You are on page 1of 3

Doha International Airport

Q0073/2

DAR AL-HANDASAH CONSULTANTS


Shair and Partners

DESIGN OF PRECAST PRESTRESSED COMPOSITE BEAMS


CHECK OF CRITICAL SECTION
(All Units are MN and m)

INPUT
A-PROPERTIES OF MID SPAN SECTION

B- LOADING

PRECAST SECTION
DEPTH=
0.525
AREA=
0.361
Y1=
-0.232
Y2=
0.293
INERTIA=
0.013
Z1=
-0.056
Z2=
0.044

M OWBeam
M OWDeck
M SDL
M LL
Final Losses

Y1

0.429
0.183
0.000
0.488
0.150

Y2

COMPOSITE SECTION
AREA=
0.492
Y1(m)=
-0.160
Y2(m)=
0.365
Y3(m)=
-0.160
Y4(m)=
-0.235
INERTIA=
0.020
Z1=
-0.125
Z2=
0.055
Z3=
-0.125
Z4=
-0.085

C- ALLOWABLE STRESSES

Y4
Y1,Y3

Ftt
Fct
Ftw
Fcw

-3.5
19.2
-3.15
21

Y2

OUTPUT
A- ECCENTRCITIES FOR A PRESTRESSING FORCE
(Pt is prestressing force after initial losses)
Pt
e1
e2
e3
e4
emin
emax
3.6
0.3282 0.2325 0.0426 0.1607 0.1607 0.2325
inside feasible range
B- LIMITING PRESTRESSING FORCES
Ptmin =

1.425 Ptmax =

6.066

1.424652

C- NORMAL STRESSES
Pt=
input e=
f1
f2
f3
f4

3.6
0.203
St1
4.57
16.80

St2
8.31
8.68

211976716.xls.ms_office - Rev. 1.0

St3
12.22
-0.22
3.90
5.73

1/3

2/18/2014

II CHECKING CABLE PROFILE


Pt

3.6

Span

19.5

Straining Actions
Sec.
1
Dist.
0.00
Mow
0
Mslab
0
Msdl
0
Mll
0

2
1.00
0.083
0.036
0.000
0.095

3
2.00
0.158
0.067
0.000
0.180

4
3.00
0.223
0.095
0.000
0.254

5
4.00
0.280
0.119
0.000
0.318

6
5.00
0.327
0.140
0.000
0.372

7
6.00
0.366
0.156
0.000
0.416

8
7.00
0.395
0.168
0.000
0.449

9
8.00
0.415
0.177
0.000
0.472

10
9.75
0.429
0.183
0.000
0.488

Cable Profile
Sec.
Dist.
#Strands
Force
emin
input e
emax

2
1.00
12
2.160
-0.104
0.230
0.137

3
2.00
14
2.520
-0.047
0.225
0.157

4
3.00
16
2.880
0.003
0.220
0.175

5
4.00
18
3.240
0.046
0.210
0.191

6
5.00
20
3.600
0.083
0.203
0.204

7
6.00
20
3.600
0.112
0.203
0.215

8
7.00
20
3.600
0.135
0.203
0.223

9
8.00
20
3.600
0.150
0.203
0.229

10
9.75
20
3.600
0.161
0.203
0.233

-0.34
16.23

0.63
17.25

1.80
18.03

2.75
19.10

3.43
18.23

3.96
17.57

4.32
17.11

4.57
16.80

Check of Stresses after casting of toping slab


f1
-2.14
-0.34
1.34
2.84
f2
12.30
11.94
11.74
11.75

4.42
11.68

5.71
11.97

6.69
10.73

7.44
9.78

7.96
9.13

8.31
8.68

Check of Stresses at Final Stage


f1
-2.14
0.42
2.78
f2
12.30
10.21
8.46
f3
0.00
0.76
1.44
f4
0.00
1.12
2.11

6.97
5.87
2.55
3.74

8.69
5.18
2.98
4.37

10.02
3.14
3.33
4.89

11.03
1.59
3.59
5.28

11.74
0.51
3.78
5.55

12.22
-0.22
3.90
5.73

1
0.00
10
1.800
-0.168
0.233
0.113

Check of Stresses at Transfer


f1
-2.52
-1.42
f2
14.47
15.33

4.88
7.11
2.03
2.99

2.1
2.8
1.4

-2.1

12.
3

Sec. At Dist.0

211976716.xls.ms_office - Rev. 1.0

3.7
2.5

8.5

5.7

7.0

5.9

Sec. At Dist.2

Sec. At Dist.4

2/3

3.9

12.2

-0.2

Mid Span

2/18/2014

III CHECKING ULTIMATE CAPACITY


b
t
f'c
f's
b1
g*
Astrand
f

Sec.
Dist.
Mult
d
As*
r*
fsu*
Ductility
Eq stress
Block
fMn

2.05
0.15
40
1860
0.7597
0.28
140
1

1
2
0.00
1.00
0.000
0.361
0.598
0.595
0.0014 0.0017
0.0011 0.0014
1823.6 1816.1
0.0521 0.0625

3
4
5
6
7
8
9
10
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.75
0.683
0.966
1.210
1.210
1.415
1.581
1.707
1.855
0.590
0.585
0.575
0.575
0.568
0.568
0.568
0.568
0.002 0.0022 0.0025 0.0025 0.0028 0.0028 0.0028 0.0028
0.0016 0.0019 0.0021 0.0021 0.0024 0.0024 0.0024 0.0024
1808.3 1800.5 1791.9 1791.9 1783.3 1783.3 1783.3 1783.3
0.0733 0.0841 0.0958 0.0958 0.1072 0.1072 0.1072 0.1072

0.0366

0.0438

0.0509

0.0579

0.0648

0.0648

0.0716

0.0716

0.0716

0.0716

1.479

1.747

1.999

2.240

2.447

2.447

2.654

2.654

2.654

2.654

9.17 Flexural Strength


9.17.2 Rectangular Sections
a) having Prestressing Steel only

* *
r * f su*
fM n = f As f su d 1 - 0.6 '
f c

9.17.4 Steel Stress

fsu* = fs' 1-(g * / b1)(r* fs' / fc'

9.18 Ductility Limits


9.18.1 Maximum Prestressing Steel

r * f su*
f c'

0 . 36 b 1

211976716.xls.ms_office - Rev. 1.0

As*= area of prestressing steel (Art. 9.17).


b = width of flange of flanged member or width of
rectangular member.
d = distance from extreme compressive fiber to
centroid of the prestressing force, or to centroid of
negative moment reinforcing for precast girder
bridges made continuous.
f'c = compressive strength of concrete at 28days.
f*su= average stress in prestressing steel at ultimate
load.
f's = ultimate stress of prestressing steel.
t = average thickness of the flange of a flanged
member (Art. 9.17 and 9.17).
f = strength capacity reduction factor (Art. 9.14)
for factory produced precast prestressed concrete
members f = 1.0.
for post tensioned cast in place concrete
members f = 0.95.
for shear f = 0.90.
for anchorage zones f = 0.85 for normal weight

3/3

2/18/2014