You are on page 1of 3

A.

OH Activity Progress Report:



A1. OH Completion Score:
SNo Dept/Section Total
Act.
Plan
Act. to be
Compl. till
Yesterday
Act.
Compl.
Incomplete Activities %
Compl.
Remark Act Status
not Updated
/Not Started
Last
Update on
1 MM-GT GT1B
TURBINE &
AUXILLARIES
30 14 14 0 0 08.07.2013
2 MM-WHRB
ACTIVITIES
10 4 2 1. EXPANSION JOINT
INSPECTION AND REPAIR
40 Hor expansion
joint Plate rep-IP
0 10.07.2013
2. PM OF DIVERTER DAMPER
& WEATHER DAMPER
95 OH of Diverter
Damper-IP
10.07.2013
3 ELECTRICAL
ACTIVITIES
14 10 10 0 0 10.07.2013
4 C&I ACTIVITIES 14 5 5 0 0 01.07.2013
5 COMMISSIONING
ACTIVITIES
7 2 2 0 0 24.06.2013
TOTAL 75 35 33 0 0
A2. Other Activities Status:
SNo Description Total no of Activities
1 Activities to be completed today or later but already completed 1
2 Activities to be completed today or later and are in progress 14
3 Activities which should have started till yesterday but not started 0
B. Milestones Report:
SNo Milestone Planned Rev. Plan Actual Reason for delay, if any
1 Stopping of Barring Gear 20.06.2013 20.06.2013
2 DESYNCHRONISATION 20.06.2013 20.06.2013
3 WHRB-Removal of Old Panels 26.06.2013 26.06.2013
4 GT Gen Rotor threadout 26.06.2013 24.06.2013
5 Removal of old Mark IV panel, 27.06.2013 24.06.2013
6 Removal of Turbine casing 28.06.2013 24.06.2013
7 Rotor lifting of Compressor
and turbine
04.07.2013 30.06.2013
8 TP Modification & Alignment 07.07.2013 29.06.2013
9 GT Gen Rotor thread in 08.07.2013 07.07.2013
10 RLA of WHRB-1B 08.07.2013 28.06.2013
11 Gas turbine Auxiliaries
Inspection
10.07.2013 27.06.2013
12 OH of Gas Turbine Fin-Fan
Motors
13.07.2013 27.06.2013
13 Installation of GT Mark Vie
Panel
17.07.2013 29.06.2013
14 Casing Alignment activities 23.07.2013 03.07.2013
15 Positioning of Turbine Rotor 28.07.2013 28.07.2013
16 Positioning of Compressor
rotor
29.07.2013 29.07.2013
17 WHRB-Termination of new 31.07.2013 01.07.2013
Overhauling Flash Report Date :10.07.2013 18:47:33
KAWAS OVERHAUL FOR FY 2013-14 Page : 1 of 2
MI/R&M of GT/WHRB 1B
SNo Milestone Planned Rev. Plan Actual Reason for delay, if any
panels
18 Installation of Turbine casing 03.08.2013 03.08.2013
19 HYDRO TESTING HP & LP
CKT
06.08.2013 29.07.2013
20 WHRB-Installation of new
mark VI-E Panel
07.08.2013 01.07.2013
21 BOX UP OF WHRB 08.08.2013 31.07.2013
22 Control Room Equipment
Upgrade
08.08.2013 06.07.2013
23 Generator Box up 12.08.2013 12.08.2013
24 Gas Turbine
Commissioning-C&I
17.08.2013 16.08.2013
25 Unit on Turning Gear 18.08.2013 17.08.2013
26 Protection Checking 18.08.2013 18.08.2013
27 First Fire, FSNL 18.08.2013 18.08.2013
28 Unit on crank 18.08.2013 18.08.2013
29 Synchronization 19.08.2013 19.08.2013
C. Joints Work Progress :
SNo Section Joints
Ident.
Joints
Compl.
Radiography
Completed
& accepted
Joints failed
in Radiography
R/T Failed
Joints yet to
be rectified
Remark
Total 0 0 0 0 0
D. Major Surprises / Observations
SNo Area Major Surprises / Observations
1 MI/R&M of GT1B TURBINE &
AUXILLARIES
1)Cracks observed on exhaust diffuser casing, welding to be
done.2)Cracks observed on exhaust casing inner cone,struts cover
plates-Repairing to be done. 3)Pitting observed on Brg#3 bottom half
tilting pad,rubbing marks observed on Brg#2 top half ,Bearings to be
replaced with new one.
2 CAPITAL OH of GENERATOR-1B &
AUX.
20 nos out of 108 of Gen Winding overhang found in danger zone in
NFT.Consolidation work completed,NFT done results are OK
E. Physical Systems Overhauling Status :
SNo Description Total no of Activities
1 Physical Systems whose OH Completed 0
2 Physical Systems whose OH yet to be Completed 5
F. Constraints (if any) Areawise :
SNo Area Description
1 MI/R&M of GT1B TURBINE &
AUXILLARIES
NIL
Overhauling Flash Report Date :10.07.2013 18:47:33
KAWAS OVERHAUL FOR FY 2013-14 Page : 2 of 2
MI/R&M of GT/WHRB 1B
rogress keport of G1#18 k&M
Date Network Network Descr|pt|on Act|v|ty Act|v|ty Descr|pt|on kemarks comp.
10.07.2013 92002437 MM-C1 C118 1u88lnL & AuxlLLA8lLS 14 Caslng AllgnmenL acLlvlLles lnlLlal readlng Laken, correcLlon-l 13
10.07.2013 92002437 MM-C1 C118 1u88lnL & AuxlLLA8lLS 17 lnsLallaLlon of 8uckeLs sLage # 1,2,3 nu1 of roLor aL sLage#1-l 20
10.07.2013 92002437 MM-C1 C118 1u88lnL & AuxlLLA8lLS 18 lnsL. of nozzles Shroud Lop &boLLom half urllllng of shrouds-l 28
10.07.2013 92002438 MM-WP88 AC1lvl1lLS 2 LxAnSlCn !Cln1 lnSLC1lCn Anu 8LAl8 Por expanslon [olnL laLe rep-l 40
10.07.2013 92002438 MM-WP88 AC1lvl1lLS 3 M Cl ulvL81L8 uAML8 & WLA1PL8 uAML8 CP of ulverLer uamper-l 93
10.07.2013 92002438 MM-WP88 AC1lvl1lLS 7 PAnCL8S C8LASlnC / vALvLS C8LASlnC l 43
10.07.2013 92002439 LLLC18lCAL AC1lvl1lLS 8 CapaclLance & 1an delLa meas for 8ushlng l 90
10.07.2013 92002439 LLLC18lCAL AC1lvl1lLS 8 CapaclLance & 1an delLa meas for 8ushlng CompleLed 100
10.07.2013 92002439 LLLC18lCAL AC1lvl1lLS 10 SwlLchyard 220 kv 8reaker LesLlng l 90
10.07.2013 92002439 LLLC18lCAL AC1lvl1lLS 10 SwlLchyard 220 kv 8reaker LesLlng CompleLed 100
10.07.2013 92002439 LLLC18lCAL AC1lvl1lLS 11 SwlLchyard 8l8 1esLlng l 90
10.07.2013 92002439 LLLC18lCAL AC1lvl1lLS 11 SwlLchyard 8l8 1esLlng CompleLed 100
10.07.2013 92002460 C&l AC1lvl1lLS 4 new lleld Cabllng,1ermln,Cold Loop chk lleld LermlnaLlon-l 70
10.07.2013 92002460 C&l AC1lvl1lLS 3 lnsLallaLlon of C1 Mark vle anel 1ermlnaLlon-l 93
10.07.2013 92002460 C&l AC1lvl1lLS 11 WP88-lnsLallaLlon of new mark vl-L anel lleld cabllng,LermlnaLlon-l 43
10.07.2013 92002460 C&l AC1lvl1lLS 13 WP88-1ermlnaLlon of new panels 1ermlnaLlon-l 43
10.07.2013 92002437 MM-C1 C118 1u88lnL & AuxlLLA8lLS 16 Cas Lurblne Auxlllarles lnspecLlon CP of AC8-C 30
10.07.2013 92002437 MM-C1 C118 1u88lnL & AuxlLLA8lLS 16 Cas Lurblne Auxlllarles lnspecLlon Aux lub oll pump lnsLalled 30
10.07.2013 92002437 MM-C1 C118 1u88lnL & AuxlLLA8lLS 16 Cas Lurblne Auxlllarles lnspecLlon Lmegency lub oll pump lnsLalled 30