Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

DESIGN BASIS REPORT PHE


Project MIXED USE DEVELOPMENT, ADITYAPUR

Client M/s. FORUM PROJECTS Pvt. Ltd.

Architect M/s. PRACTICE DESIGN Pvt. Ltd.

MEP / Fire & IBMS Consultant M/s. AIR TREATMENT ENGINEERING [P] Ltd., Chennai

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 1

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

S.N O 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DESCRIPTION PREAMBLE INTRODUCTION CODES AND STANDARDS APPROCH TO PLANNING SYSTEM REQUIREMENT WATER REQUIREMENT WATER BALANCE CHART SOURCE OF WATER WATER STOARAGE SIZING WATER TREATMENT PLANT DISTRIBUTION OF WATER HYDRO PNEUMETIC SYSTEM SOIL AND WASTE DRAINAGE SANITARY FITTINGS AND FIXTURES SEWAGE TREATMENT PLANT STORM WATER DRAINAGE

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 2

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

1. Preamble: This basic study pertains to the PHE system for Proposed Mixed Use Development at Adityapur.

2. Introduction: The proposed project is comprised of following areas areas. Shopping mall Office Hotel It is proposed to design the total Infrastructure PHE System for the above said

3. Codes / standards The design is based on the following standards, codes and/or regulations. 1 National Building Code of India Group 5 (Part 9) 2005 Edition

2. Uniform Plumbing Code of India 3. Handbook on Water Supply & Drainage SP-35

2008 Edition 1987 Edition

4. Approaches to planning

There will be independent and separate systems for Hotel. All water supply System, Drainage System, STP, WTP, RWH, Hot water Generators, will be separate. All other areas like Offices, mall and shopping will have separate operating system. The Plumbing services for the project shall be designed keeping in view the following:
Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 3

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

1) Requirement of adequate and equal pressure of hot and cold water in guest bathroom, public toilets, and in entire hotel building. For other area toilets like office toilets, Mall toilets, Multiplex toilet and others will have only cold water supply. 2) The water storage tank capacity shall be adequate to ensure availability of water for 1.5 days required. 3) Treated water from STP for hotel building will be use for AC makeup and for gardening purpose only. While treated water from STP for other buildings will be recycled for Flushing water supply and for AC makeup water. 4) Implementation of requirements of MoEF relating to rain water harvesting, water conservation, solar energy use etc 5) Drainage and water supply provision for Landscape layout. 5. System Requirement a) Water treatment plant (WTP) to ensure that the chemical and bacteriological parameters of water supply in the Hotel are in accordance with World Health Organization (WHO) standards. Since, quality of water from municipal water authority /bore well is presently not available. WTP shall be very basic, comprising of carbon/sand filter, dosing Unit for disinfection and Softener. b) Domestic water supply through a set of VFD (variable frequency drive) booster pumping unit systems for making water available at minimal residual pressure of 20 PSI, the maximum pressure not to exceed 40 PSI, based on operators guidelines. c) Sewage and sullage collection & conveyance system based on NBC standard and applicable guidelines by Pollution Control Board. Each fixture in the system shall be vented to protection of trap seal against siphonage and for efficient performance of the installation. d) Storm / rain water drainage system from the roof terrace and various levels of the building, including balcony drains, planter drains and fountain drains by means of draining, storing part rain water, its re-use and surface run-off water to rain water recharge pits.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 4

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

e) Podium/ basement drainage to be disposed into storm water drain via oil interceptor.

f) Swimming pool recirculation & filtration system complete with balancing tanks, filters, dosing system, Emergency shut off switches, Drain Channel with grating and Pump circulation system( Single or double) have minimum two approved section outlet with 3 feet of separation as per Marriot Design Standard. g) Sewage treatment plant meant for hotel is for treatment of sewage & sullage waste. The plant shall comprise of preliminary, secondary (chemical & biological) and tertiary treatment units. The treated effluent shall be recycled and reused for AC make up and gardening for Hotel building and reused for AC make up for Hotel building.It will be ensured earned to provide high flow UV System in tertiary treatment plant of STP. h) Sewage treatment plant for retail and offices is for treatment of sewage & sullage waste. The plant shall comprise of preliminary, secondary (chemical & biological) and tertiary treatment units. The treated effluent shall be recycled and reused for toilet flushing, for landscape Softened used for Cooling tower etc. as per commitment to MoEF, it will be ensured earned to provide high flow UV System in tertiary treatment plant of STP.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 5

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

6. Water Requirement

A) Water requirement for hotel has been calculated for the Hotel in-house guests, visitors, staff, F&B and recreation requirement.
COLD WATER REQUIREMENT SL. NO. DESCRIPTION OCCUPANCY No Of Units Population Considered (2 Persons per room ) FLUSHING LPCD 1 2 3 4 5 6 7 GUEST ROOMS LAUNDRY KITCHEN (ASSUMED) STAFF FOR GUEST ROOMS & PUBLIC ARES SPA & Club POOL & DOMESTIC FILTER BACKWASH BOILER MAKE UP & BLOW DOWN SWIMMING POOL, WATER BODY & FIRE WATER MAKE UP TOTAL SAY IN CUM/DAY 120 240 LS LS 200 45 9000 2500 60 45 LPD 10800 DOMESTIC LPCD 90 LPD 21600 20000 12000 12000 7500 10000 5000 5000 30 HOT WATER REQIREMENT TOTAL DOMESTIC & FLUSHNG REQUIREME NT LPD 46800 30000 18000 27000 15000 10000 5000 5000

FLOW TO STP

LPCD 60

LPD 14400 10000 6000 6000 5000 -

% 90 90 90 90 90 0

LPD 42120 27000 16200 24300 13500 10000 0 0 133120 133

22300 23

93100 93

41400 42

156800 157

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 6

Project : Forum Adityapur Mixed use development. B)

Design Basis Report Plumbing

Water requirement for office & mall has been calculated as below
COLD WATER REQUIREMENT TOTAL DOMESTIC & FLUSHNG REQUIREMENT LPD

FLOW TO STP

SL. NO.

DESCRIPTION OCCUPANCY

AREA in SQ.M

Population Considered

FLUSHING LPCD LPD

DOMESTIC LPCD LPD

% 90 90 90 90 90 90

LPD 101450 3375 69525 52245 13500 2025 242120 242

1 2 3 4 5 6

OFFICE AREA OFFICE VISITIORS RETAIL AREA VISITORS RETAIL AREA EMPLOYEE MULTIPLEX SRECTATOR MULTIPLEX EMPLOYEE TOTAL SAY IN CUM/DAY

25050

2505 250 5150 1290 1000 50

25 10 10 25 10 25

62625 2500 51500 32250 10000 1250 160125 160

20 5 5 20 5 20

50100 1250 25750 25800 5000 1000 108900 109

112725 3750 77250 58050 15000 2250 269025 269

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 7

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

7. Water Balance Chart

S.N O. 1 2 3 4 5 6

DAILY WATER REQUIREMENT IN CUM / DAY DISCRIPTION HOTEL BUILDING DOMESTIC WATER HOT WATER TOTAL (1+2) FLUSHING WATER FLOW TO SEWER STP DESIGN 93 42 135 23 133 135 RECYCLE WATER FROM STP OFFICE & MALL BUILDING 109 109 160 242 250

7 8 9

FLUSHING WATER COOLING TOWER MAKE UP FOR AC GARDENING TOTAL CONCLUSION TOTAL WATE REQUIREMENT / DAY FROM OUTSIDE FRESH WATER REQUIREMENT / DAY RECYCLED WATER USED / DAY

70 22 92

160 215 375

734 267 310

SHORT FALL OF WATER FOR COOLING 157 TOWER FOR MALL & OFFICE BUILDING

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 8

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

8. Source of water It is expected that the daily potable domestic water requirement for the Hotel Complex and for other areas shall be met through municipal mains supply& bore well or if needed by tankers. 9. Water storage sizing a) Hotel Building S. No. 1. 2 3. 4. 5. 6. 7. Water usage Description Fire water Tank Raw Water Tank Domestic Water Flushing Water Tank Soft Water Tank Terrace Fire Water Flushing Water Tank at Terrace Location of Storage Basement Basement Basement Basement STP area Basement Fire Tank at Terrace At Terrace Tank Capacity in CUM 2 X 100 2 X 60 2 X 40 1 X 25 Part of STP 2 X 25 1 X 20

b) Office & Mall Building S. No. 1. 2 3. 4. 5. 6. 7. 8. Water usage Description Fire water Tank Raw Water Tank Domestic Water Flushing Water Tank Soft Water Tank Terrace Fire Water Terrace Domestic Tank Terrace Flushing Tank Location of Storage Basement Basement Basement Basement STP area Basement Fire Tank at Terrace At Terrace level At Terrace level Tank Capacity in CUM 2 X 100 1 X 50 1 X 45 2 X 40 Part of STP 2 X 2 X 25 2 X 40 2 X 80

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 9

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

It is proposed to provide separate raw water & domestic water storages equivalent to 1.5 days water requirement for the entire Hotel Complex and for mall and office building. For both hotel and mall building, water from Municipal supply / bore well will be received in fire fighting tank. Fire fighting tank will be divided in to two compartments. Both compartments are interconnected from the bottom. The water from fire fighting tank will be over flow in to raw water tank. This symphonic flow of the water insures no stagnation of water in fire tank. Hence water received in raw water tank will be one day old water. The capacity of Raw Water tank will be as given in annexure. Treated Water Tank receives water from respective Raw water tank after required treatment. The capacities of Treated water tank will be as given in Annexure. Thus we will have separate storage of one and half time the daily water consumption for hotel and mall / office building. 10. Water Treatment Plant The Bore well water shall be used only after passing it through water treatment plant. Incase Municipal water is not of desired quality (during monsoon), then the same shall be treated before distribution. Detailed specifications for water treatment plant shall be prepared after getting water analysis report of tanker water & municipal water supply. Proposed water treatment disinfections of water. plant comprises filtering, softening and

Raw water will be pump to pressure filter through pressure pumps. Pressure filter will have quartz of different sizes, which removes suspended impurities. Calculated quantity of alum dose will be given to the raw water before pressure filter for promoting the process of coagulation and flocculation. From pressure filter water will be pass through softener to reduce the hardness to commercial zero i.e. 50 ppm to 60 ppm. The hardness of incoming water varies, as water will be supplies from different sources in case of shortage. In this case concentration of resins in the softener has to be monitored and a required change has to be make accordingly by the operating staff. Finally water will be pass thru U V Rays before water stored in the treated water tank for disinfections propose. 11. Distribution of cold water for domestic and flushing purpose: Hotel Building Domestic water for hotel building will be supplied by hydro pneumatic system. Entire hotel will be considered as one zone. . It will be ensured that the minimum water pressure at out let shall not be less than 1.5 Kg/cm2 and

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 10

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

shall not be more than 2.5 Kg/cm2. Hot water will be supplied thru the same systems. Flushing water to the entire building will be supplied by gravity. A set of pump will supply water from flushing water tank at basement level to the terrace flushing water tank. From this terrace tank flushing water will be supplied by gravity to each toilet. Water supply loop will be provided at terrace level to ensure equal water distribution. Mall, Multiplex and Office Building Domestic and Flushing water for these areas will be supplied under gravity. There will be Domestic water tank and Flushing water tank at basement level. Flushing water tank at basement will be part of STP. Respective set of pumps supply water to respective tanks at terrace level. There will be different tanks on each office towers. Water from these terrace tanks will be distributed by gravity. Loop will be provided for each domestic and flushing water supply to ensure equal distribution of water Hydro pneumatic system details will be given in separate section. PRV will be provided wherever pressure exceeds the maximum permissible pressure.

The following piping materials are proposed for the project. Domestic Cold water piping within the building Flushing water piping within the building Hot water supply & return within the building Main Header for Water Supply Cold & Hot water piping outside the building (buried in ground) Internal drainage Soil / waste and vent pipe Kitchen /Laundry & BOH wet area PPR

PPR

PPR with insulation UPVC Pre-insulated PB

CI/UPVC

CI

The pipe sizing shall be based on fixture unit calculation as per NBC and SP 35 standard. The pipe size will be design at 4 % friction loss.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 11

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

All inlets, outlets, washouts, vents, ball cocks, overflows control valves and all such other piping connections including level indicator shall be provided for underground water storage tanks. Full way gate valves of approved make shall be provided as close to the underground tank as practicable on every outlet pipe from the storage tank, except the overflow pipe. Overflow and vent pipes shall terminate with mosquito proof grating. The overflow pipe shall be so placed as to allow the discharge of water being readily seen. The overflow pipe shall be of size as indicated. A stop valve shall also be provided in the inlet water connection to the tank. The outlet pipes shall be fixed approximately 75mm above the bottom of the tank towards which the floor of the tank is sloping to enable the tank to be nearly emptied for cleaning. Water meters (Kitchen/Guest Room / Public Areas/ Laundry /Health SPA) shall be provided in identified areas for water consumption recording for efficient monitoring and assessment. Head losses through water meter shall be accounted for in water distributions calculations. Colour coding for flushing domestic and hot water (supply & return) water supply piping shall be ensured for clear identification of the piping as per specifications. The landscape water supply system comprising of pumping, piping, water supply nozzles and control equipment shall be designed and built by the appointed irrigation water supply vendor. Water for irrigation of lawns for non-guest areas shall be sourced from recycled treated water from STP. Appurtenant Following appurtenants shall be included in the design of water supply system for efficient functioning: 1) Domestic Air Vents : Automatic air vent shall be provided on cold and hot water risers to eliminate possibility of air locking and to ensure efficient water floor/ pressure availability at the user outlets. 2) Flow Restrictors: Appropriate flow restrictors shall be provided for economizing on water consumption. The flow resistors shall be typically sized for following flow / discharge. Rain Shower will require more flow. Wash Basin : Shower: Kitchen Sink: 6.5 LPM 6.5 LPM 6.5 LPM

3) Ball Valve: Full bore gun-metal ball valve shall be provided for isolation of cold and hot water supply for the designated area. Further chrome-plated

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 12

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

angle valve shall be provided for cold / hot water isolation to wash basin faucets and for WC cistern & bidet water supply. 4) Globe Valve: Globe valve shall be provided on cold & hot water pipes where dual function of providing isolation for maintenance, and flow regulation is required.

5) Temperature Gauge: Temperature gauge shall be provided on hot water supply and return line for efficient balancing and monitoring of the system.

12. Hydro pneumatic system Cold water to entire Hotel will be supplied by hydro pneumatic system. This system enables supply of water under pressure to taps, by means of automatic pumping equipments. Water from treated water tank will be supplied through hydro pneumatic pumps to entire hotel for domestic water supply. The hydro pneumatic system comprises of three electrically driven pumps. Two pumps working and one will be stand by. One pump will run with variable speed drive so as to maintain a fixed predetermined constant pressure in spite of variable consumption. Three pumps will be used with software, which operate system. Each pump will be of 50% capacity of maximum demand. Hence in case of maximum demand two pumps will be operates and third will be stand by pump. The system will have a control panel; with one variable speed drive controller and two nos. fixed speed drive. This panel also has a software and pressure transducers. The control circuit shall be such out of three pumps one pump will be with variable speed and two pumps will be with fixed speed drives. Software device will operates such that all three pumps will run for the same number of hours. The software shall start the first pump on VFD. The pressure transmitter will provide the signals to the variable frequency drive through software controller in such a manner that as long as consumption is within the capacity of the one variable speed pump at fixed predetermined pressure shall be maintained by varying the speed of the motor proportioned to demand. If the consumption is more and the variable speed pump cannot cope with the demand the software device will keep first VFD pump running at its full speed and start the second pump on VFD. During peak load one pump will therefore be working on fixed speed and one pump on VFD. In case of no demand the software shall build up the speed of VFD pump to its maximum RPM for a set of time period to charge the diaphragm tank after which the same shall cut off and no pumps shall be operational in case of no consumption.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 13

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

13. Soil and waste drainage Design Conditions a. b. Termination of vent cowl at terrace level. Provision of adequate slope for horizontal header pipes in the ceiling level of the transfer floor for achieving self-cleaning velocity in the pipes. Provision of cleanout plugs.

c.

Sewage & sullage waste drainage. The soil and waste shall be carried down in separate independently vented pipes. Two pipe drainage systems shall be adopted as per NBC / SP 35 standard. The soil and waste water from hotel building and from office building will be collected separately in the raw sewage tanks of respective STP. There will be separate STP for both the buildings. The sanitary, waste & vent system shall be water tight and gas tight designed to prevent escape of foul gas and odor from various fixtures. Vent system shall be designed to facilitate escape of gases and odor from all parts of sanitary and waste system to the atmosphere at a point above the building and to allow admittance of air to all part of the system, so that siphonage, aspiration or back pressure conditions do not cause loss of seal at traps. It is proposed to use cast iron/UPVC pipe for soil / waste drainage. The soil & waste piping shall be under-slung (in the ceiling slab of floor below) and the horizontal header shall be subsequently connected to the vertical stack located inside the associated pipe shaft which shall be coordinated carefully with other services and in consultation with Architect. Care shall be taken to avoid pipe runs in electrical switch rooms, PABX rooms and other critical areas. Provision for cleaning and rodding eyes shall be made at strategic locations to allow the system maintenance. These cleaning & rodding eyes shall be located in BOH areas, in ceiling space and shall be remote from kitchen / pantry and other critical areas. Stainless steel grease interceptors shall be provided for kitchen waste, located close to the source of grease. The design of grease inceptors shall be in accordance with standard and shall include cleanout at entry and exit. The cover shall be non-slip. Provision of independent vent shall be made to avoid odour / smell nuisance in the surrounding areas. Drain channel shall be provided in the basement level car parking and plant room areas within the floor fill above the raft. Drain channels shall be provided with adequate slope to achieve self cleaning velocity and shall terminate in sumps. For each sump, 2 nos. submersible pumps (1 working + 1 standby) shall be provided for disposal of collected run-off. Pumps shall be

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 14

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

installed in identified sumps and shall be operated by Hi-Lo level switches with automatic changeover between both pumps.

14. Sanitary fixtures & fittings All sanitary wares shall be selected by the Architect / Interior Designer. Water closets (European pattern) shall be floor mounted or wall mounted vitreous china, having S or P trap. All water closets shall have low level cisterns of 4 to 5 liters capacity. However, provision of flush valve shall be made for public area toilets. All wash basins for hotel shall be of vitreous china, below-counter oval, with single lever basin fitting coming through the marble counter. Hot water return piping shall be provided to minimize hot water delay time thus benefiting in water & energy conservation. Pop-up waste and waste coupling with CP bottle trap shall be provided to the drain outlet. Inlet water connections shall be made thru CP angle stop cocks below the counter. Wash basins for offices, malls and multiplex will be similar type, except only cold water will be supplied to these wash basins and no provision for hot water will be provide. Waste coupling will be provided without pop up arrangement.

Showers in Guest Room & Health Club shall have single lever - thermostatic mixer arrangement to regulate water flow and temperature. It is proposed to provide thermostatic mixer on shower to ensure minimize wastage of hot water and for guest comfort. Thermostat mixer shall have cold & hot water inlet ports and temperature setting dial duly calibrated for desired temperature rating of the water at the outlet. The mixer shall have auto shut off of water supply in case of cold water supply failure. The shower arm and rose shall be of the throw-off type and the spray from the rose shall be adjustable by lever. Provision of rain shower in designated area shall be made as per Operator / Architect requirement. For rain showers, pipe size for water supply shall be increased to ensure availability of adequate water flow. Urinals shall be flat back white vitreous china, with auto-flushing system and CP spreader. Provision of dome type waste coupling with CP bottle trap shall be made. Urinal waste will connected to soil header. Accessories such as toilet paper holder, towel rails, soap dispenser and hand drier shall be provided as identified by the Architect / Interior Designer. Provision of Eye wash facilities as required shall be provided by the architect. Provision of water supply & drainage shall be ensured for all such eye wash facility stations accordingly.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 15

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

15. Sewage treatment plant We shall provide sewage treatment plant for treatment of sewage & sullage water. The treated effluent shall be of a quality suitable for use as make-up water in cooling towers of air conditioning system, for flushing and for horticulture for external areas. There will be exclusive STP for hotel building and a separate STP for rest of the areas. The STP will be provided in basement level. Following parameters shall be adopted for the design of sewage treatment plant.

Parameters for design of sewage treatment plant with MBR Technology . Parameters Ph BOD Suspended Solids COD Oil & Grease Process Description The out fall sewer main from the last manholes, (135 M/ day for Hotel Building & 250 M/ day for other areas ) will be let into a screening chamber by gravity flow. Large solids particles shall be intercepted by a bar screen, preceded by a grease trap. The primary clarified wastewater is then further pre-treated by fine screening before entering the bioreactor portion of the MBR process. Fine screening shall be done by proposed bar screen. a. The sewage after screening is collected in a oil & grease trap after that goesin to grit chamber & finally to the equalization sump for smoothing out peak flows. The provision of air shall be kept in this tank to break the solids in suspension and to homogenize the sewage. The homogenized effluent is then pumped into the Biological reactor for the removal of BOD, COD, Posphate and Nitrates. The reactor is equipped to perform suspension growth of microorganism (Mixed Liquor) in 12000-15000 MLSS. The air shall be provided through an air diffusion system all round the membrane to soccer the sludge & for biological treatment of sewage in the reactor. The mixed liquor suspended solids from the bioreactor is then shuck through the polymeric hollow-fiber (flat sheet type) or reinforced (hollow sheet membrane module consists of S.S housing, air diffusion system, permeate water manifold & membrane elements. U.F. membrane (0.03 micron pore size) system shall be work to separate the sludge and the treated effluent. The treated water passed through U.V unit for disinfection purpose and stored in a Clear water tank for further reuse. Value Before Treatment 7.5 8.5 250 - 450 Mg/L 250-400 Mg/L 400 - 600Mg/L 50 -100 Mg/L After Treatment 6.0 - 8.5 Less than 10 Mg/L Less than 5 Mg/L Less than 20 Mg/L Less than 10 Mg/L

b.

c.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 16

Project : Forum Adityapur Mixed use development.

Design Basis Report Plumbing

d.

Depending on the MLSS to be retained in the Biological reactor the sludge is wasted. The wasted sludge is collected in sludge thicker and aerated with diffused aeration and then sludge shall be feed to Centrifuge where sludge shall be collected in the form of manure. To avoid the membrane to get chocked due to bacreria generation in membrane & organic substance, chemical cleaning shall be carried out once in two to three months for removing substances polluting and clogging the membranes. Normal cleaners used are sodium hypo chloride and citric acid.

e.

16. Storm water drainage Separate and independent rain water drainage system shall be provided for collecting rain water from terrace, paved area, lawns and roads. Independent rain water down takes of appropriate size and number shall be provided in Guest room toilet shafts or external face of building duly approved by Architect. Perforated pipe drainage system shall be provided for open-to-sky courtyard/lawn. The storm water runoff from the basement ramp shall be separately collected and connected to sump at basement. It shall be ensured to have electrical supply for all sump pump panel from electrical panel located at basement. Emergency supply shall also be made available to the sump pump electrical panel. It is also proposed to provide standby diesel engine pump for storm water drainage in inventory in case of extreme emergency. The final disposal shall be in rain water harvesting pit with overflow connection to the rain water storage tank. The stored rain water shall be used for washing BOH and car parking areas.

Architect: M/s. Practice design. MEP Consultant: M/s. Air Treatment Engineering [P] Ltd., Chennai

Page 17