Professional Documents
Culture Documents
Project Name..
Names of project students
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Revision History
Revision #
Date
Description
Author
PESIT SE Project
1 of 5
Approver Comments
Contents
1
INTRODUCTION .................................................................................................................................. 3
1.1 OVERVIEW ................................................................................................................................................... 3
1.2 PROJECT SCOPE ............................................................................................................................................ 3
1.2.1
The Problem .................................................................................................................................... 3
1.2.2
Scope ............................................................................................................................................... 3
1.2.3
Processes and Data ......................................................................................................................... 3
1.2.4
High level system requirements ...................................................................................................... 3
1.2.5
Constraints ...................................................................................................................................... 3
1.2.6
Team coordinator/Interface for the project .................................................................................... 3
1.2.7
Sponsor/People Involved with the project (other than the students) ............................................. 3
1.3 DOCUMENTATION/LITERATURE SURVEY SUMMARY ............................................................................................. 3
1.4 REFERENCES ................................................................................................................................................. 3
PROJECT APPROACH....................................................................................................................... 4
POTENTIAL SOLUTIONS................................................................................................................... 4
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
BASIC INTRODUCTION..................................................................................................................................... 4
REQUIRED RESOURCES .................................................................................................................................... 4
COST/BENEFIT ANALYSIS ................................................................................................................................. 4
EXPECTED DURATION ..................................................................................................................................... 4
MAJOR DELIVERABLES .................................................................................................................................... 4
PROJECT PLAN DELIVERABLES .......................................................................................................................... 4
USE CASES FOR THE SOLUTION ......................................................................................................................... 5
HIGH LEVEL RISKS AND CHALLENGES .................................................................................................................. 5
TIME COMMITMENTS FROM TEAM.................................................................................................................... 5
HIGH LEVEL SCHEDULE WITH MILESTONES ..................................................................................................... 5
INTERACTION AND COMMUNICATION PLAN WITHIN AND OUTSIDE THE PROJECT .................................................... 5
ASSUMPTIONS ......................................................................................................................................... 5
OTHER CONSIDERATIONS............................................................................................................................ 5
PESIT SE Project
2 of 5
1 INTRODUCTION
1.1 Overview
Briefly explain the current situation of business in terms of state, current
way of functioning (problem area ... since we are dealing with academic
projects) including issues and problems. Then describe the project with the
description of an expected end state of the problem space, using the end
deliverable of the project.
1.4 References
1.4.1 1.
1.4.2 2.
1.4.3
PESIT SE Project
3 of 5
2 Project Approach
This is a summary view of how the project implementation approaches. This will
also form a high level project plan. This will help towards a detailed plan which
is typically done after the approval of the feasibility report.
This could indicate an iterative incremental model of investigation and refinement
of the requirements for a clear definition of the problem and the implementation
plan for the same for research/analysis oriented projects.
This could be clear demarcated model of development as a combination of
formal document process driven and agile models with the calling out of the
relevant steps which would be followed. The presentation of this could be based
on tabular form or text, but concise and clear approach must be included. For
example Planning, Acquisition, Requirement Specification, Designing,
Development, Testing and Installing etc.
Always consider the relevancy in approach factor of feasibility report. You can
customize the standard approach according to the need of your project.
3 Potential Solutions
This is the crux of the feasibility report. Potential Solutions explains that you
need to present your evaluated solution(s one by one), which would be
implemented to resolve all problems and issues of business users.
Solutions would be present in tabular format or comparison format,
PESIT SE Project
4 of 5
Phase
Activity
Start Date
Planned
End Date
Who all
Comments
3.12 Assumptions
3.13 Other considerations
Other plans like SCM, SQA, Test Plan etc would follow as we follow the
course
PESIT SE Project
5 of 5