Rev/Status Issue Date (DD/MM/YYYY) Code Revision Description Project Number: Project Title:
ACTUATORS
Supplier Logo: Acceptance Code (Norsok): (code 1) Accepted with comments incl. (code 2) Not accepted, revise and resubmit (code 3) SDL Code: Issued for information (code 4)
ES10.004
Purchase order Number:
4511895768
Orig. Code:
6.3
Resp. Code (Norsok): Interface information as clouded is accepted and frozen (code 5)
Date :
____________________________
Signature : ___________________________
Document Title:
Registration Codes
Facility 1) EKOB Area: 1) A00 System: 1) 7 5 0 Doc.Sub. Type: A02 Achilles code: 2 1 9 0 2 Platform: E K O
Document Number
B Orig. code: V A Disc: G Sequence No.: 0 0 1 8 6
PETROLVALVES - S.r.L.
DIREZIONE TECNICA/ENGINEERING DEPT. CASTELLANZA - ITALY DOC. N. ES10-004 Rev.3 SHEET 1 OF 9
Subject
Project
PV job
: 209993
All information contained in this document is property of PETROLVALVES and cannot be disclosed to anybody without prior written authorisation. Copy of this document requires former written authorisation.
Form PRO-DEN-05A1 rev. 0.
PETROLVALVES S.r.L.
ES10.004 rev.3
Sheet 2 of 9
CONTENTS
1. 2. 3. 4. 5. INTRODUCTION ................................................................................................................................................... 3 CALCULATION ..................................................................................................................................................... 4 CALCULATION ..................................................................................................................................................... 5 CONCLUSION........................................................................................................................................................ 5 ANNEX (DRAWING) ............................................................................................................................................. 6
PETROLVALVES S.r.L.
1. INTRODUCTION
ES10.004 rev.3
Sheet 3 of 9
Blas load calculation is performed in the worst conservative condition i.e. valve stem horizontal. Calculation is performed in the worst weak point which are the actuator/valve bolts on the valve side of the mounting spool.
Pressure
Drag load
PETROLVALVES S.r.L.
ES10.004 rev.3
Sheet 4 of 9
2. CALCULATION Actuator model RSOM 4500-125-NS, calculation for the horizontal stem installation:
Actuator center gravity distance to the top flange Actuator drag load acting distance to the top valve flange Bolts flange diameter Bolts number Bolt resistent area Bolt material yield Actuator blast area Blast pressure Blast load Actuator weight M30
Conservatively all weight and blast load is acting on the two external bolts only. Bolts preload is not considered in the calculation because will reduce the stress level. Torque effect due to the centre gravity offset is taken by flange friction and is negligible compare to actuator torque. Ft := F a := b := We g L 2 db Fa L1 2 db F a + Ft Ab < Ft = 6.231 10 N F a = 1.879 10 N b = 44.604 MPa S y = 723 MPa
4 3
b = 44.604 MPa
PETROLVALVES S.r.L.
3. CALCULATION
ES10.004 rev.3
Sheet 5 of 9
Actuator model RJOM 1400-90-BG and 1400-80-BG calculation for horizontal stem installation, the different length doesnt affect the bolts verification (see par. * ):
Actuator center gravity distance to the top flange Actuator drag load acting distance to the top flange Bolts flange diameter Bolts number Bolt resistent area Bolt material yield A320 L7 Actuator blast area Blast pressure Blast load Actuator weight M20
Conservatively all weight and blast load is acting on the two external bolts only. Bolts preload is not considered in the calculation because will reduce the stress level. (*) Torque effect due to centre gravity offset is taken by flange friction and is negligible compare to actuator torque We g L 3 Weight load effect on bolt Ft := Ft = 2.54 10 N 2 db F a := b := Fa L1 2 db F a + Ft Ab < F a = 7.27 10 N b = 40.04 MPa S y = 723 MPa
3
b = 33.516 MPa
4. CONCLUSION Valve and actuator assembly are suitable to operate with the required blast load.