APPROVAL AP

MATERIAL SUBMITTAL SU AND APPROVAL


MATERIAL SUBMITTAL SUBM
CIVIL AND ARCH MATIRIAL
S B1SHC340 S B1SHC350 S B1SHC360 S B1SHC370 S B1SHC460 S B1SHC380 S B1SHC470 S B1SHC390 S B1SHC410 S B1SHC430 S B1SHC440 S B1SHC450 S B8SHM350 S B8SHM360 S B8SHM310 S B8SHM370 S B8SHM320 S B8SHE130 S B8SHE160 Actual Work Remaining Work Critical Remaining Work Back filling materials and structure filling Concrete and steel Black bituminius Paint & terminte treatment Masonry block Precast concret Door mat local draWg. Elevator Unglazed ceramic floor tiels marble stone Expansion joint & control joint& construction joint Metal door & hardware Al Windows & hardware Paint Storm drainage piping Hydronic piping Plumbing fixtures Fire protection piping Air handling unit Basic electrical materials Transformers

Mechanical MATERIAL MAT

Electrical MATERIAL MATER

IT COLLEGE
Activity ID
S B8SHE190 S B8SHE220

BASELINE SCHEDULE
Original Start Duration
40 03-Jun-13 40 11-Jun-13 60 20-Feb-13 20 20-Feb-13 20 04-Mar-13 20 16-Mar-13 20 27-Mar-13 20 08-Apr-13 861 01-May-13 255 01-May-13

Activity Name
Telephone & intercommunication equipment Fire alarm system

Finish F
18-Jul-13 27-Jul-13 30-Apr-13 14-Mar-13 26-Mar-13 07-Apr-13 18-Apr-13 30-Apr-13 31-Jan-16 22-Feb-14 05-Jan-14 12-May-13 04-Jun-13 13-Jun-13 07-Aug-13 13-Nov-13 05-Jan-14 13-Jan-14 23-May-13 16-Jun-13 25-Jun-13 15-Aug-13 21-Nov-13 13-Jan-14 22-Feb-14 10-Jun-13 15-Jul-13 30-Jul-13 27-Aug-13 23-Dec-13 22-Feb-14 13-Jan-14 19-Jun-13 08-Jul-13 16-Jul-13 04-Sep-13 30-Nov-13 13-Jan-14 15-Jan-14 29-Jun-13 03-Aug-13 11-Aug-13 12-Sep-13 03-Dec-13 15-Jan-14 03-Jan-15 30-Mar-14 04-Feb-14

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Telephone & intercommunication equipment Fire alarm system 30-Apr-13, MOBILIZATION Prepare Site Layout Site Cleaning, Grubbing, & Leveling Install Temporary Fencing & Facilities Prepare Soil Investigation Report Install Consultant & Contractor Offices 31-Jan-16, C 22-Feb-14, Earth Work 05-Jan-14, Zone A3 Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G 13-Jan-14, Zone A4 Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G 22-Feb-14, Zone A5 Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G 13-Jan-14, Zone A1 Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G 15-Jan-14, Zone A2 Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G 03-Jan-15, CONCRETE 30-Mar-14, SUBSTRUCTURE WORK 04-Feb-14, Zone A3

MOBILIZATION MOBILIZATIO
AZKB-MO-1 AZKB-MO-5 AZKB-MO-6 AZKB-MO-2 AZKB-MO-7 Prepare Site Layout Site Cleaning, Grubbing, & Leveling Install Temporary Fencing & Facilities Prepare Soil Investigation Report Install Consultant & Contractor Offices

CONSTRUCTION WORK CONSTRUCTIO


Earth Work
Zone A3
EAR A1250 EAR A1260 EAR A1270 EAR A1310 EAR A1280 EAR A1290 Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G Excavation Works Up To Req Level Soil Improvment ( Vebro Stone Columns ) Completed Excavation Up To Foundation Level Testing For Ston Columns Backfiling Up To Column Neck Backfiling Up To S.O.G

214 01-May-13 10 01-May-13 20 13-May-13 8 05-Jun-13 7 31-Jul-13 24 17-Oct-13 15 18-Dec-13 211 13-May-13 10 13-May-13 20 25-May-13 8 17-Jun-13 7 08-Aug-13 24 26-Oct-13 15 26-Dec-13 235 25-May-13 15 25-May-13 30 11-Jun-13 13 16-Jul-13 10 17-Aug-13 27 23-Nov-13 22 27-Jan-14 186 11-Jun-13 8 11-Jun-13 16 20-Jun-13 7 09-Jul-13 7 28-Aug-13 24 03-Nov-13 13 29-Dec-13 180 20-Jun-13 8 20-Jun-13 16 16-Jul-13 7 04-Aug-13 7 05-Sep-13 24 06-Nov-13 13 31-Dec-13 440 08-Aug-13 201 08-Aug-13 155 08-Aug-13

Zone A4
EAR A1490 EAR A1500 EAR A1510 EAR A1540 EAR A1520 EAR A1530

Zone A5
EAR A1300 EAR A1320 EAR A1330 EAR A1360 EAR A1340 EAR A1350

Zone A1
EAR A1430 EAR A1440 EAR A1450 EAR A1480 EAR A1460 EAR A1470

Zone A2
EAR A1370 EAR A1380 EAR A1390 EAR A1420 EAR A1400 EAR A1410

CONCRETE
SUBSTRUCTUR WORK SUBSTRUCTURE Zone A3
Actual Work Remaining Work Critical Remaining Work Milestone Summary

Page 2 of 10

IT COLLEGE
Activity ID Activity Name
AZKB-CO-2 Form/Pour Blinding Under Foundation AZKB-CO-3 Form/Pour R C Footings AZKB-CO-7 Form/Pour Concrete Columns' Necks & Shear Wal FOU A1710 Bituminous For Foundation & Column Neck AZKB-CO-1 Form/Pour Blinding Under Grade Beams AZKB-CO-1 Form/Pour Grade Beams FOU A1700 Bituminous For Grade Beams FOU A1720 Electrical & Mechanical Sleeves Under S.O.G FOU A1165 Termit Control FOU A1730 Polyethylene Works Under S.O.G AZKB-CO-1 Form/Pour Slab On Grade

BASELINE SCHEDULE
Original Start Duration
6 08-Aug-13 30 15-Aug-13 20 19-Sep-13 4 13-Oct-13 5 14-Nov-13 20 20-Nov-13 5 14-Dec-13 6 05-Jan-14 2 12-Jan-14 4 13-Jan-14 15 18-Jan-14 155 17-Aug-13 6 17-Aug-13 30 24-Aug-13 20 28-Sep-13 4 21-Oct-13 5 23-Nov-13 20 28-Nov-13 5 22-Dec-13 6 13-Jan-14 2 20-Jan-14 4 21-Jan-14 15 26-Jan-14 184 28-Aug-13 8 28-Aug-13 40 07-Sep-13 22 23-Oct-13 4 18-Nov-13 5 24-Dec-13 20 30-Dec-13 5 22-Jan-14 6 22-Feb-14 2 01-Mar-14 4 02-Mar-14 20 06-Mar-14 135 07-Sep-13 6 07-Sep-13 25 14-Sep-13 15 13-Oct-13 3 30-Oct-13 5 01-Dec-13 15 07-Dec-13 5 24-Dec-13 6 13-Jan-14 2 20-Jan-14 4 21-Jan-14 13 26-Jan-14 132 14-Sep-13 Milestone Summary Page 3 of 10

Finish F
14-Aug-13 18-Sep-13 12-Oct-13 16-Oct-13 19-Nov-13 12-Dec-13 18-Dec-13 12-Jan-14 15-Jan-14 18-Jan-14 04-Feb-14 12-Feb-14 22-Aug-13 26-Sep-13 20-Oct-13 24-Oct-13 27-Nov-13 21-Dec-13 26-Dec-13 20-Jan-14 23-Jan-14 26-Jan-14 12-Feb-14 30-Mar-14 05-Sep-13 22-Oct-13 17-Nov-13 21-Nov-13 29-Dec-13 21-Jan-14 27-Jan-14 01-Mar-14 04-Mar-14 06-Mar-14 30-Mar-14 10-Feb-14 12-Sep-13 12-Oct-13 29-Oct-13 02-Nov-13 05-Dec-13 23-Dec-13 29-Dec-13 20-Jan-14 23-Jan-14 26-Jan-14 10-Feb-14 13-Feb-14

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Form/Pour Blinding Under Foundation Form/Pour R C Footings Form/Pour Concrete Columns' Necks & Shear Walls Bituminous For Foundation & Column Neck Form/Pour Blinding Under Grade Beams Form/Pour Grade Beams Bituminous For Grade Beams Electrical & Mechanical Sleeves Under S.O.G Termit Control Polyethylene Works Under S.O.G Form/Pour Slab On Grade 12-Feb-14, Zone A4 Form/Pour Blinding Under Foundation Form/Pour R C Footings Form/Pour Concrete Columns' Necks & Shear Walls Bituminous For Foundation & Column Neck Form/Pour Blinding Under Grade Beams Form/Pour Grade Beams Bituminous For Grade Beams Electrical & Mechanical Sleeves Under S.O.G Termit Control Polyethylene Works Under S.O.G Form/Pour Slab On Grade 30-Mar-14, Zone A5 Form/Pour Blinding Under Foundation Form/Pour R C Footings Form/Pour Concrete Columns' Necks & Shear Walls Bituminous For Foundation & Column Neck Form/Pour Blinding Under Grade Beams Form/Pour Grade Beams Bituminous For Grade Beams Electrical & Mechanical Sleeves Under S.O.G Termit Control Polyethylene Works Under S.O.G Form/Pour Slab On Grade 10-Feb-14, Zone A1 Form/Pour Blinding Under Foundation Form/Pour R C Footings Form/Pour Concrete Columns' Necks & Shear Walls Bituminous For Foundation & Column Neck Form/Pour Blinding Under Grade Beams Form/Pour Grade Beams Bituminous For Grade Beams Electrical & Mechanical Sleeves Under S.O.G Termit Control Polyethylene Works Under S.O.G Form/Pour Slab On Grade 13-Feb-14, Zone A2

Zone A4
AZKB-CO-1 Form/Pour Blinding Under Foundation AZKB-CO-1 Form/Pour R C Footings AZKB-CO-1 Form/Pour Concrete Columns' Necks & Shear Wal FOU A1770 Bituminous For Foundation & Column Neck AZKB-CO-4 Form/Pour Blinding Under Grade Beams AZKB-CO-2 Form/Pour Grade Beams FOU A1740 Bituminous For Grade Beams FOU A1750 Electrical & Mechanical Sleeves Under S.O.G FOU A1175 Termit Control FOU A1760 Polyethylene Works Under S.O.G AZKB-CO-2 Form/Pour Slab On Grade

Zone A5
AZKB-CO-6 Form/Pour Blinding Under Foundation AZKB-CO-4 Form/Pour R C Footings AZKB-CO-6 Form/Pour Concrete Columns' Necks & Shear Wal FOU A1890 Bituminous For Foundation & Column Neck AZKB-CO-7 Form/Pour Blinding Under Grade Beams AZKB-CO-6 Form/Pour Grade Beams FOU A1860 Bituminous For Grade Beams FOU A1870 Electrical & Mechanical Sleeves Under S.O.G FOU A1205 Termit Control FOU A1880 Polyethylene Works Under S.O.G AZKB-CO-5 Form/Pour Slab On Grade

Zone A1
AZKB-CO-4 Form/Pour Blinding Under Foundation AZKB-CO-2 Form/Pour R C Footings AZKB-CO-2 Form/Pour Concrete Columns' Necks & Shear Wal FOU A1810 Bituminous For Foundation & Column Neck AZKB-CO-5 Form/Pour Blinding Under Grade Beams AZKB-CO-3 Form/Pour Grade Beams FOU A1780 Bituminous For Grade Beams FOU A1790 Electrical & Mechanical Sleeves Under S.O.G FOU A1185 Termit Control FOU A1800 Polyethylene Works Under S.O.G AZKB-CO-3 Form/Pour Slab On Grade

Zone A2
Actual Work Remaining Work Critical Remaining Work

IT COLLEGE
Activity ID Activity Name
AZKB-CO-5 Form/Pour Blinding Under Foundation AZKB-CO-3 Form/Pour R C Footings AZKB-CO-5 Form/Pour Concrete Columns' Necks & Shear Wal FOU A1850 Bituminous For Foundation & Column Neck AZKB-CO-6 Form/Pour Blinding Under Grade Beams AZKB-CO-5 Form/Pour Grade Beams FOU A1820 Bituminous For Grade Beams FOU A1830 Electrical & Mechanical Sleeves Under S.O.G FOU A1195 Termit Control FOU A1840 Polyethylene Works Under S.O.G AZKB-CO-4 Form/Pour Slab On Grade

BASELINE SCHEDULE
Original Start Duration
4 14-Sep-13 25 18-Sep-13 14 17-Oct-13 3 03-Nov-13 5 04-Dec-13 14 10-Dec-13 5 26-Dec-13 6 15-Jan-14 2 22-Jan-14 4 23-Jan-14 14 28-Jan-14 285 04-Feb-14 135 04-Feb-14 20 04-Feb-14 30 27-Feb-14 20 03-Apr-14 30 27-Apr-14 15 01-Jun-14 20 18-Jun-14 135 12-Feb-14 20 12-Feb-14 30 08-Mar-14 20 12-Apr-14 30 05-May-14 15 09-Jun-14 20 26-Jun-14 239 30-Mar-14 25 30-Mar-14 35 28-Apr-14 8 08-Jun-14 25 17-Jun-14 35 16-Jul-14 8 26-Aug-14 25 04-Sep-14 35 04-Oct-14 8 13-Nov-14 15 23-Nov-14 20 10-Dec-14 113 10-Feb-14 15 10-Feb-14 20 27-Feb-14 18 23-Mar-14 25 13-Apr-14 15 12-May-14 20 29-May-14 113 13-Feb-14 15 13-Feb-14 20 03-Mar-14 18 26-Mar-14

Finish F
17-Sep-13 16-Oct-13 02-Nov-13 05-Nov-13 09-Dec-13 25-Dec-13 31-Dec-13 22-Jan-14 26-Jan-14 28-Jan-14 13-Feb-14 03-Jan-15 12-Jul-14 27-Feb-14 03-Apr-14 27-Apr-14 01-Jun-14 18-Jun-14 12-Jul-14 20-Jul-14 08-Mar-14 12-Apr-14 05-May-14 09-Jun-14 26-Jun-14 20-Jul-14 03-Jan-15 28-Apr-14 08-Jun-14 17-Jun-14 16-Jul-14 26-Aug-14 04-Sep-14 04-Oct-14 13-Nov-14 23-Nov-14 10-Dec-14 03-Jan-15 22-Jun-14 27-Feb-14 23-Mar-14 13-Apr-14 12-May-14 29-May-14 22-Jun-14 25-Jun-14 03-Mar-14 26-Mar-14 16-Apr-14

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Form/Pour Blinding Under Foundation Form/Pour R C Footings Form/Pour Concrete Columns' Necks & Shear Walls Bituminous For Foundation & Column Neck Form/Pour Blinding Under Grade Beams Form/Pour Grade Beams Bituminous For Grade Beams Electrical & Mechanical Sleeves Under S.O.G Termit Control Polyethylene Works Under S.O.G Form/Pour Slab On Grade 03-Jan-15, SUPERSTRUCTURE WORK 12-Jul-14, Zone A3 Form/Pour Ground Floor Columns & Shear Walls Form/Pour Ground Floor Slab Form/Pour First Floor Columns & Shear Walls Form/Pour First Floor Slab Form/Pour Roof Deck Floor Columns & Shear Walls Form/Pour Roof Deck Floor Slab 20-Jul-14, Zone A4 Form/Pour Ground Floor Columns & Shear Walls Form/Pour Ground Floor Slab Form/Pour First Floor Columns & Shear Walls Form/Pour First Floor Slab Form/Pour Roof Deck Floor Columns & Shear Walls Form/Pour Roof Deck Floor Slab 03-Jan-15, Zone A5 Form/Pour Ground Floor Columns & Shear Walls Form/Pour Ground Floor Slab Hole Core Precast panal Ground Floor Form/Pour First Floor Columns & Shear Walls Form/Pour First Floor Slab Hole Core Precast panal First Floor Form/Pour Second Floor Columns & Shear Walls Form/Pour Second Floor Slab Hole Core Precast panal Second Floor Form/Pour Roof Deck Floor Columns & Shear Walls Form/Pour Roof Deck Floor Slab 22-Jun-14, Zone A1 Form/Pour Ground Floor Columns & Shear Walls Form/Pour Ground Floor Slab Form/Pour First Floor Columns & Shear Walls Form/Pour First Floor Slab Form/Pour Roof Deck Floor Columns & Shear Walls Form/Pour Roof Deck Floor Slab 25-Jun-14, Zone A2 Form/Pour Ground Floor Columns & Shear Walls Form/Pour Ground Floor Slab Form/Pour First Floor Columns & Shear Walls

SUPERSTRUCT SUPERSTRUCTURE WORK Zone A3


AZKB-CO-1 Form/Pour Ground Floor Columns & Shear Walls AZKB-CO-2 Form/Pour Ground Floor Slab AZKB-CO-2 Form/Pour First Floor Columns & Shear Walls AZKB-CO-2 Form/Pour First Floor Slab AZKB-CO-3 Form/Pour Roof Deck Floor Columns & Shear Wal AZKB-CO-3 Form/Pour Roof Deck Floor Slab

Zone A4
AZKB-CO-3 Form/Pour Ground Floor Columns & Shear Walls AZKB-CO-8 Form/Pour Ground Floor Slab AZKB-CO-7 Form/Pour First Floor Columns & Shear Walls AZKB-CO-6 Form/Pour First Floor Slab AZKB-CO-7 Form/Pour Roof Deck Floor Columns & Shear Wal AZKB-CO-7 Form/Pour Roof Deck Floor Slab

Zone A5
AZKB-CO-2 Form/Pour Ground Floor Columns & Shear Walls AZKB-CO-3 Form/Pour Ground Floor Slab AZKB-CO-1 Hole Core Precast panal Ground Floor AZKB-CO-3 Form/Pour First Floor Columns & Shear Walls AZKB-CO-4 Form/Pour First Floor Slab AZKB-CO-1 Hole Core Precast panal First Floor AZKB-CO-3 Form/Pour Second Floor Columns & Shear Walls AZKB-CO-4 Form/Pour Second Floor Slab AZKB-CO-1 Hole Core Precast panal Second Floor AZKB-CO-5 Form/Pour Roof Deck Floor Columns & Shear Wal AZKB-CO-4 Form/Pour Roof Deck Floor Slab

Zone A1
AZKB-CO-4 Form/Pour Ground Floor Columns & Shear Walls AZKB-CO-9 Form/Pour Ground Floor Slab AZKB-CO-8 Form/Pour First Floor Columns & Shear Walls AZKB-CO-8 Form/Pour First Floor Slab AZKB-CO-9 Form/Pour Roof Deck Floor Columns & Shear Wal AZKB-CO-8 Form/Pour Roof Deck Floor Slab

Zone A2
AZKB-CO-5 Form/Pour Ground Floor Columns & Shear Walls AZKB-CO-1 Form/Pour Ground Floor Slab AZKB-CO-9 Form/Pour First Floor Columns & Shear Walls Actual Work Remaining Work Critical Remaining Work Milestone Summary

Page 4 of 10

IT COLLEGE
Activity ID Activity Name
AZKB-CO-1 Form/Pour First Floor Slab AZKB-CO-1 Form/Pour Roof Deck Floor Columns & Shear Wal AZKB-CO-9 Form/Pour Roof Deck Floor Slab

BASELINE SCHEDULE
Original Start Duration
25 16-Apr-14 15 15-May-14 20 02-Jun-14 577 03-Mar-14 317 27-Apr-14 80 27-Apr-14 20 29-Jul-14 20 21-Aug-14 15 14-Sep-14 28 01-Oct-14 20 03-Nov-14 20 15-Nov-14 25 26-Nov-14 28 25-Dec-14 9 27-Dec-14 9 06-Jan-15 16 27-Jan-15 8 27-Jan-15 9 27-Jan-15 8 05-Feb-15 20 15-Feb-15 8 15-Feb-15 25 10-Mar-15 20 08-Apr-15 287 03-Mar-14 70 03-Mar-14 35 29-Jul-14 25 21-Aug-14 20 02-Sep-14 15 08-Sep-14 10 14-Sep-14 10 25-Sep-14 30 25-Sep-14 20 07-Oct-14 30 07-Oct-14 30 19-Oct-14 30 11-Nov-14 30 23-Nov-14 30 04-Dec-14 30 16-Dec-14 30 28-Dec-14 165 29-Jul-14 50 29-Jul-14 25 25-Sep-14 40 07-Oct-14 20 25-Oct-14 25 23-Nov-14 10 22-Dec-14

Finish F
15-May-14 02-Jun-14 25-Jun-14 06-Jan-16 02-May-15 29-Jul-14 21-Aug-14 14-Sep-14 01-Oct-14 03-Nov-14 26-Nov-14 08-Dec-14 25-Dec-14 27-Jan-15 05-Jan-15 15-Jan-15 15-Feb-15 05-Feb-15 07-Feb-15 15-Feb-15 10-Mar-15 24-Feb-15 08-Apr-15 02-May-15 01-Feb-15 24-May-14 08-Sep-14 20-Sep-14 25-Sep-14 25-Sep-14 25-Sep-14 07-Oct-14 30-Oct-14 30-Oct-14 11-Nov-14 23-Nov-14 16-Dec-14 28-Dec-14 08-Jan-15 20-Jan-15 01-Feb-15 07-Feb-15 25-Sep-14 25-Oct-14 23-Nov-14 17-Nov-14 22-Dec-14 03-Jan-15

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Form/Pour First Floor Slab Form/Pour Roof Deck Floor Columns & Shear Walls Form/Pour Roof Deck Floor Slab 06-Jan-16, Grou 02-May-15, Finishing Work Install Internal Siporex Walls Install CMU Walls Spatter Dash For Walls Plaster Water proofing For Wet Areas Plaster For Walls Porcelain Tiles Wall Install External Siporex Walls Metal ceiling System- First Stage Prcelain Tiles For Floor Acoustical panels Absorber ceiling Granite Work For Floor & stairs Ramp granite ACCESS FLOORING Epoxy Paint Flooring Gypsum Board-- First Stage Drinking Fountain Paint First Stage Metals doors 01-Feb-15, Electrical Work Ground Floor Electrical First Fix In slab Ground Floor Electrical First Fix In Walls Ground Floor Electrical Wire Pulling Install Ground Floor Wiring Devices And Switches Ground Floor Cable Tray Install Ground Floor Panel Boards Ground Floor Cable & busway Ground Floor Fire Alarm System Install Ground Floor Lighting Fixtures & Control Ground Floor Security Access & CCTV Surveillance System Install Ground Floor Data System&Telephone System Install Ground Floor Public Address Install Ground Floor Audio Visual System Install Ground Floor Master Clock System & IP MATV Install Ground Floor Access Control Install Ground Floor BMS System 07-Feb-15, Mechanical Work Ground Floor Mechanical First Fix Install Ground Floor Fire Fighting System Ground Floor Duct Installation F-200 System Install HVAC Equipment Install Ground Floor Grilles

Ground Floor
Finishing Work
AZKB-MA-1 AZKB-MA-12 FSH A3350 FSH A3370 FSH A3380 FSH A3400 FSH A3410 FSH A3420 AZKB-MA-41 AZKB-MA-51 FSH A3430 FSH A3960 A15650 FSH A3970 FSH A3450 FSH A3980 FSH A3440 FSH A3460 Install Internal Siporex Walls Install CMU Walls Spatter Dash For Walls Plaster Water proofing For Wet Areas Plaster For Walls Porcelain Tiles Wall Metal ceiling System- First Stage Prcelain Tiles For Floor Acoustical panels Absorber ceiling Granite Work For Floor & stairs Ramp granite ACCESS FLOORING Epoxy Paint Flooring Gypsum Board-- First Stage Drinking Fountain Paint First Stage Metals doors

AZKB-MA-101 Install External Siporex Walls

Electrical Work
AZKB-ELE-34 Ground Floor Electrical First Fix In slab AZKB-ELE-4 Ground Floor Electrical First Fix In Walls AZKB-ELE-13 Ground Floor Electrical Wire Pulling AZKB-ELE-16 Install Ground Floor Wiring Devices And Switches AZKB-ELE-44 Ground Floor Cable Tray AZKB-ELE-5 Install Ground Floor Panel Boards AZKB-ELE-17 Ground Floor Cable & busway AZKB-ELE-35 Ground Floor Fire Alarm System AZKB-ELE-15 Install Ground Floor Lighting Fixtures & Control AZKB-ELE-75 Ground Floor Security Access & CCTV Surveillance AZKB-ELE-95 Install Ground Floor Data System&Telephone Syste AZKB-ELE-115 Install Ground Floor Public Address AZKB-ELE-145 Install Ground Floor Audio Visual System AZKB-ELE-155 Install Ground Floor Master Clock System & IP MAT AZKB-ELE-165 Install Ground Floor Access Control AZKB-ELE-85 Install Ground Floor BMS System

Mechanical Work
AZKB-MEC-7 Ground Floor Mechanical First Fix AZKB-MEC-15 Install Ground Floor Fire Fighting System AZKB-MEC-14 Ground Floor Duct Installation AZKB-MEC-45 F-200 System AZKB-MEC-44 Install HVAC Equipment AZKB-MEC-30 Install Ground Floor Grilles Actual Work Remaining Work Critical Remaining Work Milestone Summary

Page 5 of 10

IT COLLEGE
Activity ID Activity Name
AZKB-MEC-54 Install Chilled Water Pipes AZKB-MEC-13 Install Ground Floor Sanitary Fixtures AZKB-SP-11 Install Sanitary Accessories Windows Metal ceiling System Final Stage Installation Equipment For Data, Fire Alarm & Secu Install Handrails & Accessories Gypsum Board & Gypsum Board tiles Final Stage Elect. Communication, Fixtures & Switches EIFS Paint Final Stage Install All equipments carpet heavy duty, Install Vinyl tiles Install All Furniture Counters&Kitchen cabinets

BASELINE SCHEDULE
Original Start Duration
25 22-Dec-14 15 03-Jan-15 15 20-Jan-15 208 07-May-15 20 07-May-15 11 13-May-15 15 26-May-15 19 26-May-15 5 26-May-15 12 13-Jun-15 12 28-Jun-15 20 19-Sep-15 15 12-Oct-15 10 31-Oct-15 15 11-Nov-15 23 29-Nov-15 10 26-Dec-15 497 30-Apr-14 236 24-Jun-14 60 24-Jun-14 10 02-Sep-14 14 14-Sep-14 9 30-Sep-14 28 11-Oct-14 28 12-Nov-14 25 06-Dec-14 28 29-Dec-14 9 05-Jan-15 9 15-Jan-15 14 18-Jan-15 8 31-Jan-15 9 31-Jan-15 14 03-Feb-15 8 03-Feb-15 20 10-Feb-15 14 19-Feb-15 16 08-Mar-15 267 30-Apr-14 75 30-Apr-14 35 02-Sep-14 25 25-Sep-14 20 07-Oct-14 15 13-Oct-14 10 19-Oct-14 10 30-Oct-14 30 30-Oct-14 20 11-Nov-14 30 11-Nov-14

Finish F
20-Jan-15 20-Jan-15 07-Feb-15 06-Jan-16 31-May-15 26-May-15 13-Jun-15 17-Jun-15 01-Jun-15 28-Jun-15 11-Jul-15 12-Oct-15 31-Oct-15 11-Nov-15 29-Nov-15 26-Dec-15 06-Jan-16 02-Dec-15 26-Mar-15 02-Sep-14 14-Sep-14 30-Sep-14 11-Oct-14 12-Nov-14 15-Dec-14 05-Jan-15 31-Jan-15 15-Jan-15 26-Jan-15 03-Feb-15 09-Feb-15 10-Feb-15 19-Feb-15 12-Feb-15 05-Mar-15 08-Mar-15 26-Mar-15 08-Mar-15 27-Jul-14 13-Oct-14 25-Oct-14 30-Oct-14 30-Oct-14 30-Oct-14 11-Nov-14 04-Dec-14 04-Dec-14 16-Dec-14

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Install Chilled Water Pipes Install Ground Floor Sanitary Fixtures Install Sanitary Accessories 06-Jan-16, Soft F Windows Metal ceiling System Final Stage Installation Equipment For Data, Fire Alarm & S Install Handrails & Accessories Gypsum Board & Gypsum Board tiles Final Stage Elect. Communication, Fixtures & Switches EIFS Paint Final Stage Install All equipments carpet heavy duty, Install Vinyl tiles Install All Furniture Counters&Kitche 02-Dec-15, First Floo 26-Mar-15, Finishing Work Install Internal Siporex Walls Install CMU Walls Spatter Dash For Walls Plaster Water proofing For Wet Areas Plaster For Walls Porcelain Tiles Wall Metal ceiling System- First Stage Prcelain Tiles For Floor Acoustical panels Absorber ceiling Granite Work For Floor & stairs Epoxy Paint Flooring ACCESS FLOORING Gypsum Board-- First Stage Drinking Fountain Install External Siporex Walls Paint First Stage Metals doors 08-Mar-15, Electrical Work Frist Floor Electrical First Fix In slab Frist Floor Electrical First Fix In Walls Frist Floor Electrical Wire Pulling Install Frist Floor Wiring Devices And Switches Ground Floor Cable Tray Install Frist Floor Panel Boards Install Frist Floor Cable & busway Frist Floor Fire Alarm System Install Frist Floor Lighting Fixtures & Control Frist Floor Security Access & CCTV Surveillance System

Soft Finishing
SOF A2150 SOF A2160 SOF A2140 SOF A2510 SOF A2170 SOF A2130 SOF A2520 SOF A2120 SOF A2530 A15630 FSH A4080 SOF A2540 SOF A2320

First Floor
Finishing Work
AZKB-MA-11 AZKB-MA-22 FSH A3360 FSH A3390 FSH A3480 FSH A3490 FSH A3510 FSH A3530 AZKB-MA-61 AZKB-MA-71 FSH A3540 FSH A4010 A15710 FSH A3550 FSH A4000 FSH A3560 FSH A3570 Install Internal Siporex Walls Install CMU Walls Spatter Dash For Walls Plaster Water proofing For Wet Areas Plaster For Walls Porcelain Tiles Wall Metal ceiling System- First Stage Prcelain Tiles For Floor Acoustical panels Absorber ceiling Granite Work For Floor & stairs Epoxy Paint Flooring ACCESS FLOORING Gypsum Board-- First Stage Drinking Fountain Paint First Stage Metals doors

AZKB-MA-111 Install External Siporex Walls

Electrical Work
AZKB-ELE-745 Frist Floor Electrical First Fix In slab AZKB-ELE-14 Frist Floor Electrical First Fix In Walls AZKB-ELE-23 Frist Floor Electrical Wire Pulling AZKB-ELE-26 Install Frist Floor Wiring Devices And Switches AZKB-ELE-765 Ground Floor Cable Tray AZKB-ELE-25 Install Frist Floor Panel Boards AZKB-ELE-27 Install Frist Floor Cable & busway AZKB-ELE-45 Frist Floor Fire Alarm System AZKB-ELE-55 Install Frist Floor Lighting Fixtures & Control AZKB-ELE-125 Frist Floor Security Access & CCTV Surveillance Sy Actual Work Remaining Work Critical Remaining Work Milestone Summary

Page 6 of 10

IT COLLEGE
Activity ID Activity Name
AZKB-ELE-135 Install Ground Floor Data System&Telephone Syste AZKB-ELE-185 Install Frist Floor Public Address AZKB-ELE-195 Install Frist Floor Audio Visual System AZKB-ELE-205 Install Frist Floor Master Clock System & IP MATV AZKB-ELE-215 Install Frist Floor Access Control AZKB-ELE-225 Install Frist Floor BMS System

BASELINE SCHEDULE
Original Start Duration
30 23-Nov-14 30 16-Dec-14 30 28-Dec-14 30 08-Jan-15 30 20-Jan-15 30 01-Feb-15 165 02-Sep-14 50 02-Sep-14 25 30-Oct-14 40 11-Nov-14 20 29-Nov-14 25 28-Dec-14 10 26-Jan-15 25 26-Jan-15 15 07-Feb-15 15 24-Feb-15 158 31-May-15 20 31-May-15 11 23-Jun-15 15 06-Jul-15 19 06-Jul-15 5 06-Jul-15 12 23-Jul-15 20 13-Sep-15 15 06-Oct-15 5 25-Oct-15 23 31-Oct-15 5 26-Nov-15 363 07-Oct-14 216 07-Dec-14 40 07-Dec-14 10 22-Jan-15 14 03-Feb-15 9 19-Feb-15 28 02-Mar-15 28 04-Apr-15 25 27-Apr-15 20 03-May-15 28 20-May-15 9 27-May-15 9 07-Jun-15 14 09-Jun-15 8 22-Jun-15 9 22-Jun-15 14 25-Jun-15 8 25-Jun-15 14 12-Jul-15 16 28-Jul-15 Milestone Summary Page 7 of 10

Finish F
28-Dec-14 20-Jan-15 01-Feb-15 12-Feb-15 24-Feb-15 08-Mar-15 14-Mar-15 30-Oct-14 29-Nov-14 28-Dec-14 22-Dec-14 26-Jan-15 07-Feb-15 24-Feb-15 24-Feb-15 14-Mar-15 02-Dec-15 23-Jun-15 06-Jul-15 23-Jul-15 28-Jul-15 12-Jul-15 08-Aug-15 06-Oct-15 25-Oct-15 31-Oct-15 26-Nov-15 02-Dec-15 06-Dec-15 16-Aug-15 22-Jan-15 03-Feb-15 19-Feb-15 02-Mar-15 04-Apr-15 06-May-15 27-May-15 26-May-15 22-Jun-15 07-Jun-15 17-Jun-15 25-Jun-15 01-Jul-15 02-Jul-15 12-Jul-15 05-Jul-15 28-Jul-15 16-Aug-15

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Install Ground Floor Data System&Telephone System Install Frist Floor Public Address Install Frist Floor Audio Visual System Install Frist Floor Master Clock System & IP MATV Install Frist Floor Access Control Install Frist Floor BMS System 14-Mar-15, Mechanical Work Install Mechanical First Fix Install Fire Fighting System Install Duct Works F-200 System Install HVAC Equipment Install Grilles Works Install Chilled Water Pipes Install Sanitary Fixtures Install Sanitary Accessories 02-Dec-15, Soft Finish Windows Metal ceiling System Final Stage Installation Equipment For Data, Fire Alarm Install Handrails & Accessories Gypsum Board & Gypsum Board tiles Final Elect. Communication, Fixtures & Switch Paint Final Stage kitchen equipment Install Vinyl tiles Furniture Counters&Kitchen cab 06-Dec-15, Second F 16-Aug-15, Finishing Work Install Internal Siporex Walls Install CMU Walls Spatter Dash For Walls Plaster Water proofing For Wet Areas Plaster For Walls Porcelain Tiles Wall Metal ceiling System- First Stage Install External Siporex Walls Prcelain Tiles For Floor Acoustical panels Absorber ceiling Granite Work For Floor & stairs Epoxy Paint Flooring ACCESS FLOORING Gypsum Board-- First Stage Drinking Fountain Paint First Stage Metals doors

Mechanical Work
AZKB-MEC-17 Install Mechanical First Fix AZKB-MEC-25 Install Fire Fighting System AZKB-MEC-24 Install Duct Works AZKB-MEC-55 F-200 System AZKB-MEC-64 Install HVAC Equipment AZKB-MEC-40 Install Grilles Works AZKB-MEC-74 Install Chilled Water Pipes AZKB-MEC-23 Install Sanitary Fixtures AZKB-SP-21 Install Sanitary Accessories Windows Metal ceiling System Final Stage Installation Equipment For Data, Fire Alarm & Secu Install Handrails & Accessories Gypsum Board & Gypsum Board tiles Final Stage Elect. Communication, Fixtures & Switches Paint Final Stage kitchen equipment Install Vinyl tiles Furniture Counters&Kitchen cabinets

Soft Finishing
SOF A2230 SOF A2240 SOF A2220 SOF A2550 SOF A2250 SOF A2210 SOF A2200 SOF A2560 FSH A4090 SOF A2570 SOF A2330

Second Floor
Finishing Work
AZKB-MA-21 AZKB-MA-32 FSH A3580 FSH A3590 FSH A3600 FSH A3610 FSH A3620 FSH A3630 AZKB-MA-81 AZKB-MA-91 FSH A3640 FSH A4040 A15720 FSH A3650 FSH A4030 FSH A3660 FSH A3670 Actual Work Remaining Work Critical Remaining Work Install Internal Siporex Walls Install CMU Walls Spatter Dash For Walls Plaster Water proofing For Wet Areas Plaster For Walls Porcelain Tiles Wall Metal ceiling System- First Stage Prcelain Tiles For Floor Acoustical panels Absorber ceiling Granite Work For Floor & stairs Epoxy Paint Flooring ACCESS FLOORING Gypsum Board-- First Stage Drinking Fountain Paint First Stage Metals doors

AZKB-MA-121 Install External Siporex Walls

IT COLLEGE
Activity ID
Electrical Work
AZKB-ELE-755 Second Floor Electrical First Fix In slab AZKB-ELE-24 Second Floor Electrical First Fix In Walls AZKB-ELE-33 Second Floor Electrical Wire Pulling AZKB-ELE-36 Install Second Floor Wiring Devices And Switches AZKB-ELE-775 Ground Floor Cable Tray AZKB-ELE-65 Install Second Floor Panel Boards AZKB-ELE-37 Second Floor Cable & busway AZKB-ELE-235 Second Floor Fire Alarm System AZKB-ELE-245 Install Second Floor Lighting Fixtures & Control AZKB-ELE-255 Second Floor Security Access & CCTV Surveillance AZKB-ELE-265 Install Ground Floor Data System&Telephone Syste AZKB-ELE-285 Install Second Floor Public Address AZKB-ELE-295 Install Second Floor Audio Visual System AZKB-ELE-305 Install Second Floor Master Clock System & IP MAT AZKB-ELE-315 Install Second Floor Access Control AZKB-ELE-325 Install Second Floor BMS System

BASELINE SCHEDULE
Original Start Duration
252 07-Oct-14 15 07-Oct-14 35 22-Jan-15 25 15-Feb-15 20 26-Feb-15 15 04-Mar-15 10 10-Mar-15 10 22-Mar-15 30 22-Mar-15 20 02-Apr-15 30 02-Apr-15 30 14-Apr-15 30 07-May-15 30 19-May-15 30 31-May-15 30 11-Jun-15 30 23-Jun-15 150 22-Jan-15 35 22-Jan-15 25 04-Mar-15 40 16-Mar-15 20 02-Apr-15 25 02-May-15 10 31-May-15 25 31-May-15 15 11-Jun-15 15 29-Jun-15 141 23-Jun-15 20 23-Jun-15 18 01-Jul-15 20 22-Jul-15 19 22-Jul-15 5 22-Jul-15 20 15-Aug-15 20 07-Sep-15 15 30-Sep-15 9 19-Oct-15 23 29-Oct-15 9 25-Nov-15 188 14-Dec-14 54 03-Jan-15 40 03-Jan-15 10 14-Jan-15 5 26-Jan-15 9 01-Feb-15 19 12-Feb-15 137 14-Dec-14 15 14-Dec-14

Activity Name

Finish F
28-Jul-15 25-Oct-14 04-Mar-15 16-Mar-15 22-Mar-15 22-Mar-15 22-Mar-15 02-Apr-15 26-Apr-15 26-Apr-15 07-May-15 19-May-15 11-Jun-15 23-Jun-15 05-Jul-15 16-Jul-15 28-Jul-15 16-Jul-15 04-Mar-15 02-Apr-15 02-May-15 26-Apr-15 31-May-15 11-Jun-15 29-Jun-15 29-Jun-15 16-Jul-15 06-Dec-15 16-Jul-15 22-Jul-15 15-Aug-15 13-Aug-15 28-Jul-15 07-Sep-15 30-Sep-15 19-Oct-15 29-Oct-15 25-Nov-15 06-Dec-15 21-Jul-15 07-Mar-15 18-Feb-15 26-Jan-15 01-Feb-15 12-Feb-15 07-Mar-15 23-May-15 31-Dec-14

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

28-Jul-15, Electrical Work Second Floor Electrical First Fix In slab Second Floor Electrical First Fix In Walls Second Floor Electrical Wire Pulling Install Second Floor Wiring Devices And Switches Ground Floor Cable Tray Install Second Floor Panel Boards Second Floor Cable & busway Second Floor Fire Alarm System Install Second Floor Lighting Fixtures & Control Second Floor Security Access & CCTV Surveillance S Install Ground Floor Data System&Telephone Syste Install Second Floor Public Address Install Second Floor Audio Visual System Install Second Floor Master Clock System & Install Second Floor Access Control Install Second Floor BMS System 16-Jul-15, Mechanical Work Install Mechanical First Fix Install Fire Fighting System Install Duct Works F-200 System Install HVAC Equipment Install Grilles Works Install Chilled Water Pipes Install Sanitary Fixtures Install Sanitary Accessories 06-Dec-15, Soft Finis Windows Metal ceiling System Final Stage Installation Equipment For Data, Fire A Install Handrails & Accessories Gypsum Board & Gypsum Board tiles Fin Elect. Communication, Fixtures & S Paint Final Stage kitchen equipment Install Vinyl tiles Furniture Counters&Kitchen cab 21-Jul-15, Roofing Work 07-Mar-15, Finishing Work Build Ground Floor Siporex Walls Build Ground Floor CMU Walls Spatter Dash For Plaster for - walls Plaster For Walls Waterproof Roofing System 23-May-15, Electrical Work Roof Deck Floor Electrical First Fix In slab

Mechanical Work
AZKB-MEC-27 Install Mechanical First Fix AZKB-MEC-35 Install Fire Fighting System AZKB-MEC-34 Install Duct Works AZKB-MEC-65 F-200 System AZKB-MEC-84 Install HVAC Equipment AZKB-MEC-50 Install Grilles Works AZKB-MEC-94 Install Chilled Water Pipes AZKB-MEC-33 Install Sanitary Fixtures AZKB-SP-31 Install Sanitary Accessories Windows Metal ceiling System Final Stage Installation Equipment For Data, Fire Alarm & Secu Install Handrails & Accessories Gypsum Board & Gypsum Board tiles Final Stage Elect. Communication, Fixtures & Switches Paint Final Stage kitchen equipment Install Vinyl tiles Furniture Counters&Kitchen cabinets

Soft Finishing
SOF A2290 SOF A2300 SOF A2280 SOF A2580 SOF A2310 SOF A2270 SOF A2260 SOF A2590 FSH A4100 SOF A2600 SOF A2340

Roofing Work
Finishing Work
AZKB-MA-31 AZKB-MA-42 FSH A3470 FSH A3500 FSH A3520 Build Ground Floor Siporex Walls Build Ground Floor CMU Walls Spatter Dash For Plaster for - walls Plaster For Walls Waterproof Roofing System

Electrical Work
AZKB-ELE-785 Roof Deck Floor Electrical First Fix In slab

Actual Work Remaining Work Critical Remaining Work

Milestone Summary Page 8 of 10

IT COLLEGE
Activity ID
AZKB-ELE-11

BASELINE SCHEDULE
Original Start Duration
20 18-Feb-15 15 14-Mar-15 5 31-Mar-15 10 06-Apr-15 20 18-Apr-15 10 11-May-15 51 23-May-15 6 23-May-15 15 30-May-15 25 16-Jun-15 5 15-Jul-15 10 07-Mar-15 5 07-Mar-15 5 12-Mar-15 31 26-Dec-15 29 26-Dec-15 14 14-Jan-16 252 13-Jul-14 252 13-Jul-14

Activity Name
Roof Deck Floor Electrical First Fix In Walls

Finish F
14-Mar-15 31-Mar-15 06-Apr-15 18-Apr-15 11-May-15 23-May-15 21-Jul-15 30-May-15 16-Jun-15 15-Jul-15 21-Jul-15 18-Mar-15 12-Mar-15 18-Mar-15 31-Jan-16 28-Jan-16 31-Jan-16 03-May-15 03-May-15 15-Nov-14 10-Feb-15 03-May-15 17-Aug-15 07-Feb-15 06-Apr-15 26-May-15 21-Apr-15 14-Apr-15 26-Apr-15 26-May-15 18-Jul-15 13-Aug-15 17-Aug-15 17-Mar-15 04-Apr-15 30-Jun-15 21-Apr-15 09-May-15 07-Jun-15 30-Jun-15 24-Jun-15 26-May-15 13-Jun-15 24-Jun-15 17-Aug-15 19-Jul-15 25-Jul-15 25-Jul-15

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Roof Deck Floor Electrical First Fix In Walls Roof Deck Floor Electrical Wire Pulling Install Roof Deck Floor Wiring Devices And Switches Install Roof Deck Floor Panel Boards Roof Deck Floor Fire Alarm System Install Roof Deck Floor Lighting Fixtures & Control 21-Jul-15, Mechanical Work Installing Roof Drain Install Roof Deck Floor Fire Fighting System Install Electric Water Heaters &Pumps Install Spilt Unit 18-Mar-15, Soft Finishing Windows Paint 31-Jan-16, Te Testing & com Remaining w 03-May-15, External Work 03-May-15, PRECAST Precast Concret Curtain For Ground Floor Precast Concret Curtain For First Floor Precast Concret Curtain For Second Floor 17-Aug-15, General Items Install SKYLIGHT TOILET PARTITION Elevators Installation FLOWER BOX Installing Electrical Generator & Transformers Installing of Earthing & Lightening Protection System EXTERNAL CEILING FINISHES INTERIOR GLASS WALL SYSTEM Signage 17-Aug-15, SITE WORK Clearing and Leveling For Site Backfilling/Compaction up to req Level 30-Jun-15, WALK WAY WORKS PRECAST CURBS & WHEEL STOPPER STAMPED CONCRETE INTERLOCK PAVING TILES ASPHALT PAVEMENT & Roads Markings 24-Jun-15, IRRIGATION SYUSTEM Installation Of Irrigation System Instalation Of Sprinklers And All Acc. Installation Of Box Valve And Fixing The Valve 17-Aug-15, LANDSCAPE PALM Works TREES Works SHRUBS Works

AZKB-ELE-43 Roof Deck Floor Electrical Wire Pulling AZKB-ELE-47 Install Roof Deck Floor Wiring Devices And Switche AZKB-ELE-12 Install Roof Deck Floor Panel Boards AZKB-ELE-735 Roof Deck Floor Fire Alarm System AZKB-ELE-46 Install Roof Deck Floor Lighting Fixtures & Control

Mechanical Work
AZKB-MEC-11 Installing Roof Drain AZKB-MEC-32 Install Roof Deck Floor Fire Fighting System AZKB-MEC-42 Install Electric Water Heaters &Pumps AZKB-MEC-52 Install Spilt Unit

Soft Finishing
SOF A2190 SOF A2180 A12680 A12700 Windows Paint Testing & commissioning for building Remaining work for final handing over

Testing, Commissioning Commis & Handing Over

External Work
PRECAST
A12480 A12490 A12500 Precast Concret Curtain For Ground Floor Precast Concret Curtain For First Floor Precast Concret Curtain For Second Floor

107 13-Jul-14 100 16-Oct-14 70 10-Feb-15 194 03-Jan-15

General Items
A15610 A15640 A12430 A12630 AZKB-ELE-30 AZKB-ELE-10 A12690 A15620 A12610 Install SKYLIGHT TOILET PARTITION Elevators Installation FLOWER BOX Installing Electrical Generator & Transformers Installing of Earthing & Lightening Protection System EXTERNAL CEILING FINISHES INTERIOR GLASS WALL SYSTEM Signage Clearing and Leveling For Site Backfilling/Compaction up to req Level PRECAST CURBS & WHEEL STOPPER STAMPED CONCRETE INTERLOCK PAVING TILES ASPHALT PAVEMENT & Roads Markings Installation Of Irrigation System Instalation Of Sprinklers And All Acc. Installation Of Box Valve And Fixing The Valve PALM Works TREES Works SHRUBS Works Milestone Summary

30 03-Jan-15 30 02-Mar-15 60 17-Mar-15 30 17-Mar-15 20 22-Mar-15 10 14-Apr-15 30 21-Apr-15 45 26-May-15 23 18-Jul-15 146 28-Feb-15 15 28-Feb-15 15 17-Mar-15 75 04-Apr-15 15 04-Apr-15 15 21-Apr-15 15 20-May-15 20 07-Jun-15 40 09-May-15 15 09-May-15 15 26-May-15 10 13-Jun-15 55 14-Jun-15 30 14-Jun-15 30 20-Jun-15 30 20-Jun-15

SITE WORK
A12720 A12730 A15700 A12510 A12540 A15730 A12560 A12570 A15660

WALK WAY WOR WORKS

IRRIGATION SYU SYUSTEM

LANDSCAPE
A12590 A12600 A15680 Actual Work Remaining Work Critical Remaining Work

Page 9 of 10

IT COLLEGE
Activity ID
A15670 A15690

BASELINE SCHEDULE
Original Start Duration
30 07-Jul-15 30 13-Jul-15 94 04-Apr-15 90 04-Apr-15 90 08-Apr-15 162 13-Aug-15 12 13-Aug-15 19 27-Aug-15 8 27-Aug-15 17 31-Jan-16

Activity Name
Ground cover lawns & Grass Works Install Mechanical Works Install ELECTRIC Works

Finish F
11-Aug-15 17-Aug-15 22-Jul-15 18-Jul-15 22-Jul-15 20-Feb-16 27-Aug-15 19-Sep-15 06-Sep-15 20-Feb-16

M A

2013 J Jul A

O N

M A

2014 J Jul A

F M A

2015 J Jul A

2016 F M AM

Ground cover lawns & Grass Works 22-Jul-15, General Install Mechanical Works Install ELECTRIC Works 20-Feb-16 Testing & Commissioning For Buildin AS BUILT DRAWING Initial Handing Over Final Hand

General
A12750 A12760

Testing, Commissioning Commi & Handing Over


A12640 A12710 A12650 A12660 Testing & Commissioning For Building AS BUILT DRAWING Initial Handing Over Final Handing Over

Actual Work Remaining Work Critical Remaining Work

Milestone Summary Page 10 of 10